Dome constructing method

Information

  • Patent Grant
  • 6701691
  • Patent Number
    6,701,691
  • Date Filed
    Wednesday, April 18, 2001
    23 years ago
  • Date Issued
    Tuesday, March 9, 2004
    20 years ago
Abstract
A dome constructing method comprising the steps of assembling a triangular frame, which is the fundamental unit for a polyhedral skeleton, by using three joints and three frame members with the three joints used as the apexes and the three frame members used as the sides and with the triangular frame in contact with the ground, assembling new triangular frames around the ground-contacting triangular frame by using similar frame members and joints, thereby assembling the polyhedral skeleton of a multipyramid, such as pentagonal pyramid or hexagonal pyramid, with one joint that is positioned at one apex in the ground-contacting triangular frame being used as the apex and with the ground-contacting triangular frame used as one surface, wherein each time the polyhedral skeleton for the multipyramid is thus assembled, the same is turned to bring a new triangular frame other than the ground-contacting triangular frame into contact with the ground and then the assembling operation is repeated to assemble a polyhedral skeleton, thus constructing a spherical dome.
Description




TECHNICAL FIELD




This invention relates to a method for constructing a spherical dome, and more particularly to a dome constructing method which is enabled to construct a spherical dome, if relatively high, merely by using a relatively small-sized construction equipment and by assembling it at a relatively low position.




BACKGROUND ART




When a large-sized spherical dome is to be constructed, there may be adopted a method of constructing a polyhedron for a skeleton at first. For constructing this polyhedral skeleton, it is a general method of the prior art to construct a foundation on the land to be scheduled so that the polyhedron for the skeleton is sequentially assembled up on the foundation. As the spherical dome grows the larger (to have the highest point up to several tens meters in recent years), therefore, not only the construction equipment used for the dome construction becomes the larger but also the special works are required at the higher position.




When the works at the high position are increased in the spherical dome constructing method of the prior art, more specifically, large-sized construction equipments are required for building up the scaffold and for lifting and assembling the materials. On the other hand, special considerations have to be taken into the safety management of the workers at the high position. For this dome construction, great quantities and numbers of materials, labors and expenses are required to raise various problems in the drop of efficiency, in the rise of the construction cost and so on.




In order that the workers may go up to the their positions, for example, it is indispensable to construct a long scaffold, and it takes a sequentially longer time to lift the materials to be assembled. Thus, the spherical dome constructing method of the prior art have difficult problems to solve.




DISCLOSURE OF THE INVENTION




This invention relates to a dome constructing method for constructing a spherical dome by assembling a polyhedral skeleton and then by finishing the interior/exterior of the same, as will be specified in the following. Specifically, a plurality of joints, which are to be arranged when assembled at the positions of the individual vertexes of a polyhedral skeleton and each of which has a plurality of joint blades in the directions of the individual sides of the polyhedral skeleton, as extended from said individual vertexes, and a plurality of frame members are adopted as members for constructing the polyhedral skeleton of the spherical dome. Three joints and three frame members are assembled into a triangular frame or a basic unit of the polyhedral skeleton in a grounded state by using the three joints as the vertexes and the three frame members as the individual sides of the triangular frame. In addition, a new triangular frame is assembled around said grounded triangular frame by using similar frame members and joints, thereby to assemble the polyhedral skeleton of a polyhedral cone such as a pentahedral cone or a hexahedral cone, which uses the joints positioned at one vertex of said grounded triangular frame as its vertex and said grounded triangular frame as its one side. When the polyhedral skeleton of a polyhedral cone is thus assembled, a triangular frame different from said triangular frame is newly grounded by turning said polyhedral skeleton. The polyhedral skeleton is subsequently assembled by repeating similar assembling works, wherein the assembled polyhedral skeleton is fixed on the foundation, and the fixed polyhedral skeleton is then finished on its interior/exterior to complete the spherical dome.




