The present invention relates to concrete wall forming devices and methods and more particularly, to device for securing one face wall mesh to vertical rebar and standard concrete forms.
In the construction of concrete walls of fixed width, securing one face wall mesh to rebar and forms is an expensive and cumbersome process. Conventional ties for this purpose are made up of multiple parts that either had to be connected and adjusted for the width of the concrete wall, or secured with a nut and link. If one piece was lost, the tie was unusable.
As can be seen, there is a need for a simple, one-piece tie design that allows the tie to be easily handled and installed by whomever is installing the mesh and form and pouring the concrete.
In one aspect of the present invention, a device for securing one face wall mesh to vertical rebar and standard concrete forms comprises a tie rod; a bend formed in a first direction at a first end of the tie rod; a U-bend, formed in a second direction, opposite that of the first direction, the U-bend having a curvature operable to retain rebar therewithin; and a shaft tie operable to wrap around an opening formed by the U-bend, proximate to the bend in the tie rod.
In another aspect of the present invention, a device for securing one face wall mesh to vertical rebar and standard concrete forms comprises a tie rod having a first end and a second end; a bend formed in a first direction at the first end of the tie rod; a U-bend, formed in a second direction, opposite that of the first direction, located adjacent the bend, the U-bend having a curvature operable to retain rebar therewithin; a wire tie operable to wrap around an opening formed by the U-bend, proximate to the bend in the tie rod; and one of a knob and a loop disposed on a second end of the tie rod.
In a further aspect of the present invention, a method for securing one face wall mesh to vertical rebar and standard concrete forms comprises bending a tie rod in a first direction at a first end of the tie rod; forming a U-bend in a second direction, opposite that of the first direction; retaining rebar in a curvature formed by the U-bend; and wrapping a shaft tie around an opening formed by the U-bend, proximate to the bend in the tie rod.
These and other features, aspects and advantages of the present invention will become better understood with reference to the following drawings, description and claims.
The following detailed description is of the best currently contemplated modes of carrying out exemplary embodiments of the invention. The description is not to be taken in a limiting sense, but is made merely for the purpose of illustrating the general principles of the invention, since the scope of the invention is best defined by the appended claims.
Broadly, an embodiment of the present invention provides a simple, one-piece mechanical tie that allows quick and secure connection between rebar, mesh and form. A single piece of tie wire can secure the tie to the mesh and rebar, making the installation process much quicker than conventional processes. Unlike other devices that have multiple pieces where, if one piece is lost, the tie is unusable, the device of the present invention is designed as a single piece making installation and use quick and simple.
Referring now to
Referring to
To make the tie of the present invention, a standard snap tie or loop tie can be cut to the appropriate length. The cut end of the tie can then be deformed at the end to act as a catch for the wire used to secure the tie. The tie can then be bent into a 180 degree bend (first bend 14-1), creating an inside radius capable of hooking around an existing installed rebar 16 and extending through the one faced wall mesh 18. With the tie 10, 12 hooked around the rebar 16 and sticking through the mesh 18, a single tie of wire (connector 26) can be secured around the step of the tie and under the deformed end (second bend 14-2) of the tie. Thus secured, the mesh 18 cannot slide off the tie 10, 12 and the tie cannot slide off the rebar 16.
Depending on the forming system in use, the loop end 22 or the snap end 24 of the tie is secured through the strippable side of the wall, making a complete rigid chamber for the pouring of a concrete wall in a fixed diameter.
The system of the present invention can provide the user with a quick and secure connection between the rebar, mesh and form, greatly simplifying the process as compared to conventional methods.
It should be understood, of course, that the foregoing relates to exemplary embodiments of the invention and that modifications may be made without departing from the spirit and scope of the invention as set forth in the following claims.
This application claims the benefit of priority of U.S. provisional application No. 61/681,134, filed Aug. 8, 2012, the contents of which are herein incorporated by reference.
Number | Name | Date | Kind |
---|---|---|---|
1498595 | Wedmore | Jun 1924 | A |
2843230 | Nelsson | Jul 1958 | A |
3168912 | Marica | Feb 1965 | A |
3473285 | Reiland | Oct 1969 | A |
4999965 | Schmidgall et al. | Mar 1991 | A |
5042218 | Nasca et al. | Aug 1991 | A |
D330846 | Woolledge et al. | Nov 1992 | S |
5287672 | Moore | Feb 1994 | A |
5392580 | Baumann | Feb 1995 | A |
5678952 | Shaw et al. | Oct 1997 | A |
5743678 | Pitre | Apr 1998 | A |
5924458 | Kaines | Jul 1999 | A |
6536180 | Rosenblat et al. | Mar 2003 | B1 |
6655105 | Swenson | Dec 2003 | B2 |
7377083 | McCafferty et al. | May 2008 | B2 |
20050055956 | Hardy | Mar 2005 | A1 |
Number | Date | Country | |
---|---|---|---|
20140041333 A1 | Feb 2014 | US |
Number | Date | Country | |
---|---|---|---|
61681134 | Aug 2012 | US |