The present invention relates to a device for controlling an assembled battery provided with a plurality of single batteries.
Regarding an assembled battery provided with a plurality of single batteries, technologies to perform a capacity adjustment of the plurality of single batteries constructing the assembled battery are generally known. For example, Patent document 1 proposes a technology for detecting that the assembled battery is in a state substantially corresponding to an abnormal state when a time interval, during which a capacity adjustment is executed, becomes less than or equal to a predetermined threshold value.
However, in the above-mentioned prior art, in order to detect such an abnormal state of the assembled battery, the time interval, during which the capacity adjustment is executed, has to become less than or equal to the predetermined threshold value. This leads to the problem of a long time needed to detect that the assembled battery is in a state substantially corresponding to an abnormal state. Also, this leads to another problem that it is possible to detect the assembled battery being in a state substantially corresponding to an abnormal state, but it is impossible to predict time when the assembled battery becomes an abnormal state.
A task to be solved by the invention is to appropriately predict time when an assembled battery provided with a plurality of single batteries becomes an abnormal state.
By the invention, the aforementioned task is solved by predicting time when an assembled battery becomes an abnormal state, based on a time-dependent change in voltage-difference data detected in a voltage region different from a targeted voltage, needed to equalize voltages of a plurality of single batteries constructing the assembled battery, by a predetermined voltage or more, or based on a time-dependent change in SOC-difference data detected in a SOC region corresponding to the voltage region.
According to the invention, it is possible to more precisely grasp the tendency of a change in voltage difference or a change in SOC difference, and whereby it is possible to appropriately predict time when the assembled battery becomes an abnormal state.
The embodiments according to the invention are hereinafter explained by reference to the drawings.
As shown in
Assembled battery 10 is constructed by connecting single batteries C1, C2, . . . , CN, whose number N is an integer, in series. An alkaline storage battery such as a nickel-hydrogen battery cell or an organic electrolyte secondary battery such as a lithium-ion battery cell can be used as each single battery C1, C2, . . . , CN. In the shown embodiment, a lithium-ion battery cell is used or exemplified as each of the single batteries C1, C2, . . . , CN. As each of the single batteries C1, C2, . . . , CN, a plurality of battery cells, which are connected in parallel and regarded as a single battery, and whose measurable terminal voltage becomes the same, may be included. By the way, the number N of the single batteries is not limited. As necessary, the number of the single batteries can be set suitably. The assembled battery 100 is also equipped with a temperature sensor 102 for measuring a temperature of the single batteries C1, C2, . . . , CN. A battery temperature, measured by the temperature sensor 102, is sent to the battery controller 500.
Capacity adjustment circuits 400 are parallel-connected with the respective single batteries C1, C2, . . . , CN, constructing the assembled battery 100. Each of the capacity adjustment circuits 400 is comprised of an electric resistance 401 and a switch 402, and configured to enable the single-battery capacity adjustment by performing the capacity-adjustment discharge for the single battery by closing the associated switch 402. Opening/closing action of each of the switches 402 is controlled by the battery controller 500.
Load 200 is a motor and an inverter, which are mounted on a hybrid vehicle, an electric vehicle or the like. For instance, when executing regenerative control, the assembled battery 100 can be charged by inverse transformation to electric energy via the motor and the inverter. Also, the assembled battery 100 can be charged by connecting it to an external power source (not shown).
Voltage detection section 501 measures a terminal voltage of each of the single batteries C1, C2, . . . , CN, constructing the assembled battery 100, in time-series periodically at predetermined time intervals, via a plurality of terminal lines connected to the respective single batteries, and converts the measured terminal voltage of each of the single batteries from an analogue signal to a digital signal, and sends the converted signal to the control section 505. For instance, a method for measuring the terminal voltage of each of the single batteries includes a flying-capacitor method.
Current detection section 502 acquires a charge/discharge current, measured by a current sensor 300 periodically at predetermined time intervals, and converts the acquired charge/discharge current from an analogue signal to a digital signal, and sends the converted signal to the control section 505. For instance, the current sensor 300 can be constructed by a resistive element, a current transformer, or the like.
Battery temperature detection section 503 acquires the temperature of each single battery C1, C2, . . . , CN, measured by the temperature sensor 102 installed on the assembled battery 100 periodically at predetermined time intervals, and converts the acquired temperature of each of the single batteries C1, C2, . . . , CN from an analogue signal to a digital signal, and sends the converted signal to the control section 505.
Capacity adjustment section 504 controls, responsively to a capacity-adjustment command from the control section 505, opening/closing action of each of the switches 402 disposed in the respective capacity adjustment circuits 400 when a terminal voltage difference among the single batteries C1, C2, . . . , CN becomes greater than or equal to a predetermined value, thereby performing the capacity adjustment of the assembled battery 100.
Control section 505 carries out a control by which the capacity adjustment is performed by means of the capacity adjustment section 504, on the basis of the data indicating the terminal voltage of each of the single batteries, the charge/discharge current, and the battery temperature, respectively received from the voltage detection section 501, the current detection section 502, and the battery temperature detection section 503. Concretely, the control section 505 sets, first of all, a targeted equalization voltage Vtar, needed to equalize voltages of the single batteries C1, C2, . . . , CN, constructing the assembled battery 100. By the way, the targeted equalization voltage Vtar is not limited. The targeted equalization voltage can be arbitrarily set. For instance, a given voltage, substantially corresponding to the assembled battery 100 fully charged, can be set as the targeted equalization voltage Vtar. In lieu thereof, a predefined voltage, such as a full-charge voltage or a given voltage near the full-charge voltage, may be preset as the targeted equalization voltage Vtar. The targeted equalization voltage Vtar, set as discussed above, is stored in a memory (not shown) incorporated in the battery controller 500. Thereafter, the control section 505 finds a maximum voltage value and a minimum voltage value from the terminal voltages of the single batteries C1, C2, . . . , CN, and then calculates a voltage difference between the maximum voltage value and the minimum voltage value. When a predetermined amount of voltage difference has occurred, the control section generates a capacity-adjustment command for executing a control such that voltages of the single batteries C1, C2, . . . , CN, constructing the assembled battery 100, are equalized at the targeted equalization voltage Vtar by means of the capacity adjustment section 504. The control section sends the generated capacity-adjustment command to the capacity adjustment section 504.
