The present disclosure pertains to wireless communication technology, in particular in the context of dual connectivity.
In dual connectivity (DC) the UE (which may also be called terminal) can be served by two or more network nodes that may be called main/master eNB (MeNB) and secondary eNB (SeNB), or primary and secondary, or anchor and booster, and which may be seen as providing a “leg” of the dual connectivity each. The UE may be configured with a PCC (primary component carrier) or primary cell (PCell) from both MeNB and SeNB. The PCells from the MeNB and SeNB are called PCell and PSCell (primary secondary cell), respectively. The PCell and PSCell typically operate the terminal or UE independent from each other. The terminal or UE may be also configured with one or more SCCs (secondary component carrier; secondary cells of a carrier aggregate associated to a primary cell like the PCell or PSCell) from each of MeNB and SeNB. The corresponding secondary serving cells served by MeNB and SeNB may be called SCells. The terminal or UE in DC typically has separate TX/RX (transmitter/receiver) for each of the connections with MeNB and SeNB, respectively for an associated master cell group and secondary cell group. This allows the MeNB and SeNB to independently configure/control/schedule resources for the terminal or UE with one or more procedures e.g. radio link monitoring (RLM), DRX cycle, etc. on their respective PCell and PSCell.
As in single connectivity states, the terminal may be subject to limitations (e.g., regulatory and/or standard-defined limitations) pertaining to its transmission power over the cells (cell group) or carriers (carrier group) associated to each leg of the dual connectivity.
It is an object of this disclosure to provide approaches allowing determination of a transmission power of a terminal in dual connectivity.
The drawings are provided for illustrative purposes, and are not intended to limit the approaches to the embodiments shown. In the drawings,
In the following UE or user equipment may be used interchangeably for terminal; eNodeB may be used interchangeably for network node; and vice versa. Subclauses referred to pertain to related 3GPP/LTE specifications.
More specifically dual connectivity (DC) is a mode of operation of a terminal or UE, in particular in RRC_CONNECTED state, wherein the terminal or UE is configured with a Master Cell Group (MCG) and a Secondary Cell Group (SCG). A Cell Group (CG) is a group of serving cells associated with either the MeNB or the SeNB. The MCG and SCG are defined as follows:
Two kinds of operation modes may be considered, with the first being implemented in 3GPP EUTRA Rel.12 and the other in a later release of the standard:
Synchronized operation: Downlink timing for MeNB and SeNB is synchronized down to about half an OFDM symbol (about ±33 μs). This means the terminal or UE supporting synchronized DC operation should be capable of receiving signals from MCG and SCG within ±33 μs. More specifically, in synchronized DC operation the time difference (Δτ) between signals received at the UE from MeNB (i.e. from serving cells in MCG) and SeNB (i.e. from serving cells in SCG) should be within a first limit (Γ1) or a first threshold (e.g. within ±33 μs).
Unsynchronized operation: Downlink timing for MeNB and SeNB is synchronized down to half a subframe (±500 μs). This means the UE supporting unsynchronized DC operation should be capable of receiving signals from MCG and SCG within ±500 μs. More specifically in unsynchronized DC operation, ‘Δτ’ should be within a second limit (Γ2) or a second threshold (e.g. within ±500 μs), wherein |Γ2|>|Γ1|. In some exemplary embodiments, the DC operation may be considered to be unsynchronized provided that ‘Δτ’ is outside Γ1. Also in some exemplary embodiments, the DC operation may be considered to be unsynchronized if the ‘Δτ’ is allowed to have any arbitrary value.
Uplink power control is discussed in the following. Uplink power control plays an important role in radio resource management which has been adopted in most modern communication systems. It balances the needs to maintain the link quality against the needs to minimize interference to other users of the system and to maximize the battery life of the terminal.
In LTE, the aim of power control is to determine the average power over a SC-FDMA symbol and it is applied for both common channel and dedicated channel (PUCCH/PUSCH/SRS). A combined open-loop and closed-loop power control may be defined as:
Open loop power control: The terminal or UE calculates basic open-loop set-point based on the path-loss estimate and eNodeB controlled semi-static base level (P0) comprising a nominal power level common for all UEs or terminals in the cell and a terminal or UE-specific offset;
Closed-loop power control: the network node or eNodeB updates the dynamic adjustment relative to set-point; terminal or UE adjusts the transmit power based on commands, e.g. upon TPC (transmit power control) commands, transmitted by the network node/eNodeB. It is also possible to connect the power control to modulation and coding scheme used for the uplink transmission.
Herein, P0 represent a control value for an open-loop part, α is a parameter between 0 and 1 and PL represents a pathloss correction. Uplink power control for PUSCH and PUCCH is discussed in the following. Uplink power control is used both on the PUSCH and on PUCCH. The purpose is to ensure that the UE or terminal or mobile terminal transmits with sufficiently high but not too high power, since the latter would increase the interference to other users in the network as well as drain the battery of the terminal. In both cases, a parameterized open loop combined with a closed loop mechanism may generally be used. Roughly, the open loop part is used to set a point of operation, around which the closed loop component operates. Different parameters (targets and ‘partial compensation factors’) for user and control plane may be used.
In more detail, for PUSCH, the terminal sets the output power according to
PPUSCHc(i)=min{PMAXc,10 log10(MPUSCHc(i))+PO_PUSCHc(j)+αc·PLc+ΔTFc(i)+fc(i)} [dBm],
wherein PMAXc is the maximum transmit power for the mobile terminal, MPUSCHc(i) is the number resource blocks assigned, PO_PUSCHc(j) and αc control the target received power, PLc is the estimated pathloss, ΔTFc(i) is transport format compensator and fc(i) is the a UE specific offset or ‘closed loop correction’ (the function fc may represent either absolute or accumulative offsets). The index c numbers the component carrier and is of relevance for Carrier Aggregation cases.
