The present application claims priority from U.S. patent application Ser. No. 12/559,577, filed 15 Sep. 2009 which claims the priority benefit of U.S. Provisional Application Ser. No. 61/097,082, filed 15 Sep. 2009.
This disclosure relates to energy management, and more particularly to energy management of household consumer appliances. The disclosure finds particular application in changing existing appliances via add-on features or modules, and incorporating new energy saving features and functions into new appliances.
Currently utilities charge a flat rate or flat cost, but with increasing cost of fuel prices and high energy usage at certain parts of the day, utilities have to buy more energy to supply customers during peak demand. Consequently, utilities are charging higher rates, or structuring higher costs, during peak demand. If peak demand can be lowered, then a potential huge cost savings can be achieved and the peak load that the utility has to accommodate is lessened.
One proposed third party solution is to provide a system where a controller “switches” the actual energy supply to the appliance or control unit on and off. However, there is no active control beyond the mere on/off switching. It is believed that others in the industry cease some operations in an appliance during on-peak time.
Most dishwashers have or will have an automatic hot start feature that automatically occurs at the beginning of a cycle if incoming water temperature is not hot enough to effectively aid in wash performance. If the water temperature on a first fill does not exceed a predetermined temperature, the controller automatically re-runs the fill (i.e., the water is drained from the dishwasher and filled again). Subsequently, the controller then checks the water temperature again to determine if the incoming water meets or exceeds the temperature requirement. The controller will repeat this process up to three times in an effort to purge the incoming hot water line of any residual cold water. A possibility of cold water in the incoming hot water line is particularly evident in homes, for example, where the water line from the hot water heater to the dishwasher is very long, or is in either a crawl space or slab during the cold winter months. As a result of the hot start feature, a user can use up to six gallons of water from the hot water heater, instead of using one and one-half gallons of hot water. These volumes are approximate only. By disabling the auto hot start feature during a high or critical rate period, a consumer or homeowner may save on water and energy usage from the hot water heater during such periods.
Accordingly, a need exists for an improved dishwasher control that in response to elevated operation rates of the energy company, e.g., high or critical rate or demand periods, is operative to selectively disable the auto hot start feature.
In one aspect of the disclosure, a dishwasher is provided comprising one or more power consuming functions and a controller in communication with an associated utility. The controller can receive and process a signal from the associated utility indicative of current cost of supplied energy. The controller operates the dishwasher in one of a normal operating mode and an energy savings mode based on the received signal. The controller is configured to change the power consuming functions by adjusting one or more of an operation schedule, an operation delay, an operation adjustment, and a selective deactivation of at least one of the one or more power consuming functions to reduce power consumption of the dishwasher in the energy savings mode.
In another aspect of the disclosure, a dishwasher control method is provided comprising: determining the operating or demand state of an associated utility, the state being indicative of a peak demand period or an off-peak demand period, and/or a cost of supplied energy from the associated utility, the cost being indicative of the operating state; operating the dishwasher in a normal mode during the off-peak demand period; operating the dishwasher in an energy savings mode during the peak demand period; scheduling, delaying, adjusting and/or selectively deactivating any number of one or more power consuming features/functions of the dishwasher to reduce power consumption of the dishwasher in the energy savings mode; and, returning to the normal mode after the peak demand period is over.
A dishwasher of an exemplary embodiment includes at least a power consuming feature including a hot start feature at the beginning of a wash cycle. A controller adapted to receive and process a signal indicative of the demand state of the utility supplying energy to the dishwasher and/or the current cost of supplied energy operates the dishwasher in one of a plurality of operating modes. The controller is configured to modify the hot start feature in response to a signal representing the energy savings mode. The typical response of the controller to an energy savings mode signal is to delay operation of the dishwasher until a “critical” or “high” peak demand period has passed. If however, the consumer overrides the delay, the controller in the energy savings mode is configured to modify the hot start feature. If the energy savings mode signal is received before operation of the dishwasher begins and a homeowner inputs an override to the energy savings mode, the controller modifies the hot start feature.
According to a method of controlling the dishwasher, the method includes receiving a signal indicative of a peak demand period, and modifying a hot start feature in response to a homeowner electing to ignore or override the peak demand period signal.
The modifying step may include disabling the hot start feature.
The modifying step may include reducing a target temperature of the hot start feature.
The modifying step may be only responsive if the peak demand signal is received before the beginning of a wash cycle, or alternatively may be responsive if the peak demand signal is received any time prior to completion of the pre-wash cycle.
