This application claims the benefit of German Application DE 102 55 753.5, filed Nov. 28, 2002, the entirety of which is incorporated herein by reference.
The invention relates to a pile driving device for driving in piles, with an axially-guided impact body movable in a hammer housing, an impact hood and a pile sleeve.
The invention further relates to a method for assembling a pile driving device for driving in piles, the device comprising an impact body axially movable in a hammer housing, a foot, where applicable with an adapter ring, an impact hood and a pile sleeve.
Pile driving devices of this kind are known from Patent Specifications DE 27 48 668 and DE 36 34 905 and have proved excellent for pile driving work on land and under water for the purpose of fixing structural bodies.
Such pile driving devices are designed for piles having a diameter of less than two and half meters and are no wider than this diameter. However, for other structures, such as, for example, wind generators, there is now an increasing need for pile driving devices which are suitable for driving in piles of a much larger diameter. These pile driving devices must have a point where they are set on the pile where they are of the same size greater than the pile to be driven. Special particularly wide pile driving devices are thereby required which are expensive to manufacture. Furthermore, a general rule of thumb applies where the pile sleeve should have a length which corresponds to at least twice the diameter of the pile which is to be driven in. This is necessary for securely guiding the pile sleeve in order to prevent tilting during operation. The structural length of the pile driving device thereby increases additionally because the pile sleeve has to be extended in proportion to the pile diameter in accordance with the above mentioned rule of thumb. Apart from the increased manufacturing costs a greater transport expense is also incurred. If pile driving devices are used in off-shore areas the pile driving devices can be conveyed for most of the journey length by ship. If however pile driving devices are used on land, such as when setting up wind generating plants, then the transport is often only, or for the most part, over land routes. Normal road transport of the load is only possible for widths of up to two and half meters. If the load is wider than this then the transport is only permissible on shut-off roads under special safety measures. Under such conditions extensive planning is required, possibly with structural measures on route being necessary. Conveyance by road is therefore time-consuming, complicated and expensive.
The object of the invention is therefore to provide a pile driving device and a method where the aforementioned drawbacks are avoided and the pile driving device can be manufactured cost-effectively. Furthermore it should be able to be transported over land without requiring any expensive special transport.
This is achieved according to the invention in that a distance is provided between the lower end of the pile sleeve and the impact hood which is less than twice the inner diameter, preferably less than half the inner diameter of the pile sleeve. Hitherto the rule applies that the pile sleeve is to have a length which corresponds to twice the diameter of the pile which is to be driven in, in order to prevent tilting. However it has surprisingly been shown that with pile diameters larger than two and half meters the pile sleeve can be considerably shorter. Thus, with a pile diameter of about four meters, according to the above rule of thumb actually a pile sleeve length of eight meters ought to be necessary but in actual fact only a length of below one meter is required. The reason for this is that with a pile having a diameter larger than two and half meters, during each impact the hammer always strikes close to the axis at the center of gravity of the pile. Surprisingly, the structural length of the pile sleeve can thereby be reduced which reduces the manufacturing costs and makes transport of the pile driving device easier.
The pile sleeve is designed to be divisible into two or more parts along at least one preferably radial and/or circular concentric partition line. The hammer housing of the conventional pile driving devices has as a rule a diameter of less than one and half meters. The pile driving devices widen out considerably at their lower end, particularly in the area of the pile sleeve where it is placed on the driving pile. There it is necessary to reach at least the diameter of the pile which is to be driven in. Through separating the pile sleeve this can be split into two parts which can be transported individually. Through this feature of the invention the width of the pile sleeve is halved. A further reduction in width is possible where necessary through additional partition lines so that conveyance of the pile driving device is possible without expensive special transport measures. If the pile sleeve can additionally be split up by means of circular concentric partition lines then assembly is easier since structural elements such as, for example, the impact hood can be inserted through the openings.
If the pile sleeve has a seal between the parts this can be made airtight. When used underwater air can be blown into the pile sleeve and water displaced, making use of the pile driving device possible in offshore areas.
Known pile driving devices are suitable for use with piles having a diameter of typically 2.5 meters or less. Whilst a device according to the present invention could also be used for a pile of such a diameter, it is likely that this would not be economic due to the additional manufacturing costs involved in producing a device according to the present invention.
The pile driving device of the present invention is likely to be of great use in driving piles having a diameter greater than 2.5 meters, such as the 5 meter diameter piles that are commonly used in offshore wind energy projects.
Presently it is believed that the maximum practical diameter for a pile is 8 meters and there is no reason why the pile driving device of the present invention could not be used with such a pile. The pile sleeve may have one or more adapter elements for adapting to piles of different diameter. The same pile sleeve can be used for different diameters, which lowers the cost.
The adapter elements are designed as radially disposed plates. Hereby, in a simple way the distance between the pile and sleeve is maintained. Through the radial arrangement of the adapter elements the stiffness and stability of the pile sleeve is increased.