The closed loop power control can be operated in two different modes, either accumulated or absolute. Both modes are based on TPC (Transmit Power Control), which may be represented by a command which is part of the downlink control signaling. When absolute power control is used, the closed loop correction function is reset every time a new power control command is received. When accumulated power control is used, the power control command is a delta correction with regard to the previously accumulated closed loop correction.
The accumulated power control command is defined as
fc(i)=fc(i−1)+δPUSCHc(i−KPUSCH),
where δPUSCHc represents the TPC command received in KPUSCH subframe before the current subframe i and fe(i−1) is the accumulated power control value.
The absolute power control has no memory, so that fc(i)=δPUSCHc(i−KPUSCH) may be assumed to hold.
The PUCCH power control has in principle the same configurable parameters with the exception that PUCCH only has full pathloss compensation, i.e. does only cover the case of α=1.
The configured transmitted power PCMAX is described in the following. The configured transmitted power PCMAX may be defined as: The UE is allowed to set its configured maximum output power PCMAX,c for serving cell c. The configured maximum output power PCMAX,c is set within the following bounds:
PCMAX_L,c≤PCMAX,c≤PCMAX_H,c with PCMAX_L,c=MIN{PEMAX,c−ΔTC,c,PPowerClass−MAX(MPRc+A-MPRc+ΔTIB,c+ΔTC,c,P-MPRc)}
PCMAX_H,c=MIN{PEMAX,c,PPowerClass}
where
P-MPRc is the allowed maximum output power reduction for
a) ensuring compliance with applicable electromagnetic energy absorption requirements and addressing unwanted emissions/self desense requirements in case of simultaneous transmissions on multiple RAT(s) for scenarios not in scope of 3GPP RAN specifications;
b) ensuring compliance with applicable electromagnetic energy absorption requirements in case of proximity detection is used to address such requirements that require a lower maximum output power.
The UE shall apply P-MPRc for serving cell c only for the above cases. For UE conducted conformance testing P-MPR shall be 0 dB.
P-MPRc was introduced in the PCMAX,c equation such that the UE can report to the eNB the available maximum output transmit power. This information can be used by the eNB for scheduling decisions.
P-MPRc may impact the maximum uplink performance for the selected UL transmission path.
For each subframe, the PCMAX_L,c for serving cell c is evaluated per slot and given by the minimum value taken over the transmission(s) within the slot; the minimum PCMAX_L,c over the two slots is then applied for the entire subframe. PPowerClass shall not be exceeded by the UE during any period of time.
The measured configured maximum output power PUMAX,c shall be within the following bounds:
PCMAX_L,c−MAX{TL,T(PCMAX_L,c)}≤PUMAX,c≤PCMAX_H,c+T(PCMAX_H,c)
where T(PCMAX,c) is defined by the tolerance table below and applies to PCMAX_L,c and PCMAX_H,c separately, while TL is the absolute value of the lower tolerance in Table 6.2.2-1 for the applicable operating band.
For the terminal or UE which supports inter-band carrier aggregation configurations with uplink assigned to one E-UTRA band the ΔTIB,c is defined for applicable bands in Table 6.2.5-2.
The existing PCMAX definitions only cover the synchronized multiple carrier case i.e when two or more UL carriers are time synchronized or their transmit time difference is typically very small e.g. within CP length. However UL transmit time difference (Δμ) between CCs in CA due to independent timing advanced commands (e.g. pTAG and sTAG) can become large. The maximum allowed UL time difference may be limited to about 32.5 μs as defined in section 7.9, TS 36.133 V12.5.0.
The UE in CA or in synchronized DC operation can still perform UL power control based on existing PCMAX parameter even if maximum UL time difference is up to 32.5 μs or in this order.
However in unsynchronized DC operation where the received time difference (Δτ) is about ±500 μs, the UE may have to transmit signals on CCs belonging to SCG and MCG well outside the existing transmit timing window of 32.5 μs. For example, the magnitude of Δμ may be 500 μs or become even larger due to independent TA commands which the UE has to apply on UL CCs (i.e. TA1 to CCs in MCG and TA2 to CCs in SCG). The current power control requirements including the manner in which UE derives PCMAX on CCs is not suitable when the UL transmit timings of the CCs are shifted beyond 32.5 μs.
There are described methods for operating a wireless communication network and nodes and terminals for unsynchronized dual connectivity, including:
(1) Methods to define subframe pairs for dual connectivity calculations are defined
(2) Methods to define PCMAX calculations on subframe basis and slot basis are defined
(3) Methods to enhance the PCMAX definitions based on network guidance
(4) Methods to adapt between first and second methods or schemes for deriving PCMAX depending on whether the UE is configured in unsynchronized or synchronized DC operations.
(5)
In one embodiment the method in a UE configured or being configured in DC comprises steps of:
In another embodiment the method in a UE configured or being configured in DC comprises steps of:
In this specification, configured transmitted power for unsynchronized dual connectivity scheme is defined. Moreover, some enhancement of the PCMAX definition is also proposed.
The terminal or UE behavior with respect to PCMAX to be used for transmitting UL signals in each CG is well specified and consistent for all UEs.
The available UE output power can be used more efficiently.
In this section, there are mainly described systems with dual links (dual connectivity with one MCG and one SCG). In general, the solutions described in this disclosure may be easily applied to cases with multiple connectivity, e.g. with more than one secondary cell group.
The general term “network node” may be used, which may correspond to any type of radio network node or any network node, which communicates with a UE and/or with another network node. Examples of network nodes are NodeB, MeNB, SeNB, a network node belonging to MCG or SCG, base station (BS), multi-standard radio (MSR) radio node such as MSR BS, eNodeB, network controller, radio network controller (RNC), base station controller (BSC), relay, donor node controlling relay, base transceiver station (BTS), access point (AP), transmission points, transmission nodes, RRU, RRH, nodes in distributed antenna system (DAS), core network node (e.g. MSC, MME etc), O&M, OSS, SON, positioning node (e.g. E-SMLC), MDT etc.