Another advantage is the ability to control functions and features within the appliance and/or unit at various energy levels, i.e., as opposed to just an on/off function.
Another benefit is the increased flexibility with an associated electrical service provider, and the provision of several modes of operation (not simply an on/off mode).
A primary advantage is minimizing the effect of high rate periods to the consumer.
Another advantage is the ability to adequately address higher than usual water and energy usage during high or critical rate periods.
Still another benefit is associated with minimizing the impact of a hot start feature if a user elects to override the delay.
Still other features and benefits of the present disclosure will become apparent from reading and understanding the following detailed description,
An exemplary embodiment of a demand managed appliance 100 is dishwasher 110 illustrated in
The controller 104 operates the dishwasher 110 in one of a plurality of operating modes, including a normal operating mode and an energy savings mode, in response to the received signal. Specifically, the dishwasher 110 operates in the normal mode in response to a signal indicating an off-peak demand state or period and operates in an energy savings mode in response to a signal indicating a peak demand state or period. As will be discussed in greater detail below, the controller 104 is configured to at least selectively adjust and/or disable the at least one of the power consuming features/functions to reduce power consumption of the dishwasher 110 in the energy savings mode.
The dishwasher 110 generally includes an outer case or housing 112 and a control panel or user interface 116 that operatively interacts with the controller 104 and the power consuming feature/function 102. The dishwasher further includes a door mounted within a door frame. The door sealingly encloses a wash chamber for receiving dishes and/or utensils and the like to be washed. Though not shown in the drawings, the dishwasher includes a conventional water distribution system comprising one or more rotating spray arms for spraying water on the dishes and a motor driven pump for circulating the water through the spray arm(s) during pre-wash, wash and rinse cycles and removing water from the chamber during pump out or drain cycles. Dishwasher 110 also includes a detergent dispensing mechanism and a rinse aid dispensing mechanism. A sheathed electric resistance heater is disposed in the lower region of the wash chamber to heat the interior of the chamber during heated dry cycles. The heater in some embodiments might be used to heat the water such as for sanitization cycles.
The controller is configured to implement a plurality of user selectable operating cycles. Each such operating cycle may comprise a combination of one or more of a pre-wash cycle, a wash cycle, a pump out cycle and a dry cycle, each of which may be of varying duration. The power consuming functions/features of the dishwasher 110 include the pre-wash, wash, rinse and pump out cycles, all of which involve at least energizing the motor that drives the pump, and the heated dry cycles which involve energizing the heating element. The number and types of cycles, and the duration of the cycles, determine the amount of energy consumed by these power consuming features/functions. The control panel 116 can include a display 118 and control buttons for making various operational selections. Dish washing algorithms can be preprogrammed in the memory for many different types of cycles. Instructions and selections are displayed on the display 118, for example,
As described above, appliances can be delayed in their operation, rescheduled for a later start time, and/or altered in their functioning/features in order to reduce energy demands. Some appliances lend themselves to an altered operational schedule to off-peak demand periods due to their functionality. For example, a dishwasher has the capacity to run at off-peak hours because demand on this appliance is either not constant and/or the functions of the dishwasher is such that immediate response is not necessary. As one illustrative example, a dishwasher that has been loaded during the daytime, i.e., on-peak demand period hours, can be programmed to start its operations for a later, albeit off-peak demand hours. It is to be appreciated that on-peak and off-peak demand hours can correspond to high utility costs and relatively low utility costs ($/kilowatt), respectively. In this manner, dishes can be cleaned using energy during the off-peak demand period wherein the subsequently cleaned dishes become available either later in the present day or at a time the following day. As most users can appreciate, particularly for household consumers, immediate cleaning of dishes is many times not necessary.
In order to reduce the peak energy consumed by a dishwasher, modifications and/or delays of individual dishwasher cycles can be adjusted in order to reduce the total energy consumed. Reducing total energy consumed also encompasses reducing the energy consumed at peak times and/or reducing the overall electricity demands during peak times and non-peak times. Electricity demand can be defined as average watts over a short period of time, typically 5-60 minutes.
