The invention relates to a device for placing a component of a wind turbine on a wind turbine tower. The invention likewise relates to a method for placing a component of a wind turbine on a wind turbine tower, wherein use is made of the device. The invention relates particularly to a device and method for placing a nacelle, a wind turbine blade or a complete rotor of a wind turbine on a wind turbine tower.
Placing on a wind turbine tower is understood to mean placing a component directly on a wind turbine tower, such as when a nacelle is placed, or placing a component on another component already placed on the wind turbine tower, such as when a wind turbine blade is mounted on a nacelle already placed on a wind turbine tower. The placing can if desired also comprise of mounting the component in question.
Although the invention will be elucidated mainly within the context of placing a component of a wind turbine at sea, the device and method according to the invention can expressly be used both on land (onshore) and at sea (offshore).
The number of high structures erected, maintained or repaired on land or offshore is growing. A typical example is a wind turbine (also referred to hereinbelow as WTG) comprising a gondola (or nacelle) which is placed on a wind turbine tower or mast and forms the housing for electromechanical equipment such as a power generator. The nacelle is provided with a hub on which a number of wind turbine blades are arranged, these together forming a rotor. The wind turbine blades convert the kinetic energy of the wind into a rotating movement of the shaft of the nacelle, which is converted into electrical energy by the power generator.
During the placing of components of such large structures the components are taken up according to the prior art by a lifting crane and placed and mounted on an already available support structure for the structure, or on an already placed component of the structure. In the case of a wind turbine the support structure can for instance comprise a wind turbine tower placed on a suitable foundation.
During the lifting of a load with an offshore lifting crane mounted on a vessel movements of the load will be caused by movements of the vessel itself, such as pitch, yaw, roll, surge, sway and heave. Movements of the load can also be caused by a wind load on the load. A tag line and/or a tugger system will typically be present in order to control and stabilize movements of the load during the lifting from the vessel, so that relative movements between the load and the vessel are controlled.
The lifting and placing of large, slender components, such as for instance a wind turbine blade, can also be hampered by wind load. A wind turbine blade in particular has to be attached by means of bolt connections to a hub, this requiring a precise positioning of the wind turbine blade relative to a hub already installed on a mast. During mounting of a wind turbine nacelle from a floating vessel on an offshore foundation—a turbine tower fixed to the seabed, or optionally a floating wind turbine tower—the relative movements between the nacelle taken up by a hoisting means and the foundation must also be controlled in order to bring the nacelle in line with the receiving flange.
An object of the present invention is to provide a device and method with which a structural component, in particular a component of a wind turbine, can be placed and, if desired, mounted on a support structure, particularly a wind turbine tower, onshore or offshore, wherein the relative movements between a component taken up with a hoisting means and the support structure can be controlled better than is the case in the prior art.
This object is achieved with a device as described herein. A device for placing a component of a wind turbine on a wind turbine tower comprises according to the invention a hoisting means with a hoisting cable for taking up the component, and a positioning tool which is connected to the hoisting cable and an intermediate construction of which is connected to the hoisting cable, and a guide frame of which is connected on one side to the intermediate construction and is provided on another side with engaging means for engaging a peripheral part of the wind turbine tower.
The invented device contributes to the (initial) setup and adjustment during placing of a wind turbine component such as a nacelle from for instance a (floating) installation vessel, and the control of the relative movements of the component and the receiving wind turbine tower. The invented positioning tool operates as a structural added component which is integrated with the hoisting cable, or with a hoisting guide frame, via the intermediate construction connected to the hoisting cable in order to stabilize the component while it is being taken up, wherein the fixed wind turbine tower is used as support and guide.
By making use of a guide frame which is connected via the intermediate construction to the hoisting cable and which supports on a support side on a peripheral part of the wind turbine tower by means of the engaging means the taken-up component is as it were temporarily connected flexibly to the wind turbine tower, whereby relative movements thereof relative to the wind turbine tower are reduced.
An embodiment relates to a device wherein the suspension of the intermediate construction from the hoisting cable is able to absorb a moment of force.