The term terminal or user equipment (UE) may be used, which may refer to any type of wireless device communicating with a network node and/or with another terminal or UE in a cellular or mobile communication system. Examples of terminals or UEs are target device, device to device (D2D) UE, machine type UE or UE capable of machine to machine (M2M) communication, PDA, PAD, Tablet, mobile terminals, smart phone, laptop embedded equipped (LEE), laptop mounted equipment (LME), USB dongles etc.
There are described methods for operating a terminal or UE to determine subframe pairs and reference subframe.
For dual connectivity, there may hold:
1. SFN alignment (synchronizing to a common timing/frequency reference) may not be possible between MCG and SCG and/or
2. there may be a significant or maximum receive timing difference between signals in subframe level from MeNB (as an example for a master network node) and SeNB (as an example for a secondary network node); e.g. a maximum of 500 μs; this may lead to signals received or transmitted by the terminal via the MCG associated to a master network node and signals received or transmitted by the terminal via a SCG associated to a secondary network node in dual connectivity being unsynchronized.
As shown in
(1) when the mismatch is less than the maximum of e.g. 500 μs (by extension, synchronized case is included here),
(2) when the mismatch is more than the maximum of e.g. 500 μs (referring to the beginning of the subframes in temporal domain), and
(3) when the mismatch is exactly on the maximum threshold of e.g. 500 μs (this is truly a theoretical case, with very little probability, in the order of 0.2%).
Due to these different possibilities of subframe boundary mismatch, the PCMAX needs to be derived by the UE for unsynchronized DC operation based on a rule and/or information received from at least one of the network nodes. The terminal or UE in unsynchronized DC operation will use the derived PCMAX value for transmitting in UL and/or for performing UL power control. These principles, which are elaborated in proceeding sections, may also apply in unsynchronized DC operation for any value of ‘Δτ’. They may also be utilized generally for any kind of DC operation.
To define the PCMAX for dual connectivity, two subframes, one each of MCG and SCG, to be compared with each other may be identified.
Based on the illustrations in
Generally, the subframe pairs may include two reference subframes (one each in MCG and SCG), which should be considered together for the purpose of defining the PCMAX. In case of
Based on these discussions, the PCMAX may be derived based on the following main principles:
1. The subframes in one CG that overlap with subframes in another CG in their respective slot 1 should be paired together between CGs.
2. The leading CG is always taken as reference subframe i.e. whose subframe leads in time compared to the other subframe in the subframe pair. The reference subframe may be the subframe for which the calculated per terminal/UE PCMAX is applied by the terminal/UE. This is explained with an example below:
a. If subframe p and subframe q are the subframe pairs between MCG and SCG respectively, then
I. if MCG leads, subframe p in MCG and subframes q−1 and q in SCG are considered for PCMAX definition i.e. for deriving the value of PCMAX.
II. if SCG leads, subframes p and p−1 in MCG and subframe q in SCG are considered for PCMAX definition i.e. for deriving the value of PCMAX.
Methods in the UE to define PCMAX by calculating on subframe basis are discussed in the following. For unsynchronized dual connectivity, the following subframes may be considered:
Table 1 shows the subframe number in the subframe pair and the reference subframe for PCMAX definition or determination. It briefly summarizes the subframe pairs for the examples shown in
The total configured maximum output power PCMAX may be set within the following bounds:
Here, the above mentioned PCMAX is applied to the reference subframes, i.e. to the pth and qth subframes when MCG leads and SCG leads respectively. PCMAX_L,a(b) and PCMAX_H,a(b) are the PCMAX,c lower and higher limit respectively for CG a on subframe b.
PCMAX_L,a(b) is defined as:
and the other parameters in the above equation are defined for serving cell c in CG a for subframe b.
Similarly, PCMAX_H,a(b) is defined as:
Once the PCMAX is defined, then the measured configured maximum output power, PCMAX can be defined per UE for the reference subframe.
Methods in the UE to define PCMAX by calculating on slot basis are described in the following. In a variant, the PCMAX calculations can be done on slot basis instead of subframe level. Therein, the principles described above for PCMAX calculation based on subframe level also applies for PCMAX calculation on slot basis. The calculated or derived PCMAX will be applied by the UE for UL transmission also on the reference subframe, which is the subframe containing the first slot of leading CG.
As seen in
Similarly, PCMAX_H can be defined as:
In the both of the above equation, PCMAX_L,a(b,c) and PCMAX_H,a(b,c) denotes lower and higher PCMAX for CG a in subframe b and slot c.
Methods in the UE to enhance the PCMAX definitions are described in the following. In a Rel-12 LTE system, the MeNB provides guidance to UE regarding the ratio of PCMAX that should be assigned for transmitting signals to the MeNB and the remaining power for transmitting signals to the SeNB.
For example, a MeNB may configure the terminal or UE with one or more parameters via higher layer signaling to transmit power up to a certain limit in each CG such as U % and V % of total amount of UE transmit power for MCG and SCG respectively. Herein, U+V=100.
The UE is configured with the ratio of PCMAX in different CGs or similar parameters (e.g. U, V etc as stated above) for transmitting in MCG and SCG regardless of whether the UE operates in synchronized DC or unsynchronized DC scenarios.
In this case, the PCMAX in each CG is further calculated or derived or adapted by taking into account the ratio of PCMAX or similar parameters. The UE then transmits using the derived value of PCMAX in each CG.