Then, the capacity adjustment section 504 performs a capacity adjustment responsively to the capacity-adjustment command. Concretely, the capacity adjustment section 504 performs the capacity adjustment by controlling, responsively to the capacity-adjustment command, opening/closing action of each of the switches 402 and by executing a control such that voltages of the single batteries C1, C2, . . . , CN are equalized at the targeted equalization voltage Vtar. In lieu thereof, the capacity adjustment section 504 may perform a capacity adjustment so that voltages of the single batteries C1, C2, . . . , CN are adjusted to respective given voltages by controlling, responsively to the capacity-adjustment command, opening/closing action of each of the switches 402, and thereafter execute a control such that voltages of the single batteries C1, C2, . . . , CN are equalized at the targeted equalization voltage Vtar by repeated executions of charging/discharging actions in the assembled battery 100.
Control section 505 is also configured to send the data indicating the terminal voltage of each of the single batteries, the charge/discharge current, and the battery temperature, respectively received from the voltage detection section 501, the current detection section 502, and the battery temperature detection section 503 to both the abnormality determination section 506 and the prediction section 507.
Abnormality determination section 506 determines whether the assembled battery 100 is in an abnormal state (i.e., a state where use restrictions are required), using the data indicating the terminal voltage of each of the single batteries, the charge/discharge current, and the battery temperature, and sent from the control section 505. In the embodiment, a method for determining whether the assembled battery is in an abnormal state is not limited. A well-known method can be used. For instance, absolute values of electric currents charged/discharged in the assembled battery 100 before a given time has expired are integrated or summed, and then the summed value (the total charging/discharging capacity) is acquired as an abnormality criterion value. It is possible to determine an abnormality by determining whether the acquired abnormality criterion value is greater than or equal to a predetermined threshold value.
Prediction section 507 executes abnormality-time prediction processing for predicting, on the basis of the data indicating the terminal voltage of each of the single batteries, the charge/discharge current, and the battery temperature, and sent from the control section 505, time when the assembled battery 100 becomes an abnormal state. Concretely, the prediction section 507 detects the highest voltage Vmax of the single battery whose terminal voltage becomes the maximum value of the terminal voltages of the single batteries C1, C2, . . . , CN and the lowest voltage Vmin of the single battery whose terminal voltage becomes the minimum value of the terminal voltages of the single batteries. The prediction section calculates a voltage difference ΔV between the highest voltage and the lowest voltage, and executes the abnormality-time prediction processing for predicting time when the assembled battery 100 becomes an abnormal state, using the calculated voltage difference ΔV, and then sends the obtained prediction result to the communication section 509. Details of the abnormality-time prediction processing of the embodiment are described later. In the embodiment, in predicting time when the assembled battery 100 becomes an abnormal state, for instance, a point of time of the occurrence of a state where use restrictions are required due to a battery capacity fall in one battery, or two or more batteries of the single batteries constructing the assembled battery 100 is utilized as the time when the abnormal state occurs.
Voltage-difference data storage section 508 allows voltage-difference ΔV data, calculated by the prediction section 507, to be stored in the memory (not shown) incorporated in the battery controller 500.
Referring now to
On the other hand, in the embodiment, as shown in
In the embodiment, when storing voltage-difference ΔV data, calculated by the prediction section 507, in the memory incorporated in the battery controller 500, the voltage-difference data storage section 508 determines, by reference to the SOC-section table illustrating the specified relationship shown in
Communication section 509 sends the prediction result of the time when the assembled battery 100 becomes an abnormal state, which result has been obtained by the abnormality-time prediction processing executed within the prediction section 507, to a wireless communication terminal such as a cellular phone that the user has, or an on-vehicle equipment installed on the vehicle, for informing the user about the prediction result via the wireless communication terminal or the on-vehicle equipment.
Then, the abnormality-time prediction processing of the embodiment, executed within the prediction section 507 of the battery controller 500, is described in detail.
First, at step S1, data acquisition for the terminal voltage of each of the single batteries C1, C2, . . . , CN, and the battery temperature is executed.
Then, at step S2, the targeted equalization voltage Vtar, set by the control section 505, is compared to the terminal voltage of each of the single batteries C1, C2, . . . , CN, so as to determine whether the difference between the targeted equalization voltage Vtar and the terminal voltage of each of the single batteries C1, C2, . . . , CN is greater than or equal to a predetermined voltage V1. When the difference between them is greater than or equal to the predetermined voltage V1, the routine proceeds to step S3. Conversely when the difference between them is less than the predetermined voltage V11 the current processing terminates and thus the routine returns again to step S1. By the way, in the embodiment, in determining about whether the difference between the targeted equalization voltage Vtar and the terminal voltage of each of the single batteries C1, C2, . . . , CN is greater than or equal to the predetermined voltage V1, an affirmative determination that the difference between them is greater than or equal to the predetermined voltage V1 can be made when the terminal voltages of all of the single batteries C1, C2, . . . , CN differ from the targeted equalization voltage Vtar by the predetermined voltage V1 or more. However, such a determination is not limited to such a condition. For instance, when the terminal voltage of each of the single batteries more than a predetermined number, among the single batteries C1, C2, . . . , CN, differs from the targeted equalization voltage Vtar by the predetermined voltage V1 or more, such a determination that the difference between them is greater than or equal to the predetermined voltage V1 may be made. Also, the predetermined voltage V1 is not limited. The predetermined voltage may be set to an arbitrary voltage at which it can be determined that the targeted equalization voltage Vtar and the terminal voltage of each of the single batteries C1, C2, . . . , CN substantially differ from each other. For instance, the predetermined voltage can be set to a voltage value within a voltage range from 1 millivolt to dozens of millivolts.
