Downhole cable deployment

Information

  • Patent Grant
  • 11572752
  • Patent Number
    11,572,752
  • Date Filed
    Wednesday, February 24, 2021
    3 years ago
  • Date Issued
    Tuesday, February 7, 2023
    a year ago
Abstract
A method of deploying a flexible cable in a wellbore includes carrying, by a tubular assembly, a cable spool cartridge into the wellbore. The cable spool cartridge is attached to an exterior of the tubular assembly and contains the flexible cable. A first end of the flexible cable is attached to a buoyancy device, and the buoyancy device is releasably attached to the cable spool cartridge. A fluid is flowed by the tubular assembly in a downhole direction through an interior of the tubular assembly and in an uphole direction within an annulus at least partially defined by the exterior of the tubular assembly. The fluid has a greater density than the buoyancy device. The buoyancy device is released by the cable spool cartridge, and the buoyancy device is configured to travel after release in the uphole direction with the fluid and thereby pull the flexible cable from the cable spool cartridge and into the annulus.
Description
TECHNICAL FIELD

This disclosure relates to wellbore drilling and completion.


BACKGROUND

In hydrocarbon production, a wellbore is drilled into a hydrocarbon-rich geological formation. After the wellbore is partially or completely drilled, a completion system is installed to secure the wellbore in preparation for production or injection. The completion system can include a series of casings or liners cemented in the wellbore to help control the well and maintain well integrity.


Flexible cables such as fiber optic cables or electric cables are used for various downhole sensing, power, and/or data transmission purposes.


SUMMARY

This disclosure describes a system and method for deploying a flexible cable in a downhole conduit.


Certain aspects of the subject matter herein can be implemented as a method of deploying a flexible cable in a wellbore. The method includes carrying, by a tubular assembly, a cable spool cartridge into the wellbore. The cable spool cartridge is attached to an exterior of the tubular assembly and contains the flexible cable. A first end of the flexible cable is attached to a buoyancy device, and the buoyancy device is releasably attached to the cable spool cartridge. A fluid is flowed by the tubular assembly in a downhole direction through an interior of the tubular assembly and in an uphole direction within an annulus at least partially defined by the exterior of the tubular assembly. The fluid has a greater density than the buoyancy device. The buoyancy device is released by the cable spool cartridge, and the buoyancy device is configured to travel after release in the uphole direction with the fluid and thereby pull the flexible cable from the cable spool cartridge and into the annulus.


An aspect combinable with any of the other aspects can include the following features. The flexible cable comprises a fiber optic cable. A light signal is transmitted through the fiber optic cable.


An aspect combinable with any of the other aspects can include the following features. The fluid comprises a cement slurry. A position of the cement slurry in the annulus is detected based on a signal from the flexible cable.


An aspect combinable with any of the other aspects can include the following features. A change in a mechanical property of cement in the annulus is detected based on a signal from the flexible cable.


An aspect combinable with any of the other aspects can include the following features. The mechanical property is a strain load.


An aspect combinable with any of the other aspects can include the following features. The flexible cable comprises an electric cable. A change in an electrical resistance of cement in the annulus is detected.


An aspect combinable with any of the other aspects can include the following features. The cable spool cartridge includes a plurality of flexible cables. Each of the flexible cables has a respective first end attached to the buoyancy device.


An aspect combinable with any of the other aspects can include the following features. A first casing has been installed in the wellbore. The tubular assembly includes a second casing. The annulus is defined by the interior of the first casing and the exterior of the second casing.


An aspect combinable with any of the other aspects can include the following features. A second cable spool cartridge is attached to an exterior of a third casing. The second cable spool cartridge contains a second flexible cable, and a first end of the second flexible cable is attached to a second buoyancy device releasably attached to the second cable spool cartridge. The third casing assembly is lowered into the wellbore within the second casing, and the second cable spool cartridge is positioned proximate to the downhole end of the third casing within a second annulus defined by the interior of the second casing and the exterior of the third casing. A fluid is flowed in an uphole direction in the second annulus, the fluid having a greater density than the second buoyancy device. The second buoyancy device is released from the second cable spool cartridge, thereby allowing the first end of the second flexible cable to travel in an uphole direction with the fluid and thereby pull the second flexible cable from the second cable spool cartridge and into the second annulus.


An aspect combinable with any of the other aspects can include the following features. The first end of the flexible cable and the first end of the second flexible cable are attached to a data acquisition unit.


An aspect combinable with any of the other aspects can include the following features. The flexible cable comprises a power cable.


Certain aspects of the subject matter herein can be implemented as a downhole deployment system for a flexible cable. The system includes a cable spool cartridge configured to be attached to an exterior of a wellbore assembly at a downhole location. The cable spool cartridge contains the flexible cable. A buoyancy device is releasably attached to a first end of the flexible cable and releasably attached to the cable spool cartridge. The buoyancy device is configured to be released from the cable spool cartridge to travel in an upwards direction within a conduit at least partially filled with a fluid having a higher density than the buoyancy device, thereby pulling the flexible cable from the cable spool cartridge and into the conduit.


An aspect combinable with any of the other aspects can include the following features. The flexible cable comprises a fiber optic cable.


An aspect combinable with any of the other aspects can include the following features. The flexible cable comprises an electric cable.


An aspect combinable with any of the other aspects can include the following features. The fluid comprises a cement slurry.


An aspect combinable with any of the other aspects can include the following features. The wellbore assembly comprises a second casing within a first casing, and the conduit comprises an annulus defined by the interior of the first casing and the exterior of the second casing.


An aspect combinable with any of the other aspects can include the following features. The system includes a shear pin configured to release the buoyancy device in response to plug landing in a plug seat.


An aspect combinable with any of the other aspects can include the following features. The system includes an electronic control unit configured to release the buoyancy device in response to a signal from a circuit closing in response to pumpable plug landing in a downhole plug seat, a signal generated by a sensor configured to sense an arrival of a pumpable plug at a downhole location, or a signal from an operator.


An aspect combinable with any of the other aspects can include the following features. A data acquisition unit attachable to an end of the flexible cable.


An aspect combinable with any of the other aspects can include the following features. The data acquisition unit is a laser box.


An aspect combinable with any of the other aspects can include the following features. The cable spool cartridge includes a plurality of flexible cables, each of the plurality of flexible cables having a respective first end, and wherein each respective first end of the plurality of flexible cables is attached to the buoyancy device.


An aspect combinable with any of the other aspects can include the following features. The flexible cable comprises a power cable.


The details of one or more implementations of the subject matter of this disclosure are set forth in the accompanying drawings and the description. Other features, aspects, and advantages of the subject matter will become apparent from the description, the drawings, and the claims.





BRIEF DESCRIPTION OF DRAWINGS


FIG. 1 is a drawing of an example cable deployment system in accordance with an embodiment of the present disclosure.



FIG. 2 is a process flow diagram of a method for deployment of a cable accordance with an embodiment of the present disclosure.



FIGS. 3A-3D are drawings of a deployment of a cable in a wellbore conduit in in accordance with an embodiment of the present disclosure.



FIG. 4 is a drawing of a well system wherein cables are deployed in multiple casing-casing annuli in accordance with an embodiment of the present disclosure.



FIG. 5 is a drawing of an example triplet cable deployment system in accordance with an embodiment of the present disclosure.



FIG. 6 is a drawing of a well system wherein multiple triplet cables are deployed in multiple casing-casing annuli in accordance with an embodiment of the present disclosure.



FIG. 7 is a drawing of a well system wherein each cable of a triplet cable set is connected to a separate data acquisition unit in accordance with an embodiment of the present disclosure.



FIGS. 8A-8B are drawings of a fiber optic acoustic sensor system in accordance with an embodiment of the present disclosure.





DETAILED DESCRIPTION

This disclosure describes a system, tool, and method for deploying a downhole flexible cable.


Downhole flexible cables such as fiber optic cables or electric cables are used for various downhole sensing and/or data transmission purposes. For example, it may be advantageous to deploy a fiber optic cable within the cement sheath along the vertical length of the cemented annular space in between two casing strings, called the casing-casing annulus. Such a fiber optic cable can be deployed in the casing-casing annulus during cementing operations to, for example, measure the height of the cement slurry as it exits the casing shoe and advances towards the surface within the annulus.


Alternatively or in addition, a fiber optic cable installed in the casing-casing annulus after cement placement can be used to detect the change in mechanical properties of the cement as the cement dehydrates and hardens.


Alternatively or in addition, a fiber optic cable installed in the casing-casing annulus can be used to measure strain or other properties throughout the life of the well, thus detecting pressure-induced events and/or any cracks or other failures in the cement sheath.


The system, tool, and method of the present disclosure can efficiently deploy a fiber optic cable or other cable in a casing-casing annulus or other conduit with a low risk of cable breakage or other damage, thus resulting in more efficient and effective detection and monitoring of the cement sheath or other downhole conditions with a low risk of failure. Furthermore, in some embodiments, the system, tool, and method of the present disclosure can efficiently deploy multiple cables in parallel in an annulus or other conduit, thus enabling redundancy and/or multiple sensing modes in the same conduit.



FIG. 1 illustrates a cable deployment system 100 in accordance with an embodiment of the present disclosure. In the illustrated embodiment, cable deployment system 100 includes a tubular assembly 101 which includes casing shoe track 102 and casing string 104. Casing shoe track 102 is attached to the downhole end of casing string 104. In some embodiments, tubular assembly 101 can include more, fewer, or different components.


Cable spool cartridge 120 is attached to an exterior surface of casing shoe track 102. Cable spool cartridge 120 includes a cable 122 spooled inside of a housing and buoyancy device 124 attached to a first end of cable 122. In some embodiments, cable 122 can be a fiber optic cable or other sensor cable. In some embodiments, cable 122 can be an electric cable or other power cable. The second end of cable 122 is attached to cable spool cartridge 120 and the remaining length of cable 122 is spooled within cable spool cartridge 120.