The further adaptation of PCMAX in response to the obtained ratio of PCMAX in different CGs or similar parameters is carried out by the UE regardless of whether the UE is configured to operate in unsynchronized DC or synchronized DC operations. The further adaptation of the PCMAX is described below:
α may represent as the ratio for PMeNB and PSeNB (configured maximum transmitted power for MeNB and SeNB respectively; in particular for UL transmission by the terminal/UE), where
PMeNB=αPPowerClass
PSeNB=(1−α)PPowerClass
and α can be of any value between 0 and 1 (corresponding to U and V as mentioned earlier). PPowerClass may generally refer to the power available/allowable for the terminal or UE of a given class as defined by the relevant standard. Denoting x=MeNB and y=SeNB, when MCG leads, the PCMAX_L,x and PCMAX_L,y may be defined as:
PCMAX_L,x=MIN{PMeNB,PCMAX_L,x(p),Δ1}
PCMAX_L,y=MIN{PSeNB,PCMAX_L,y(q−1),PCMAX_L,y(q),Δ2}
wherein
Δ1=MIN{PCMAX_L,y(q−1),PCMAX_L,y(q)}−PSeNB
Δ2=PCMAX_L,x(p)−PMeNB (5.4-1)
Similarly, when SCG leads, the PCMAX_L,x and PCMAX_L,y may be defined as:
PCMAX_L,x=MIN{PMeNB,PCMAX_L,x(p−1),PCMAX_L,x(p)Δ1}
PCMAX_L,y=MIN{PSeNB,PCMAX_L,y(q),Δ2}
wherein
Δ1=PCMAX_L,y(q)−PSeNB
Δ2=MIN{PCMAX_L,y(p−1),PCMAX_L,y(p)}−PMeNB (5.4-2)
In case of synchronized DC operation the UL subframes in both MCG and SCG don't lead with each and rather are time aligned or are within a certain limit e.g. 33 μs. In synchronized DC operation the PCMAX adaptation may be based on any one of the two rules (5.4-1 and 5.4-2) above.
A method in or for operating a UE of adapting a PCMAX calculation based on a level of synchronization is discussed in the following. A DC capable UE and/or a terminal adapted for DC may be configured by a network node (e.g. master network node) with different level of synchronizations. For example, a UE capable of operating in both unsynchronized DC or synchronized DC scenarios may be configured with or for either unsynchronized DC or synchronized DC operations by the network node. The network node may be adapted to configure a terminal, which may be adapted for DC and/or be in dual connectivity with a MCG and a SCG, with different levels of synchronizations.
In yet another embodiment, the terminal or UE adapts between a first method and a second method for calculating or deriving the PCMAX based on the synchronized level with which the UE is configured to operate in DC. For example the terminal or UE:
Regardless of the level of synchronization, the terminal or UE may further adapt PCMAX in response to the obtained ratio of PCMAX in different CGs or similar parameters as described above. The UE then transmit in each CG using the derived values of PCMAX for each CG.
In order to apply the method disclosed in this embodiment, the terminal or UE configured or being configured in DC may perform the following minimum steps:
Alternatively or additionally, there may be considered a method for operating a terminal in a wireless communication network, the terminal being adapted for dual connectivity. The terminal may be connected to a master network node via a master cell group (MCG), and to a secondary network node via a secondary cell group (SCG). The method may comprise obtaining, by the terminal, of synchronization information, in particular information regarding the time difference between signals from the MCG and the SCG. The method may further comprise determining a PCMAX based on the synchronization information. Determining a PCMAX based on the synchronization information may comprise selecting a method to determine PCMAX depending on the synchronization level, in particular selecting between a first method and a second method as described herein. The second method may be slot-based or subframe based, as described herein. Optionally or additionally, determining PCMAX may comprise calculating PCMAX based on the selected method. The method may comprise UL transmitting based on the determined PCMAX.
There may generally be considered a terminal adapted to perform any one or more than one of the methods for operating a terminal as disclosed herein.
Alternatively or additionally, there may be considered a terminal for a wireless communication network, the terminal being adapted for dual connectivity. The terminal may be adapted for, and/or comprise a connectivity module for, being connected or connectable to a master network node via a master cell group (MCG), and to a secondary network node via a secondary cell group (SCG). The terminal may be adapted for, and/or comprise an obtaining module for, obtaining synchronization information, in particular information regarding the time difference between signals from the MCG and the SCG.
It may be considered that the terminal is adapted for, and/or may comprise a determining module for, determining a PCMAX based on the synchronization information. Determining a PCMAX based on the synchronization information may comprise selecting a method to determine PCMAX depending on the synchronization level, in particular selecting between a first method and a second method as described herein, e.g. by a selecting module of the terminal. Optionally or additionally, determining PCMAX may comprise calculating PCMAX based on the selected method, e.g. by a calculating module.
The terminal may optionally be adapted for, and/or comprise a transmitting module for, UL transmitting based on the determined PCMAX.
There may be considered a method of operating a network node, in particular a master network node and/or secondary network node. The network node may be in dual connectivity with a terminal. The method may comprise obtaining, by the network node, synchronization information regarding the time difference between signals from a MCG and a SCG a terminal is configured with. The method may additionally comprise transmitting the obtained synchronization information to the terminal.
There may be considered a network node for a wireless communication network, in particular a master network node and/or secondary network node. The network node may optionally be adapted for, and/or comprise a connectivity module for, dual connectivity with a terminal.
The network node may be adapted for, and/or comprise an obtaining module for, obtaining, by the network node, synchronization information regarding the time difference between signals from a MCG and a SCG a terminal is configured with. It may be considered that the network node further is adapted for, and/or comprises a transmitting module for, transmitting the obtained synchronization information to the terminal.
Generally, any terminal and/or network node described herein may comprise circuitry, in particular control circuitry and/or radio circuitry configured to carry out the respective methods described and/or to provide the described functionality.
Obtaining, by the terminal or UE and/or a network node, may comprise determining or obtaining synchronization information and/or information about the level of synchronization with which the UE is configured to operate in DC and/or the time difference between MCG signals and SCG signals autonomously (e.g. based on received time difference of signals from and/or transmitted via CGs), and/or receiving an indication received from the network, e.g. one of the network nodes, e.g. the master network node or the secondary network node.
Configured transmitted power for dual connectivity is discussed in the following.