Then, at step S3, the voltage difference ΔV, corresponding to a finite difference among the terminal voltages of the single batteries C1, C2, . . . , CN, is calculated. Concretely, on the basis of the terminal voltage of each of the single batteries C1, C2, . . . , CN, acquired at step S1, detection processing is carried out for detecting both the highest voltage Vmax of the single battery whose terminal voltage becomes the maximum value and the lowest voltage Vmin of the single battery whose terminal voltage becomes the minimum value. Thereafter, the voltage difference ΔV is calculated by arithmetically calculating the difference between the highest voltage Vmax and the lowest voltage Vmin. Then, the calculated voltage-difference ΔV data is sent to the voltage-difference data storage section 508.
Then, at step S4, the voltage-difference data storage section 508 of the battery controller 500 determines a SOC section Ssec, to which a SOC region, corresponding to the terminal voltage of each of the single batteries C1, C2, . . . , CN when arithmetic calculation for the voltage-difference ΔV data has been executed, belongs, from the voltage-difference ΔV data calculated at step S3 by reference to the SOC-section table illustrating the specified relationship shown in
Then, at step S5, the voltage-difference ΔV data, stored in the memory and calculated by the arithmetic processing executed before the previous execution cycle, is read out. By the way, in the embodiment, when reading out the voltage-difference ΔV data calculated by the arithmetic processing executed before the previous execution cycle, only the voltage-difference ΔV data belonging to the same SOC section Ssec, which SOC section is determined at step S4, as the voltage difference ΔV calculated by the current arithmetic processing, is read out.
Then, at step S6, by performing linear regression of the correlation of the voltage-difference ΔV data calculated by the arithmetic processing executed before the previous execution cycle and belonging to the same SOC section Ssec as the voltage difference ΔV calculated by the current arithmetic processing, and the voltage-difference ΔV data calculated by the current arithmetic processing, with the measurement times of these data, a regression line is obtained.
Then, at step S7, a correlation coefficient R2 of the regression line, obtained at step S6, is calculated. On the basis of the calculated correlation coefficient R2, the reliability of the regression line, obtained at step S6, is evaluated. When the correlation coefficient R2 of the regression line is greater than or equal to a predetermined threshold value and thus it is determined that the reliability is enough, the routine proceeds to step S8. Conversely when the correlation coefficient R2 of the regression line is less than the predetermined threshold value, the routine proceeds to step S10. By the way, the aforementioned predetermined threshold value can be set or determined depending on whether or not the reliability of the regression line is enough.
When it is determined that the reliability of the regression line, obtained at step S6, is enough, the routine proceeds to step S8. At step S8, an error flag is set to “0”, and then the routine proceeds to step S9. At step S9, on the basis of the regression line obtained at step S5, processing for predicting time when the assembled battery 100 becomes an abnormal state is executed. Concretely, extrapolation processing for the regression line, obtained at step S6, is executed. Time when the voltage difference ΔV becomes greater than or equal to a predetermined threshold value ΔV, is calculated from the extrapolated regression line. The calculated time is set as the time when the assembled battery 100 becomes an abnormal state. By the way, in the embodiment, the aforementioned predetermined threshold value ΔVα can be set to an arbitrary value at which it can be determined that the assembled battery 100 becomes an abnormal state (for example, a state where use restrictions are required due to a battery capacity fall in one or two or more batteries of the single batteries constructing the assembled battery 100).
Information about the time when the assembled battery 100 becomes an abnormal state, which time is predicted or obtained in this way, is sent from the prediction section 507 to the communication section 510. Then, the information is sent via the communication section 510 to the wireless communication terminal such as a cellular phone that the user has, or the on-vehicle equipment installed on the vehicle, for supplying the information about the time when the assembled battery 100 becomes an abnormal state via the wireless communication terminal or the on-vehicle equipment to the user. In this manner, by supplying the information about the time when the assembled battery 100 becomes an abnormal state to the user, the exchange of some single batteries of the single batteries constructing the assembled battery 100 can be promoted, thereby enabling the longer but safe use of the assembled battery 100 by the user.
The error flag is a flag for determining whether the voltage-difference ΔV data that an error probability P (described later) has become greater than or equal to a predetermined threshold value has occurred. In the embodiment, the error flag is set every SOC sections Ssec. That is, in the embodiment, the error flags can be set depending on the number of the SOC sections Ssec.
Conversely when step S7 determines that the correlation coefficient R2 of the regression line, obtained at step S6, is the predetermined threshold value and thus the reliability is low, the routine proceeds to step S10. At step S10, an error probability P of the voltage-difference ΔV data calculated by the current arithmetic processing is calculated. The error probability P is actually calculated by calculating an average value AVE(ΔV) and a standard deviation STDV(ΔV) of the voltage-difference ΔV data calculated by the arithmetic processing executed before the previous execution cycle and belonging to the same SOC section Ssec as the voltage difference ΔV calculated by the current arithmetic processing, and the voltage-difference ΔV data calculated by the current arithmetic processing, and by calculating the difference {ΔV−AVE(ΔV)} between the voltage difference ΔV calculated by the current arithmetic processing and the average value AVE(ΔV), and by calculating a probability density from the difference {ΔV−AVE(ΔV)} and the standard deviation STDV(ΔV).
At step S11, a check is made to determine whether the error probability P of the voltage-difference ΔV data calculated by the current arithmetic processing is greater than or equal to the predetermined threshold value. When the error probability P is greater than or equal to the predetermined threshold value, the routine proceeds to step S12. Conversely when the error probability P is less than the predetermined threshold value, the current processing terminates and thus the routine returns again to step S1.
By the way, the predetermined threshold value used in step S11 is set to an arbitrary value at which it can be determined that the voltage-difference ΔV data calculated by the current arithmetic processing clearly deviates from a distribution of the voltage-difference data ΔV calculated by the arithmetic processing executed before the previous execution cycle.
At step S12, a check is made to determine whether the error flag is set to a value greater than or equal to “1”. In the shown embodiment, in the case that the error probability P has been calculated by the previous arithmetic processing (see step S10) and it has been determined that the error probability P becomes greater than or equal to the predetermined threshold value (see step S11), the error flag is set to “1” at step S18 (described later). When the error flag is set to a value greater than or equal to “1”, the routine proceeds to step S13. Conversely when the error flag is not set to a value greater than or equal to “1”, that is, the error flag is “0”, the routine proceeds to step S18. At step S18, the error flag is set to “1”. Then, the current processing terminates and thus the routine returns again to step S1.