The component can be positioned relative to the wind turbine tower or partially erected wind turbine tower by suspending the component from the hoisting cable of a hoisting means such as for instance a lifting crane and rotating the hoisting means about a vertical axis by rotating a boom of the hoisting means up and downward in a lifting plane, and/or by moving a hoisting tackle or hoisting guide frame suspended from the hoisting cable up and downward with the hoisting cable. A positioning of the component which is substantially independent of wind and vessel movement is made possible by coupling the component at least temporarily to the wind turbine tower. This is understood to mean that influences of wind and vessel movements are substantially neutralized.
A further advantage of the invented device is that it allows work to take place in considerably more unfavourable conditions, whereas the known device can only be deployed up to determined wind speeds and swell. The assembly time of a wind turbine can hereby be significantly reduced. It thus for instance becomes possible to place a component at an operational swell of up to HS=2 m (significant wave height of 2 m) and more, for instance HS=2.5 m or 3 m. In addition, vessel dimensions and vessel shape and wave length can also play a part.
In an embodiment of the invention the guide frame is pivotally connected on one side to the intermediate construction, and the guide frame can be brought into different angular positions relative to the intermediate construction using angle adjusting means. In this way it becomes possible to realize a connection between the wind turbine tower and the taken-up component, wherein an optimal engagement with the peripheral part of the wind turbine tower is possible. A certain flexibility is also built into the connection in this way, which is important for bridging an initially lesser alignment between the component and the wind turbine tower.
The device can be seen as an extension of the hoisting cable or lifting tool connected thereto, and in this embodiment brings about a mechanical ‘soft’ connection between the wind turbine tower and the taken-up WTG component. The rigidity of the connection depends on a number of factors, such as the rigidity of the guide frame and (transverse) beams which may be used therein; on the characteristics of the applied pivoting connection; on the possible use of springs between guide frame and intermediate construction; on the characteristics of optionally applied (hydraulic, pneumatic and/or electric) cylinders between guide frame and intermediate construction; and on the properties of the engaging means which can also have a certain elasticity.
In an embodiment of the invention it is thus possible to provide the device with angle adjusting means configured to move the guide frame between angular positions relative to the intermediate construction with damping. This allows relative movements between the taken-up component and the wind turbine tower to be absorbed and damped.
It is also possible to provide a different embodiment wherein the angle adjusting means are configured to hold the guide frame in a fixed angular position relative to the intermediate construction. In this embodiment the connection between guide frame and intermediate construction is substantially rigid, and possible relative movements between the component temporarily connected to the wind turbine tower via the positioning tool and the wind turbine tower are absorbed by the hoisting cable.
The angle adjusting means can be configured in any manner known to the skilled person. It has practical advantages for the angle adjusting means to comprise in an embodiment at least one spacer arranged between the intermediate construction and the guide frame, which spacer is variable in length and thus varies the angular position between the intermediate construction and the guide frame. A suitable embodiment has at least one spacer in the form of a hydraulic cylinder. It is also possible to provide a spacer in the form of a different spring-back construction, for instance an electric or pneumatic cylinder. A spacer based on a tool other than a hydraulic cylinder is also possible.
As soon as the initial ‘soft’ connection between the device and the wind turbine tower has been formed, the engaging means can engage a peripheral part of the wind turbine tower in order to bring about the connection and to be able to transmit forces to the wind turbine tower. It is advantageous for the engaging means to engage a top part of the wind turbine tower here, wherein a top part generally comprises an upper half of the wind turbine tower, more preferably an upper 40% of the length, still more preferably an upper 30% of the length, still more preferably an upper 20% of the length, and most preferably an upper 10% of the length of the wind turbine tower. The length is here the length of the part of the wind turbine tower extending above the sea surface.
The height of the engagement on the wind turbine tower, and so the distance covered by the engaging means in a longitudinal direction of the wind turbine tower, can be chosen within practical limits. A determined distance can for instance be important if a moment of force must be absorbed. A typical moment of force which can be absorbed and transmitted by the tool lies for instance between 2000 kNm and 5000 kNm when the horizontal force exerted on the wind turbine tower amounts to respectively between 10 t (100 kN) and 20 t (200 kN), and the lifting point (or the hoisting beam) lies respectively 20 m to 25 m higher than the point of engagement on or at the wind turbine tower. A suitable distance covered by the engaging means in a longitudinal direction of the wind turbine tower amounts to for instance 20% of the height of the wind turbine tower, more preferably to 15% of the height, and most preferably to 10% of the height.