Independently or additionally to the above, there may be considered:
For dual connectivity with one uplink carrier per cell group the UE or terminal may be allowed to and/or adapted to and/or comprise a power setting module adapted to set, and/or set, its configured maximum output power PCMAX,c,x and PCMAX,c,y on each serving cells of groups x respectively y, and its total configured maximum output power PCMAX. The UE or terminal may be allowed to and/or adapted to and/or comprise a power setting module adapted to conform, and/or perform conforming, to any one or any one combination of the following conditions and/or prescriptions:
The total configured maximum output power PCMAX may or shall be set within the following bounds:
PCMAX_L≤PCMAX≤PCMAX_H
When synchronized transmissions occur between cell groups uplink serving cells, PCMAX_L and PCMAX_H, respectively, may be standard-defined, e.g. in subclause 6.2.5A of TS36.101 for carrier aggregation inter-band case.
It the UE or terminal is configured in Dual Connectivity in a synchronized scenario and transmissions of the UE or terminal on subframe p for any serving cell in one cell group overlap some portion of the first symbol of the transmission on subframe q+1 for a different serving cell in another cell group (where subframe p and subframe q are the subframe pairs between MCG and SCG respectively), the UE or terminal minimum of PCMAX_L for subframes pairs (p, q) and (p+1, q+1) respectively applies for any overlapping portion of subframes (p, q) and (p+1, q+1). It may be considered that PPowerClass shall not be exceeded by the UE or terminal during any period of time.
When unsynchronized overlapping transmissions occur, the subframes in one CG that overlap with subframes in another CG in their respective slot 1 should be paired together between CGs. The terminal may be adapted for such pairing and/or comprise a corresponding pairing module. The leading CG may be taken as reference subframe i.e. whose subframe leads in time compared to the other subframe in the subframe pair. The terminal or UE may be adapted to determine the reference subframe thusly and/or comprise a corresponding referencing module. The reference subframe is the subframe where the calculated per terminal or UE PCMAX is applied by the UE or terminal, which may be adapted correspondingly and/or comprise a corresponding PCMAX applying module and/or calculating module.
If subframe p and subframe q are the subframe pairs between MCG and SCG respectively, then
1. if MCG leads, subframe p in MCG and subframes q−1 and q in SCG are considered for PCMAX definition i.e. for deriving the value of PCMAX.
2. if SCG leads, subframes p and p−1 in MCG and subframe q in SCG are considered for PCMAX definition i.e. for deriving the value of PCMAX.
When unsynchronized overlapping transmissions occur between two cell groups uplink serving cells, and a reference subframe p from cell group x is overlapping with 2 contiguous subframes q−1 and q on cell group y (or a reference subframe q from cell group y is overlapping with 2 contiguous subframes p−1 and p on cell group x), then the above PCMAX_L and PCMAX_H for the reference subframe p (or reference subframe q) duration are defined as follows:
where pEMAX,c∈a, ΔtC,c∈a, ΔtIB,c∈a and the other parameters in the above equation are defined for serving cell c in CG a for subframe b.
The UE measured maximum output power PUMAX,i over all uplink serving cells of a cell group i may be defined if a single uplink cell is active (see e.g. subclause 6.2.5 of TS36.101).
The UE total measured maximum output power PUMAX for a reference subframe p (or reference subframe q) duration over all serving cells of both defined cell groups may be defined as follows:
PUMAX=ΣPUMAX,i
PCMAX_L−TLOW(PCMAX_L)≤PUMAX≤PCMAX_H+THIGH(PCMAX_H)
In the context of this description, wireless communication may be communication, in particular transmission and/or reception of data, via electromagnetic waves and/or an air interface, in particular radio waves, e.g. in a wireless communication network and/or utilizing a radio access technology (RAT). The communication may involve one or more than one terminal connected to a wireless communication network and/or more than one node of a wireless communication network and/or in a wireless communication network. It may be envisioned that a node in or for communication, and/or in, of or for a wireless communication network is adapted for communication utilizing one or more RATs, in particular LTE/E-UTRA.
A communication may generally involve transmitting and/or receiving messages, in particular in the form of packet data. A message or packet may comprise control and/or configuration data and/or payload data and/or represent and/or comprise a batch of physical layer transmissions. Control and/or configuration data may refer to data pertaining to the process of communication and/or nodes and/or terminals of the communication. It may, e.g., include address data referring to a node or terminal of the communication and/or data pertaining to the transmission mode and/or spectral configuration and/or frequency and/or coding and/or timing and/or bandwidth as data pertaining to the process of communication or transmission, e.g. in a header. Each node or terminal involved in communication may comprise radio circuitry and/or control circuitry and/or antenna circuitry, which may be arranged to utilize and/or implement one or more than one radio access technologies. Radio circuitry of a node or terminal may generally be adapted for the transmission and/or reception of radio waves, and in particular may comprise a corresponding transmitter and/or receiver and/or transceiver, which may be connected or connectable to antenna circuitry and/or control circuitry. Control circuitry of a node or terminal may comprise a controller and/or memory arranged to be accessible for the controller for read and/or write access. The controller may be arranged to control the communication and/or the radio circuitry and/or provide additional services. Circuitry of a node or terminal, in particular control circuitry, e.g. a controller, may be programmed to provide the functionality described herein.
A corresponding program code may be stored in an associated memory and/or storage medium and/or be hardwired and/or provided as firmware and/or software and/or in hardware. A controller may generally comprise a processor and/or microprocessor and/or microcontroller and/or FPGA (Field-Programmable Gate Array) device and/or ASIC (Application Specific Integrated Circuit) device. More specifically, it may be considered that control circuitry comprises and/or may be connected or connectable to memory, which may be adapted to be accessible for reading and/or writing by the controller and/or control circuitry. Radio access technology may generally comprise, e.g., Bluetooth and/or Wifi and/or WIMAX and/or cdma2000 and/or GERAN and/or UTRAN and/or in particular E-Utran and/or LTE. A communication may in particular comprise a physical layer (PHY) transmission and/or reception, onto which logical channels and/or logical transmission and/or receptions may be imprinted or layered.