In the embodiment shown in FIG. 1, casing shoe track 102 includes a float collar 130, plug seat 132, and float shoe 134. In the illustrated embodiment, and as described in more detail with respect to FIG. 2 and FIGS. 3A-3D, system 100 is configured such that landing a plug in plug seat 132 will break shear pin 136, which thereby releases buoyancy device 124 from cartridge 120.



FIG. 2 is a process flow diagram of a method 200 for deployment of a flexible cable in accordance with an embodiment of the present disclosure. The method is described with reference to the components described in reference to FIGS. 1 and 3A-3D.


At step 202, a wellbore assembly carries a cable spool cartridge (such as cable spool cartridge 120 from FIG. 1) into a wellbore such as wellbore 300 as shown in FIG. 3A. In the embodiment shown in FIGS. 3A-3D, the wellbore assembly is a tubular assembly, specifically, tubular assembly 101 including casing string 104 and casing shoe track 102 as described in reference to FIG. 1, and cable spool cartridge 120 is attached to the exterior of casing shoe track 102. In some embodiments, the cable spool cartridge may be attached to another suitable wellbore assembly such as a downhole tool (such as a packer) or a production tubing or work string. In some embodiments, the wellbore assembly to which the cable spool cartridge is attached is a non-tubular assembly.


In the embodiment of the present disclosure shown in FIG. 3A, cable spool cartridge 122 may contain a cable 122 (as illustrated in FIG. 1) that is a fiber optic cable; in some embodiments of the present disclosure, cable spool cartridge may contain an electrical cable or other suitable flexible cable spooled in the cartridge instead of or in addition to a fiber optic cable.


With casing string 104 lowered into the wellbore 300, a casing-casing annulus 304 is formed by the exterior surface of casing string 104 and the interior surface of outer casing 302. In FIG. 3A, casing string 104 has not yet been cemented in place, and drilling fluid 306 or another suitable displacement fluid fills casing-casing annulus 304.


At step 204 (FIG. 2), a fluid is flowed in the conduit containing the cable spool cartridge. In the embodiment shown in FIGS. 3A-3D, the fluid is a cement slurry 310 and the conduit is the casing-casing annulus 304. In some embodiments, the fluid can be drilling fluid or a displacement fluid flowed through the annulus prior to cementing.


As shown in FIG. 3B, cement slurry 310 is first flowed in a downhole direction behind a plug 308 within the interior of tubular casing string 104 and through casing shoe track 102. As shown in FIG. 3C, plug 308 lands on the landing seat of casing shoe track 102. Plug 308 has a rupture disc 312 configured to rupture when a pressure at which cement slurry 310 exceeds a pre-determined amount. At FIG. 3D, as pressure continues to increase, rupture disc 312 ruptures, allowing cement slurry 310 to exit the downhole end of casing string 104 and fill casing-casing annulus 304.


At 206, the buoyancy device 124 is released and cable 122 is pulled into the conduit. In the embodiment shown in FIGS. 1 and 3A-3D, the release is triggered by the landing of plug 308 into landing seat 132. Specifically, in the illustrated embodiment, shear pins 136 connect landing seat 132 with buoyancy device 124. Shear pins 136 are configured to break at a lower pressure than that required to break rupture disc 312. As shown in FIG. 3C, plug 308 has landed on the landing seat of casing shoe track 102. The pressure at which cement slurry 310 is pumped is increased until shear pins 136 break. Breakage of shear pins 136 releases buoyancy device 124 from cartridge 120.


In some embodiments, buoyancy device 124 can be released from cable spool cartridge 120 by other or additional means. In some embodiments, cable spool cartridge 120 is configured to release buoyancy device 124 in response to casing shoe track 102 being pushed against the bottom of the well at a predetermined slack-off weight. In some embodiments, cable spool cartridge 120 is configured to release buoyancy device 124 in response to rotation of casing string 104 by a pre-determined number of rotations.


In some embodiments, an electronic control unit (ECU) can be attached to cable spool cartridge 120 and the ECU can be configured to release buoyancy device 124 in response to a detection of plug 308 arriving in casing shoe track 102 and/or landing in landing seat 132. The ECU can be connected to sensor(s) and can include a processor, a power source (such as a battery), and a release mechanism. Detection of plug 308 to trigger release by the ECU can be by one of several methods: In some embodiments, the seat of the plug has two un-connected metal sides, and the plug has a metal component such that landing of the plug closes an electrical circuit which provides a signal to the ECU, in response to which buoyancy device 124 is released. In some embodiments, landing seat 132 is equipped with a strain gauge that senses the pressure applied by plug 308 after landing, and the ECU is configured to release buoyancy device 124 when the strain reaches a predetermined amount. In some embodiments, the ECU is equipped with a sensor that detects plug 308 and is configured to release buoyancy device 124 when plug 308 arrives in proximity of the sensor, such as a magnetic sensor, sonar sensor, radio-frequency identification (RFID), or other suitable sensor. In some embodiments, the ECU is configured to receive a signal from the surface (such as a pressure signal) and thereby release buoyancy device 124 in response to receipt of the signal.


Buoyancy device 124 is configured to have a lower density than the cement in cement slurry 210. In the illustrated embodiment, as shown in FIG. 3D, as cement slurry 310 travels in an uphole direction past cartridge 120, buoyancy device 124 (which has been released from cartridge 120 as described above) tends to float in an upward direction along with the flow of cement slurry 310. As buoyancy device 124 floats in the uphole direction, the first end of cable 122 (attached to buoyancy device 124) is pulled out of cartridge 120 and into annulus 304. A second end of cable 122 remains attached to cartridge 120. In this way, as cement slurry 210 and buoyancy device 124 continue in an uphole direction and approach the surface, a length of cable 122 is deployed in the casing-casing annulus 304 for the full vertical distance (or a substantial portion of the vertical distance) from the cartridge 120 at the downhole end of casing string 104 up to a surface location (or proximate a surface location)


At step 208 (FIG. 2), upon reaching the surface or other final desired vertical location of the first (uphole) end of cable 122, the first end can be disconnected from buoyancy device 124 and attached to a surface unit such as a data acquisition unit, control unit, power unit, measurement unit, or other component which is disposed at the surface at the wellhead or at another suitable location. In some embodiments, cable 122 is a sensor cable such as a fiber optic cable and is attached to a data acquisition unit configured to transmit and/or receive a signal to or from the fiber optic cable, such that data can be collected and processed on the surface. In embodiments wherein the cable 122 is a fiber optic cable, the data acquisition unit can be a laser box configured to transmit and/or receive a light signal to or from fiber optic cable 122. The data acquisition unit can in some embodiments include a signal processing circuit and a reference fiber optic cable which receives a signal from a reference signal generator.


In some embodiments, cable 122 is a power cable and attached to a surface power source after disconnection from buoyancy device 124. In such embodiments where cable 122 is a power cable, cartridge 120 can include a connection to a downhole component such that power from the surface power source can be transmitted from the power source via cable 122 to the downhole component.


The system and method illustrated in FIGS. 1-3 can be used to deploy a fiber optic cable or other cable in a downhole conduit such as a casing-casing annulus. In one embodiment of the present disclosure, a fiber optic cable can be deployed in the casing-casing annulus before cementing with drilling fluid or other suitable fluid, such that subsequent cementing operations can be monitored. In such an embodiment, the deployed fiber optic cable can be used to, for example, measure the height of the cement slurry as it exits the casing shoe and advances towards the surface within the annulus. The higher density cement slurry can be detected as the untethered fiber optic cable will exhibit increased strain load along the portions of the annulus in which the cement is pumped. Through similar logic the position of lower density spacers pumped ahead of the cement as well as the displaced mud can also be derived.


In some embodiments, a fiber optic cable can be installed before or along with the cement slurry and can be used to detect the change in mechanical properties of the cement as the cement dehydrates and hardens. As the cement slurry gains compressive strength, this will be detected as the untethered fiber cable will exhibit increased strain load along the portions of the annulus in which the cement is hardening. This will allow the comparison of the planned cement properties to be compared to what is actually achieved during field application. The cement may not reach the designed properties due to several reasons, such as, for example, unexpected operational conditions that may lead to cement contamination, undiagnosed wellbore geometry considerations such as over-gauge hole, or lost circulation events during the cementing operation. Whatever the cause, detection of the failure of the cement to reach its desired mechanical properties (considered as a function of stress over time) can aid in diagnoses and the need for remediation can be considered. Wellbore integrity can therefore be improved as the well will only become increasingly hard to perform any remediation of the cement sheath once additional strings of casing and cement are added as the well is deepened. In some embodiments, installation of a temperature sensor will allow these properties to be examined with respect to the temperature gradient as calculated along the casing string from the casing shoe to surface.


Alternatively or in addition, a fiber optic cable installed in the casing-casing annulus using the system and method illustrated in FIGS. 1-3 can be used to measure strain or other properties throughout the life of the well, thus detecting pressure-induced events and/or any cracks or other failures in the cement sheath. Typically, cement slurries are designed to reach designed mechanical properties over the course of a few days, but the value of measuring the strain measured along the cemented fiber cable allows well integrity to be monitored for years, throughout the life of the well for detection of any degradation of the cement that may occur. By monitoring the stress along the cemented annuli, the pressure induced events that result in a change of the radial stress across the cement sheath can be monitored and any failure in the cement sheath can be detected. This can be beneficial for assessing any need for repair and continued operation of the wellbore throughout its producing life.