When the error flag is set to a value greater than or equal to “1”, the routine proceeds to step S13, at which a check is made to determine whether the error flag is set to “2”. In the shown embodiment, in the case that the error probability P has been calculated (see step S10) under such a state where the error flag has been set to “1” at the previously-discussed step S18 at the previous arithmetic processing, and it has been determined that the error probability P becomes greater than or equal to the predetermined threshold value (see step S11), the error flag is set to “2” at step S19 (described later). When the error flag is set to “2”, the routine proceeds to step S14. Conversely when the error flag is not set to “2”, that is, the error flag is “1”, the routine proceeds to step S19, at which the error flag is set to “2”. Then, the current processing terminates without predicting time when the assembled battery 100 becomes an abnormal state, and thus the routine returns again to step S1.
That is, in the embodiment, when it has been determined that, regarding the voltage-difference ΔV data belonging to the same SOC section Ssec, their error probabilities P become greater than or equal to the predetermined threshold value consecutively three times, the routine proceeds to step S14.
At step S14, a regression line showing the correlation of the voltage difference ΔV data with their measurement times is calculated in the same manner as the previously-discussed step S6, using the consecutive data for three points from the initial voltage-difference ΔV data which have been acquired consecutively three or more times.
At step S15, in the same manner as the previously-discussed step S7, a correlation coefficient R2 of the regression line, obtained at step S14, is calculated. On the basis of the calculated correlation coefficient R2, the reliability of the regression line, obtained at step S14, is evaluated. When the correlation coefficient R2 of the regression line is greater than or equal to the predetermined threshold value and thus it is determined that the reliability is enough, the routine proceeds to step S16. Conversely when the correlation coefficient R2 of the regression line is less than the predetermined threshold value, the current processing terminates and thus the routine returns again to step S1.
When it is determined that the reliability of the regression line, obtained at step S14, is enough, the routine proceeds to step S16. At step S16, the error flag is set to “0”, and then the routine proceeds to step S17. At step S17, in the same manner as the previously-discussed step S9, on the basis of the regression line obtained at step S14, processing for predicting time when the assembled battery 100 becomes an abnormal state is executed. Concretely, extrapolation processing for the regression line, obtained at step S14, is executed. Time when the voltage difference ΔV becomes greater than or equal to the predetermined threshold value ΔVα is calculated from the extrapolated regression line. The calculated time is set as the time when the assembled battery 100 becomes an abnormal state. Information about the time when the assembled battery 100 becomes an abnormal state, which time is predicted or obtained in this way, is sent from the prediction section 507 to the communication section 510. Then, the information is sent via the communication section 510 to the wireless communication terminal such as a cellular phone that the user has, or the on-vehicle equipment installed on the vehicle, for supplying the information about the time when the assembled battery 100 becomes an abnormal state via the wireless communication terminal or the on-vehicle equipment to the user.
By the way, in the case that the previously-discussed processing of steps S14-S17 (hereinafter referred to as “error processing”) has been executed, when, at the previously-discussed step S5 in the arithmetic processing after the next execution cycle, reading out the selected voltage-difference ΔV data of the voltage-difference ΔV data calculated by the arithmetic processing executed before the previous execution cycle, belonging to the same SOC section Ssec, while correlating with the measurement time, the voltage-difference ΔV data used by the error processing are read out. Processing for predicting time when the assembled battery 100 becomes an abnormal state is executed, using the read-out data. By the way, in the embodiment, the error flag is set every SOC sections Ssec, and the previously-discussed error processing is executed every SOC sections Ssec. Thus, in the embodiment, regarding each of the SOC sections Ssec that the error processing has been executed, the voltage-difference ΔV data used for the error processing are read out. On the other hand, regarding each of the SOC sections Ssec that the error processing has not yet been executed, the voltage-difference ΔV data calculated by the arithmetic processing executed before the previous execution cycle is read out as usual without reading out the voltage-difference ΔV data used for the error processing.
Also, in the case that the previously-discussed step S15 determines that the correlation coefficient R2 of the regression line is less than the predetermined threshold value, when, in the processing after the next execution cycle, the error probability P is further calculated (see step S10) and then it is determined that the calculated error probability P is greater than or equal to the predetermined threshold value (see step S11), by performing linear regression of the correlation of the consecutive voltage-difference ΔV data for four points (or five points or more) in total, whose error probabilities P become greater than or equal to the predetermined threshold value, measurement times, in the same manner as previously, the regression line is obtained and then the previously-discussed processing of steps S14-S17 is executed. At this time, assuming that, in the processing after the next execution cycle, a state where arithmetic for the error probability P is executed (see step S10) and it is determined that the calculated error probability P is greater than or equal to the predetermined threshold value (see step S11), continues, the previously-discussed processing of steps S14-S17 is repeatedly executed, until such time that step S15 has determined that the correlation coefficient R2 of the regression line becomes greater than or equal to the predetermined threshold value.
In the embodiment, when voltages of single batteries C1, C2, . . . , CN exist in a voltage region different from a targeted equalization voltage Vtar, needed to equalize the voltages of the single batteries C1, C2, . . . , CN, a voltage difference ΔV among the single batteries C1, C2, . . . , CN is calculated. Additionally, in the embodiment, by finding a time-dependent change in the calculated voltage difference ΔV, the tendency of a change in voltage difference ΔV can be grasped. Thus, according to the embodiment, it is possible to precisely grasp the tendency of a change in voltage difference ΔV. Hence, it is possible to appropriately predict time when the assembled battery 100 becomes an abnormal state (for example, a state where use restrictions are required due to a battery capacity fall in one or two or more batteries of the single batteries constructing the assembled battery 100). In particular, according to the embodiment, when the voltages of the single batteries C1, C2, . . . , CN exist in the voltage region different from the targeted equalization voltage Vtar by a predetermined voltage V1 or more, the voltage difference ΔV is calculated. By executing processing for predicting time when the assembled battery 100 becomes an abnormal state, using the calculated data, it is possible to greatly reconcile the capacity adjustment and prediction for an abnormal state of the assembled battery 100. That is, according to the embodiment, it is possible to execute processing for predicting time when the assembled battery 100 becomes an abnormal state without being affected by the capacity adjustment, while appropriately executing the capacity adjustment.