According to this invention, more specifically, there is proposed a dome constructing method for constructing a spherical dome by assembling a polyhedral skeleton and then by finishing the interior/exterior of the same, which method comprises the following steps, by using a plurality of joints, which are to be arranged when assembled at the positions of the individual vertexes of a polyhedral skeleton and each of which has a plurality of joint blades in the directions of the individual sides of the polyhedral skeleton, as extended from said individual vertexes, and a plurality of frame members are adopted as members for constructing the polyhedral skeleton of the spherical dome, of steps:




(1) assembling a first triangular frame having three frame members as its sides in a grounded state with a side formed of said first triangular frame being in parallel with the ground surface, by using three joints as vertexes and three frame members to connect the two end sides of the three frame members to the adjoining ones of a plurality of joint blades in said three joints;




(2) assembling a polyhedral cone skeleton of a polyhedron, which has said one joint as its vertex and the number of the joint blades of said one joint as its side number, and which contains a side formed of said first triangular frame as its one side by connecting one-end sides of the remaining individual frame members to at least one of the three joints and connecting the joint blades of the remaining joints to the other end sides of each of said remaining frame members;




(3) assembling a polyhedral cone skeleton, which has said one joint of said grounded triangular frame as its vertex and the number of the joint blades of said one joint as its side number and which contains the side formed of said grounded triangular frame as its one side, by turning the polyhedral cone skeleton assembled at said step (2), to ground a triangular frame other than said first triangular frame so that a side formed thereof may be in parallel with the ground surface, by connecting one-end sides of the remaining individual frame members to at least one of the three joints positioned at the vertexes of said grounded triangular frame, and by connecting the joint blades of the remaining joints to the other end sides of each of said remaining frame members;




(4) assembling a polyhedral cone skeleton which has said one joint of said newly grounded triangular frame as its vertex and the number of the joint blades of said one joint as its side number and which contains the side formed of said newly grounded triangular frame as its one side, by turning the polyhedral skeleton assembled at said step (3), by grounding the triangular frame other than the said first triangular frame and the triangular frame grounded at said step (2), so that the side formed thereof may be in parallel with the ground surface, by connecting one-end sides of said remaining frame members to the individual joint blades of at least one of the three joints positioned at the vertexes of said newly grounded triangular frame, and by connecting the joint blades of said remaining joints to the other end sides of said remaining individual frame members;




(5) assembling the skeleton of the polyhedron which has a plurality of joints as its individual vertexes and a plurality of frame members as its individual sides, by repeating said step (4); and




(6) completing the spherical dome by fixing the skeleton of the assembled polyhedron on the foundation and then by finishing the interior/exterior of the polyhedron.




In said method, the joint blades of the joint are four to six. If there are used a plurality of joints having four joint blades and a plurality of joints having six joint blades, for example, it is possible to construct a polyhedral skeleton having twenty four sides. If there are used joints (twelve) having five joint blades and joints (twenty) having six joint blades, it is possible to construct a polyhedral skeleton having sixty sides.




Here in said dome constructing method, after the polyhedral skeleton having a plurality of joints as its vertexes and a plurality of frame members as its sides was assembled, it can be placed in a hole, which has been excavated to have a depth of several underground floors in the scheduled land, and is fixed in the foundation. After this, the polyhedral skeleton can also be finished on its interior/exterior to complete the spherical dome.




After the polyhedral skeleton having a plurality of joints as its vertexes and a plurality of frame members as its sides was assembled, it is moved to the scheduled land, and reinforcing bars are laid over the grounded triangular frame. Concrete is placed over the reinforcing bars to construct the foundation of the dome. After this, the polyhedral skeleton can also be finished on its interior/exterior to complete the spherical dome.




According to the dome constructing method of this invention, the polyhedral skeleton for the spherical dome can be constructed at a relatively low position near the ground surface. It is sufficient to prepare the scaffold which has been used in the prior art for constructing an ordinary building having a two floors or the like. The works can be done at a relatively low position while retaining the safety of workers easily. On the other hand, the polyhedral skeleton for constructing the spherical dome is enabled to continue its assembling works by turning the polyhedral skeleton such as a pentahedral cone or a hexahedral cone, each time three joints and three frame members are used to assemble a triangular frame having the three joints as its vertexes and the three frame members as its sides sequentially thereby to assemble the polyhedral skeleton. If one set of movable scaffold is prepared, therefore, it is economically possible to move the scaffold for the continuous use.