In some embodiments, the flexible cable deployed using the method and system described herein can be a cable other than a fiber optic cable, such as an electric cable, instead of or in addition to a fiber optic cable. For example, cracks or flaws in the cement sheath can be detected by configuring the cement to have piezoelectric properties or by adding carbon fibers to the cement, such that such cracks or flaws can be detected by an electric cable as a change in the electrical resistance of the cement.


In some circumstances, a well may be drilled with multiple casing strings, such that a well may have multiple casing-casing annuli. In some embodiments of the present disclosure, cables can be deployed in each annulus of such a multi-casing system, to allow for monitoring and/or data transmission within each annulus, using the method and system illustrated in FIGS. 1-3 for each casing string in sequence. As shown in FIG. 4, multiple cable spool cartridges 120 may be used, with a cable spool cartridge 120 attached to the exterior of the downhole ends of each casing string as that casing string is lowered into the wellbore 400, and, using the method as described above with respect to FIGS. 1-3 with respect to each cartridge, a cable may be deployed within each annuli. As shown in FIG. 4, a first cable 420 is deployed in the annulus between the wellbore 400 and the first (outer) casing 402. A second cable 422 is deployed within the annulus between the first (outer) casing 402 and the second casing 404. A third cable 424 is deployed within the annulus between the second casing 404 and the third casing 406. A fourth cable 426 is deployed in the annulus between the third casing 406 and the fourth (inner) casing 408 (or production tubing).


In the illustrated embodiment, each of cables 420, 422, 424, and 426 are attached to a common data acquisition unit 450. In some embodiments, each of the cables from the different annuli may be attached to a different data acquisition unit. Data acquisition unit 450 can be disposed at the surface or at another suitable location.



FIG. 5 illustrates an example triplet cable deployment system in accordance with an embodiment of the present disclosure. In the embodiment shown in FIG. 5, cable spool cartridge 502 is configured to house three spools, each of which contains a flexible cable. A first spool contains a first cable 504, a second spool contains a second cable 506, and a third spool contains a third cable 508. Cables 504, 506, and 508 can in some embodiments comprise a fiber optic cable. One end of each of cables 504, 506, and 508 is attached to a buoyancy device 520, and the other end of each of cable 504, 506, and 508 is attached to the cable spool cartridge 502. Buoyancy device 520 is releasable attached to cable spool cartridge 502 in a manner as described in reference to one of the various embodiments as described in reference to FIGS. 3A-3D above. In other embodiments, a different cable spool cartridge 502 may be configured to house a different number of spools, such as four or five.


The embodiment shown in reference to FIG. 5 provides a system for deploying multiple (in the illustrated embodiment, three) cables within vertical length of a casing-casing annulus or other downhole conduit. Although three cables are illustrated in FIG. 5, in some embodiments another number (such as four or five) can be deployed by increasing the number of spools within cartridge 502. In some embodiments, the preferable number of cable may depend on the volume of the casing-casing annulus or other conduit into which the cables are to be deployed. Multiple cables equally spaced apart can ensure the whole cement sheath area, the space between the outer diameter of the casing and the wellbore wall, is covered for real-time distributed sensing. Multiple cables can provide redundancy and increase the probability of at least one cable reaching the surface. Another advantage of having multiple cables is the ability to interrogate multiple parameters. Small events in the cable are related to multiple parameters (such as temperature, pressure and acoustic energies) and it can be challenging to discriminate multiple parameters from one cable. While it is possible to provide simultaneous measurements of multiple parameters, there is an inherent trade-off between performance parameters such as sensing range, spatial resolution, and sensing resolution. Therefore, having dedicated cables for specific parameters can increase the accuracy of casing-casing annulus evaluation parameters.



FIG. 6 is a drawing of a well system wherein multiple triplet cables are deployed in multiple casing-casing annuli in accordance with an embodiment of the present disclosure. As shown in FIG. 6, multiple triplet cable spool cartridges 502 may be used, with a triplet cable spool cartridge 502 attached to the exterior of the downhole ends of each casing string as that casing string is lowered into a wellbore 600, and, using the method as described above with respect to FIGS. 3A-3D and FIG. 5 with respect to each cartridge, a cable triplet may be deployed within each annuli as described in reference to FIG. 5. As shown in FIG. 6, a first cable triplet 620 is deployed in the annulus between wellbore 600 and the first (outer) casing 602. A second cable triplet 622 is deployed within the annulus between the first (outer) casing 602 and the second casing 604. A third cable triplet 624 is deployed within the annulus between the second casing 604 and the third casing 606. A fourth cable triplet 626 is deployed in the annulus between the third casing 606 and the fourth (inner) casing 608 (or production tubing).


In the illustrated embodiment, each of cable triplets 620, 622, 624, and 626 are attached to a common data acquisition unit 650. In some embodiments, each of the cables from the different annuli may be attached to a different data acquisition unit.



FIG. 7 is a drawing of a well system wherein each cable of a triplet cable set is connected to a separate data acquisition unit in accordance with an embodiment of the present disclosure. The cables 710, 712, and 714 are components of a triplet of cables deployed in a casing-casing annulus 702 as described in reference to FIG. 5. Cable 710 is connected to first data acquisition unit 750. Cable 712 is connected to a second data acquisition unit 752. Cable 714 is connected to third data acquisition unit 754. Each cable and data acquisition unit can be configured to a single type or mode of sensor, or may each reflect a different type or mode of sensor. For example, in the illustrated embodiment, cable 710 attached to first data acquisition unit 750 can be a fiber optic cable connected to a single-point sensor 720. Cable 712 attached to second data acquisition unit 752 can be a fiber optic cable connected to multiple point sensors 730. Cable 714 attached to third data acquisition unit 754 can comprise a fiber optic cable as part of a distributed temperature sensing system. Data acquisition units 750, 752, and 754 can be disposed at the surface or at another suitable location.


As shown in FIG. 7, by easily and cost-effectively deploying multiple cables within the casing-casing annulus, the system can be readily configured for different sensing modes within a single annulus. Single point fiber optic sensing is an intrinsic or extrinsic measurement of a single sensor on an optical fiber. Single point strain sensing can be achieved by many mechanisms knowingly by an individual fiber Bragg grating (FBG), long period gratings (LPG) or Fabry-Perot and Mach-Zehnder systems. Single-point fiber sensors, even when multiplexed to form multi-point fiber sensors, may not intrinsically provide the wealth of information that can be provided through distributed optical fiber-based schemes that function along the entire fiber length. Distributed optical fiber sensors are generally based on Rayleigh, Brillouin, and Raman scattering, and use various demodulation schemes, including optical time-domain reflectometry, optical frequency-domain reflectometry, and related schemes. Local external perturbations along the sensing fiber (such as temperature and strain) can be detected by variations in amplitude, frequency, polarization, or phase of the backscattered sensing light. Each technique has its own advantages and disadvantages in terms of spatial resolution (which defines how close two events can be detected separately), sensitivity (which is measure of system SNR and/or a deciding factor for maximum measurable length), and sensing resolution (which is a measure of the smallest parameter change that can be recorded).



FIGS. 8A-8B are drawings of a fiber optic acoustic sensor system in accordance with an embodiment of the present disclosure. In the embodiment illustrated in FIG. 8A-8B, wellbore 800 is being drilled by drill bit 806 attached to the downhole end of drill string 804. As shown in FIG. 8A, casing 802 is installed in the uphole portion of wellbore 800 and cement 810 fills the annulus between the wellbore and casing 802. Fiber optic cable 822 is installed in the cement 810, using the methods described in reference to FIGS. 1 to 3A-3D above. Specifically, fiber optic cable 822 is deployed from cable spool cartridge 820 attached to the exterior of casing 802 and using buoyancy device (not shown) attached to the upper end of fiber optic cable 822.


In an embodiment of the present disclosure, fiber optic cable 822 deployed as shown in FIG. 8A can be used for vibration monitoring of drilling operations. In the illustrated embodiment, a pulse of light can be transmitted down fiber optic cable 822 by a data acquisition unit at the surface (not shown). As the light travels down the fiber, light reflections known as backscatter can be detected, which are caused by tiny strain events within the fiber which in turn are caused by localized energy from acoustic signals 850 (shown in FIG. 8B). This backscattered light travels back up the fiber optic cable 822 towards the data acquisition unit where it is sampled. The time synchronization of the laser pulse, reflecting the phase, frequency, and amplitude of acoustic signals 850, allows the backscatter event to be accurately mapped to a distance along fiber optic cable 822 (and therefore to a point along the vertical length of the annulus). Detection and analysis of acoustic signals 850 can be utilized to monitor the effect of drilling on the mechanical integrity of cement 810. In addition, when combined with drilling parameters, such detection and analysis can also be utilized for predicting geological formations and detecting downhole events and problems, such as mechanical or other failures of the bottom-hole-assembly or other portion of drill string 804.