A node of a wireless communication network may be implemented as a terminal and/or user equipment and/or network node and/or base station (e.g. eNodeB) and/or relay node and/or any device generally adapted for communication in a wireless communication network, in particular cellular communication.
A wireless communication network or cellular network may comprise a network node, in particular a radio network node, which may be connected or connectable to a core network, e.g. a core network with an evolved network core, e.g. according to LTE. A network node may e.g. be a base station. The connection between the network node and the core network/network core may be at least partly based on a cable/landline connection. Operation and/or communication and/or exchange of signals involving part of the core network, in particular layers above a base station or eNB, and/or via a predefined cell structure provided by a base station or eNB, may be considered to be of cellular nature or be called cellular operation.
A terminal may be implemented as a user equipment; it may generally be considered that a terminal is adapted to provide and/or define an end point of a wireless communication and/or for a wireless communication network. A terminal or a user equipment (UE) may generally be a device configured for wireless device-to-device communication and/or a terminal for a wireless and/or cellular network, in particular a mobile terminal, for example a mobile phone, smart phone, tablet, PDA, etc. A user equipment or terminal may be a node of or for a wireless communication network as described herein, e.g. if it takes over some control and/or relay functionality for another terminal or node. It may be envisioned that terminal or user equipment is adapted for one or more RATs, in particular LTE/E-UTRA.
It may be considered that a terminal or user equipment comprises radio circuitry and/control circuitry for wireless communication. Radio circuitry may comprise for example a receiver device and/or transmitter device and/or transceiver device. Control circuitry may include a controller, which may comprise a microprocessor and/or microcontroller and/or FPGA (Field-Programmable Gate Array) device and/or ASIC (Application Specific Integrated Circuit) device. It may be considered that control circuitry comprises or may be connected or connectable to memory, which may be adapted to be accessible for reading and/or writing by the controller and/or control circuitry. It may be considered that a terminal or user equipment is configured to be a terminal or user equipment adapted for LTE/E-UTRAN. Generally, a terminal may be adapted to support dual connectivity. It may comprise two independently operable transmitter (or transceiver) circuitries and/or two independently operable receiver circuitries; for dual connectivity, it may be adapted to utilize one transmitter (and/or receiver or transceiver, if provided) for communication with a master network node and one transmitter (and/or receiver or transceiver, if provided) for communication with a secondary network node. It may be considered that a terminal comprises more than two such independently operable circuitries.
A network node or base station, e.g. an eNodeB, may be any kind of base station of a wireless and/or cellular network adapted to serve one or more terminals or user equipments. It may be considered that a base station is a node or network node of a wireless communication network. A network node or base station may be adapted to provide and/or define and/or to serve one or more cells of the network and/or to allocate frequency and/or time resources for communication to one or more nodes or terminals of a network. Generally, any node adapted to provide such functionality may be considered a base station. It may be considered that a base station or more generally a network node, in particular a radio network node, comprises radio circuitry and/or control circuitry for wireless communication. It may be envisioned that a base station or network node is adapted for one or more RATs, in particular LTE/E-UTRA. Radio circuitry may comprise for example a receiver device and/or transmitter device and/or transceiver device. Control circuitry may include a controller, which may comprise a microprocessor and/or microcontroller and/or FPGA (Field-Programmable Gate Array) device and/or ASIC (Application Specific Integrated Circuit) device. It may be considered that control circuitry comprises or may be connected or connectable to memory, which may be adapted to be accessible for reading and/or writing by the controller and/or control circuitry. A base station may be arranged to be a node of a wireless communication network, in particular configured for and/or to enable and/or to facilitate and/or to participate in cellular communication, e.g. as a device directly involved or as an auxiliary and/or coordinating node.
Generally, a base station may be arranged to communicate with a core network and/or to provide services and/or control to one or more user equipments and/or to relay and/or transport communications and/or data between one or more user equipments and a core network and/or another base station. A network node or base station may generally be adapted to allocate and/or schedule time/frequency resources of a network and/or one or more cells serviced by the base station. An eNodeB (eNB) may be envisioned as an example of a base station, e.g. according to an LTE standard. It may be considered that a base station is configured as or connected or connectable to an Evolved Packet Core (EPC) and/or to provide and/or connect to corresponding functionality. The functionality and/or multiple different functions of a base station may be distributed over one or more different devices and/or physical locations and/or nodes. A base station may be considered to be a node of a wireless communication network. Generally, a base station may be considered to be configured to be a controlling node and/or coordinating node and/or to allocate resources in particular for cellular communication via one or more than one cell.
It may be considered for cellular communication there is provided at least one uplink (UL) connection and/or channel and/or carrier and at least one downlink (DL) connection and/or channel and/or carrier, e.g. via and/or defining a cell, which may be provided by a network node, in particular a base station or eNodeB. An uplink direction may refer to a data transfer direction from a terminal to a network node, e.g. base station and/or relay station. A downlink direction may refer to a data transfer direction from a network node, e.g. base station and/or relay node, to a terminal. UL and DL may be associated to different frequency resources, e.g. carriers and/or spectral bands. A cell may comprise at least one uplink carrier and at least one downlink carrier, which may have different frequency bands.
A network node, e.g. a base station or eNodeB, may be adapted to provide and/or define and/or control one or more cells, e.g. a group of cells, which may be carrier aggregated (CA) cells. The group of cells may comprise at least one primary cell, which may be considered to be a member of the group and/or to be associated to the group. The cell group may comprise one or more secondary cells (it should be noted that every group may comprise secondary cells, not only a secondary group; the secondary in this context refers to being secondary to the primary cell of a group). A primary cell may be adapted and/or utilised for providing control information (in particular allocation data, and/or scheduling and/or allocation information regarding the primary cell and/or the group of cells to and/or from a terminal connected for communication (transmission and reception) and/or configured with the cell. The control information may pertain to the primary cell and/or the group of cells. Each primary cell and/or the associated group may be associated to a specific network node. A master network node may be adapted to provide and/or service and/or define a primary cell in a master cell group. A secondary network node may be adapted to provide and/or service and/or define a secondary cell group.