Also, in the embodiment, by reference to the SOC-section table illustrating the specified relationship shown in
Furthermore, according to the embodiment, as shown in
Additionally, according to the embodiment, in predicting time when the assembled battery 100 becomes an abnormal state, on the basis of a regression line, obtained by performing linear regression of the correlation of voltage-difference ΔV data with voltage-difference ΔV measurement times, the time when the voltage difference ΔV becomes greater than or equal to the predetermined threshold value ΔVα, is predicted as the time when the assembled battery 100 becomes an abnormal state. Hence, it is possible to comparatively simply but precisely predict time when the assembled battery 100 becomes an abnormal state. In particular, according to the embodiment, when the correlation coefficient R2 of the regression line is greater than or equal to the predetermined threshold value and thus the reliability of the regression line is assured enough, processing for predicting time when the assembled battery 100 becomes an abnormal state is executed. Hence, it is possible to enhance the reliability of the prediction processing.
Also, according to the embodiment, in the case that the voltage difference ΔV is sharply increasing and hence the correlation coefficient R2 of the regression line becomes low, the consecutive voltage-difference data for three points or more, whose error probabilities P become greater than or equal to the predetermined threshold value, are acquired and then another regression line is newly calculated. Processing for predicting time when the assembled battery 100 becomes an abnormal state is executed by the use of the newly calculated regression line. Thus, it is possible to more appropriately predict time when the assembled battery 100 becomes an abnormal state.
In the exemplified system configuration of the previously-described embodiment, voltage differences ΔV, calculated at all SOC sections Ssec of the SOC sections Ssec shown in
In this case, from a viewpoint that the previously-discussed effects can be more greatly enhanced, it is preferable to predict time when the assembled battery 100 becomes an abnormal state, using only the voltage differences ΔV obtained in the SOC section Ssec, corresponding to the SOC region in which the ratio of the terminal-voltage change to the SOC change of the battery is greater than or equal to the predetermined ratio, and different from the SOC section Ssec belonging to the targeted equalization voltage Vtar.
Furthermore, when the SOC section Ssec, to which the targeted equalization voltage Vtar belongs, exists in a SOC region near the full charge SFULL, it is preferable to use only the voltage differences ΔV, obtained in the SOC section Ssec existing in a SOC region near the discharge lower limit SL
Next, the second embodiment of the invention is hereunder described.
The second embodiment is similar to the first embodiment except that, in the assembled battery system shown in
The abnormality-time prediction processing of the second embodiment is hereinafter described.
First, at step S101, in the same manner as the previously-discussed step S1 of the first embodiment, data acquisition for the terminal voltage of each of the single batteries C1, C2, . . . , CN, and the battery temperature is executed.
Then, at step S102, in the same manner as the previously-discussed step S1 of the first embodiment, a check is made to determine whether the difference between the targeted equalization voltage Vtar set by the control section 505 and the terminal voltage of each of the single batteries C1, C2, . . . , CN is greater than or equal to the predetermined voltage V1. When the difference between them is greater than or equal to the predetermined voltage V1, the routine proceeds to step S103. Conversely when the difference between them is less than the predetermined voltage V1, the current processing terminates and thus the routine returns again to step S101.
Then, at step S103, the voltage difference, corresponding to a finite difference among the terminal voltages of the single batteries C1, C2, . . . , CN, is normalized with respect to a prescribed SOC, so as to execute normalized voltage-difference calculation processing. Hereupon, as shown in
By the way, the prescribed SOCα is not limited but set to an arbitrary state of charge. In the shown embodiment, the prescribed SOCα is set to a given SOC in SOC regions, in which a ratio of a terminal-voltage change with respect to a SOC change is large, concretely, in a SOC region near the full charge SFULL or in a SOC region near the discharge lower limit SL
Additionally, the prescribed SOCα can be set to a given SOC in a SOC region near the discharge lower limit SL
A calculation processing method for the normalized voltage difference among the single batteries C1, C2, . . . , CN is hereinafter described by reference to the flowchart shown in
First, at step S201 shown in
At step S202, calculation processing is carried out for calculating, from the highest voltage Vmax and the lowest voltage Vmin both detected at step S201 and the battery temperature acquired at step S101, a SOC (hereinafter referred to as “SOCmax”) of the single battery having the highest voltage Vmax and a SOC (hereinafter referred to as “SOCmin”) of the single battery having the lowest voltage Vmin, on the basis of the table of
At step S203, a capacity difference ΔAh between the single battery having the highest voltage Vmax and the single battery having the lowest voltage Vmin is calculated based on the SOCmax and the SOCmin both calculated at step S202. For instance, the capacity difference ΔAh can be calculated by multiplying a battery capacity (a rated capacity or an actual capacity) of each of the single batteries M1, M2, . . . , MN constructing the assembled battery 100 with the difference between the SOCmax and the SOCmin both calculated at step S202.
At step S204, a normalized capacity difference ΔAhnor, corresponding to the difference capacity between the SOC of the single battery having the lowest voltage Vmin and the prescribed SOCα, is calculated from the SOC of the single battery having the lowest voltage Vmin and the prescribed SOCα, on the basis of the table of
At step S205, on the basis of the SOC of the single battery having the highest voltage Vmax and the table of
At step S206, a normalized voltage difference ΔVnor is calculated based on the normalized lowest voltage Vmin
In this manner, calculation processing for the normalized voltage difference ΔVnor among the single batteries C1, C2, . . . , CN is executed. The normalized voltage difference ΔVnor, calculated as discussed above, is a normalized value that the voltage difference, corresponding to the capacity difference ΔAh between the single battery having the highest voltage Vmax and the single battery having the lowest voltage Vmin, is normalized with respect to the prescribed SOCα. Hence, the normalized voltage difference enables comparison between data measured in different SOC regions.