Claims
  • 1. A method of deploying flexible cables in a wellbore, the method comprising: carrying, by a first tubular assembly, a first cable spool cartridge into the wellbore, the first cable spool cartridge attached to an exterior of the first tubular assembly and containing a first flexible cable, wherein a first end of the first flexible cable is attached to a first buoyancy device, and wherein the first buoyancy device is releasably attached to the first cable spool cartridge, and wherein a first annulus is at least partially defined by the exterior of the first tubular assembly;flowing a first fluid into the first annulus, the first fluid having a greater density than the first buoyancy device;releasing, by the first cable spool cartridge, the first buoyancy device, wherein the first buoyancy device is configured to travel after release in the uphole direction and thereby pull the first flexible cable from the cable spool cartridge and into the first annulus;disposing a second tubular assembly within the first tubular assembly, wherein a second cable spool cartridge containing a second flexible cable is attached to an exterior of the second tubular assembly, wherein a first end of the second flexible cable is attached to a second buoyancy device, and wherein the second buoyancy device is releasably attached to the second cable spool cartridge, and wherein a second annulus is at least partially defined by the exterior of the second tubular assembly,flowing a second fluid into the second annulus, the second fluid having a greater density than the second buoyancy device;releasing, by the second cable spool cartridge, the second buoyancy device, wherein the second buoyancy device is configured to travel after release in the uphole direction with the fluid and thereby pull the first flexible cable from the cable spool cartridge and into the second annulus; andattaching the first end of the first flexible cable and the first end of the second flexible cable to a data acquisition unit.
  • 2. The method of claim 1, wherein the first flexible cable comprises a fiber optic cable, wherein the method further comprises transmitting a light signal through the fiber optic cable.
  • 3. The method of claim 1, wherein the first fluid and the second fluid comprise cement slurries, and wherein the method further comprises detecting a position of the cement slurry in the first annulus based on a signal from the first flexible cable and detecting a position of the cement slurry in the second annulus based on a signal from the second flexible cable.
  • 4. The method of claim 1, further comprising detecting a change in a mechanical property of cement in the first annulus based on a signal from the first flexible cable.
  • 5. The method of claim 4, wherein the mechanical property is a strain load.
  • 6. The method of claim 1, wherein the first flexible cable comprises an electric cable, and wherein the method further comprises detecting a change in an electrical resistance of cement in the first annulus.
  • 7. The method of claim 1, wherein the first cable spool cartridge comprises a plurality of flexible cables, each of the plurality of flexible cables having a respective first end, wherein each respective first end of the plurality of flexible cables is attached to the first buoyancy device.
  • 8. The method of claim 1, wherein the first flexible cable comprises a power cable.
  • 9. A method of deploying flexible cables in a wellbore, the method comprising: carrying, by a second casing disposed in first casing disposed in the wellbore, a first cable spool cartridge into the wellbore, the first cable spool cartridge attached to an exterior of the second casing and containing a first flexible cable, wherein a first end of the first flexible cable is attached to a first buoyancy device, and wherein the buoyancy device is releasably attached to the first cable spool cartridge;flowing a first fluid in a downhole direction through an interior of the second casing and in an uphole direction within an annulus at least partially defined by the exterior of the second casing, the first fluid having a greater density than the first buoyancy device;releasing, by the first cable spool cartridge, the first buoyancy device, wherein the buoyancy device is configured to travel after release in the uphole direction with the first fluid and thereby pull the first flexible cable from the cable spool cartridge and into the first annulus;attaching a second cable spool cartridge to an exterior of a third casing, the second cable spool cartridge containing a second flexible cable, a first end of the second flexible cable attached to a second buoyancy device releasably attached to the second cable spool cartridge;lowering the third casing into the wellbore within the second casing, the second cable spool cartridge positioned proximate to the downhole end of the third casing within a second annulus defined by the interior of the second casing and the exterior of the third casing;flowing a second fluid in an uphole direction in the second annulus, the second fluid having a greater density than the second buoyancy device;releasing the second buoyancy device from the second cable spool cartridge, thereby allowing the first end of the second flexible cable to travel in an uphole direction with the second fluid and thereby pull the second flexible cable from the second cable spool cartridge and into the second annulus; and attaching the first end of the first flexible cable and the first end of the second flexible cable to a data acquisition unit.
  • 10. A downhole deployment system for flexible cables, the system comprising: a first cable spool cartridge attached to an exterior of a first tubular assembly disposed in a wellbore, the first cable spool cartridge containing a first flexible cable;a first buoyancy device releasably attached to a first end of the first flexible cable and releasably attached to the first cable spool cartridge, wherein the first buoyancy device is configured to be released from the first cable spool cartridge to travel in an upwards direction within a first annulus at least partially defined by the exterior of the first tubular assembly at least partially filled with a fluid having a higher density than the first buoyancy device, such that, upon release, the first flexible cable is pulled from the cable spool cartridge and into the first annulus;a second cable spool cartridge attached to an exterior of a second tubular assembly disposed in the wellbore within the first tubular assembly, the second cable spool cartridge containing a second flexible cable;a second buoyancy device releasably attached to a first end of the second flexible cable and releasably attached to the second cable spool cartridge, wherein the second buoyancy device is configured to be released from the second cable spool cartridge to travel in an upwards direction within a second annulus at least partially defined by the exterior of the second tubular assembly at least partially filled with a second fluid having a higher density than the second buoyancy device, such that, upon release, the second flexible cable is pulled from the second cable spool cartridge and into the second annulus; anda data acquisition unit, wherein the system is configured such that, after release of the first flexible cable and of the second flexible cable into the first annulus and the second annulus, respectively, the first end of the first flexible cable and the first end of the second flexible cable can be connected to the data acquisition unit.
  • 11. The downhole deployment system of claim 10, wherein the first flexible cable comprises a fiber optic cable.
  • 12. The downhole deployment system of claim 10, wherein the first flexible cable comprises an electric cable.
  • 13. The downhole deployment system of claim 12, wherein the first fluid and the second fluid comprise cement slurries.
