This is a nationalization of PCT/HR02/00058 filed Nov. 20, 2002 and published in English.
The present invention relates to the construction of the roofs of industrial building or other similar buildings of prestressed, reinforced concrete and in particular some steel parts become integral parts of the structure. The field of the invention is described in IPC Classification E 04 B 1/00 that generally relates to constructions or building elements or more particularly group E 04 C 3/00 or 3/294.
The present invention relates to a specific roof-ceiling construction of the original conception and shape. The technical problem that is to be solved by this application is assembling method of constructing roofs with flat soffit over extremely large spans (more than 50 m) whereby the roof-ceiling construction solves both the roof and the finished flat soffit simultaneously. In practice, roof constructions over extremely large spans are mostly unique constructions carried out on special projects and usually constructed completely on the site.
The technical problem of this invention, if defined as a task, is to find out an assembling method of constructing roof-ceiling constructions over extremely large spans, suitable for serial pre-fabrication, as an alternative to customary practice of constructing unique constructions.
The technical problem that is to be solved is to divide the huge construction, unsuitable for transport and handling, into plurality of small assemblies that can be prefabricated and transported and assembled on site into the extremely large-span construction unit with flat soffit. As a part of the present invention some partial technical problems are to be solved such as; forming the light assembly-able soffit, lateral stabilization of the upper longitudinal girder over a large span without increasing its mass through increasing its lateral dimensions, longitudinal and transversal interconnecting of the assembly elements into the entirety. All the other solutions that are part of this invention are related to the practical use of the construction itself, including the advantages described in HR-P20000906A that these constructions offer when compared to other customary roof and ceiling constructions.
The present invention includes the basic concept of the construction and prestressing principles disclosed in U.S. Pat. No. 6,966,159under the name “doubly prestressed composite roof-ceiling constructions”. The just-mentioned patent discloses constructions with flat plate-soffit over mostly used big spans up to 30 m. Such constructions with full-plate-ceilings are not suitable for spans bigger than 30 m because at spans larger than that the full-plate soffit becomes too weighty what modifies many assumptions which are the basis of the work of the construction at smaller spans making this construction inapplicable. For instance, the distinctly thin full plate, at spans up to 30 m, has the overall depth of 5 cm what provides enough depth for anchoring interconnecting bars into the soffit plate concrete to ensure them from pooling-out. The full, thin soffit-plate, if applied at large spans, requires an increment of depth because its connection to the upper longitudinal construction near supports become too weak to bear significant amount of shear. However, at very large spans the soffit plate should have an increased depth that would increase its self-weight and change the concept of its working mechanism based on the light soffit which deflects upwards due to rotation of ends of the construction. Moreover, constructions with full-plate soffit and a span over 50 m would be too long for transport and there would appear a problem of interconnecting smaller assemblies into the soffit plate entirety. Even if possible, carrying-out of such constructions would require pre-tensioning and concreting in site that may be uneconomic.
The present invention relates to a construction that is similar to the construction described in U.S. Pat. No. 6,966,159 and solves its applicability to extremely large spans, allows prefabrication of smaller assemblies that are assembled on site into the entirety and provides the assembling soffit formed by inserting light-plates into the openings of the grid-soffit reducing the weight of the entire construction before being hoisted.
No other similar constructions with flat soffit, except abovementioned ones are known to me.
The prestressed roof-ceiling construction for extremely large spans is pre-fabricated, one-way bearing construction, comprising grid flat soffit (1), the upper girder (2) and a plurality of space arranged stabilizing rods (3), attended for constructing buildings with extremely large spans solving both the roof and the ceiling with flat soffit simultaneously.
The object of the invention is, on contrary to customized unique large spans constructions establishment of a simpler and more economic, with adaptable spans, assembling system for constructing buildings with extremely large spans of pre-fabricated elements that are assembled into large segments of the construction—units that can be hoisted and interconnected into the large roof-ceiling with continuous flat soffit. The assembled light-grid, flat-soffit construction replaces a full-plate soffit whereby the flat soffit is achieved by inserting plurality of light plates into the openings within grid elements after the construction is assembled.
In some way it is an improvement of the likely constructions with flat soffit disclosed in U.S. Pat. No. 6,966,159 that provides a reasonable application of the same principle to extremely large spans (over 50 m).
The auxiliary technical solutions that are part of the present construction are; solutions that provide reduction of the self-weight of the entire construction to be applicable on extremely large spans, solution of stabilizing the upper girder (2) against lateral buckling without enlarging the mass of the construction by increasing lateral moment of inertia of its cross section, the solution of simple and practical interconnecting of pre-fabricated assemblies (1.1) of the grid construction (1) (in one embodiment the grid construction is made of steel tubes with a light foam filler and conductors that keep the inner cable distances) and the solution of forming the flat-soffit plane by inserting plurality of light plates (6) into openings within elements of the grid construction.
Generally, a solution of the static system for such constructions on extra large spans is achieved with slender pipe-bars (3) that do not transmit neither the bending moments between the upper girder (2) and the soffit grid (1) nor they are capable to transmit considerable axial forces and consequently can not bend the longitudinally slender grid (1) whereby the pipe-rods (3) are utilized simultaneously to stabilize the upper girder (2) against lateral buckling and to ensure stability of the grid plane itself during prestressing.