Returning again to
At step S105, the normalized voltage-difference ΔVnor data, stored in the voltage-difference data storage section 508 and calculated by the arithmetic processing executed before the previous execution cycle (arithmetic processing until now) is read out, while correlating with the measurement time.
At step S106, in the same manner as the previously-discussed step S6 of the first embodiment, by performing linear regression of the correlation of the normalized voltage-difference ΔVnor data calculated by the arithmetic processing executed before the previous execution cycle, and the normalized voltage-difference ΔVnor data calculated by the arithmetic processing executed by the current arithmetic processing, with the measurement times of these data, a regression line is obtained.
Then, at step S107, in the same manner as the previously-discussed step S7 of the first embodiment, a check is made to determine whether a correlation coefficient R2 of the regression line is greater than or equal to the predetermined threshold value. When the correlation coefficient R2 is greater than or equal to the predetermined threshold value, the routine proceeds to step S108 and thus an error flag is set to “0”. Then, at step S109, in the same manner as the previously-discussed step S9 of the first embodiment, processing for predicting time when the assembled battery 100 becomes an abnormal state is performed by calculating time when the normalized voltage difference ΔVnor becomes greater than or equal to the predetermined threshold value ΔVα.
Conversely when step S107 determines that the correlation coefficient R2 of the regression line is less than the predetermined threshold value, processing of steps S110-S119 shown in
The second embodiment has the following merits in addition to the merits of the first embodiment.
That is, in the second embodiment, when calculating a voltage difference among the single batteries C1, C2, . . . , CN, a normalized voltage difference ΔVnor that the SOC of each of the single batteries is normalized with respect to the prescribed SOCα, is calculated. Time when the assembled battery 100 becomes an abnormal state is predicted by the use of the normalized voltage difference ΔVnor. Hence, according to the second embodiment, it is possible to more greatly enhance the data compatibility between the voltage-difference data detected or measured in different SOC conditions, and whereby it is possible to compare the voltage-difference data with a high accuracy and thus it is possible to more precisely find a time-dependent change in voltage difference among the single batteries.
Next, the third embodiment of the invention is hereunder described.
The third embodiment is similar to the first embodiment except that, in the assembled battery system shown in
The abnormality-time prediction processing of the third embodiment is hereinafter described.
First, at step S301, in the same manner as the previously-discussed step S1 of the first embodiment, data acquisition for the terminal voltage of each of the single batteries C1, C2, . . . , CN, and the battery temperature is executed.
Then, at step S302, in the same manner as the previously-discussed step S1 of the first embodiment, a check is made to determine whether the difference between the targeted equalization voltage Vtar set by the control section 505 and the terminal voltage of each of the single batteries C1, C2, . . . , CN is greater than or equal to the predetermined voltage V1. When the difference between them is greater than or equal to the predetermined voltage V1, the routine proceeds to step S303. Conversely when the difference between them is less than the predetermined voltage V1, the current processing terminates and thus the routine returns again to step S301.
At step S303, a check is made to determine, based on the terminal voltage of each of the single batteries C1, C2, . . . , CN, whether the SOC of each of the single batteries C1, C2, . . . , CN is within a predetermined SOC region Sr. When the SOC of each of the single batteries is within the predetermined SOC region Sr, the routine proceeds to step S305. Conversely when the SOC of each of the single batteries is outside of the predetermined SOC region Sr, the current processing terminates and thus the routine returns again to step S301. By the way, the predetermined SOC region Sr is not limited. In the shown embodiment, the predetermined SOC region Sr is set to a given SOC range in SOC regions, in which a ratio of a terminal-voltage change with respect to a SOC change is large, concretely, in a SOC region near the full charge SFULL or in a SOC region near the discharge lower limit SL
Then, at step S304, in the same manner as the previously-discussed step S3, the voltage difference ΔV, corresponding to a finite difference among the terminal voltages of the single batteries C1, C2, . . . , CN, is calculated.
Then, at step S305, the voltage-difference data storage section 508 of the battery controller 500 executes processing for storing the voltage-difference ΔV data, calculated at step S304, in the voltage-difference data storage section 508. At this time, the voltage-difference ΔV data, together with the measurement-time data for the terminal voltage of each of the single batteries C1, C2, . . . , CN, used for arithmetic calculation for the voltage difference ΔV, is stored in the memory incorporated in the battery controller 500. In the third embodiment, the voltage-difference data storage section 508 is configured to store the voltage-difference ΔV data in the memory incorporated in the battery controller 500, without executing correlation processing as executed in the first embodiment for correlating with the SOC section Ssec.
At step S306, the voltage-difference ΔV data, stored in the voltage-difference data storage section 508 and calculated by the arithmetic processing executed before the previous execution cycle (arithmetic processing until now) is read out, while correlating with the measurement time.
At step S307, in the same manner as the previously-discussed step S6 of the first embodiment, by performing linear regression of the correlation of the voltage-difference ΔV data calculated by the arithmetic processing executed before the previous execution cycle, and the voltage-difference ΔV data calculated by the arithmetic processing executed by the current arithmetic processing, with the measurement times of these data, a regression line is obtained.
Then, at step S308, in the same manner as the previously-discussed step S7 of the first embodiment, a check is made to determine whether a correlation coefficient R2 of the regression line is greater than or equal to the predetermined threshold value. When the correlation coefficient R2 is greater than or equal to the predetermined threshold value, the routine proceeds to step S309 and thus an error flag is set to “0”. Then, at step S310, in the same manner as the previously-discussed step S9 of the first embodiment, processing for predicting time when the assembled battery 100 becomes an abnormal state is performed by calculating time when the voltage difference ΔV becomes greater than or equal to the predetermined threshold value ΔVα.
Conversely when step S308 determines that the correlation coefficient R2 of the regression line is less than the predetermined threshold value, the processing of steps S110-S119 shown in
The third embodiment has the following merits in addition to the merits of the first embodiment.