According to the dome constructing method of this invention, all the polyhedral skeletons for the skeleton of the dome can be assembled at a position near the ground. For the dome construction, therefore, the large-sized construction equipments, as might otherwise be necessary in the prior art, can be eliminated, and a relatively low scaffold is sufficient. On the other hand, main works can be done at the low position so that the dome construction can be made highly efficiently in all the works including the lifting of the materials (e.g., the joints or the frame members) for constructing the polyhedral skeleton. Thus, it is possible to reduce the labors in the spherical dome construction thereby to shorten the construction period and lower the construction cost.




According to the dome constructing method of this invention, the fundamental unit of the polyhedral skeleton for the spherical dome construction is the triangular frame having the three joints as its vertexes and the three frame members as its individual sides. Therefore, the polyhedral skeleton is remarkably strong even in its partially completed state so that it is hardly deformed in its assembling procedure while hardly requiring a remedy of the shape of the polyhedral skeleton being assembled.




On the other hand, the polyhedral skeleton, as assembled for the dome construction, is the polyhedron having sixty sides and so on and is spherical so that it is balanced in the stress at the individual portions. Even if an external force is partially applied, it is rationally dispersed. Therefore, the stress is hardly concentrated locally to break the polyhedral skeleton.




The polyhedral skeleton to be formed by assembling the triangular frames of said basic unit sequentially is a quadrangular pyramid, a pentahedral cone or a hexahedral cone having the joints as its vertexes, as determined by the number of the joint blades belonging to the joints. The angles, at which the joint blades are attached to the joints, are determined by the directions of the individual sides of the polyhedron, as extending from the vertexes of the polyhedral skeleton using said joints.




These joints can be highly precisely manufactured by casting to the sizes which have been determined by the design. The joints can also be manufactured by welding the joint blades at predetermined angles to a cylindrical body.




On the other hand, the frame members to construct the individual sides of the triangular frame or said basic unit can be manufactured in advance to a high sizing precision because the sides of the polyhedral skeleton scheduled to construct the quadrangular pyramid, the pentahedral cone or the hexahedral cone have known lengths. These frame members are made of iron pipes, pipes or frames extrusion-molded of aluminum, or timber.




The joints of the frame members to the joint blades of the joint can be done merely by jointing the end portion sides of the frame members, which have been highly precisely made in advance, to the joint blades having a predetermined angle. Therefore, the joints can be done simply and extremely highly precisely not by the skilled workers.




Specifically, the construction of the polyhedral skeleton for the spherical dome construction in the dome constructing method of the present invention can be made extremely simply, highly precisely and efficiently not by the skilled workers so that the dome can be constructed simply, efficiently and highly precisely




Here, the connections of the frame member end portions to the joint blades of the joints can be made by means of bolts and nuts, or pins. In the fastening case using the bolts and nuts, no connection fault will occur if a torque wrench is used by checking its fastening force.











BRIEF DESCRIPTION OF DRAWINGS





FIG. 1

is a top plan view for explaining a first assembled state of a triangular frame providing a basis for assembling a polyhedral skeleton for a dome construction.





FIG. 2

is a side elevation of the state in which there is assembled a polyhedral skeleton (or a pentagonal cone skeleton) using a joint


4


of the triangular skeleton shown in

FIG. 1

as its vertex.





FIG. 3

is a side elevation of the state in which there is assembled a polyhedral skeleton using joints


50


and


51


of the triangular frame shown in

FIG. 1

as their vertexes.





FIG. 4

is a side elevation of the state in which there is assembled a polyhedral skeleton using a joint


57


of the triangular skeleton as its vertex, as turned from the state of

FIG. 3

to ground newly.





FIG. 5

is a side elevation of the state in which there is assembled a polyhedral skeleton using a joint


72


of the triangular skeleton, as turned from the state of

FIG. 4

to ground newly as its vertex, by returning it from the state of

FIG. 4

to ground newly, and in which the assembly of a polyhedral skeleton


20


has proceeded by about 40%.





FIG. 6

is a side elevation of the state in which the assembly of the polyhedral skeleton


20


has been advanced by about 50% by turning it from the state shown in FIG.