Changes or adjustments to the dishwasher's scheduled time for which cycles begin can be varied in a number of ways. Delaying or modifying the dishwasher's cycle schedule can be in response to a signal from the controller 104 for the appliance to conserve energy or can be at the user's/consumer's commands. The controller 104 can be in communication with an associated utility where the controller 104 receives and processes a signal from the associated utility indicative of current costs of supplying energy. The appliance controller 104 can be in communication with another appliance, ‘master’ appliance, or ‘master’ controller that is in communication with the associated utility. The controller 104 can then operate the dishwasher in one of a normal operating mode and an energy savings mode based on the received signal. The controller 104 can be configured to change the power consuming functions by adjusting one or more of an operation schedule, an operation delay, an operation adjustment, and a selective deactivation of at least one of the one or more power consuming functions to reduce power consumption of the dishwasher in the energy savings mode. In order to reduce the peak energy consumed by the dishwasher 110, the controller 104 is configured to selectively adjust and/or disable at least one of the one or more power consuming features/functions to reduce power consumption of the dishwasher 110 in the energy savings mode. To this extent, the controller 104 is configured to reduce power levels in the energy savings mode. The controller 104 is also configured to reduce functions and/or reduce the intensity of functions in the energy savings mode.
It is to be appreciated that energy savings mode can be accomplished by adjusting operation functions/features during on peak demand periods, delaying or rescheduling operations to an off peak demand period, and through a combination of both adjustment of operations and rescheduling to off peak demands. Off peak demand periods correspond to periods during which lower cost energy is being supplied by the utility relative to peak demand periods during identifiable periods.
Changing the start of an appliance operation can be through a delay in start time or a rescheduling to a particular time period. Operational delays include one or more of a delay in start time, an extension of time to the delayed start, stopping an existing cycle and delaying a restart, finishing an existing cycle and delaying a restart (or start of subsequent cycle), and stopping after more than one cycle and delaying a restart. The stopping after more than one cycle can comprise advancing through one or more cycles until a logical stop is reached and then delaying any further operations until off-peak mode hours. The logical stop can include before a main wash, before a rinse phase, and/or before a dry cycle. In this manner, operations can either be delayed before they are initiated and/or they can be stopped after they have been initiated and restarted at a later time. For some functions, e.g., a wash cycle, it may be advantageous to finish an existing wash cycle and delaying a start of any subsequent cycles to an off peak demand period. In still other circumstances, a wash cycle followed by a rinse cycle may be advantageously programmed for completion and then the subsequent drying cycle delayed for an off peak demand period. In this manner, the dishwasher's cycles effectively operate “normally” but can be delayed wherein one or more of the cycles are stopped/delayed and restarted/started during a non-peak demand period.
Alternatively, or in conjunction with the above operational delays, an operational schedule can be initiated wherein a user interface gives a user the ability to select which of the one or more dishwasher functions are to be scheduled by the dishwasher control system at non-peak mode hours. Additionally, the dishwasher control system can receive a zip code entry which corresponds to a time of use schedule of a utility company from which the dishwasher control system can determine on-peak mode hours and off-peak mode hours. The information can use a time versus day of the week schedule input method that receives a cost, or price, per kilowatt hour signal directly from the utility advising of the current costs and schedules activation of the dishwasher to off-peak mode hours.
A control method in accordance with the present disclosure comprises determining the state of the utility, e.g., if it is operating in a peak demand period or an off-peak demand period, operating the dishwasher in a normal mode during the off-peak demand period, operating the dishwasher in an energy savings mode during the peak (or off-peak) demand period, scheduling, delaying, adjusting and/or selectively deactivating any number of one or more power consuming features/functions of the dishwasher to reduce power consumption of the dishwasher in the energy savings mode, and returning to the normal mode after the peak demand period is over. Off peak demand periods correspond to periods during which lower cost energy is being supplied by the utility relative to peak demand periods.
In conjunction with the scheduling delays described above, or as separate operational changes, the following operation adjustments can be selected in order to reduce energy demands. The operation adjustments to be described hereinafter, can be implemented in conjunction with off-peak mode hours and/or can be implemented during on-peak mode hours. Associated with a dishwasher, the operational adjustments can include one or more of the following: a reduction in operating temperature (i.e. temperature set point adjustments) in one or more cycles, a disablement of one or more heaters in one or more cycles, reduction in power to one or more heaters, a switch from a selected cycle to a reduced power consumption cycle, a reduction in a duration of cycle time in one or more cycles, a disablement of one or more cycles, a skipping of one or more cycles, a reduction of water volume and/or water temperature in one or more cycles, and an adjustment to wash additives (i.e. detergent, water softener, rinse agents, drying agents, etc.) in one or more cycles. Illustratively, a switch from a selected cycle to a reduced power consumption cycle could include a change to the cycle definition when a command is received. For example, if a customer/user selects a pot scrubbing cycle which uses more energy than a normal cycle the selected cycle would then switch to a “normal” cycle, or the customer/user selects the “normal” cycle which would then switch to a “light” cycle which uses less energy than the normal cycle. As described, the switching is in response to lowering the energy demands from a selected cycle to a reduced power consumption cycle that performs a generally similar function.