That is, in the third embodiment, when the SOC of each of single batteries is within the predetermined SOC region Sr, the voltage difference ΔV is calculated. Processing for predicting time when the assembled battery 100 becomes an abnormal state is executed by the use of the calculated voltage difference ΔV. Hence, it is possible to execute processing for predicting time when the assembled battery 100 becomes an abnormal state with a high accuracy, while ensuring a reduction in the number of data stored in the memory and a reduction of the operation load.
By the way, in the third embodiment, when the targeted equalization voltage Vtar exists in a SOC region near the full charge SFULL, the predetermined SOC region Sr is set to a SOC region near the discharge lower limit SL
Next, the fourth embodiment of the invention is hereunder described.
The fourth embodiment is similar to the first embodiment except that, in the assembled battery system shown in
The abnormality-time prediction processing of the fourth embodiment is hereinafter described.
In the fourth embodiment, as shown in
Conversely when the difference between the targeted equalization voltage Vtar and the terminal voltage of each of the single batteries C1, C2, . . . , CN is less than the predetermined voltage V1, on the one hand, it can be determined that each of the single batteries C1, C2, . . . , CN becomes in a state where the terminal voltages of the single batteries have already been equalized at the targeted equalization voltage Vtar (or in a state where there is a less charging/discharging action for each of the single batteries after having been equalized). Hence, in this case, it can be usually considered that the terminal voltages of the single batteries C1, C2, . . . , CN become equalized. However, on the other hand, in the event that a micro shirt-circuit occurs in the single batteries, constructing the assembled battery 100, it is assumed that the terminal voltage of the single battery, which has been micro-short-circuited, becomes low, as compared to the other single batteries. For this reason, in the fourth embodiment, when the difference between the targeted equalization voltage Vtar and the terminal voltage of each of the single batteries C1, C2, . . . , CN is less than the predetermined voltage V1, the micro-short-circuit abnormality detection processing (described later) is executed for predicting time when the degree of a micro short-circuit becomes large and as a result the assembled battery becomes an abnormal state.
The micro-shirt-circuit abnormality detection processing for predicting, by virtue of detection of a micro short-circuit, time when the assembled battery becomes an abnormal state, is hereinafter described.
First, at step S401 of
Then, at step S402, the voltage-difference data storage section 508 of the battery controller 500 executes processing for storing the micro-short-circuit detection voltage-difference ΔVs data, calculated at step S402, in the voltage-difference data storage section 508. At this time, the micro-short-circuit detection voltage-difference ΔVs data, together with the measurement-time data for the terminal voltage of each of the single batteries C1, C2, . . . , CN, used for arithmetic calculation for the micro-short-circuit detection voltage difference ΔVs is stored in the memory incorporated in the battery controller 500. In the micro-short-circuit abnormality detection processing, the micro-short-circuit detection voltage-difference ΔVs data is stored in the memory incorporated in the battery controller 500, without executing correlation processing for correlating with the SOC section Ssec.
At step S403, the micro-short-circuit detection voltage-difference ΔVs data, stored in the voltage-difference data storage section 508 and calculated by the arithmetic processing executed before the previous execution cycle is read out, while correlating with the measurement time.
At step S404, in the same manner as the previously-discussed step S6 of the first embodiment, by performing linear regression of the correlation of the micro-short-circuit detection voltage-difference ΔVs data calculated by the arithmetic processing executed before the previous execution cycle, and the micro-short-circuit detection voltage-difference ΔVs data calculated by the arithmetic processing executed by the current arithmetic processing, with the measurement times of these data, a regression line is obtained.
Then, at step S405, in the same manner as the previously-discussed step S7 of the first embodiment, a check is made to determine whether a correlation coefficient R2 of the regression line is greater than or equal to the predetermined threshold value. When the correlation coefficient R2 is greater than or equal to the predetermined threshold value, the routine proceeds to step S406 and thus a micro-short-circuit detection error flag is set to “0”. Then, the routine proceeds to step S407.
At step S407, on the basis of the regression line obtained at step S404, processing for predicting time when the degree of a micro short-circuit becomes large and as a result the assembled battery becomes an abnormal state is executed. Concretely, extrapolation processing for the regression line, obtained at step S404, is executed. Time when the micro-short-circuit detection voltage difference ΔVs becomes greater than or equal to a predetermined micro-short-circuit detection threshold value ΔVβ is calculated from the extrapolated regression line. The calculated time is set as the time when the degree of a micro short-circuit becomes large and as a result the assembled battery becomes an abnormal state. By the way, in the embodiment, the aforementioned threshold value ΔVβ can be set to an arbitrary value at which it can be determined that the degree of a micro short-circuit becomes large and as a result the assembled battery becomes an abnormal state, for example, the same value as the threshold value ΔVα or an arbitrary value different from the threshold value ΔVα. Information about the time when the degree of a micro short-circuit becomes large and as a result the assembled battery becomes an abnormal state, which time is predicted or obtained in this way, is sent from the prediction section 507 to the communication section 510. Then, the information is sent via the communication section 510 to the wireless communication terminal such as a cellular phone that the user has, or the on-vehicle equipment installed on the vehicle, for supplying the information via the wireless communication terminal or the on-vehicle equipment to the user. Then, the micro-short-circuit abnormality detection processing terminates and thus the routine returns again to step S1.
Conversely when step S405 determines that the correlation coefficient R2 of the regression line is less than the predetermined threshold value, processing of steps S408-S417 shown in
The fourth embodiment has the following merits in addition to the merits of the first embodiment.
That is, when the difference between the targeted equalization voltage Vtar and the terminal voltage of each of the single batteries C1, C2, . . . , CN is less than the predetermined voltage V1, a micro-short-circuit detection voltage difference ΔVs is calculated. It is possible to appropriately predict time when the degree of a micro short-circuit becomes large and as a result the assembled battery becomes an abnormal state, different from an abnormal state being predictable in the first embodiment (for instance, a state where use restrictions are required due to a battery capacity fall in one or two or more batteries of the single batteries constructing the assembled battery 100), by the use of the calculated micro-short-circuit detection voltage difference ΔVs.
