Wall systems with digitally designed components provide innovative solutions over drywall installation by providing manufactured wall components to be used for quick and efficient onsite installation.
Construction projects may involve the purchase and delivery to a job site of 30% more materials than what is needed. These projects rely on materials/tools such as screw guns, time, garbage bins, and a laborer to fill the garbage bins with waste created from the construction. When the project is completed, the bin is hauled to a dump.
In another example referred to as modular construction, everything is built in a factory, loaded in trucks, and then taken to a jobsite. After the walls or room modules are unloaded, the modules are placed side-by-side in precisely designated locations and orientations. Each module is then individually leveled and attached to adjacent modules.
The present specification describes a construction method that combines aesthetics with high-performing and cost-effective environments. Work spaces, classroom settings, and hospital rooms are just a few examples of environments in which these construction methods may be used.
The present specification describes digital component construction. Using digital technology, individual components are precisely manufactured and then delivered and installed. There is no need, however, for clean up or waste removal. The cost remains competitive with other types of construction.
As part of a digital component construction, a wall system is assembled using various components and methodology that will be described herein.
An example method for building a drop-in ceiling wall system includes the installation of a floor track. This is followed by a support structure of studs being installed along the floor track. Cornice rails are installed to the studs. Also, a top cladding is installed to at least a portion of the studs. Ceiling mounts are secured to tops of the studs. This is followed by a secondary cladding installed to the studs. To complete the wall system, a drop-in ceiling is secured on top of the ceiling mounts.
An example system for building a drop-in ceiling wall system includes a floor track and a support structure of studs along the floor track. Ceiling mounts are to be secured on tops of the studs. A drop-in ceiling is to be lowered and secured on top of the ceiling mounts. Cornice rails are to be installed on the studs. A top cladding is to be installed on at least a portion of the studs. A secondary cladding is to be installed on the studs.
An example system for building a drop-in ceiling wall system includes a floor track to be secured on a base floor. A support structure of studs is secured to the floor track. Cornice rails are placed on top of the studs. Splice plates connect ends of the cornice rails together. A top cladding is installed to at least a portion of the studs at a fixed distance below the top of the studs. The top cladding is installed prior to the cornice rails being secured to the top of the studs. Ceiling mounts are installed on top of the top cladding in a manner that provides equal spacing reveals between the ceiling mounts and the top cladding. Splice plates connect ends of the ceiling mounts together. A secondary cladding is installed to the studs. To complete the wall system, a drop-in ceiling is secured on top of the ceiling mounts.
Turning to
The walls, or cladding may be pre-formed or cut to desired sizes on site during construction. The cladding are then connected using various stud assemblies and components that allow for adjustments, replacements, and overall modularity of the wall system 100.
For installation, the floor track 102 may be cut to a desired length. In an example, the floor track 102 includes a set of holes therethrough. Relatively small holes are used for fasteners to fasten the floor track to a ground surface. The floor track 102 may further include holes (not shown) that allow for ease of electrical and mechanical wires to pass through. The holes further provide a visual cue to an installer to align with centerline markings, such as chalk lines, for layout purposes. The holes may be equally spaced apart or otherwise spaced in a manner that allows for precision.
A wall system 100 may also be added to an existing building by abutting a floor track 102 against a base building wall. In this position, the floor track 102 is secured with anchors to the base floor (not shown).
Once the floor track 102 is secured to the base floor, whether alone on the base floor, or up against a base building wall, the support structure may be installed. Installation begins at a corner connection of the floor track 102, such as a 90 degree angle connection or other angle connection. At least one stud 106 is secured at the corner connection. This is shown in
Following the stud 106 at the corner connection, adjacent studs to the stud 106 are continually installed to define a skeletal frame wall around the floor track 102. In
Once the studs 106-1, -2, -3, -4, -5 are positioned as desired, the studs 106-1, -2, -3, -4, -5 are leveled to a benchmark height above the floor track. The base floor may have a high spot. Beginning at the high spot, the nearest stud is leveled to a benchmark height above the base floor. In an example, the height from the bottom of the stud to the base floor may be approximately 5½″. The height may be less than 5½″ or greater than 5½″. The benchmark height will serve as a reference level for the remaining studs as they are leveled. If the highest stud was 106-1, then it would serve as the benchmark height for the remaining studs 106-2, -3, -4, -5. The benchmark height may also be referenced with respect to the floor track 102.
A threaded leveler 144 may be inserted between the stud 106 and spacer block 126 for incremental adjustment in height. A drill 146 is used to secure the threaded leveler 144 to the floor track 102 with the stud 126 at a height above the floor track 102.
Turning to
Cornice rails 130-1, -2 are used for “free standing” applications, or in other words, to be used with studs that are not abutting a building wall or other structure. They are also used in situations where additional structural support is needed. The cornice rails 130-1, -2 placed on top of the studs 106-1, -2, -3, -4, -5, -6 provide stability. As shown in
In addition to a corner splice plate 131, securement of cornice rails 130-1, -2 may be accomplished with a straight splice plate 132 or a T-shaped splice plate. A straight splice plate 132 is an elongate, generally flat member with side walls as shown in
The splice plates 131 and 132 may include holes for being secured with wafer screws to the cornice rails. As shown in
Once the cornice rails 130-1, -2 are secured by the splice plate 132, a top cladding 108-1, -2, -3 is installed, as shown in
After the top cladding 108-1, -2, -3 are installed, the cornice rails 130-1, -2 are attached to the studs 106-1, -2 as illustrated in
In another example, the top cladding 108-1, -2, -3 (
Turning to
To install the ceiling mount 108, a first side portion of the ceiling mount 110 is tilted to lay behind a top edge of the top cladding. As shown in
In
Ceiling mounts 110-1, -2 shown in
The ceiling mounts 110-1, -2 being mounted below the top of the studs 106 allow for heat resistant properties which eliminates a need for having a fire-rated material above the ceiling level.