A terminal may be adapted to be configured with and/or to communicate via master cell group (at least one primary cell) for communicating with a master network node.
Additionally, a terminal may be adapted to be configured with and/or to communicate via secondary cell group (at least one (secondary) primary cell) for communicating with a secondary network node; the terminal may generally be adapted for dual connectivity. The terminal may comprise suitable circuitry, e.g. a first transmitter and/or receiver and/or transceiver circuitry (e.g., for communicating with the master network node) and a second first transmitter and/or receiver and/or transceiver circuitry (e.g., for communicating with the secondary network node/s).
A network node, in particular a base station, and/or a terminal, in particular a UE, may be adapted for communication in spectral bands (frequency bands) licensed and/or defined for LTE.
Resources or communication resources may generally be frequency and/or time resources, which may comprises e.g. frames, subframes, slots, resource blocks, carriers, subcarriers, channels, frequency/spectral bands, etc. Allocated or scheduled resources may comprise and/or refer to frequency-related information, in particular regarding one or more carriers and/or bandwidth and/or subcarriers and/or time-related information, in particular regarding frames and/or slots and/or subframes, and/or regarding resource blocks and/or time/frequency hopping information. Transmitting on allocated resources and/or utilizing allocated resources may comprise transmitting data on the resources allocated, e.g. on the frequency and/or subcarrier and/or carrier and/or timeslots or subframes indicated. It may generally be considered that allocated resources may be released and/or de-allocated. A network or a node of a network, e.g. a network node or allocation node, e.g. a base station, may be adapted to determine and/or transmit corresponding allocation or scheduling data, e.g. data indicating release or de-allocation of resources and/or scheduling of UL and/or DL resources. Accordingly, resource allocation may be performed by the network and/or by a network node; a network node adapted for providing resource allocation/scheduling for one or more than one terminals may be considered to be a controlling node. Resources may be allocated and/or scheduled on a cell level and/or by a network node servicing and/or providing the cell.
Allocation data may be considered to be data indicating and/or granting resources allocated by a network node, e.g. a controlling and/or allocation node, in particular data identifying or indicating which resources are reserved or allocated, e.g. for cellular communication, which may generally comprise transmitting and/or receiving data and/or signals; the allocation data may indicate a resource grant or release and/or resource scheduling. A grant or resource grant may be considered to be one example of allocation data. It may be considered that an allocation node is adapted to transmit allocation data directly to a node and/or indirectly, e.g. via a relay node and/or another node or base station. Allocation data may comprise control data and/or be part of or form a message, in particular according to a pre-defined format, for example a DCI format, which may be defined in a standard, e.g. LTE. In particular, allocation data may comprise information and/or instructions to reserve resources or to release resources, which may already be allocated. A terminal may generally be adapted to perform transmission of data to, e.g. UL data, and/or reception of data from, a network node and/or to more than one network nodes, according to allocation data.
There is described a method for operating a wireless device, e.g. a user equipment, The method comprising
There may be considered a network node adapted for performing any one of the methods for operating a network node described herein.
There may be considered a terminal adapted for performing any one of the methods for operating a terminal described herein.
There is also disclosed a program product comprising code executable by control circuitry, the code causing the control circuitry to carry out and/or control any one of the method for operating a terminal or network node as described herein, in particular if executed on control circuitry, which may be control circuitry of a terminal or a network node as described herein.
Moreover, there is disclosed a carrier medium carrying and/or storing at least any one of the program products described herein and/or code executable by control circuitry, the code causing the control circuitry to perform and/or control at least any one of the methods described herein. Generally, a carrier medium may be accessible and/or readable and/or receivable by control circuitry. Storing data and/or a program product and/or code may be seen as part of carrying data and/or a program product and/or code. A carrier medium generally may comprise a guiding/transporting medium and/or a storage medium. A guiding/transporting medium may be adapted to carry and/or carry and/or store signals, in particular electromagnetic signals and/or electrical signals and/or magnetic signals and/or optical signals. A carrier medium, in particular a guiding/transporting medium, may be adapted to guide such signals to carry them. A carrier medium, in particular a guiding/transporting medium, may comprise the electromagnetic field, e.g. radio waves or microwaves, and/or optically transmissive material, e.g. glass fiber, and/or cable. A storage medium may comprise at least one of a memory, which may be volatile or non-volatile, a buffer, a cache, an optical disc, magnetic memory, flash memory, etc.
A cell group may alternatively be referred to as carrier group, in particular due to each cell comprising one or more carriers (a carrier in this context may refer to a carrier frequency and/or band for wireless transmission, in particular according to a telecommunication standard like LTE.
A terminal and/or network node may be adapted, and/or comprise a connectivity module for, supporting dual connectivity. For example, a terminal, and/or its connectivity module, may be adapted to communicate, in particular to transmit and/or receive control and/or scheduling and/or allocation data, with more than one network node, one of which may be a master network node and at least one other node may be a secondary node.
A master network node, and/or its connectivity module, may be adapted to control functionality of a secondary network node in dual connectivity, in particular handover between secondary network node; the master network node, and/or its connectivity module, may be adapted to transmit and/or receive corresponding control signaling to the secondary network node, e.g. via a backhaul and/or communication interface, e.g. a X2 interface.