By the way, in the previously-discussed processing exemplified by the fourth embodiment, the micro-short-circuit abnormality detection processing is executed when the difference between the targeted equalization voltage Vtar and the terminal voltage of each of the single batteries C1, C2, . . . , CN is less than the predetermined voltage V1. Execution of micro-short-circuit abnormality detection processing is not limited to the fourth embodiment described herein. As a matter of course, such micro-short-circuit abnormality detection processing may be executed in the second and third embodiments. In such a modified case, the same operation and effects can be provided.
By the way, in the previously-described embodiments, the prediction section 507 corresponds to an internal state detection means and a prediction means of the invention. The voltage-difference data storage section 508 corresponds to a time-series data storage means of the invention. The capacity adjustment section 504 and the control section 505 correspond to a capacity adjustment means of the invention. The control section 505 also corresponds to a targeted voltage setting means. The SOC table storage section 510 corresponds to a SOC-voltage table storage means of the invention.
While the foregoing is a description of the embodiments carried out the invention, it will be understood that these embodiments are described for easy understanding of the invention and thus the invention is not limited to the particular embodiments shown and described herein, but that various design changes and modifications and equivalents, belonging to the scope or spirit of this invention may be included.
For instance, the previously-described embodiments are exemplified by prediction processing for predicting, based on a time-dependent change in voltage difference among the single batteries, time when the assembled battery 100 becomes an abnormal state. Instead of using a time-dependent change in the voltage difference, the system may be configured to predict, based on a time-dependent change in the SOC difference among the single batteries, a time-dependent change in the capacity difference among the single batteries, or a time-dependent change in the internal-resistance difference among the single batteries, time when the assembled battery 100 becomes an abnormal state. In particular, there is a specified correlation between a voltage difference and a SOC difference among the single batteries. For this reason, in the previously-described embodiments, when using a SOC difference instead of a voltage difference among the single batteries, almost the same system configuration can be adopted and hence it is very preferable.
Furthermore, in the previously-described embodiments, when the difference between the targeted equalization voltage Vtar and the terminal voltage of each of the single batteries C1, C2, . . . , CN is greater than or equal to (or less than) the predetermined voltage V1, the voltage difference ΔV (or the micro-short-circuit detection voltage difference ΔV) is calculated. The system configuration is exemplified by prediction processing for predicting, based on this calculation result, time when the assembled battery 100 becomes an abnormal state. In lieu thereof, when the difference between the SOC corresponding to the targeted equalization voltage Vtar and the SOC of each of the single batteries C1, C2, . . . , CN is greater than or equal to (or less than) a predetermined value, the voltage difference ΔV (or the micro-short-circuit detection voltage difference ΔV) may be calculated, and then prediction processing may be executed for predicting, based on this calculation result, time when the assembled battery 100 becomes an abnormal state. Moreover, instead of directly comparing the targeted equalization voltage Vtar with the terminal voltage of each of the single batteries, when the time, elapsed from a point of time when each of the single batteries has been equalized at the targeted equalization voltage Vtar, becomes longer than or equal to (or shorter than) a predetermined time, it may be determined that the difference between the targeted voltage Vtar and the terminal voltage of each of the single batteries C1, C2, . . . , CN has been greater than or equal to (or less than) the predetermined voltage V1, and thus the voltage difference ΔV (or the micro-short-circuit detection voltage difference ΔV) may be calculated, and then prediction processing may be executed for predicting, based on this calculation result, time when the assembled battery 100 becomes an abnormal state.
Furthermore, in predicting time when the assembled battery 100 becomes an abnormal state, the system may be configured as follows. That is, time-series voltage-difference data of other assembled batteries except the assembled battery 100 are acquired, and then processing for predicting time when the assembled battery 100 becomes an abnormal state is performed by reference to the time-series voltage-difference data of the other assembled batteries. In particular, by adopting such a system configuration, it is possible to collect statistical much information. Additionally, by the utilization of the information about the states of these other assembled batteries, an abnormal degree of the controlled assembled battery can be determined in advance, adequately taking account of the whole battery-state tendency including the current states of the other assembled batteries as well as the controlled assembled battery. Additionally, it is possible to predict time when the assembled battery 100 becomes an abnormal state with a high accuracy.
Also, in the exemplified system configurations of the previously-described embodiments, another regression line is newly calculated in the case that the consecutive voltage-difference data for three points or more, whose error probabilities P become greater than or equal to the predetermined threshold value, have been acquired. The condition for calculating another regression line is not limited to such a condition that the consecutive voltage-difference data for three points or more, whose error probabilities P become greater than or equal to the predetermined threshold value, have been acquired. For instance, the system may be configured such that another regression line is newly calculated when the consecutive voltage-difference data for four points or more, whose error probabilities P become greater than or equal to the predetermined threshold value, have been acquired or when the more consecutive voltage-difference data, whose error probabilities become greater than or equal to the predetermined threshold value, have been acquired.
Also, in the exemplified system configurations of the previously-described embodiments, the abnormality-time prediction processing is executed within the battery controller 500. In lieu thereof, the system may be configured such that the previously-discussed abnormality-time prediction processing is executed by means of an external abnormality detection device. In this case, the external abnormality detection device may be configured to acquire the terminal voltage of each of the single batteries constructing the assembled battery 100 from the battery controller 500 via a wireless communication terminal such as a cellular phone that the user of the assembled battery 100 has, an on-vehicle equipment installed on the vehicle, or a networked charging equipment. Thereafter, the abnormality detection device detects, based on the acquired terminal-voltage information, a voltage difference among the single batteries under a prescribed condition, and executes processing for predicting, based on the detected voltage-difference data, time when the assembled battery 100 becomes an abnormal state, according to the method as discussed previously. Then, in such a system configuration, the prediction result is sent to the cellular phone that the user of the assembled battery 100 has, or the on-vehicle equipment installed on the vehicle.
Number | Date | Country | Kind |
---|---|---|---|
2010-257194 | Nov 2010 | JP | national |
2010-272252 | Dec 2010 | JP | national |
Filing Document | Filing Date | Country | Kind | 371c Date |
---|---|---|---|---|
PCT/JP2010/072074 | 12/9/2010 | WO | 00 | 5/13/2013 |