Note that the drop-in ceiling can be installed even after all the cladding is already installed.
Turning to
An example of L-shaped molding 142 that may be used on the perimeter as a ceiling starter as shown in
Turning to
In
The descriptions of the various examples of the present disclosure have been presented for purposes of illustration, but are not intended to be exhaustive or limited to the examples disclosed. Many modifications and variations will be apparent to those of ordinary skill in the art without departing from the scope and spirit of the described examples. The terminology used herein was chosen to best explain the principles of the examples, the practical application or technical improvement over technologies found in the marketplace, or to enable others of ordinary skill in the art to understand the examples disclosed herein.
Number | Name | Date | Kind |
---|---|---|---|
2101952 | Anders | Dec 1937 | A |
3323262 | Cesare, Jr. | Jun 1967 | A |
4193233 | Vandenhoek | Mar 1980 | A |
4899509 | Power | Feb 1990 | A |
4910938 | McGee | Mar 1990 | A |
4986047 | Power | Jan 1991 | A |
5157884 | Schwartz | Oct 1992 | A |
5279088 | Heydon | Jan 1994 | A |
5377466 | Insalaco | Jan 1995 | A |
5606836 | Insalaco | Mar 1997 | A |
5619833 | Neff | Apr 1997 | A |
5685662 | Rollin | Nov 1997 | A |
5839240 | Elsholz | Nov 1998 | A |
5992109 | Jonker | Nov 1999 | A |
6003273 | Elsholz | Dec 1999 | A |
6109461 | Kluge | Aug 2000 | A |
6112485 | Beyer | Sep 2000 | A |
6213679 | Frobosilo | Apr 2001 | B1 |
6349516 | Powell | Feb 2002 | B1 |
6481177 | Wood | Nov 2002 | B1 |
6711871 | Beirise | Mar 2004 | B2 |
6889477 | Kottman | May 2005 | B1 |
7694483 | Tucker | Apr 2010 | B1 |
8015767 | Glick | Sep 2011 | B2 |
8695310 | Tremblay | Apr 2014 | B2 |
9255403 | Lehane | Feb 2016 | B1 |
9963869 | Mironchuk | May 2018 | B1 |
10041288 | Flood | Aug 2018 | B1 |
10323412 | Koziol | Jun 2019 | B2 |
10738466 | Boyce | Aug 2020 | B1 |
11142901 | Friedlos | Oct 2021 | B2 |
20010039774 | Beirise | Nov 2001 | A1 |
20020062617 | Digirolamo | May 2002 | A1 |
20020157335 | Vos | Oct 2002 | A1 |
20030089057 | Wiechecki | May 2003 | A1 |
20040231271 | Bruno | Nov 2004 | A1 |
20050034408 | Palumbo | Feb 2005 | A1 |
20050247654 | Walker | Nov 2005 | A1 |
20060016139 | Beck | Jan 2006 | A1 |
20060236625 | MacDonald | Oct 2006 | A1 |
20080060288 | Frobosilo | Mar 2008 | A1 |
20080104922 | Glick | May 2008 | A1 |
20090013639 | Tremblay | Jan 2009 | A1 |
20090193735 | Kalinowski | Aug 2009 | A1 |
20100006518 | Brobst | Jan 2010 | A1 |
20130091691 | Oetlinger | Apr 2013 | A1 |
20140331564 | Wei | Nov 2014 | A1 |
20160069072 | Rice | Mar 2016 | A1 |
20160168863 | Kwan | Jun 2016 | A1 |
20160273214 | Kopish | Sep 2016 | A1 |
20170204600 | Daudet | Jul 2017 | A1 |
20180094422 | Getz | Apr 2018 | A1 |
20180094431 | Koziol | Apr 2018 | A1 |
20190071869 | Maley | Mar 2019 | A1 |
20190249418 | Chapman | Aug 2019 | A1 |
20190380492 | Heap | Dec 2019 | A1 |
20200318339 | Friedlos | Oct 2020 | A1 |
20210079648 | Viebahn | Mar 2021 | A1 |
20210180315 | Marshall | Jun 2021 | A1 |
Number | Date | Country |
---|---|---|
3076354 | Mar 2020 | CA |
01058767 | Mar 1989 | JP |
2012039678 | Mar 2012 | WO |
2017069698 | Apr 2017 | WO |
Entry |
---|
Murray, Tara; “Solid Wall Patent Background”; Haworth; Mar. 13, 2020; 7 pages. |
Author unknown; Teknion Leveler Foot Image; 1 page; Retrieved from online search in Apr. 2019. |
Slotted Standard Hooks Image; Retrieved from internet search Jun. 2019; 1 page. |
Racking Images; Retrieved from internet search Apr. 2019; 1 page. |
https://www.bmp-group.com/; viewed website on Feb. 3, 2022; 3 pages. |
https://www.clarkdietrich.com/; viewed website on Feb. 3, 2022; 3 pages. |
Number | Date | Country | |
---|---|---|---|
20230111235 A1 | Apr 2023 | US |