In a first embodiment of the engagement the engaging means are configured to engage a peripheral part extending through a peripheral angle≤180° of the periphery of the wind turbine tower. In this embodiment a relatively small offset of the vessel relative to the wind turbine tower can ensure that a substantially horizontally directed force is exerted on the wind turbine tower. Such a dynamic equilibrium of forces can allow the relative movements of the taken-up component relative to the wind turbine tower to be absorbed or compensated for to a certain extent.
In a second embodiment of the engagement engaging means are provided which are configured to engage a peripheral part extending through a peripheral angle>180° of the periphery of the wind turbine tower, and preferably extends over substantially the whole periphery. This provides for a temporary connection between the taken-up component and the wind turbine tower, which can transmit forces in substantially all horizontal directions.
From the moment that the mechanical connection is brought about, the invented device, and particularly the positioning tool thereof, can in embodiments optionally also help align in a rotation direction a component flange relative to a receiving flange to which the component must be coupled. It is also possible with the invented device, and particularly with the positioning tool thereof, to exert according to embodiments a vertical force on a component which has already connected to the wind turbine tower, without already being coupled thereto. Such a vertical force provides damping and can help prevent unacceptable shock loads in the component.
In an embodiment the engaging means themselves are selected from bumpers, rolls, wheels, caterpillar tracks, suction cups and support straps, and combinations thereof. The engaging means are here configured such that they are able to bear the forces acting on the wind turbine tower.
According to the invention, an intermediate construction of the positioning tool provides for the connection to the hoisting cable. The intermediate construction can here form the geometric bridge between the taken-up or suspended component and the guide frame whereby the temporary connection to the wind turbine tower is formed.
It is possible in an embodiment for the intermediate construction to comprise a hoisting frame for the component. The use of a hoisting frame or hoisting yoke is advantageous because it can be adapted to the component to be lifted. The use of a hoisting yoke is particularly advantageous when taking up and lifting wind turbine blades for wind turbines. Rotor blades are generally vulnerable since they must by nature be light and for this reason are preferably manufactured from fibre-reinforced plastic. A hoisting yoke can be adapted to avoid damage to the component to be taken up.
The geometry of the intermediate construction can be chosen such that the guide frame can be positioned in optimal manner relative to the peripheral part of the wind turbine tower to be engaged so as to be able to obtain an optimal force transmission to the tower.
It is possible to apply the device according to the invention without additional auxiliary means. It is however sometimes essential to apply auxiliary devices, particularly a tugger winch with tag line provided on the vessel—which also comprises the hoisting means. Using the tag line a lifted component can be engaged and kept further under control. The tag line is tightened or payed out by means of the available tugger winch.
The device according to the invention is particularly suitable for placing a component of a wind turbine on a wind turbine tower, wherein the component comprises a nacelle, a wind turbine blade and/or a rotor. The intermediate construction of the device in particular will be adaptable for each specific component.
According to another aspect of the invention, a method is for this purpose provided which comprises the steps of:
The component taken up with the hoisting means is preferably brought into the vicinity of a top part of the wind turbine tower.
An embodiment relates to a method wherein the suspension of the intermediate construction from the hoisting cable absorbs a moment of force.
In an embodiment of the method the guide frame can further be pivotally connected on one side to the intermediate construction, and the guide frame can be brought into different angular positions relative to the intermediate construction using angle adjusting means.
In order to be able to bring about the coupling between the taken-up component and the wind turbine tower, wherein the component must eventually be aligned with for instance a connecting flange of the wind turbine tower, an embodiment has the feature that the angle adjusting means move the guide frame between angular positions relative to the intermediate construction with damping.
In another embodiment it is also possible for the angle adjusting means to hold the guide frame in a fixed angular position relative to the intermediate construction. This is particularly important just before the coupling is brought about.
The angle adjusting means can comprise at least one spacer which is arranged between the intermediate construction and the guide frame and which is varied in length and thus varies the angular position between the intermediate construction and the guide frame. In an embodiment a suitable spacer comprises a hydraulic, pneumatic or electric cylinder.
With the engaging means a peripheral part extending through a peripheral angle≤180° of the periphery of the wind turbine tower can be engaged, although in other embodiments of the method the engaging means engage a peripheral part extending through a peripheral angle>180° of the periphery of the wind turbine tower, and preferably extending over substantially the whole periphery.