With reference to
It is to be appreciated that a selectable override option can be provided on the user interface 116 providing a user the ability to select which of the one or more power consuming features/functions are adjusted by the controller in the energy savings mode. The user can override any adjustments, whether time related or function related, to any of the power consuming functions. The override option can be initiated at any time or can be initiated based on a certain $/kilowatt hour. For the method outlined in
The duration of time that the dishwasher 110 operates in the energy savings mode may be determined by information in the energy signal 106. For example, the energy signal 106 may inform the dishwasher 110 to operate in the energy savings mode for a few minutes or for one hour, at which time the dishwasher returns to normal operation. Alternatively, the energy signal 106 may be continuously transmitted by the utility provider, or other signal generating system, as long as it is determined that instantaneous load reduction is necessary. Once transmission of the signal 106 has ceased, the dishwasher 110 returns to normal operating mode. In yet another embodiment, an energy signal may be transmitted to the dishwasher to signal the dishwasher to operate in the energy savings mode. A normal operation signal may then be later transmitted to the dishwasher to signal the appliance to return to the normal operating mode.
The operation of the dishwasher 110 may vary as a function of a characteristic of the supplied energy, e.g., availability and/or price. Because some energy suppliers offer what is known as time-of-day pricing in their tariffs, price points could be tied directly to the tariff structure for the energy supplier. If real time pricing is offered by the energy supplier serving the site, this variance could be utilized to generate savings and reduce chain demand. Another load management program offered by energy supplier utilizes price tiers which the utility manages dynamically to reflect the total cost of energy delivery to its customers. These tiers provide the customer a relative indicator of the price of energy and are usually defined as being LOW (level 1), MEDIUM (level 2), HIGH (level 3), and CRITICAL (level 4). These tiers are shown in the chart of
As noted in the Background, most dishwashers include an automatic hot start feature that is included at the beginning of the first washing operation, which is typically a pre-wash cycle. The concept is intended to assure that the water temperature is sufficiently elevated to provide for an immediate and effective wash performance. Since there is the potential that water between the water heater and the inlet to the wash chamber of the dishwasher is at a cooler temperature than desired, the automatic hot start feature senses the water temperature at its inlet for the prewash cycle. If the temperature is insufficient, the water is drained, and the wash chamber refilled. This can occur up to three times which would likely assure that water from the water heater has reached the wash chamber.
As described previously, the consumer or homeowner has the option to override any suggested energy savings mode in response to a peak demand period. One typical manner of reducing energy costs with a dishwasher would be to modify the prewash cycle(s), and more particularly to modify the hot start feature associated with the first prewash. Thus, if the controller has received an indication of a peak demand period and the need to consider an energy savings mode, and the consumer chooses to override the energy savings mode, the controller in the dishwasher may be programmed to undertake a modification or disabling of the hot start feature. Alternatively, if the consumer has not indicated a desire to override the energy savings mode (and the wash cycle has not been delayed or was already started when the energy savings mode signal is received), the controller then disables or modifies the hot start feature and the wash cycle proceeds through the first prewash, and through subsequent cycles in the overall wash cycle. For example, as shown in
Thus, if the homeowner elects to override the energy savings mode associated with dishwasher operation in response to the peak demand signal as shown at step 310, the controller is programmed to disable or modify the hot start feature at step 312 prior to entering the first prewash 304. Again, modification of the hot start feature may be as simple as reducing the temperature required in the hot start feature. This modification could result in a reduced number of fills, and may only require the initial fill. Of course, still other modifications could be considered either at the water heater, or the dishwasher to implement energy and associated cost saving features.
Similarly, if the high or critical period is no longer in effect, a second decision step 350 is encountered to determine whether a minimum hot start temperature has been reached. If the hot start temperature has been reached, then the controller directs operation of the dishwasher to proceed with the normal wash operation at step 340. On the other hand, if the minimum hot start temperature has not been reached, the controller directs operation of the dishwasher to step 352 where the water is heated or the hot start feature is enabled (i.e., the wash chamber is drained, and a second and/or third fill operation undertaken) before proceeding with the remainder of the wash cycle in step 340.