  • 14. The downhole deployment system of claim 12, further comprising a shear pin configured to release the first buoyancy device in response to a plug landing in a plug seat.
  • 15. The downhole deployment system of claim 12, further comprising an electronic control unit configured to release the first buoyancy device in response to one of: a signal from a circuit closing in response to pumpable plug landing in a downhole plug seat;a signal generated by a sensor configured to sense an arrival of a pumpable plug at a downhole location; anda signal from an operator.
  • 16. The downhole deployment system of claim 10, wherein the data acquisition unit comprises a laser box.
  • 17. The downhole deployment system of claim 10, wherein the first flexible cable comprises a power cable.
US Referenced Citations (463)
Number Name Date Kind
891957 Schubert Jun 1908 A
2043225 Armentrout et al. Jun 1936 A
2110913 Lowrey Mar 1938 A
2227729 Lynes Jan 1941 A
2286673 Douglas Jun 1942 A
2305062 Church et al. Dec 1942 A
2344120 Baker Mar 1944 A
2757738 Ritchey Sep 1948 A
2509608 Penfield May 1950 A
2688369 Broyles Sep 1954 A
2690897 Clark Oct 1954 A
2719363 Richard et al. Oct 1955 A
2763314 Gill Sep 1956 A
2795279 Erich Jun 1957 A
2799641 Gordon Jul 1957 A
2805045 Goodwin Sep 1957 A
2822150 Muse et al. Feb 1958 A
2841226 Conrad et al. Jul 1958 A
2899000 Medders et al. Aug 1959 A
2927775 Hildebrandt Mar 1960 A
3016244 Friedrich et al. Jan 1962 A
3028915 Jennings Apr 1962 A
3071399 Cronin Jan 1963 A
3087552 Graham Apr 1963 A
3102599 Hillburn Sep 1963 A
3103975 Hanson Sep 1963 A
3104711 Haagensen Sep 1963 A
3114875 Haagensen Dec 1963 A
3133592 Tomberlin May 1964 A
3137347 Parker Jun 1964 A
3149672 Joseph et al. Sep 1964 A
3169577 Erich Feb 1965 A
3170519 Haagensen Feb 1965 A
3211220 Erich Oct 1965 A
3220478 Kinzbach Nov 1965 A
3236307 Brown Feb 1966 A
3253336 Brown May 1966 A
3268003 Essary Aug 1966 A
3331439 Lawrence Jul 1967 A
3428125 Parker Feb 1969 A
3468373 Smith Sep 1969 A
3522848 New Aug 1970 A
3547192 Claridge et al. Dec 1970 A
3547193 Gill Dec 1970 A
3642066 Gill Feb 1972 A
3656564 Brown Apr 1972 A
3696866 Dryden Oct 1972 A
3839791 Feamster Oct 1974 A
3862662 Kern Jan 1975 A
3874450 Kern Apr 1975 A
3931856 Barnes Jan 1976 A
3946809 Hagedorn Mar 1976 A
3948319 Pritchett Apr 1976 A
4008762 Fisher et al. Feb 1977 A
4010799 Kern et al. Mar 1977 A
4064211 Wood Dec 1977 A
4084637 Todd Apr 1978 A
4129437 Taguchi et al. Dec 1978 A
4135579 Rowland et al. Jan 1979 A
4140179 Kasevich et al. Feb 1979 A
4140180 Bridges et al. Feb 1979 A
4144935 Bridges et al. Mar 1979 A
4191493 Hansson et al. Mar 1980 A
4193448 Jearnbey Mar 1980 A
4193451 Dauphine Mar 1980 A
4196329 Rowland et al. Apr 1980 A
4199025 Carpenter Apr 1980 A
4265307 Elkins May 1981 A
RE30738 Bridges et al. Sep 1981 E
4301865 Kasevich et al. Nov 1981 A
4320801 Rowland et al. Mar 1982 A
4334928 Hara Jun 1982 A
4337653 Chauffe Jul 1982 A
4343651 Yazu et al. Aug 1982 A
4354559 Johnson Oct 1982 A
4373581 Toellner Feb 1983 A
4394170 Sawaoka et al. Jul 1983 A
4396062 Iskander Aug 1983 A
4412585 Bouck Nov 1983 A
4413642 Smith et al. Nov 1983 A
4449585 Bridges et al. May 1984 A
4457365 Kasevich et al. Jul 1984 A
4470459 Copland Sep 1984 A
4476926 Bridges et al. Oct 1984 A
4484627 Perkins Nov 1984 A
4485868 Sresty et al. Dec 1984 A
4485869 Sresty et al. Dec 1984 A
4487257 Dauphine Dec 1984 A
4495990 Titus et al. Jan 1985 A
4498535 Bridges Feb 1985 A
4499948 Perkins Feb 1985 A
4508168 Heeren Apr 1985 A
4513815 Rundell et al. Apr 1985 A
4524826 Savage Jun 1985 A
4524827 Bridges et al. Jun 1985 A
4545435 Bridges et al. Oct 1985 A
4553592 Looney et al. Nov 1985 A
4557327 Kinley et al. Dec 1985 A
4576231 Dowling et al. Mar 1986 A
4583589 Kasevich Apr 1986 A
4592423 Savage et al. Jun 1986 A
4612988 Segalman Sep 1986 A
4620593 Haagensen Nov 1986 A
4636934 Schwendemann Jan 1987 A
RE32345 Wood Mar 1987 E
4660636 Rundell et al. Apr 1987 A
4705108 Little et al. Nov 1987 A
4817711 Jearnbey Apr 1989 A
5012863 Springer May 1991 A
5018580 Skipper May 1991 A
5037704 Nakai et al. Aug 1991 A
5055180 Klaila Oct 1991 A
5068819 Misra et al. Nov 1991 A
5070952 Neff Dec 1991 A
5074355 Lennon Dec 1991 A
5082054 Kiamanesh Jan 1992 A
5092056 Deaton Mar 1992 A
5107705 Wraight et al. Apr 1992 A
5107931 Valka et al. Apr 1992 A
5228518 Wilson et al. Jul 1993 A
5236039 Edelstein et al. Aug 1993 A
5278550 Rhein-Knudsen et al. Jan 1994 A
5387776 Preiser Feb 1995 A
5388648 Jordan, Jr. Feb 1995 A
5490598 Adams Feb 1996 A
5501248 Kiest, Jr. Mar 1996 A
5523158 Kapoor et al. Jun 1996 A
5595252 O'Hanlon Jan 1997 A
5603070 Cerutti et al. Feb 1997 A
5690826 Cravello Nov 1997 A
5803186 Berger et al. Sep 1998 A
5803666 Keller Sep 1998 A
5813480 Zaleski, Jr. et al. Sep 1998 A
5853049 Keller Dec 1998 A
5890540 Pia et al. Apr 1999 A
5899274 Frauenfeld et al. May 1999 A
5947213 Angle Sep 1999 A
5955666 Mullins Sep 1999 A
5958236 Bakula Sep 1999 A
RE36362 Jackson Nov 1999 E
5987385 Varsamis et al. Nov 1999 A
6008153 Kukino et al. Dec 1999 A
6012526 Jennings et al. Jan 2000 A
6032742 Tomlin et al. Mar 2000 A
6041860 Nazzal et al. Mar 2000 A
6047239 Berger et al. Apr 2000 A
6096436 Inspektor Aug 2000 A
6170531 Jung et al. Jan 2001 B1
6173795 McGarian et al. Jan 2001 B1
6189611 Kasevich Feb 2001 B1
6254844 Takeuchi et al. Jul 2001 B1
6268726 Prammer Jul 2001 B1
6269953 Seyffert et al. Aug 2001 B1
6287079 Gosling et al. Sep 2001 B1
6290068 Adams et al. Sep 2001 B1
6305471 Milloy Oct 2001 B1
6325216 Seyffert et al. Dec 2001 B1
6328111 Bearden et al. Dec 2001 B1
6330913 Langseth et al. Dec 2001 B1
6354371 O'Blanc Mar 2002 B1
6371302 Adams et al. Apr 2002 B1
6413399 Kasevich Jul 2002 B1
6443228 Aronstam Sep 2002 B1
6454099 Adams et al. Sep 2002 B1
6469278 Boyce Oct 2002 B1
6510947 Schulte et al. Jan 2003 B1
6534980 Toufaily et al. Feb 2003 B2
6544411 Varandaraj Apr 2003 B2
6561269 Brown et al. May 2003 B1
6571877 Van Bilderbeek Jun 2003 B1
6607080 Winkler et al. Aug 2003 B2
6612384 Singh et al. Sep 2003 B1
6622554 Manke et al. Sep 2003 B2
6623850 Kukino et al. Sep 2003 B2
6629610 Adams et al. Oct 2003 B1
6637092 Menzel Oct 2003 B1
6678616 Winkler et al. Jan 2004 B1
6722504 Schulte et al. Apr 2004 B2
6741000 Newcomb May 2004 B2
6761230 Cross et al. Jul 2004 B2
6814141 Huh et al. Nov 2004 B2
6827145 Fotland et al. Dec 2004 B2
6845818 Tutuncu et al. Jan 2005 B2
6847034 Shah et al. Jan 2005 B2
6850068 Chernali et al. Feb 2005 B2
6895678 Ash et al. May 2005 B2
6912177 Smith Jun 2005 B2
6971265 Sheppard et al. Dec 2005 B1
6993432 Jenkins et al. Jan 2006 B2
7000777 Adams et al. Feb 2006 B2
7013992 Tessari et al. Mar 2006 B2
7048051 McQueen May 2006 B2
7063155 Ruttley Jun 2006 B2
7086463 Ringgenberg et al. Aug 2006 B2
7091460 Kinzer Aug 2006 B2
7109457 Kinzer Sep 2006 B2
7115847 Kinzer Oct 2006 B2
7124819 Ciglenec et al. Oct 2006 B2
7131498 Campo et al. Nov 2006 B2
7216767 Schulte et al. May 2007 B2
7255582 Liao Aug 2007 B1
7312428 Kinzer Dec 2007 B2
7322776 Webb et al. Jan 2008 B2
7331385 Symington Feb 2008 B2
7376514 Habashy et al. May 2008 B2
7387174 Lurie Jun 2008 B2
7445041 O'Brien Nov 2008 B2
7455117 Hall et al. Nov 2008 B1
7461693 Considine et al. Dec 2008 B2
7484561 Bridges Feb 2009 B2
7539548 Dhawan May 2009 B2
7562708 Cogliandro et al. Jul 2009 B2
7629497 Pringle Dec 2009 B2
7631691 Symington et al. Dec 2009 B2
7647980 Corre et al. Jan 2010 B2
7650269 Rodney Jan 2010 B2
7677673 Tranquilla et al. Mar 2010 B2
7730625 Blake Jun 2010 B2
7779903 Bailey et al. Aug 2010 B2
7828057 Kearl et al. Nov 2010 B2
7909096 Clark et al. Mar 2011 B2
7951482 Ichinose et al. May 2011 B2
7980392 Varco Jul 2011 B2
8067865 Savant Nov 2011 B2
8096349 Considine et al. Jan 2012 B2
8210256 Bridges et al. Jul 2012 B2
8237444 Simon Aug 2012 B2
8245792 Trinh et al. Aug 2012 B2
8275549 Sabag et al. Sep 2012 B2
8286734 Hannegan et al. Oct 2012 B2
8484858 Brannigan et al. Jul 2013 B2
8511404 Rasheed Aug 2013 B2
8526171 Wu et al. Sep 2013 B2
8528668 Rasheed Sep 2013 B2
8567491 Lurie Oct 2013 B2
8636063 Ravi et al. Jan 2014 B2
8678087 Schultz et al. Mar 2014 B2
8683859 Godager Apr 2014 B2