5


.





FIG. 7

is a side elevation of the state in which the assembly of the polyhedral skeleton


20


has been advanced by about 80% by turning it from the state shown in FIG.


6


.





FIG. 8

is a side elevation of the state in which the assembly of the polyhedral skeleton


20


is completed.





FIG. 9

is a partially sectional side elevation of the state in which the polyhedral skeleton


20


is placed in a hole excavated in a ground scheduled for the dome construction.




FIG.


10


(


a


) is a perspective view of a joint to be used for assembling the polyhedral skeleton in the dome constructing method of this invention.




FIG.


10


(


b


) is a perspective view of another joint.




FIG.


11


(


a


) is a partially enlarged sectional view of the interior/exterior finish works of the dome.




FIG.


11


(


b


) is a partially enlarged sectional view of a roof portion in FIG.


11


(


a


).











BEST MODE FOR CARRYING OUT THE INVENTION




A preferred embodiment of this invention will be described with reference to the accompanying drawings.




In this embodiment, there are used twelve joints


4


each providing with five joint blades


4




a


to


4




e


, as shown in FIG.


10


(


a


), and twenty joints


50


each provided with six joint blades


50




a


to


50




f


, as shown in FIG.


10


(


b


), to assemble a polyhedral skeleton


20


(

FIG. 8

) having sixty sides thereby to construct a spherical dome.




On the ground, as shown in

FIG. 1

, frame members


1


and


3


are jointed at their one-end portions to the adjoining joint blades


4




a


and


4




b


of the joint


4


. To the other one-end portions of the frame members


1


and


3


, respectively, there are then jointed the joint blade


50




e


of the joint


50


and a joint blade


51




f


of a joint


51


. Next, a frame member


2


is jointed at its two end portions individually to the joint blade


50




d


adjacent to the joint blade


50




e


of the joint


50


and to a joint blade


51




a


adjacent to the joint blade


51




f


of the joint


51


. Thus, a first triangular frame a having its individual sides composed of the three frame members


1


,


2


and


3


is so assembled (

FIG. 1

) that it is placed on the ground with its place being in parallel with the ground surface.




Here, the joint


4


having the five joint blades


4




a


to


4




e


is used as one of the vertexes of the first triangular frame a, whereas the joints


50


and


51


having the six joint blades


50




a


to


50




f


and


51




a


to


51




f


are used as the remaining two vertexes. As a result, the first triangular frame a is formed as the isosceles triangle having two sides of equal lengths composed of the frame members


1


and


3


. In this embodiment for assembling the polyhedral skeleton having sixty sides, the joints


4


having the five joint blades and the joints


50


having the six joint blades are thus combined so that the triangular frames to be constructed are all the isosceles triangles.




Therefore, what has to be prepared is the two kinds of frame members, that is, the frame members having the length of the frame members


1


and


3


, and the frame members having the length of the frame member


2


so that the cost for the materials can be lowered to reduce the cost for the dome construction.




Where a polyhedral skeleton of a regular icosahedron is assembled for the spherical dome construction by using the twelve joints


4


having the five joint blades, as shown in FIG.


10


(


a


), the triangular frame as the fundamental unit for the polyhedral skeleton is a regular triangle so that what has to be prepared is only one kind of frame members of equal lengths.




To at least one of the three joins


4


,


50


and


51


, i.e., to the joint blades


4




c


,


4




d


and


4




e


of the joint


4


in this embodiment, there are respectively jointed one-end sides of frame members


6


,


8


and


10


. At the same time, the joint blades of joints


52


,


53


and


54


are jointed to the other end sides of the frame members


6


,


8


and


10


, respectively, to assemble a polyhedral cone skeleton A (

FIG. 2

) which is formed of a polyhedron having the joint


4


as its vertex and a side number of the number (i.e., five) of the joint blades of the joint


4


and which contains the side formed of the aforementioned first triangular frame a as its one side. Here, the joint


4


is provided with the five joint blades


4




a


to


4




e


so that the polyhedral cone skeleton A is a skeleton of pentagonal cone.