The cross sections of the upper girder (2) are of the original shapes as shown in
In following, the preferred embodiment with the upper girder (2) of an inverse “V”-shaped cross-section, shown by the isometric view in
The global bearing unit of the construction that is thereafter assembled at the site is shown in
At the constructing site the horizontal plane is to be prepared with plurality of supports on which smaller parts (1.1) of the grid are leaned before being assembled into grid entirety (1), the unit that with its width and length belongs to the bearing area of one assembled upper girder (2) as it is illustrated in
At the midspan a temporarily supporting frame (9) is positioned. Both halves (2.1) of the upper girder are then positioned on the grid and are turned each to another with their ends that are to be connected leaned at the midspan on the supporting frame (9) whereby their opposite ends, with incorporated stiff steel-pipe legs (4) were laid on the grid elements as it is shown in
In the longitudinal, bearing direction of the construction because of presence of high tension in grid elements grid (1) is prestressed centrically with cables (7) conducted through grid elements longitudinally as it is shown in
During prestressing of the grid elements (1), the upper girder (2) is disconnected at the midspan whereby both the separated halves (2.1) stand on their own legs (3) and (4) being welded to the grid (1). After prestressing of the grid (1) is done, the upper girder (2) is subjected to another prestressing, by the wedge (5,) driven into a special detail between the two separated halves (2.1), by the method disclosed in U.S. Pat. No. 6,966,159 under the name “Flat soffit, doubly prestressed, composite, roof-ceiling construction for large span industrial buildings”. Prestressing of the grid (1) ensures presence of permanent compression inside its longitudinal elements under all applied loads as well as all interconnected joined grid parts (1.1) into the grid entirety (1).
In one another embodiment the “T”-shaped cross section upper girder (2) may be applied with the same steel-tube grid. In that case all the carrying-out procedure remains the same. If now in these two variants the steel-tube grid is replaced by the concrete one, the two additional variants appear.
As a second embodiment the variant with “T”-shaped or inversed “V” cross section upper girder (2) is taken, with the grid (1) of prestressed concrete elements. The elements (1.1) as the assemblies of the grid-soffit (1) are assembled and connected to the entirety in the same manner as in previous variant at the construction site also by means of the same temporary connection.
The grid elements in concrete variant are solid-ones, with centrically incorporated conductors (7), supplied by the same tube connectors at their ends for temporarily assembling of the grid. The difference between joints of concrete and steel variants of the grid is only in details that are adapted to concrete with incorporated tubes at ends of elements that are to be joined. The concrete variant is not emphasized or described because it contains itself nothing new.
In all variants, after the large-size unit of the roof-ceiling construction was completed and prestressed at site the construction is hoisted and joined to adjacent one forming a continuous grid soffit. The grids of the large-size units of the constructions are thereby interconnected to another such units in the same manner as smaller parts (2.1) were interconnected into grid large-unit (1).
Finally the soffit plane is closed by inserting of light plates (6) into openings within grid elements such that a large continuous flat-soffit is achieved.
Number | Date | Country | Kind |
---|---|---|---|
P 20020208 A | Mar 2002 | HR | national |
Filing Document | Filing Date | Country | Kind | 371c Date |
---|---|---|---|---|
PCT/HR02/00058 | 11/20/2002 | WO | 00 | 10/8/2004 |
Publishing Document | Publishing Date | Country | Kind |
---|---|---|---|
WO03/083232 | 10/9/2003 | WO | A |
Number | Name | Date | Kind |
---|---|---|---|
1181013 | Inglis | Apr 1916 | A |
2202850 | Guignon, Jr. | Jun 1940 | A |
2415709 | Sechaud et al. | Feb 1947 | A |
2939554 | Bolton et al. | Jun 1960 | A |
3058549 | Anderson | Oct 1962 | A |
3562994 | Linsowe | Feb 1971 | A |
3750697 | Kump | Aug 1973 | A |
3858374 | Ben-Zvi | Jan 1975 | A |
4144686 | Gold | Mar 1979 | A |
4187652 | Bobrovnikov et al. | Feb 1980 | A |
4489659 | Kamohara et al. | Dec 1984 | A |
4947599 | Sadahiro | Aug 1990 | A |
5008967 | Barrios et al. | Apr 1991 | A |
5134821 | Sadahiro | Aug 1992 | A |
5146719 | Saito et al. | Sep 1992 | A |
5210988 | Shaifer | May 1993 | A |
5784842 | Wackerbauer | Jul 1998 | A |
5867948 | Liu | Feb 1999 | A |
6332301 | Goldzak | Dec 2001 | B1 |
6966159 | Skendzic et al. | Nov 2005 | B2 |
Number | Date | Country |
---|---|---|
1156960 | Nov 1963 | DE |
222 373 | May 1985 | DE |
P990305 | Jun 2000 | HR |
WO 0111159 | Feb 2001 | WO |
Number | Date | Country | |
---|---|---|---|
20050039411 A1 | Feb 2005 | US |