Consequently, since many dishwashers have or will have an auto hot start feature that automatically occurs at the beginning of a wash cycle if the incoming water temperature is not hot enough to aid in wash performance, the controller will automatically re-run the first fill if the water temperature does not exceed a predetermined temperature limit. The controller will then check the water temperature again to see if the incoming water meets the temperature requirement. The controller will repeat this process up to three times in an effort to purge the incoming hot water line of cold water. This is particularly evident in homes where the water line from the water heater to the dishwasher is very long. By disabling the auto hot start feature in a high or critical rate period, for example, the user will save on water and energy usage from the water heater during these rate periods. Thus, other demand supply responses such as delay, etc. would still be used, but if the homeowner elects to override the energy savings mode, then the auto hot start feature will not be performed. Instead, the wash chamber will simply fill one time for the first prewash and the circulated water will heat for a desired time or as needed, and then move to the next portion of the wash cycle. In other words, the auto hot start feature is associated with the beginning of a wash cycle and can be disabled or altered when the peak demand period is encountered. Operation of the dishwasher can be modified before the first prewash cycle or even during the prewash cycle in an effort to gain some energy savings.
In connection with the hot start feature, temperature is typically sensed throughout the time period because a typical first prewash has the heater on. That is, a running average of the temperature is obtained in an effort to determine whether the target temperature (e.g., 80° F.) has been reached.
The disclosure has been described with reference to the preferred embodiments. Obviously, modifications and alterations will occur to others upon reading and understanding the preceding detailed description. It is intended that the invention be construed as including all such modifications and alterations.
Number | Name | Date | Kind |
---|---|---|---|
2545054 | Stitz | Mar 1951 | A |
3683343 | Feldman et al. | Aug 1972 | A |
3720073 | McCarty | Mar 1973 | A |
4048812 | Thomason | Sep 1977 | A |
4167786 | Miller et al. | Sep 1979 | A |
4190756 | Foerstner | Feb 1980 | A |
4216658 | Baker et al. | Aug 1980 | A |
4247786 | Hedges | Jan 1981 | A |
4362970 | Grady | Dec 1982 | A |
4454509 | Buennagel et al. | Jun 1984 | A |
4637219 | Grose | Jan 1987 | A |
4659943 | Virant | Apr 1987 | A |
4718403 | McCall | Jan 1988 | A |
4731547 | Alenduff et al. | Mar 1988 | A |
4841281 | Melvin, Jr. | Jun 1989 | A |
4903502 | Hanson et al. | Feb 1990 | A |
4926837 | Parker et al. | May 1990 | A |
4998024 | Kirk et al. | Mar 1991 | A |
5040724 | Brinkruff et al. | Aug 1991 | A |
5137041 | Hall | Aug 1992 | A |
5183998 | Hoffman et al. | Feb 1993 | A |
5220807 | Bourne et al. | Jun 1993 | A |
5224355 | So et al. | Jul 1993 | A |
5230467 | Kubsch et al. | Jul 1993 | A |
5289362 | Liebl et al. | Feb 1994 | A |
5408578 | Bolivar | Apr 1995 | A |
5430430 | Gilbert | Jul 1995 | A |
5451843 | Kahn et al. | Sep 1995 | A |
5462225 | Massara et al. | Oct 1995 | A |
5479157 | Suman et al. | Dec 1995 | A |
5479558 | White et al. | Dec 1995 | A |
5481140 | Maruyama et al. | Jan 1996 | A |