8776609 Dria et al. Jul 2014 B2
8794062 DiFoggio et al. Aug 2014 B2
8824240 Roberts et al. Sep 2014 B2
8884624 Homan et al. Nov 2014 B2
8925213 Sallwasser Jan 2015 B2
8960215 Cui et al. Feb 2015 B2
8973680 MacKenzie Mar 2015 B2
9051810 Cuffe et al. Jun 2015 B1
9109429 Xu et al. Aug 2015 B2
9217291 Batarseh Dec 2015 B2
9217323 Clark Dec 2015 B2
9222350 Vaughn et al. Dec 2015 B2
9238953 Fleming et al. Jan 2016 B2
9238961 Bedouet Jan 2016 B2
9250339 Ramirez Feb 2016 B2
9353589 Hekelaar May 2016 B2
9394782 DiGiovanni et al. Jul 2016 B2
9435159 Scott Sep 2016 B2
9464487 Zurn Oct 2016 B1
9470059 Zhou Oct 2016 B2
9492885 Zediker et al. Nov 2016 B2
9494010 Flores Nov 2016 B2
9494032 Roberson et al. Nov 2016 B2
9528366 Selman et al. Dec 2016 B2
9562987 Guner et al. Feb 2017 B2
9567819 Cavender et al. Feb 2017 B2
9617815 Schwartze et al. Apr 2017 B2
9664011 Kruspe et al. May 2017 B2
9702211 Tinnen Jul 2017 B2
9731471 Schaedler et al. Aug 2017 B2
9739141 Zeng et al. Aug 2017 B2
9757796 Sherman et al. Sep 2017 B2
9765609 Chemali et al. Sep 2017 B2
9845653 Hannegan et al. Dec 2017 B2
9903010 Doud et al. Feb 2018 B2
9976381 Martin et al. May 2018 B2
10000983 Jackson et al. Jun 2018 B2
10113408 Pobedinski et al. Oct 2018 B2
10174577 Leuchtenberg et al. Jan 2019 B2
10233372 Ramasamy et al. Mar 2019 B2
10247838 Hveding Apr 2019 B1
10329877 Simpson et al. Jun 2019 B2
10352125 Frazier Jul 2019 B2
10392910 Walton et al. Aug 2019 B2
10394193 Li et al. Aug 2019 B2
10544640 Hekelaar Jan 2020 B2
10551800 Li et al. Feb 2020 B2
10641079 Aljubran et al. May 2020 B2
10673238 Boone et al. Jun 2020 B2
10927618 Albahrani et al. Feb 2021 B2
11187072 Downey Nov 2021 B2
20020066563 Langseth et al. Jun 2002 A1
20030052098 Kim et al. Mar 2003 A1
20030159776 Graham Aug 2003 A1
20030230526 Okabayshi et al. Dec 2003 A1
20040163807 Vercaemer Aug 2004 A1
20040182574 Sarmad et al. Sep 2004 A1
20040256103 Batarseh Dec 2004 A1
20050022987 Green et al. Feb 2005 A1
20050092523 McCaskill et al. May 2005 A1
20050199386 Kinzer Sep 2005 A1
20050259512 Mandal Nov 2005 A1
20060016592 Wu Jan 2006 A1
20060076347 Kinzer Apr 2006 A1
20060102625 Kinzer May 2006 A1
20060106541 Hassan et al. May 2006 A1
20060144620 Cooper Jul 2006 A1
20060185843 Smith Aug 2006 A1
20060248949 Gregory et al. Nov 2006 A1
20060249307 Ritter Nov 2006 A1
20070000662 Symington et al. Jan 2007 A1
20070108202 Kinzer May 2007 A1
20070131591 Pringle Jun 2007 A1
20070137852 Considine et al. Jun 2007 A1
20070137858 Considine et al. Jun 2007 A1
20070153626 Hayes et al. Jul 2007 A1
20070175633 Kosmala Aug 2007 A1
20070181301 O'Brien Aug 2007 A1
20070187089 Bridges Aug 2007 A1
20070193744 Bridges Aug 2007 A1
20070204994 Wimmersperg Sep 2007 A1
20070261844 Cogliandro et al. Nov 2007 A1
20070289736 Kearl et al. Dec 2007 A1
20080007421 Liu et al. Jan 2008 A1
20080047337 Chemali et al. Feb 2008 A1
20080053652 Corre et al. Mar 2008 A1
20080073079 Tranquilla et al. Mar 2008 A1
20080173443 Symington et al. Jul 2008 A1
20080173480 Annaiyappa et al. Jul 2008 A1
20080190822 Young Aug 2008 A1
20080272931 Auzerais et al. Nov 2008 A1
20080308282 Standridge et al. Dec 2008 A1
20080312892 Heggemann Dec 2008 A1
20090153354 Daussin Jun 2009 A1
20090164125 Bordakov et al. Jun 2009 A1
20090178809 Jeffryes et al. Jul 2009 A1
20090259446 Zhang et al. Oct 2009 A1
20090288820 Barron et al. Nov 2009 A1
20100006339 Desai Jan 2010 A1
20100089583 Xu et al. Apr 2010 A1
20100186955 Saasen et al. Jul 2010 A1
20100276209 Yong et al. Nov 2010 A1
20100282511 Maranuk Nov 2010 A1
20110011576 Cavender et al. Jan 2011 A1
20110031026 Oxford et al. Feb 2011 A1
20110058916 Toosky Mar 2011 A1
20110120732 Lurie May 2011 A1
20110155368 El-Khazindar Jun 2011 A1
20120012319 Dennis Jan 2012 A1
20120075615 Niclass et al. Mar 2012 A1
20120111578 Tverlid May 2012 A1
20120132418 McClung May 2012 A1
20120132468 Scott et al. May 2012 A1
20120152543 Davis Jun 2012 A1
20120169841 Chemali et al. Jun 2012 A1
20120173196 Miszewski Jul 2012 A1
20120181020 Barron et al. Jul 2012 A1
20120186817 Gibson et al. Jul 2012 A1
20120222854 McClung, III Sep 2012 A1
20120227983 Lymberopoulous et al. Sep 2012 A1
20120273187 Hall Nov 2012 A1
20120325564 Vaughn et al. Dec 2012 A1
20130008653 Schultz et al. Jan 2013 A1
20130008671 Booth Jan 2013 A1
20130025943 Kumar Jan 2013 A1
20130037268 Kleefisch et al. Feb 2013 A1
20130068525 Digiovanni Mar 2013 A1
20130076525 Vu et al. Mar 2013 A1
20130125642 Parfitt May 2013 A1
20130126164 Sweatman et al. May 2013 A1
20130146359 Koederitz Jun 2013 A1
20130191029 Heck, Sr. Jul 2013 A1
20130213637 Kearl Aug 2013 A1
20130255936 Statoilydro et al. Oct 2013 A1
20130269945 Mulholland et al. Oct 2013 A1
20130308424 Kumar Nov 2013 A1
20140034144 Cui et al. Feb 2014 A1
20140047776 Scott et al. Feb 2014 A1
20140083771 Clark Mar 2014 A1
20140090846 Deutch Apr 2014 A1
20140132468 Scott et al. May 2014 A1
20140183143 Cady et al. Jul 2014 A1
20140231075 Springett et al. Aug 2014 A1
20140231147 Bozso et al. Aug 2014 A1
20140238658 Wilson et al. Aug 2014 A1
20140246235 Yao Sep 2014 A1
20140251593 Oberg et al. Sep 2014 A1
20140251894 Larson et al. Sep 2014 A1
20140265337 Harding et al. Sep 2014 A1
20140278111 Gerrie et al. Sep 2014 A1
20140291023 Edbury Oct 2014 A1
20140300895 Pope et al. Oct 2014 A1
20140326506 Difoggio Nov 2014 A1
20140333754 Graves et al. Nov 2014 A1
20140360778 Batarseh Dec 2014 A1
20140375468 Wilkinson et al. Dec 2014 A1
20150020908 Warren Jan 2015 A1
20150021240 Wardell et al. Jan 2015 A1
20150027724 Symms Jan 2015 A1
20150075714 Sun et al. Mar 2015 A1
20150083422 Pritchard Mar 2015 A1
20150091737 Richardson et al. Apr 2015 A1
20150101864 May Apr 2015 A1
20150129195 Laird May 2015 A1
20150129306 Coffman et al. May 2015 A1
20150159467 Hartman et al. Jun 2015 A1
20150211362 Rogers Jul 2015 A1
20150267500 Van Dogen Sep 2015 A1
20150284833 Hsiao et al. Oct 2015 A1
20150290878 Houben et al. Oct 2015 A1
20150300151 Mohaghegh Oct 2015 A1
20160053572 Snoswell Feb 2016 A1
20160053604 Abbassian Feb 2016 A1
20160076357 Hbaieb Mar 2016 A1
20160115783 Zeng et al. Apr 2016 A1
20160130928 Torrione et al. May 2016 A1
20160153240 Braga et al. Jun 2016 A1
20160160106 Jamison et al. Jun 2016 A1
20160237810 Beaman et al. Aug 2016 A1
20160247316 Whalley et al. Aug 2016 A1
20160339517 Joshi et al. Nov 2016 A1
20160356125 Bello et al. Dec 2016 A1
20170051785 Cooper Feb 2017 A1
20170077705 Kuttel et al. Mar 2017 A1
20170161885 Parmeshwar et al. Jun 2017 A1
20170234104 James Aug 2017 A1
20170292376 Kumar et al. Oct 2017 A1
20170314335 Kosonde et al. Nov 2017 A1
20170328196 Shi et al. Nov 2017 A1
20170328197 Shi et al. Nov 2017 A1
20170332482 Hauslmann Nov 2017 A1
20170342776 Bullock et al. Nov 2017 A1
20170350201 Shi et al. Dec 2017 A1
20170350241 Shi Dec 2017 A1
20180010030 Ramasamy et al. Jan 2018 A1
20180010419 Livescu et al. Jan 2018 A1
20180029942 Ishida Feb 2018 A1
20180171772 Rodney Jun 2018 A1
20180171774 Ringer et al. Jun 2018 A1
20180177064 Van Pol et al. Jun 2018 A1
20180187498 Soto et al. Jul 2018 A1
20180265416 Ishida et al. Sep 2018 A1
20180266226 Batarseh et al. Sep 2018 A1
20180326679 Weisenberg et al. Nov 2018 A1
20180334883 Williamson Nov 2018 A1
20180363404 Faugstad Dec 2018 A1
20190024482 Arora Jan 2019 A1
20190049054 Gunnarsson et al. Feb 2019 A1
20190101872 Li Apr 2019 A1
20190145183 Potash May 2019 A1
20190227499 Li et al. Jul 2019 A1
20190257180 Kriesels et al. Aug 2019 A1
20190267805 Kothuru et al. Aug 2019 A1
20200032638 Ezzeddine Jan 2020 A1
20200125040 Li et al. Apr 2020 A1
20200182043 Downey et al. Jun 2020 A1
20200240258 Stokely et al. Jul 2020 A1
20200248546 Torrione et al. Aug 2020 A1
20200370381 Al-Rubaii et al. Nov 2020 A1
20200371495 Al-Rubaii et al. Nov 2020 A1
20210032934 Zhan et al. Feb 2021 A1
20210032935 Zhan et al. Feb 2021 A1
20210032936 Zhan et al. Feb 2021 A1
20210034029 Zhan et al. Feb 2021 A1
20210189830 Greci Jun 2021 A1
Foreign Referenced Citations (81)
Number Date Country
1226325 Sep 1987 CA
2249432 Sep 2005 CA
2537585 Aug 2006 CA
2669721 Jul 2011 CA
2594042 Aug 2012 CA
3007884 Jul 2017 CA