In some cases the component can be taken up with interposing of a hoisting guide frame. In such cases the hoisting guide frame forms part of the intermediate construction which connects the hoisting cable to the positioning tool.
In an embodiment in which a wind turbine blade is mounted, the wind turbine blade can be mounted on a hub of the wind turbine in a substantially horizontal position. This position is also referred to as a 3 o'clock position.
Another embodiment relates to a method wherein the component comprises a wind turbine blade, and the wind turbine blade is mounted on a hub of the wind turbine at an angle of substantially 0° to the vertical direction. This position is also referred to as a 6 o'clock position.
The invented device enables assembly of offshore wind turbines up to wind speeds of 12 m/s and more, where with the known device the mast and nacelle can be assembled up to wind speeds of 10 m/s, a complete rotor (a hub on which three blades are mounted) up to 9 m/s, a nacelle with hub and two pre-mounted blades (the so-called bunny ear method) up to about 9 m/s and individual wind turbine blades up to 8 m/s.
In the case the device is applied for placing at sea of a wind turbine constructed from components, work preferably takes place from a (floating) vessel, or from a jack-up platform, which provides more stability. The wind turbine tower is then already present at sea.
The invention will now be elucidated in more detail with reference to the accompanying figures, without otherwise being limited thereto. In the figures:
The same or similar components are designated in the figures with the same reference numerals.
Referring to
Device 1 comprises a number of hoisting cables (10a, 10b) whereby nacelle 2 can be taken up. In the shown embodiment the hoisting cables 10a are connected to a hoisting block 11 which in turn is suspended from hoisting cables 12 of the hoisting means (not shown), for instance a lifting crane. A positioning tool (14, 15) is connected to hoisting cables 10a. The positioning tool (13, 14, 15) comprises an intermediate construction, the form of which depends on the component to be placed and which is embodied according to
In the embodiment shown in
Angle adjusting means 16 are configured to move guide frame 14 between angular positions relative to hoisting beam 13 with damping. For this purpose the angle adjusting means 16 comprises two, for instance hydraulic, cylinders (16a, 16b) which are arranged on either side of a transverse beam 16c and which engage on the side arms (14a, 14b) of guide frame 14 and are able to exert thereon a force running in a longitudinal direction 18 of the hydraulic cylinders (16a, 16b). It is also possible to control the hydraulic cylinders (16a, 16b) such that guide frame 14 can be held in a fixed angular position relative to hoisting beam 13. The hydraulic cylinders (16a, 16b) function as spacers arranged between hoisting beam 13 and guide frame 14, which are variable in length and can thus vary the angular position between hoisting beam 13 and guide frame 14.
In both the embodiment shown in
Referring to
As shown in
Such a connection is shown in
Referring to
Referring to
Device 1 is lowered with the crane (not shown) toward wind turbine blade 5 and connected thereto using slings 46. The centre of gravity 50 of wind turbine blade 5 here lies approximately straight under the hoisting block 11, whereby wind turbine blade 5 is oriented in a substantially horizontal position. The engaging means 15 (15b) lie under the wind turbine blade 5.
The wind turbine blade 5 is then taken up by the slings 46 and, as shown in
According to
Referring to
Referring to
Device 1 is lowered with the crane (not shown) toward the wind turbine blade 5 and connected thereto using slings 46. The centre of gravity 50 of wind turbine blade 5 here lies approximately straight under the hoisting block 11, whereby wind turbine blade 5 is initially oriented in a substantially horizontal position.
Referring to
Wind turbine blade 5 is then taken up by slings 46 and, as shown in
According to
According to
Referring to
Referring to
Device 1 is lowered with the crane (not shown) toward the rotor 6 and connected thereto by attaching the hoisting cables (10a, 10b, 10c) to hub 20. This position is shown in
Referring to
Referring to
Number | Date | Country | Kind |
---|---|---|---|
BE2020/5550 | Jul 2020 | BE | national |
This application is the United States national phase of International Patent Application No. PCT/EP2021/070876 filed Jul. 26, 2021, and claims priority to Belgian Patent Application No. BE2020/5550 filed Jul. 27, 2020, the disclosures of which are hereby incorporated by reference in their entireties.
Filing Document | Filing Date | Country | Kind |
---|---|---|---|
PCT/EP2021/070876 | 7/26/2021 | WO |