5488565 | Kennon et al. | Jan 1996 | A |
5495551 | Robinson et al. | Feb 1996 | A |
5504306 | Russell et al. | Apr 1996 | A |
5505377 | Weiss | Apr 1996 | A |
5515692 | Sterber et al. | May 1996 | A |
5574979 | West | Nov 1996 | A |
5581132 | Chadwick | Dec 1996 | A |
5635895 | Murr | Jun 1997 | A |
5706191 | Bassett et al. | Jan 1998 | A |
5761083 | Brown et al. | Jun 1998 | A |
5805856 | Hanson | Sep 1998 | A |
5816491 | Berkeley et al. | Oct 1998 | A |
5866880 | Seitz et al. | Feb 1999 | A |
5874902 | Heinrich et al. | Feb 1999 | A |
5880536 | Mardirossian | Mar 1999 | A |
5883802 | Harris | Mar 1999 | A |
5886647 | Badger et al. | Mar 1999 | A |
5926776 | Glorioso et al. | Jul 1999 | A |
5937942 | Bias et al. | Aug 1999 | A |
5956462 | Langford | Sep 1999 | A |
6018150 | Maher | Jan 2000 | A |
6026651 | Sandelman | Feb 2000 | A |
6080971 | Seitz | Jun 2000 | A |
6118099 | Lake | Sep 2000 | A |
6144161 | Kimmich et al. | Nov 2000 | A |
6179213 | Gibino et al. | Jan 2001 | B1 |
6185483 | Drees | Feb 2001 | B1 |
6229433 | Rye et al. | May 2001 | B1 |
6246831 | Seitz et al. | Jun 2001 | B1 |
6380866 | Sizer et al. | Apr 2002 | B1 |
6400103 | Adamson | Jun 2002 | B1 |
6480753 | Calder et al. | Nov 2002 | B1 |
6489597 | Hornung | Dec 2002 | B1 |
6553595 | Bruntz et al. | Apr 2003 | B1 |
6631622 | Ghent et al. | Oct 2003 | B1 |
6694753 | Lanz et al. | Feb 2004 | B1 |
6694927 | Pouchak et al. | Feb 2004 | B1 |
6704401 | Piepho et al. | Mar 2004 | B2 |
6778868 | Imamura et al. | Aug 2004 | B2 |
6784872 | Matsui et al. | Aug 2004 | B1 |
6806446 | Neale | Oct 2004 | B1 |
6817195 | Rafalovich et al. | Nov 2004 | B2 |
6828695 | Hansen | Dec 2004 | B1 |
6860431 | Jayadev | Mar 2005 | B2 |
6872919 | Wakefield et al. | Mar 2005 | B2 |
6873876 | Aisa | Mar 2005 | B1 |
6879059 | Sleva | Apr 2005 | B2 |
6904385 | Budike | Jun 2005 | B1 |
6922598 | Lim et al. | Jul 2005 | B2 |
6943321 | Carbone et al. | Sep 2005 | B2 |
6961642 | Horst | Nov 2005 | B2 |
6983210 | Matsubayashi et al. | Jan 2006 | B2 |
7010363 | Donnelly et al. | Mar 2006 | B2 |
7039575 | Juneau | May 2006 | B2 |
7043380 | Rodenberg et al. | May 2006 | B2 |
7053790 | Jang et al. | May 2006 | B2 |
7057140 | Pittman | Jun 2006 | B2 |
7069090 | Huffington et al. | Jun 2006 | B2 |
7082380 | Wiebe et al. | Jul 2006 | B2 |
7110832 | Ghent | Sep 2006 | B2 |
7155305 | Hayes et al. | Dec 2006 | B2 |
7164851 | Sturm et al. | Jan 2007 | B2 |
7206670 | Pimputkar et al. | Apr 2007 | B2 |
7266962 | Montuoro et al. | Sep 2007 | B2 |
7274973 | Nichols et al. | Sep 2007 | B2 |
7274975 | Miller et al. | Sep 2007 | B2 |
7368686 | Etheredge et al. | May 2008 | B2 |
7372002 | Nakamura et al. | May 2008 | B2 |
7420140 | Lenhart et al. | Sep 2008 | B2 |
7420293 | Donnelly et al. | Sep 2008 | B2 |
7446646 | Huomo | Nov 2008 | B2 |
7478070 | Fukui et al. | Jan 2009 | B2 |
7541941 | Bogolea et al. | Jun 2009 | B2 |
7561977 | Horst et al. | Jul 2009 | B2 |
7565813 | Pouchak | Jul 2009 | B2 |
7685849 | Worthington | Mar 2010 | B2 |
7720035 | Oh et al. | May 2010 | B2 |
7751339 | Melton et al. | Jul 2010 | B2 |
7783390 | Miller | Aug 2010 | B2 |
7919729 | Hsu | Apr 2011 | B2 |
7925388 | Ying | Apr 2011 | B2 |
7962248 | Flohr | Jun 2011 | B2 |
7991513 | Pitt | Aug 2011 | B2 |
8024073 | Imes et al. | Sep 2011 | B2 |
8027752 | Castaldo et al. | Sep 2011 | B2 |
8033686 | Recker et al. | Oct 2011 | B2 |
8094037 | Unger | Jan 2012 | B2 |
8185252 | Besore | May 2012 | B2 |
8190302 | Burt et al. | May 2012 | B2 |