101079591 Nov 2007 CN
200989202 Dec 2007 CN
102493813 Jun 2012 CN
203232293 Oct 2013 CN
104295448 Jan 2015 CN
204627586 Sep 2015 CN
106119763 Nov 2016 CN
107462222 Dec 2017 CN
109437920 Mar 2019 CN
110571475 Dec 2019 CN
102008001607 Nov 2009 DE
102011008809 Jul 2012 DE
102012022453 May 2014 DE
102013200450 Jul 2014 DE
102012205757 Aug 2014 DE
2317068 May 2011 EP
2574722 Apr 2013 EP
2737173 Jun 2014 EP
3333141 Jun 2018 EP
3051699 Dec 2017 FR
2124855 Feb 1984 GB
2357305 Jun 2001 GB
2399515 Sep 2004 GB
2422125 Jul 2006 GB
2532967 Jun 2016 GB
2009067609 Apr 2009 JP
4275896 Jun 2009 JP
5013156 Aug 2012 JP
2013110910 Jun 2013 JP
343139 Nov 2018 NO
20161842 May 2019 NO
2282708 Aug 2006 RU
122531 Nov 2012 RU
WO 1995035429 Dec 1995 WO
WO 1997021904 Jun 1997 WO
WO 2000025942 May 2000 WO
WO 2000031374 Jun 2000 WO
WO 2001042622 Jun 2001 WO
WO 2002020944 Mar 2002 WO
WO 2002068793 Sep 2002 WO
WO 2004042185 May 2004 WO
WO 2007049026 May 2007 WO
WO 2007070305 Jun 2007 WO
WO 2008146017 Dec 2008 WO
WO 2009020889 Feb 2009 WO
WO 2009113895 Sep 2009 WO
WO 2010054353 May 2010 WO
WO 2010105177 Sep 2010 WO
WO 2011038170 Mar 2011 WO
WO 2011042622 Jun 2011 WO
WO 2011130159 Oct 2011 WO
WO 201113 9697 Nov 2011 WO
WO 2012007407 Jan 2012 WO
WO 2013016095 Jan 2013 WO
WO 2013148510 Oct 2013 WO
WO 201412703 5 Aug 2014 WO
WO 2015072971 May 2015 WO
WO 2015095155 Jun 2015 WO
WO 2016178005 Nov 2016 WO
WO 2017011078 Jan 2017 WO
WO 2017027105 Feb 2017 WO
WO 2017132297 Aug 2017 WO
WO 2017196303 Nov 2017 WO
WO 2018022198 Feb 2018 WO
WO 2018046361 Mar 2018 WO
WO 2018167022 Sep 2018 WO
WO 2018169991 Sep 2018 WO
WO 2019040091 Feb 2019 WO
WO 2019055240 Mar 2019 WO
WO 2019089926 May 2019 WO
WO 2019108931 Jun 2019 WO
WO 2019125493 Jun 2019 WO
WO 2019169067 Sep 2019 WO
WO 2019236288 Dec 2019 WO
WO 2019246263 Dec 2019 WO
Non-Patent Literature Citations (79)
Entry
PCT International Search Report and Written Opinion in International Appln. No. PCT/US2022/017708, dated Apr. 11, 2022, 15 pages.
U.S. Appl. No. 16/524,935, filed Jul. 29, 2019, Zhan et al.
“IADC Dull Grading for PDC Drill Bits,” Beste Bit, SPE/IADC 23939, 1992, 52 pages.
AkerSolutions, “Aker MH CCTC Improving Safety,” AkerSolutions, Jan. 2008, 12 pages.
Anwar et al., “Fog computing: an overview of big IoT data analytics,” ID 7157192, Wiley, Hindawi, Wireless communications and mobile computing, May 2018, 2018: 1-22, 23 pages.
Artymiuk et al., “The new drilling control and monitoring system,” Acta Montanistica Slovaca, Sep. 2004, 9:3 (145-151), 7 pages.
Ashby et al., “Coiled Tubing Conveyed Video Camera and Multi-Arm Caliper Liner Damage Diagnostics Post Plug and Perf Frac,” SPE-172622-MS, Society of Petroleum Engineers (SPE), presented at the SPE Middle East Oil & Gas Show and Conference, Mar. 8-11, 2015, 12 pages.
Bilal et al., “Potentials, trends, and prospects in edge technologies: Fog, cloudlet, mobile edge, and micro data centers,” Computer Networks, Elsevier, Oct. 2017, 130: 94-120, 27 pages.
Carpenter, “Advancing Deepwater Kick Detection,” JPT, 68:5, May 2016, 2 pages.
Caryotakis, “The klystron: A microwave source of surprising range and endurance.” The American Physical Society, Division of Plasma Physics Conference in Pittsburg, PA, Nov. 1997, 14 pages.
Commer et al., “New advances in three-dimensional controlled-source electromagnetic inversion,” Geophys. J. Int., 2008, 172: 513-535, 23 pages.
Corona et al., “Novel Washpipe-Free ICD Completion With Dissolvable Material,” OTC-28863-MS, presented at the Offshore Technology Conference, Houston, TX, Apr. 30-May 3, 2018, 2018, OTC, 10 pages.
Dickens et al., “An LED array-based light induced fluorescence sensor for real-time process and field monitoring,” Sensors and Actuators B: Chemical, Elsevier, Apr. 2011, 158:1 (35-42), 8 pages.
Dong et al., “Dual Substitution and Spark Plasma Sintering to Improve Ionic Conductivity of Garnet Li7La3Zr2O12,” Nanomaterials, 9:721, 2019, 10 pages.
downholediagnostic.com [online] “Acoustic Fluid Level Surveys,” retrieved from URL <https://www.downholediagnostic.com/fluid-level> retrieved on Mar. 27, 2020, available on or before 2018, 13 pages.
edition.cnn.com [online], “Revolutionary gel is five times stronger than steel,” retrieved from URL <https://edition.cnn.com/style/article/hydrogel-steel-japan/index.html>, retrieved on Apr. 2, 2020, available on or before Jul. 16, 2017, 6 pages.
Fjetland et al., “Kick Detection and Influx Size Estimation during Offshore Drilling Operations using Deep Learning,” INSPEC 18992956, IEEE, presented at the 2019 14th IEEE Conference on Industrial Electronics and Applications (ICIEA), Jun. 19-21, 2019, 6 pages.
Gemmeke and Ruiter, “3D ultrasound computer tomography for medical imagining,” Nuclear Instruments and Methods in Physics Research Section A:580 (1057-1065), Oct. 1, 2007, 9 pages.
gryphonoilfield.com [online], “Gryphon Oilfield Services, Echo Dissolvable Fracturing Plug,” available on or before Jun. 17, 2020, retrieved on Aug. 20, 2020, retrieved from URL <https://www.gryphonoilfield.com/wp-content/uploads/2018/09/Echo-Series-Dissolvable-Fracturing-Plugs-8-23-2018-1.pdf>, 1 page.
halliburton.com [online], “Drill Bits and Services Solutions Catalogs,” retrieved from URL: <https://www.halliburton.com/content/dam/ps/public/sdbs/sdbs_contents/Books_and_Catalogs/web/DBS-Solution.pdf> on Sep. 26, 2019, 2014, 64 pages.
Hopkin, “Factor Affecting Cuttings Removal during Rotary Drilling,” Journal of Petroleum Technology 19.06, Jun. 1967, 8 pages.
Ji et al., “Submicron Sized Nb Doped Lithium Garnet for High Ionic Conductivity Solid Electrolyte and Performance of All Solid-State Lithium Battery,” doi:10.20944/preprints201912.0307.v1, Dec. 2019, 10 pages.
Johnson et al., “Advanced Deepwater Kick Detection,” IADC/SPE 167990, presented at the 2014 IADC/SPE Drilling Conference and Exhibition, Mar. 4-6, 2014, 10 pages.
Johnson, “Design and Testing of a Laboratory Ultrasonic Data Acquisition System for Tomography” Thesis for the degree of Master of Science in Mining and Minerals Engineering, Virginia Polytechnic Institute and State University, Dec. 2, 2004, 108 pages.
King et al., “Atomic layer deposition of TiO2 films on particles in a fluidized bed reactor,” Power Technology, 183:3, Apr. 2008, 8 pages.
Lafond et al., “Automated Influx and Loss Detection System Based on Advanced Mud Flow Modeling,” SPE-195835-MS, Society of Petroleum Engineers (SPE), presented at the SPE Annual Technical Conference and Exhibition, Sep. 30-Oct. 2, 2019, 11 pages.
Li et al., 3D Printed Hybrid Electrodes for Lithium-ion Batteries, Missouri University of Science and Technology, Washington State University; ECS Transactions, 77 (11) 1209-1218 (2017), 11 pages.
Liu et al., “Flow visualization and measurement in flow field of a torque converter,” Mechanic automation and control Engineering, Second International Conference on IEEE, Jul. 15, 2011, 1329-1331.
Liu et al., “Superstrong micro-grained polycrystalline diamond compact through work hardening under high pressure,” Appl. Phys. Lett. Feb. 2018, 112: 6 pages.
Liu, et al. “Hardness of Polycrystalline Wurtsite Boron Nitride (wBN) Compacts,” Scientific Reports, Jul. 2019, 9(1):1-6, 6 pages.
Luo et al., “Simple Charts to Determine Hole Cleaning Requirements in Deviated Wells,” IADC/SPE 27486, SPE/IADC Drilling Conference, Society of Petroleum Engineers, Feb. 15-18, 1994, 7 pages.
Maurer, “The Perfect Cleaning Theory of Rotary Drilling,” Journal of Petroleum Technology 14.11, 1962, 5 pages.
nature.com [online], “Mechanical Behavior of a Soft Hydrogel Reinforced with Three-Dimensional Printed Microfibre Scaffolds,” retrieved from URL <https://www.nature.com/articles/s41598-018-19502-y>, retrieved on Apr. 2, 2020, available on or before Jan. 19, 2018, 47 pages.
Nuth, “Smart oil field distributed computing,” The Industrial Ethernet Book, Nov. 2014, 85:14 (1-3), 3 pages.
Olver, “Compact Antenna Test Ranges,” Seventh International Conference on Antennas and Propagation IEEE, Apr. 15-18, 1991, 10 pages.