At this time, frame members


5


,


7


,


9


and


11


could be jointed to the joints


51


,


52


,


53


,


54


and


50


, as shown in

FIG. 2

, to provide the polyhedral cone skeleton A of the pentagonal cone with its individual bases. In either event, a worker, as designated by


100


in

FIG. 2

, is enabled to do those works merely by preparing a relatively low scaffold.




Next, to the joint blades of the joint


50


other than the joint blades


50




e


and


50




d


located at the vertexes of the first triangular frame a and to the joint blades of the joint


51


other than the joint blades


51




a


and


51




f


, there are individually jointed frame members, to the other end sides of which there are jointed joints


55


,


56


,


57


,


58


and


59


(FIG.


3


), respectively. Then, the joints


50


and


51


have the six joint blades so that polyhedral cone skeletons B and C, which are assembled to have the joints


50


and


51


as their vertexes and which contain the side formed of the first triangular frame a as their one side, have the skeleton of a hexagonal cone (FIG.


3


).




Next, the polyhedral cone skeleton B is turned, as indicated by arrow


12


in

FIG. 3

, so that the triangular frames other than the first triangular frame a may be so grounded into the state shown in

FIG. 4

as to arrange their sides in parallel with the ground. In

FIG. 4

, the triangular frame having the joints


57


,


50


and


51


at its vertexes is grounded. To at least one of the three joints located at the vertexes of the grounded triangular frame, i.e., to the individual joint blades of the joint


57


in

FIG. 4

, moreover, there are jointed the individual one-end sides of the frame members, to the individual other-end sides of which there are connected the joint blades of the remaining joints. Of the joint blades of the joint


57


, as shown in

FIG. 4

, there is only one joint blade that has failed to be jointed to the frame member after the turn in the direction arrow


12


from the state shown in FIG.


3


. To the remaining joint blade, there is connected one end side of a frame member


71


, the other end side of which is jointed the joint blade of a joint


72


(FIG.


4


).




Thus, there is assembled the polyhedral cone skeleton which has one joint


57


of the grounded triangular frame (i.e., the triangular frame having the joints


57


,


50


and


51


) as its vertex and has the number (six) of the joint blades of the joint


57


as its side number and which contains the side formed of the grounded triangular frame as its one side. In the example shown in

FIG. 4

, the joint


57


has the six joint blades so that the hexagonal cone skeleton is assembled.




In this skeleton assembling works, the polyhedral skeleton being assembled is desirably supported by posts


13


,


14


,


15


and


16


, as shown in FIG.


4


.




At the instant when the assembly is made in the state of

FIG. 4

, on the other hand, wires


61


to


65


are connected from a circular ring


60


through turnbuckles


66


,


68


,


69


and so on to joints


58


,


80


,


81


,


55


and


57


, respectively. These connections are effective for preventing the frame members from being deflected by their own weights in the procedure of constructing the polyhedral skeleton and for preventing the polyhedral skeleton being constructed from being collapsed. Especially where the frame members


1


,


2


,


3


and so on are relatively heavy because they are made of iron, it is preferable, for preventing the frame members from being deflected by their own weights in the procedure of constructing the polyhedral skeleton and the polyhedral skeleton being constructed from being collapsed, that the joints are tensed by the wires or the like toward the center of the polyhedral skeleton being assembled. The circular ring


60


and the joints


58


and so on are connected by the wires


61


and so on through the turnbuckles


66


and so on so that the distances from the circular ring


60


to the joints


58


and so on can be properly adjusted by adjusting the turnbuckles


66


.




In order to pull the joints to the center of the polyhedral skeleton by the wires or the like, the works to connect the wires or the like to the joints may be done in the course of assembling the polyhedral skeleton at each time the arrangements of the joints


58


,


80


,


81


,


55


and


57


shown in

FIG. 4

are made. Here, these connected states of the joints by the wires are omitted from the subsequent assembling steps of

FIGS. 5

to


8


.




Next, the polyhedral skeleton thus assembled to the stage of

FIG. 4

is turned, as indicated by arrow


74


in

FIG. 4

, to ground the triangular frame having the joints


51


,


59


and


57


at its vertexes (FIG.


