The invention relates to a blasting device comprising a flow passage for a carrier gas, the flow passage forming a blasting nozzle at its downstream end, and a supply line for liquid CO2, the supply line opening out into an expansion chamber that is formed coaxially in the flow passage.
EP 1 501 655 discloses a blasting device wherein the expansion chamber enters laterally into the flow passage. As an alternative, the possibility has been mentioned that the expansion chamber may be accommodated coaxially in the flow passage.
The expansion and evaporation of a part of the liquid CO2 in the expansion chamber produces evaporation chill, so that another part of the CO2 condenses to solid dry ice which then serves as a blasting medium that is carried along with the carrier gas and accelerated in the blasting nozzle. Such a device is suitable for efficiently and yet gently removing incrustations from surfaces. The cleaning effect depends critically on the number, size and velocity of the CO2 particles.
The invention with the features indicated in the independent claims solves the problem to achieve high yield of solid CO2 and a high cleaning effect by efficient coagulation and acceleration of the solid CO2 by means of a compact device and by with a reduced consumption of carrier gas.
Useful details of the invention are indicated in the dependent claims.
An embodiment example will now be described in conjunction with the drawings, wherein:
A blasting tube 10 carries at its downstream end, i.e. the upper end in
A portion of the straight flow passage 14 inside the blasting tube 10 is enlarged to form an annular space 16 which accommodates a holder 18 for a pipe 20 that is arranged coaxially in the flow passage. The supply line 22 for liquid CO2 is formed near or preferably inside of the holder 18 and extends in transverse direction of the flow passage 14. The supply line 22 opens, via an injection passage 24 that extends in parallel with the axis of the flow passage 14, into an expansion chamber 26 formed inside a pipe 20. There, the liquid CO2 that is preferably supplied at a pressure of 1 MPa or more is expanded and evaporated, so that a part of the CO2 which may amount to approximately 40-60% of the total amount of CO2 may condense to solid dry ice. The injection passage 24 and the expansion chamber 26 extending coaxially in the flow passage 14 cause the dry ice to be introduced into the flow of carrier gas with already a relatively high initial speed in flow direction of the carrier gas, so that the dry ice will be further accelerated to high speed by the carrier gas and will also be evenly distributed in the flow passage 14.
In the example shown, there is provided only a single injection passage 24 centered onto the axis of the flow passage 14.
The cross-sectional area A of the injection passage 24 and the volume V of the expansion chamber 26 fulfil the relation V1/3/A1/2>3, preferably V1/3/A1/2>10.
Downstream of the pipe 20, the flow passage 14 has accommodated therein a squeeze body 28 that is shaped as a double cone. In general, the squeeze body should have a streamline configuration, i.e. should be tapered towards both, its front and rear ends.
In the example shown, the squeeze body 28 projects slightly into the expansion chamber 26 with its upstream tip end, so that it forms an annular gap with the walls of the pipe 20. Moreover, the downstream tip end of the squeeze body projects slightly into a conical portion of the flow passage 14 shortly before the entry into the blasting nozzle 12.
The squeeze body 28 has the purpose to maintain the pressure in the expansion chamber 26 at suitable values and thereby to assist in the coagulation of the dry ice in the expansion chamber. At the same time, the squeeze body assures a better distribution and acceleration of the dry ice in the compressed air in the flow passage and a further growth of the CO2 particles, while avoiding on the other hand that the constrictions between the pipe 20 and the squeeze body and/or between the squeeze body and the walls of the flow passage 14 become clogged by the formation of ice.
As is shown in
The blasting device that has been disclosed herein has the important advantages that the low pressure of the carrier gas permits a low consumption of carrier gas which may for example amount to less than 0.1 m3/min, as compared to at least 0.8 m3/min for conventional dry ice blasting devices. Further, the construction and arrangement of the injection passage 24 and the expansion space 26 and the squeeze body 28 permit to achieve a high yield of solid CO2 and a high quality (size and hardness) of the CO2 particles, which results in a high cleaning effect.
In the example that has been shown herein, the flow passage 14 is slightly tapered in the blasting tube 10 upstream of the blasting nozzle 12, but the mouth of the expansion chamber 26 is located in a position (at least 30 mm ahead of the nozzle constriction) in which the cross-sectional area of the flow passage 14 amounts to at least 1.5 times the cross-sectional area of the constriction of the blasting nozzle 12.
The blasting tube 10 may be surrounded by a heat insulating layer. However, a certain protection against icing is achieved already by the fact that the expansion chamber 26 is arranged coaxially in the flow passage and is therefore surrounded by an annular gap through which the compressed air passes.
Filing Document | Filing Date | Country | Kind | 371c Date |
---|---|---|---|---|
PCT/EP2008/010449 | 12/9/2008 | WO | 00 | 5/25/2010 |
Publishing Document | Publishing Date | Country | Kind |
---|---|---|---|
WO2009/074294 | 6/18/2009 | WO | A |
Number | Name | Date | Kind |
---|---|---|---|
3716190 | Lindlof | Feb 1973 | A |
4633623 | Spitz | Jan 1987 | A |
4817342 | Martin et al. | Apr 1989 | A |
5125979 | Swain | Jun 1992 | A |
5320289 | Hashish et al. | Jun 1994 | A |
5335459 | Dale | Aug 1994 | A |
5876267 | Kanda | Mar 1999 | A |
6932285 | Zeng | Aug 2005 | B1 |
7708620 | Kipp | May 2010 | B2 |
7967664 | Elbing et al. | Jun 2011 | B2 |
Number | Date | Country |
---|---|---|
10243855 | Apr 2004 | DE |
20310119 | May 2004 | DE |
20310119 | Jun 2004 | DE |
20311771 | Dec 2004 | DE |
20318056 | Apr 2005 | DE |
202005018953 | Apr 2007 | DE |
1501655 | Apr 2006 | EP |
2557383 | Aug 1997 | JP |
2005-111575 | Apr 2005 | JP |
04-253331 | Sep 2012 | JP |
2004033154 | Apr 2004 | WO |
2006005377 | Jan 2006 | WO |
2007125565 | Nov 2007 | WO |
Number | Date | Country | |
---|---|---|---|
20100261416 A1 | Oct 2010 | US |