Paiaman et al., “Effect of Drilling Fluid Properties on Rate Penetration,” Nafta 60:3, 2009, 6 pages.
Parini et al., “Chapter 3: Antenna measurements,” in Theory and Practice of Modern Antenna Range Measurements, IET editorial, 2014, 30 pages.
petrowiki.org [online], “Hole Cleaning,” retrieved from URL <http://petrowiki.org/Hole_cleaning#Annular-fluid_velocity>, retrieved on Jan. 25, 2019, 8 pages.
petrowiki.org [online], “Kicks,” Petrowiki, available on or before Jun. 26, 2015, retrieved on Jan. 24, 2018, retrieved from URL <https://petrowiki.org/Kicks>, 6 pages.
Ranjbar, “Cutting Transport in Inclined and Horizontal Wellbore,” University of Stavanger, Faculty of Science and Technology, Master's Thesis, Jul. 6, 2010, 137 pages.
Rasi, “Hole Cleaning in Large, High-Angle Wellbores,” IADC/SPE 27464, Society of Petroleum Engineers (SPE), presented at the 1994 SPE/IADC Drilling Conference, Feb. 15-18, 1994, 12 pages.
rigzone.com [online], “How does Well Control Work?” Rigzone, available on or before 1999, retrieved on Jan. 24, 2019, retrieved from URL <https://www.rigzone.com/training/insight.asp?insight_id=304&c_id>, 5 pages.
Robinson and Morgan, “Effect of Hole Cleaning on Drilling Rate Performance,” Paper Aade-04-Df-Ho-42, AADE 2004 Drilling Fluids Conference, Houston, Texas, Apr. 6-7, 2004, 7 pages.
Robinson, “Economic Consequences of Poor Solids and Control,” AADE 2006 Fluids Conference and Houston, Texas, Apr. 11-12, 2006, 9 pages.
Rubaii et al., “A new robust approach for hole cleaning to improve rate of penetration,” SPE 192223-MS, Society of Petroleum Engineers (SPE), presented at the SPE Kingdom of Saudi Arabia Annual Technical Symposium and Exhibition, Apr. 23-26, 2018, 40 pages.
Ruiter et al., “3D ultrasound computer tomography of the breast: A new era?” European Journal of Radiology 81S1, Sep. 2012, 2 pages.
sageoiltools.com [online] “Fluid Level & Dynamometer Instruments for Analysis due Optimization of Oil and Gas Wells,” retrieved from URL <http://www.sageoiltools.com/>, retrieved on Mar. 27, 2020, available on or before 2019, 3 pages.
Schlumberger, “CERTIS: Retrievable, single-trip, production-level isolation system,” www.slb.com/CERTIS, 2017, 2 pages.
Schlumberger, “First Rigless ESP Retrieval and Replacement with Slickline, Offshore Congo: Zeitecs Shuttle System Eliminates Need to Mobilize a Workover Rig,” slb.com/zeitecs, 2016, 1 page.
Schlumberger, “The Lifting Business,” Offshore Engineer, Mar. 2017, 1 page.
Schlumberger, “Zeitecs Shuttle System Decreases ESP Replacement Time by 87%: Customer ESP riglessly retrieved in less than 2 days on coiled tubing,” slb.com/zeitecs, 2015, 1 page.
Schlumberger, “Zeitecs Shuttle System Reduces Deferred Production Even Before ESP is Commissioned, Offshore Africa: Third Party ESP developed fault during installation and was retrieved on rods, enabling operator to continue running tubing without waiting on replacement,” slb.com/zeitecs, 2016, 2 pages.
Schlumberger, “Zeitecs Shuttle: Rigless ESP replacement system,” Brochure, 8 pages.
Schlumberger, “Zeitecs Shuttle: Rigless ESP replacement system,” Schlumberger, 2017, 2 pages.
Sifferman et al., “Drilling cutting transport in full scale vertical annuli,” Journal of Petroleum Technology 26.11, 48th Annual Fall Meeting of the Society of Petroleum Engineers of AIME, Las Vegas, Sep. 30-Oct. 3, 1973, 12 pages.
slb.com [online] “Technical Paper: ESP Retrievable Technology: A Solution to Enhance ESP Production While Minimizing Costs,” SPE 156189 presented in 2012, retrieved from URL <http://www.slb.com/resources/technical_papers/artificial_lift/156189.aspx>, retrieved on Nov. 2, 2018, 1 pages.
slb.com [online], “Zeitecs Shuttle Rigless ESP Replacement System,” retrieved from URL <http://www.slb.com/services/production/artificial_lift/submersible/zeitecs-shuttle.aspx?t=3>, available on or before May 31, 2017, retrieved on Nov. 2, 2018, 3 pages.
Sulzer Metco, “An Introduction to Thermal Spray,” 4, 2013, 24 pages.
Takahashi et al., “Degradation study on materials for dissolvable frac plugs,” URTeC 2901283, presented at the Unconventional Resources Technology Conference, Houston, Texas, Jul. 23-25, 2018, 9 pages.
tervesinc.com [online], “Tervalloy™ Degradable Magnesium Alloys,” available on or before Jun. 12, 2016, via Internet Archive: Wayback Machine URL <https://web.archive.org/web/20160612114602/http://tervesinc.com/media/Terves_8-Pg_Brochure.pd>, retrieved on Aug. 20, 2020, <http://tervesinc.com/media/Terves_8-Pg_Brochure.pdf>, 8 pages.
Tobenna, “Hole Cleaning Hydraulics,” Universitetet o Stavanger, Faculty of Science and Technology, Master's Thesis, Jun. 15, 2010, 75 pages.
Utkin et al., “Shock Compressibility and Spallation Strength of Cubic Modification of Polycrystalline Boron Nitride,” High Temperature, 2009, 47(5):628-634, 7 pages.
Wastu et al., “The effect of drilling mud on hole cleaning in oil and gas industry,” Journal of Physics: Conference Series, Dec. 2019, 1402:2, 7 pages.
Weatherford, “RFID Advanced Reservoir Management System Optimizes Injection Well Design, Improves Reservoir Management,” Weatherford.com, 2013, 2 pages.
Wei et al., “The Fabrication of All-Solid-State Lithium-Ion Batteries via Spark Plasma Sintering,” Metals, 7: 372, 2017, 9 pages.
Wellbore Service Tools: Retrievable tools, “RTTS Packer,” Halliburton: Completion Tools, 2017, 4 pages.
wikipedia.org [online] “Optical Flowmeters,” retrieved from URL <https://en.wikipedia.org/wiki/Flow_measurement#Optical_flowmeters>, retrieved on Mar. 27, 2020, available on or before Jan. 2020, 1 page.
wikipedia.org [online] “Ultrasonic Flow Meter,” retrieved from URL <https://en.wikipedia.org/wiki/Ultrasonic_flow_meter>, retrieved on Mar. 27, 2020, available on or before Sep. 2019, 3 pages.
wikipedia.org [online], “Atomic layer deposition,” available on or before Sep. 10, 2014, via Internet Archive: Wayback Machine URL <http://web.archive.org/web/20140910101023/http://en.wikipedia.org/wiki/Atomic_layer_deposition>, retrieved on Feb. 9, 2021, <https://en.wikipedia.org/wiki/Atomic_layer_deposition>.
wikipedia.org [online], “Chemical vapor deposition,” available on or before Apr. 11, 2013, via Internet Archive: Wayback Machine URL <http://web.archive.org/web/20130411025512/http://en.wikipedia.org:80/wiki/Chemical_Vapor_Deposition>, retrieved on Feb. 9, 2021, URL <https://en.wikipedia.org/wiki/Chemical_vapor_deposition>, 12 pages.
wikipedia.org [online], “Surface roughness,” retrieved from URL <https://en.wikipedia.org/wiki/Surface_roughness>, retrieved on Apr. 2, 2020, available on or before Oct. 2017, 6 pages.
Williams and Bruce, “Carrying Capacity of Drilling Muds,” Journal of Petroleum Technology, 3.04, 192, 1951, 10 pages.
Xia et al., “A Cutting Concentration Model of a Vertical Wellbore Annulus in Deep-water Drilling Operation and its Application,” Applied Mechanics and Materials, 101-102, Sep. 27, 2011, 5 pages.
Xue et al., “Spark plasma sintering plus heat-treatment of Ta-doped Li7La3Zr2O12 solid electrolyte and its ionic conductivity,” Mater. Res. Express 7 (2020) 025518, 8 pages.
Zhan et al. “Effect of β-to-α Phase Transformation on the Microstructural Development and Mechanical Properties of Fine-Grained Silicon Carbide Ceramics,” Journal of the American Ceramic Society 84.5, May 2001, 6 pages.
Zhan et al. “Single-wall carbon nanotubes as attractive toughening agents in alumina-based nanocomposites,” Nature Materials 2.1, Jan. 2003, 6 pages.
Zhan et al., “Atomic Layer Deposition on Bulk Quantities of Surfactant Modified Single-Walled Carbon Nanotubes,” Journal of American Ceramic Society, 91:3, Mar. 2008, 5 pages.
Zhang et al, “Increasing Polypropylene High Temperature Stability by Blending Polypropylene-Bonded Hindered Phenol Antioxidant,” Macromolecules, 51:5 (1927-1936), 2018, 10 pages.
Zhu et al., “Spark Plasma Sintering of Lithium Aluminum Germanium Phosphate Solid Electrolyte and its Electrochemical Properties,” University of British Columbia; Nanomaterials, 9, 1086, 2019, 10 pages.
Related Publications (1)
Number Date Country
20220268117 A1 Aug 2022 US