8355748 | Abe et al. | Jan 2013 | B2 |
8367984 | Besore et al. | Feb 2013 | B2 |
20010025349 | Sharood et al. | Sep 2001 | A1 |
20010048361 | Mays et al. | Dec 2001 | A1 |
20020024332 | Gardner | Feb 2002 | A1 |
20020071689 | Miyamoto | Jun 2002 | A1 |
20020125246 | Cho et al. | Sep 2002 | A1 |
20020175806 | Marneweck et al. | Nov 2002 | A1 |
20020196124 | Howard et al. | Dec 2002 | A1 |
20020198629 | Ellis | Dec 2002 | A1 |
20030036820 | Yellepeddy et al. | Feb 2003 | A1 |
20030043845 | Lim et al. | Mar 2003 | A1 |
20030178894 | Ghent | Sep 2003 | A1 |
20030193405 | Hunt et al. | Oct 2003 | A1 |
20030194979 | Richards et al. | Oct 2003 | A1 |
20030233201 | Horst et al. | Dec 2003 | A1 |
20040024483 | Holcombe | Feb 2004 | A1 |
20040034484 | Solomita et al. | Feb 2004 | A1 |
20040098171 | Horst | May 2004 | A1 |
20040100199 | Yang | May 2004 | A1 |
20040107510 | Buckroyd et al. | Jun 2004 | A1 |
20040112070 | Schanin | Jun 2004 | A1 |
20040117330 | Ehlers et al. | Jun 2004 | A1 |
20040118008 | Jeong et al. | Jun 2004 | A1 |
20040128266 | Yellepeddy et al. | Jul 2004 | A1 |
20040133314 | Ehlers et al. | Jul 2004 | A1 |
20040139038 | Ehlers et al. | Jul 2004 | A1 |
20040254654 | Donnelly et al. | Dec 2004 | A1 |
20050011205 | Holmes et al. | Jan 2005 | A1 |
20050134469 | Odorcic et al. | Jun 2005 | A1 |
20050138929 | Enis et al. | Jun 2005 | A1 |
20050173401 | Bakanowski et al. | Aug 2005 | A1 |
20050184046 | Sterling | Aug 2005 | A1 |
20050190074 | Cumeralto et al. | Sep 2005 | A1 |
20060031180 | Tamarkin et al. | Feb 2006 | A1 |
20060036338 | Harkcom et al. | Feb 2006 | A1 |
20060068728 | Ishidoshiro et al. | Mar 2006 | A1 |
20060095164 | Donnelly et al. | May 2006 | A1 |
20060123807 | Sullivan et al. | Jun 2006 | A1 |
20060159043 | Delp et al. | Jul 2006 | A1 |
20060162973 | Harris et al. | Jul 2006 | A1 |
20060190139 | Reaume et al. | Aug 2006 | A1 |
20060208570 | Christian et al. | Sep 2006 | A1 |
20060259547 | Bogatin et al. | Nov 2006 | A1 |
20060272830 | Fima et al. | Dec 2006 | A1 |
20060276938 | Miller | Dec 2006 | A1 |
20060289436 | Carbone et al. | Dec 2006 | A1 |
20070005195 | Pasquale et al. | Jan 2007 | A1 |
20070008076 | Rodgers et al. | Jan 2007 | A1 |
20070030116 | Feher | Feb 2007 | A1 |
20070043478 | Ehlers et al. | Feb 2007 | A1 |
20070136217 | Johnson et al. | Jun 2007 | A1 |
20070151311 | McAllister et al. | Jul 2007 | A1 |
20070185675 | Papamichael et al. | Aug 2007 | A1 |
20070203860 | Golden et al. | Aug 2007 | A1 |
20070213880 | Ehlers | Sep 2007 | A1 |
20070220907 | Ehlers | Sep 2007 | A1 |
20070229236 | Mercer et al. | Oct 2007 | A1 |
20070271006 | Golden et al. | Nov 2007 | A1 |
20070276547 | Miller | Nov 2007 | A1 |
20080029081 | Gagas et al. | Feb 2008 | A1 |
20080034768 | Pimentel et al. | Feb 2008 | A1 |
20080083729 | Etheredge et al. | Apr 2008 | A1 |
20080106147 | Caggiano et al. | May 2008 | A1 |
20080120790 | Ashrafzadeh et al. | May 2008 | A1 |
20080122585 | Castaldo et al. | May 2008 | A1 |
20080136581 | Heilman et al. | Jun 2008 | A1 |
20080144550 | Makhlouf et al. | Jun 2008 | A1 |
20080167756 | Golden et al. | Jul 2008 | A1 |
20080167931 | Gerstemeier et al. | Jul 2008 | A1 |
20080172312 | Synesiou et al. | Jul 2008 | A1 |
20080177678 | Di Martini et al. | Jul 2008 | A1 |
20080179052 | Kates | Jul 2008 | A1 |
20080204240 | Hilgers et al. | Aug 2008 | A1 |
20080215263 | Flohr | Sep 2008 | A1 |
20080258633 | Voysey | Oct 2008 | A1 |
20080272934 | Wang et al. | Nov 2008 | A1 |
20080277487 | Mueller et al. | Nov 2008 | A1 |