In order to adapt the pile driving device to piles with different diameters, the impact hood has at its lower end an adapter plate whose diameter on the top side corresponds to the diameter of the impact hood and whose diameter on the lower side corresponds to the diameter of the pile which is to be driven in. Impact hoods can hereby be operated in a simple and cost-effective manner to accommodate piles across a wide range of pile diameter.
In that the pile guide is designed as a cone with fitted cylinder sleeve, the impact hood is covered by the cone whilst the cylinder jacket undertakes the actual guide of the pile. Operating the pile driving device under water is possible through the air and water tight design.
In order to be able to assemble rapidly the parts of the pile sleeve on site, flanges may be provided on the partition line. The pile sleeve can be assembled by the use of mechanical connecting elements, providing a rapid and reliable assembly of the pile sleeve.
If the pile sleeve is not used under water then it is not necessary for it to be air tight. In this case the cone and/or cylinder of the pile sleeve can be designed as a skeleton frame structure with interconnected supports. It is hereby particularly light which makes assembly and transport easier.
The hammer housing of the pile driving device has a hammer foot which contains shock absorbers for taking up the recoil. Between the hammer foot and pile sleeve is an adapter ring through which the pile sleeve can be fitted on the hammer foot.
After transport of the pile driving device the latter has to be assembled on site. For assembly the impact hood is first mounted on a mounting block. Then the parts of the pile sleeve are disposed to surround the mounting block and impact hood. The flanges of the pile sleeve can then be connected together, for example, by being screwed together.
The hammer foot, impact body and hammer housing may be supplied as a single structural group, preferably including the adapter ring. This structural group is connected fixedly to the impact hood during assembly. Accordingly, the assembly on site is restricted to fixing the pile sleeve on to the hammer foot and it is therefore particularly easy and quick to carry out.
If an impact hood is to be adapted to the diameter of a pile then the impact hood is first placed on an adapter plate located on the assembly block.
By connecting the parts of the pile sleeve in a water- and pressure-tight manner the pile driving device can be used also under water since it is possible to let air into the pile sleeve.
The invention will now be described by way of example with reference to a preferred embodiment illustrated in the drawings from which further advantageous details can be derived. Parts having the same function have the same reference numerals. In the drawings:
a shows a side view of the pile sleeve;
b shows a plan view of the pile sleeve;
The distance 8 between the lower end of the pile sleeve 4 and the impact hood 3 is smaller than half the internal diameter 9 of the pile sleeve 4. This produces an extremely short structural form for the pile sleeve 4.
During operation of the pile driving device the kinetic energy of the impact body 2 is transferred to the impact hood 3 which in turn transfers this to the pile. The pile driving device is guided on the pile radially through the pile sleeve 4. The pile sleeve 4 thereby enables the pile driving device to be securely set on the pile.
During transport the two parts 6 of the pile sleeve 4 are conveyed separately and are then assembled together at the building site. During assembly the impact hood 3 is initially placed on the assembly block 19. The parts 6 of the pile sleeve 4 are then disposed to surround the assembly block 19 and the impact hood 3 and the flanges 14 of the pile sleeve 4 are then connected together. The hammer foot, impact body and hammer housing are thereby pre-assembled connected as one structural group, preferably including the adapter ring, and are fixedly connected to the impact hood.
The impact hood 3 is thereby already pre-assembled with the hammer foot 16 including the adapter ring 17 connected as one structural group.
a and 3b show the divisible pile sleeve 4 in a side view and in plan view in the same embodiment. The pile sleeve 4 consists of a lower part, namely the cylinder sleeve 13 and an upper part, the cone 12, welded thereon. The pile sleeve 4 is divided by the partition line 5 into two parts 6 which are fixedly connected together by means of flanges 14 and screws 15. For underwater work a seal may be provided between the flanges 14 to prevent air from escaping the pile sleeve 4 through the partition line 5.
In this way a pile driving device is provided which is surprisingly simple and cost-effective to transport and assemble.
Number | Date | Country | Kind |
---|---|---|---|
102 55 753 | Nov 2002 | DE | national |
Number | Name | Date | Kind |
---|---|---|---|
4362216 | Jansz | Dec 1982 | A |
5110237 | Hesse | May 1992 | A |
5117924 | Bermingham | Jun 1992 | A |
6202757 | Dahlberg | Mar 2001 | B1 |
6368023 | Lau | Apr 2002 | B1 |
6386295 | Suver | May 2002 | B1 |
Number | Date | Country |
---|---|---|
1 784 396 | Jul 1971 | DE |
0 857 830 | Aug 1998 | EP |
09 84 105 | Mar 2000 | EP |
Number | Date | Country | |
---|---|---|---|
20040146364 A1 | Jul 2004 | US |