A network node may generally comprise a corresponding backhaul and/or communication interface. It may be considered that the backhaul may be non-ideal, i.e. it may have high latency (high latency may be latency which is too high to perform real-time control and/or to provide synchronized scheduling and/or allocating of resource by the master network node for the communication between the secondary network node and the terminal; alternatively or additionally, high latency may be latency higher than a predetermined high latency threshold value, which may be dependent on the implemented system and/or standard, e.g. LTE). Alternatively, it may be considered that the backhaul is ideal, allowing (in principle) such kind real-time control. A secondary network node, and/or its connectivity module, may be adapted to receive control information from a master network node. A master network node may generally be adapted for secondary network node functionality, e.g. for another terminal, and vice versa.
A terminal being configured with a cell and/or carrier, and/or being connected to a network node via a cell, may be in a state in which it may communicate (transmit and/or receive data, e.g. with the network node) using the cell or carrier, e.g. being registered with the network for communication and/or being synchronized to the cell and/or carrier; in particular, the cell may be activated for the terminal.
A terminal may be adapted to perform an activation procedure, in which it activates a cell based on a timing message and/or timing parameter received from a network node providing and/or servicing and/or defining and/or scheduling the cell. The activation procedure may be part of an access procedure, in particular a random access procedure.
An access procedure/request may generally be a random access procedure as described herein, e.g. with contention resolution or contention-free. It may be performed between a terminal and/or network node to access and/or time align and/or activate a cell, for the terminal, the cell being provided and/or serviced and/or defined and/or controlled by and/or associated to the network node.
An activation procedure may comprise an access procedure. It should be noted that the result of a performed access or activation procedure may be a failure, if the terminal was not able to activate the cell, e.g. due to unfavorable reception conditions.
Synchronization information may generally refer to information regarding the time difference between signals from the master network node, e.g. via the MCG, and the secondary network node, e.g. via the SCG, and/or to the time difference between signals received, by the terminal, via the MCG and the SCG, in particular via the respective primary cells (PCell and PSCell). Synchronization information may refer to and/or comprise a synchronization level. A synchronization level may indicate whether the time difference (or its absolute value) lies above a given threshold and/or between given thresholds, e.g. if it is larger than a threshold defining the signals of being synchronized. Generally, a synchronization level may indicate a pre-defined type or mode of synchronization in dual connectivity, as discussed herein. One or more thresholds may be defined as above in terms of types of synchronization. Synchronization information may additionally or alternatively comprise the value and/or absolute value of the time difference. An example of a synchronization level includes synchronized and unsynchronized (also referred to as synchronous and asynchronous).
Configuring a terminal or UE, by a network or network node, may comprise transmitting, by the network or network node, one or more parameters and/or commands to the terminal or UE, and/or the terminal or UE changing it configuration and/or setup based on received parameters and/or commands from the network and/or the network node.
Some useful abbreviations comprise:
Abbreviation Explanation
These and other abbreviations may be used according to LTE standard definitions
Filing Document | Filing Date | Country | Kind |
---|---|---|---|
PCT/SE2015/051014 | 9/28/2015 | WO | 00 |
Publishing Document | Publishing Date | Country | Kind |
---|---|---|---|
WO2016/053163 | 4/7/2016 | WO | A |
Number | Name | Date | Kind |
---|---|---|---|
20050013242 | Chen et al. | Jan 2005 | A1 |
20120195190 | Singh et al. | Aug 2012 | A1 |
20130157571 | Wondka | Jun 2013 | A1 |
20170013565 | Pelletier | Jan 2017 | A1 |
Number | Date | Country |
---|---|---|
102204190 | Sep 2011 | CN |
1777893 | Apr 2007 | EP |
2360377 | Jun 2009 | RU |
2010126198 | Jan 2012 | RU |
2006024225 | Mar 2006 | WO |
2014121504 | Aug 2014 | WO |
Entry |
---|
PCT/US2015/013616 Pro of U.S. Appl. No. 62/033,993. |
3GPP, “3rd Generation Partnership Project; Technical Specification Group Radio Access Network; Evolved Universal Terrestrial Radio Access (E-UTRA); User Equipment (UE) radio transmission and reception (Release 12)”, 3GPP TS 36.101 V12.4.0, Jun. 2014, 1-531. |
3GPP, “3rd Generation Partnership Project; Technical Specification Group Radio Access Network; Evolved Universal Terrestrial Radio Access (E-UTRA); Requirements for support of radio resource management (Release 12)”, 3GPP TS 36.133 V12.5.0, Sep. 2014, 1-877. |
Unknown, Author, “Pcmax definition for Dual Connectivity”, TSG-RAN WG4 meeting #72, R4-144229, Interdigital, Dresden, Germany, Aug. 1-22, 2014, 1-4. |
Unknown, Author, “Pcrnax definition principles for Dual Connectivity”, TSG-RAN WG4 meeting #71, R4-143376, Interdigital, Seoul, Korea, May 19-23, 2014, 1-6. |
Lang, J.P et al., “RSVP-TE Extensions in Support of End-to-End Generalized Multi-Protocol Label Switching (GMPLS) Recovery”, IETF Network Working Group, Request for Comments 4872, May 2007, 1-48. |
Lang, Jonathan P. et al, “Generalized Multi-Protocol Label Switching (GMPLS) Recovery Functional Specification”, IETF Network Working Group, draft-ietf-ccamp-gmpls-recovery-functional-04.txt, Apr. 2005, 1-42. |
Unknown, Author , “Remaining power control issues in dual connectivity”, Nokia Networks, Nokia Corporation, 3GPP TSG-RAN WG1 Meeting #78bis, R1-144170, Ljubljana, Slovenia, Oct. 6-10, 2014, 1-4. |
Unknown, Author, “Remaining Details on UL Power Control in Dual Connectivity”, 3GPP TSG RAN WG1 Meeting #78bis, R1-143950, Ljubljana, Slovenia, Oct. 6-10, 2014, pp. 1-3. |
Number | Date | Country | |
---|---|---|---|
20160323834 A1 | Nov 2016 | US |
Number | Date | Country | |
---|---|---|---|
62056909 | Sep 2014 | US |