20090006878 | Borghetti et al. | Jan 2009 | A1 |
20090038369 | Vondras | Feb 2009 | A1 |
20090063257 | Zak et al. | Mar 2009 | A1 |
20090105888 | Flohr et al. | Apr 2009 | A1 |
20090146838 | Katz | Jun 2009 | A1 |
20090171862 | Harrod et al. | Jul 2009 | A1 |
20090235675 | Chang et al. | Sep 2009 | A1 |
20090240381 | Lane | Sep 2009 | A1 |
20090254396 | Metcalfe | Oct 2009 | A1 |
20090326728 | Chrisop et al. | Dec 2009 | A1 |
20100017242 | Hamilton et al. | Jan 2010 | A1 |
20100070091 | Watson et al. | Mar 2010 | A1 |
20100092625 | Finch et al. | Apr 2010 | A1 |
20100131117 | Mattiocco et al. | May 2010 | A1 |
20100175719 | Finch et al. | Jul 2010 | A1 |
20100179708 | Watson et al. | Jul 2010 | A1 |
20100262963 | Wassermann et al. | Oct 2010 | A1 |
20100301774 | Chemel et al. | Dec 2010 | A1 |
20110001438 | Chemel et al. | Jan 2011 | A1 |
20110062142 | Steurer | Mar 2011 | A1 |
20110085287 | Ebrom et al. | Apr 2011 | A1 |
20110087382 | Santacatterina et al. | Apr 2011 | A1 |
20110095017 | Steurer | Apr 2011 | A1 |
20110106328 | Zhou et al. | May 2011 | A1 |
20110114627 | Burt | May 2011 | A1 |
20110123179 | Roetker et al. | May 2011 | A1 |
20110148390 | Burt et al. | Jun 2011 | A1 |
20110153106 | Drake et al. | Jun 2011 | A1 |
20110181114 | Hodges et al. | Jul 2011 | A1 |
20110290781 | Burt et al. | Dec 2011 | A1 |
20120054123 | Broniak et al. | Mar 2012 | A1 |
Number | Date | Country |
---|---|---|
1692317 | Nov 2005 | CN |
101013979 | Aug 2007 | CN |
1496324 | Jan 2005 | EP |
2105127 | Mar 1983 | GB |
11313441 | Nov 1999 | JP |
20060085711 | Jul 2006 | KR |
8600976 | Feb 1986 | WO |
9012261 | Oct 1990 | WO |
9848335 | Oct 1998 | WO |
2007060059 | May 2007 | WO |
2007136456 | Nov 2007 | WO |
Entry |
---|
PCT/US2009/056894 International Search Report. |
International Search Report from PCT Application No. PCT/US2009/056878, Nov. 17, 2009. |
International Search Report from PCT Application No. PCT/US2009/056882, Nov. 4, 2009. |
International Search Report from PCT Application No. PCT/US2009/056883, Oct. 26, 2009. |
International Search Report from PCT Application No. PCT/US2009/056886, Nov. 5, 2009. |
International Search Report from PCT Application No. PCT/US2009/056889, Nov. 10, 2009. |
International Search Report from PCT Application No. PCT/US2009/056911, Mar. 10, 2010. |
International Search Report from PCT Application No. PCT/US2009/056895, Nov. 9, 2009. |
International Search Report from PCT Application No. PCT/US2009/056901, Nov. 10, 2009. |
International Search Report from PCT Application No. PCT/US2009/056906, Nov. 10, 2009. |
International Search Report from PCT Application No. PCT/US2009/056913, Nov. 10, 2009. |
International Search Report from PCT Application No. PCT/US2009/056914, Nov. 2, 2009. |
International Search Report from PCT Application No. PCT/US2009/056919, Nov. 2, 2009. |
Search Report from EP Application No. 10153695.1, May 24, 2012. |
Real-Time Feedback, Natural Resources Canada via website www.nrcan.gc.ca , 2008, http://oee.nrcan.gc.ca/publications/equipment/10918. |
Lemay et al., An Integrated Architecture for Demand Response Communications and Control, University of Illinois Urbana-Champaign, Oct. 28, 2008. |
Weisstein, Eric W. “At Least One.”, From MathWorld—A Wolfram Web Resource. http://mathworld.wolfram.com/AtLeastOne.html, p. 1. |
Search Report from CN Application No. 201010135268.8 dated Oct. 24, 2012. |
Number | Date | Country | |
---|---|---|---|
20120073603 A1 | Mar 2012 | US |