5


). Frame members are jointed to the joint blades of the joint


59


with any frame member jointed thereto, to assemble the polyhedral cone skeleton which has the joint


59


as its vertex and the number (six) of the joint blades of the joint


49


as its side number and which contains the side formed of said grounded triangular frame as its one side.




Next, the polyhedral skeleton thus assembled to the stage of

FIG. 5

is turned, as indicated by arrow


75


in

FIG. 5

, to ground the triangular frame having the joints


57


,


59


and


72


located at its vertexes (although not shown), and similar assembling works are continued.




In any event, the worker


100


can continue the assembling works always at the relatively low position, although the polyhedral skeleton for the dome construction is constructed gradually highly from the state of

FIG. 2

to the state of FIG.


5


.




In the description thus far made, after the assembly of the skeleton proceeded to the state shown in

FIG. 3

, the polyhedral cone skeleton is turned in the direction of arrow


12


to continue the assembly. The skeleton assembling procedure may be modified without any difference in the actions and effects of this invention. When the assembly of the skeleton proceeds to the state shown in

FIG. 2

, the polyhedral cone skeleton A is turned in the direction of arrow


73


(

FIG. 2

) to ground a triangular frame c formed of the frame members


6


,


7


and


8


, and the frame members are jointed to the joint blades of the joints


52


and


53


which are located at the vertexes of that triangular frame c.




Depending upon the conveniences of the scaffold built up for the works of the worker


100


, polyhedral cone skeletons for the first floor, the second floor and the third floor can be assembled all at once and can then be turned to advance the assembly of a new polyhedral cone skeleton.




In any event, there is contained in this invention any of the constructing methods, in which there are sequentially advanced the works: to ground the triangular frame formed of the three frame members by turning the polyhedral skeleton (e.g., the pentagonal skeleton and the hexagonal skeleton) being assembled; and to joint the new frame members those joint blades of the joint located at the vertex of the newly grounded triangular frame, to which the frame members are not jointed yet, to assemble the polyhedral cone skeleton of the polygon, which has said joint as its vertex and the number of the joint blades of said joint as its side number and which contains the side formed of said newly grounded triangular frame as its one side.




In the accompanying drawings:

FIG. 5

shows the state having completed 40% of the assembly;

FIG. 6

shows a 50% completion;

FIG. 7

shows an 80% completion; and

FIG. 8

shows the polyhedral skeleton


20


(e.g., the polyhedron having sixty sides in this embodiment) at the assembled time.




In or after the state shown in

FIG. 7

, a post


17


is used in addition to the posts


13


,


14


,


15


and


16


so as to support the polyhedral skeleton being assembled, more firmly.




By thus supporting the polyhedral skeleton firmly by the posts


13


or the like, the polyhedral skeleton can be stably placed even if an earthquake occurs or an unexpected external force is applied to the polyhedral skeleton being assembled.




The polyhedral skeleton


20


, as assembled in the state of

FIG. 8

, can be finished, after fixed on the foundation, in its interior and exterior works to complete the spherical dome.




For example, the polyhedral skeleton


20


is placed on the dome building land which has been pre-worked for the foundation such as the driving of necessary piles or the placing of foundation slabs. After this, reinforcing bars are laid over the triangular frame grounded, and concrete is placed over the reinforcing bars to construct the foundation of the dome. After this, the polyhedral skeleton


20


can be interiorly or exteriorly finished to complete the spherical dome.




For this interior/exterior finish, the scaffold has to be constructed, and the triangular frame or the basic unit of the polyhedral skeleton


20


can be used for supporting the scaffold. If the polyhedral skeleton


20


is worked from its upper portion, for example, the triangular frame or the basic unit of the polyhedral skeleton


20


, i.e., the lower triangular frame can be used to the last as the post of the scaffold. As a result, it is possible not only to spare the material but also to enhance the strength reliability so that the works can be executed without anxiety.




When the polyhedral skeleton


20


is to be moved so that it may be fixed on the foundation, it can be moved either by turning it or by suspending it by a crane or the like. As a result, it is possible to advance the dome constructing works lightly and highly efficiently.





FIGS. 8 and 9

show one embodiment in which the spherical dome is completed by fixing the polyhedral skeleton


20


on the foundation and then by finishing its interior/exterior works. The polyhedral skeleton


20


is placed in a hole


19


excavated in a land scheduled for building the dome, and is fixed on the foundation. After this, the polyhedral skeleton


20


is interiorly or exteriorly finished to complete the spherical dome.




Specifically, the hole


19


is excavated in the dome-scheduled land


18


, and an anchor


41


is driven to work the ground. Next, the polyhedral skeleton


20


is placed in the hole


19


by turning it in the direction of arrow


21


in FIG.


8


.




Here, a weight


40


is suspended with a snapping line


39


from the crest


20




b


of the polyhedral skeleton


20


, to determine the vertical line with respect to horizontal lines, as designated by reference numerals


42


,


43


,


44


and


45


for floor faces thereby to position the floor face


42


and so on horizontally. Next, the reinforcing bars are laid over the grounded skeleton


20




a


of the polyhedral skeleton


20


, and the concrete is placed to bury the reinforcing bars thereby to fix the polyhedral skeleton


20


.




After this, the polyhedral skeleton


20


is interiorly or exteriorly finished to complete the spherical dome.




FIGS.


11


(


a


) and


11


(


b


) show one example of the interior/exterior finishes of a timber structure. The scaffold is constructed from the bottom. Joists


23


are crossed, and a ceiling member


24


is applied. Joists


25


are crossed, and a floor member


26


is applied. For the interior finish, a joist


27


is disposed in the triangular frame or the basic unit of the polyhedral skeleton


20


, and a ceiling member


28


is applied. This ceiling member


28


is lined with a wall member. For the exterior finish, a common rafter


30


is fixed on the outer side of a frame


29


. The exterior finish can be completed by laminating a roof board


31


, an insulator


32


, a waterproofer


33


and a roof member


34


on the outer side of the common rafter


30


.




At a suitable position of the triangular frame or the basic unit of the polyhedral skeleton


20


, on the other hand, a window frame


35


can be placed to attach a glass window


36


on the outer side thereof (FIG.


11


(


a


)). The glass window


36


can be automatically opened/closed by an electric drive, for example.




In

FIG. 9

, there are shown the wires


61


to


65


and so on, which are connected from the circular ring


60


, as disposed at the state shown in

FIG. 4

, to the joints disposed at the individual vertexes of the horizontal height portions designated by the numerals


42


and


45


for the floor faces. Those wires are provided for preventing the frame members, when made to have a relatively large weight, from being deflected by their own weights and for preventing the polyhedral skeleton being constructed from being collapsed. The wires are removed in the procedure of finishing the interior/exterior of the polyhedral skeleton


20


. In this embodiment, the connections of the joints at the individual vertex portions to the center of the polyhedral skeleton are desirably made in at least two portions of the height portions of the horizontal lines, as indicated by numerals


42


,


43


,


44


and


45


.




Here, the construction method for fixing the polyhedral skeleton


20


having a plurality of joints as its individual vertexes and a plurality of frame members as its individual sides, after having assembled the polyhedral skeleton


20


can employ not only those having been described herein with reference to the drawings but also the various methods known in the art. In any of the methods, when the polyhedral skeleton


20


is moved so that it may be fixed on the foundation, it can be moved by turning it or by suspending it by a crane or the like so that the dome constructing works can be advanced lightly and highly efficiently.



Claims
  • 1. A dome constructing method for constructing a spherical dome by assembling a polyhedral skeleton and then by finishing an interior part and an exterior part of the dome, the method comprising the steps of:preparing a plurality of joints, each having a plurality of joint blades and preparing a plurality of frame members as members for constructing the polyhedral skeleton of the spherical dome, assembling three of the joints and three of the frame members into a first triangular frame of the polyhedral skeleton in a grounded state by using the three joints as the vertexes and the three frame members as the individual sides of the triangular frame, assembling a second triangular frame around said first triangular frame by using similar frame members and joints, the second triangular frame sharing one common frame member and two common joints with the first triangular frame, turning said polyhedral skeleton so that the second triangular frame is placed in the grounded state, continuing assembling the triangular frame until the polyhedral skeleton is completed, fixing the completed polyhedral skeleton in the grounded state, and forming the interior part and the exterior part onto the completed polyhedral skeleton to complete the spherical dome.
  • 2. A dome constructing method for constructing a spherical dome by assembling a polyhedral skeleton by using a plurality of frame members and joints, each joint has a plurality of joint blades, and then by finishing an interior part and an exterior part of the dome, comprising the steps of:(1) assembling a first triangular frame having three frame members being in parallel with the ground surface, by using three joints as vertexes and three frame members as sides of the first triangular frame; (2) assembling a polyhedral cone skeleton formed by the first triangular frame and a second triangular frame, the second triangular frame sharing one common side and two common vertexes with the first triangular frame; (3) turning the polyhedral cone skeleton assembled at said step (2) so that the second triangular frame is in parallel with the ground surface; (4) continuing assembling the triangular frame until the polyhedral skeleton is completed; (5) fixing the completed polyhedral skeleton to the grounded surface; and (6) completing the spherical dome by fixing the skeleton of the assembled polyhedron on the foundation and then forming the interior part and the exterior part onto the completed polyhedral skeleton.
  • 3. A dome constructing method as set forth in claim 1, characterized in that the joint blades of the joint are four to six.
  • 4. A dome constructing method as set forth in claim 2, characterized in that the joint blades of the joint are four to six.
  • 5. A method for constructing a polyhedral skeleton for a spherical dome, the polyhedral skeleton having a plurality of surfaces, wherein each surface is a triangular frame having three sides in equal length and three vertexes, wherein all the vertexes of the triangular frames are located on one sphere, the method comprising the steps of:preparing a plurality of frame members having equal length and a plurality of joints; assembling three of the joints and three of the frame members into a first triangular frame of the polyhedral skeleton by using the three joints as the vertexes and the three frame members as the sides of the triangular frame; forming a second triangular frame of the polyhedral skeleton by assembling the frame members and the vertexes, the second triangular frame sharing one common frame member and two common joints with the first triangular frame; and continuing forming new triangular frames by assembling the frame members and the joints, until the polyhedral skeleton is completed, wherein the polyhedral skeleton is rotated to facilitate the assembling of the frame members and the joints, so that each of the frame members and the joints can be assembled by using a short scaffold.
  • 6. The method as recited by claim 5, wherein the polyhedral skeleton is rotated in such a way that a selected triangular frame is placed onto the ground surface, the selected triangular frame being closest to the frame members or joints next to be assembled.
  • 7. The method as recited by claim 5, wherein the length of the scafford is smaller than the length of the frame members.
  • 8. The method as recited by claim 5, wherein each of the joints has a plurality of joint blades extending in a fixed direction so that when a joint is assembled to a vertex of the polyhedral skeleton, the joint blades of said joint are adapted to fit onto the sides extending from said vertex.
  • 9. The method as recited by claim 5, wherein each of the joints has a fixed number of joint blades, said fixed number is between four to six.
Priority Claims (1)
Number Date Country Kind
10-322492 Nov 1998 JP
PCT Information
Filing Document Filing Date Country Kind
PCT/JP99/06312 WO 00
Publishing Document Publishing Date Country Kind
WO00/29682 5/25/2000 WO A
US Referenced Citations (15)
Number Name Date Kind
4247218 Jeanin Jan 1981 A
4260276 Phillips Apr 1981 A
4319853 Phillips Mar 1982 A
4370073 Ohme Jan 1983 A
4379649 Phillips Apr 1983 A
4395154 Phillips et al. Jul 1983 A
4432661 Phillips et al. Feb 1984 A
4442059 Boyce Apr 1984 A
4449843 Wendel May 1984 A
4464073 Cherry Aug 1984 A
4491437 Schwartz Jan 1985 A
4534672 Christian, III Aug 1985 A
4566818 Schwartz Jan 1986 A
4729197 Miller Mar 1988 A
5165207 Oehlke Nov 1992 A
Foreign Referenced Citations (2)
Number Date Country
5-39637 Feb 1993 JP
11-62003 Mar 1999 JP