Dry mix and concrete composition containing bed ash and related methods

Information

  • Patent Grant
  • 11479506
  • Patent Number
    11,479,506
  • Date Filed
    Monday, March 15, 2021
    3 years ago
  • Date Issued
    Tuesday, October 25, 2022
    2 years ago
  • Inventors
    • Schane; Douglas W. (Adena, OH, US)
    • Brown; Arthur B. (Durango, CO, US)
  • Original Assignees
    • Crown Products & Services, Inc. (Gillette, WY, US)
  • Examiners
    • Green; Anthony J
    Agents
    • Reinhart Boerner Van Deuren s.c.
Abstract
Embodiments of a dry mix for producing a concrete composition are provided. The dry mix includes aggregate, cement, and bed ash. The bed ash contains the combustion product of a fluidized bed coal combustion reaction. Additionally, embodiments of a method of preparing the dry mix and embodiments of a method of preparing a concrete composition are provided. The dry mix is also suitable for repairing soil slips, and embodiments of a method of repairing a soil slip are also provided.
Description
BACKGROUND

The disclosure relates generally to a concrete composition and more particularly to a concrete composition containing bed ash.


SUMMARY

According to one aspect, embodiments of a dry mix are provided. The dry mix includes aggregate, cement, and bed ash. The bed ash includes the combustion product of a fluidized bed coal combustion reaction.


In another aspect, embodiments of a method of preparing a dry mix are provided. The method includes a step of providing bed ash and cement. The bed ash contains the combustion product of a fluidized bed coal combustion reaction. The method also includes the steps of mixing the cement and the bed ash and adding aggregate to the mixed cement and bed ash.


In still another aspect, embodiments of a method of preparing a concrete composition are provided. The method includes a step of providing a dry mix. The dry mix includes aggregate, cement, and bed ash, the bed ash containing the combustion product of a fluidized bed coal combustion reaction. The method also includes the steps of mixing the dry mix with a fluid containing water to form a wet concrete and curing the wet concrete.


In exemplary embodiments, the combustion product of the bed ash is obtained from a fluidized bed coal combustion reaction of high sulfur coal. In such an embodiment, the combustion product may be treated with quicklime.


In other exemplary embodiments, the aggregate is a 2″ rock, such as limestone.


In still other exemplary embodiments, the dry mix includes 35% to 75% by weight of aggregate, 30% to 50% by weight of bed ash, and 5% to 15% by weight of cement. Additionally, embodiments of the dry mix also contain a fluorite catalyst.


In another aspect, embodiments of the present disclosure relate to a method of repairing a soil slip on a slope. In the method, earth is excavated from the soil slip to a depth below a slip plane of the soil slip. The earth is mixed with a dry mix to create an augmented soil. The dry mix includes bed ash and cement. The augmented soil is replaced in the soil slip, and the augmented soil is compacted.


In embodiments of the method, the weight ratio of bed ash to cement in the dry mix is from 3:1 to 5:1, more particularly about 4:1. In embodiments, the dry mix comprises 18% to 20% by weight of the cement. Further, in embodiments, the dry mix further comprises aggregate. In a particular embodiment, the dry mix comprises substantially equal volumes of aggregate and of bed ash and cement. In embodiments, the aggregate is 2″×3″ crushed stone.


In embodiments of the method, the step of excavating further comprises forming one or more keyways in the slope. Further, in embodiments, the augmented soil comprises 5% to 40% by weight of the dry mix, more particularly from 10% to 15% by weight of the dry mix.


In embodiments of the method, the step of replacing the augmented soil in the soil slip further comprises filling the soil slip in lifts of no more than 24″. Further, in embodiments, the compacting step is performed after each lift.


In embodiments of the method, at least one horizontal catchment is formed on the slope. In embodiments, the horizontal catchment is located at a base of the slope between the slop and a roadway. In embodiments, the method does not comprise a step of adding water to the augmented soil.


While the invention will be described in connection with certain embodiments, there is no intent to limit it to those embodiments. On the contrary, the intent is to cover all alternatives, modifications and equivalents as included within the spirit and scope of the invention as defined by the appended claims.


The accompanying drawings are included to provide a further understanding, and are incorporated in and constitute a part of this specification. The drawings illustrate one or more embodiment(s), and together with the description serve to explain principles and operation of the various embodiments.





BRIEF DESCRIPTION OF THE DRAWING


FIG. 1 depicts a soil slip on a slope.



FIG. 2 depicts an excavated soil slip after a step of the repair method, according to an exemplary embodiment.



FIG. 3 depicts the mixing of the dry mix composition with the excavated earth to form an augmented soil in another step of the repair method, according to an exemplary embodiment.



FIG. 4 depicts the augmented soil being replaced on the slope in a further step of the repair method, according to an exemplary embodiment.



FIG. 5 depicts the augmented soil being compacted in a final step of the repair method, according to an exemplary embodiment.





DETAILED DESCRIPTION

Generally, in this disclosure, various embodiments of dry mix for a concrete composition are provided. The dry mix includes an aggregate material, cement, and bed ash. In particular, the bed ash is produced via a coal combustion in a fluidized bed reactor. More particularly, the bed ash is produced from a combustion reaction of high sulfur coal in which the combustion product has been post treated with quicklime. Advantageously, this type of bed ash absorbs a large amount of water in an exothermic hydration reaction, which decreases cure time and leads to high early strength.


Further, the dry mix is especially suited for repairing roads in underground mining applications where mixing the dry mix with water is difficult. Additionally, the bed ash is compliant with the Environmental Protection Agency's (EPA) Class 1 water quality standards, which is the most stringent water quality criteria under the Clean Water Act (33 U.S.C. § 1251 et seq.).


Additionally, the dry mix is especially suitable for repairing soil slips. In particular, the dry mix is mixed with earth excavated from the soil slip, the augmented soil is replaced over the damaged slope, and then refilled soil slip is compacted. Moisture from the ground reacts with the dry mix in the replaced material to prevent future slippage. While certain embodiments will be discussed herein by way of example, those skilled in the art will recognize from the following description that such embodiments are provided by way of example only, not by way of limitation, and that all alternative embodiments and applications are reserved herein.


As mentioned above, the dry mix is primarily composed of three components: an aggregate material, cement, and bed ash. Beginning with the bed ash, the bed ash contains the combustion product of a fluidized bed coal combustion reaction. Such fluidized bed coal combustion reactions include atmospheric pressure fluidized bed combustion, circulating fluidized bed combustion, and pressurized fluidized bed combustion. The bed ash produced from such reactions is also known as fluidized bed combustion ash (or “FBC ash”) or bottom ash produced from a fluidized bed combustion. However, “bed ash” as used herein is not synonymous with other forms of bottom ash produced in other types of coal combustion reactions.


In a particular embodiment, the bed ash includes the fluidized bed combustion product of a combustion reaction of high sulfur coal. In embodiments, high sulfur coal refers to coal having a sulfur content of at least 1% by weight. In other embodiments, high sulfur coal refers to coal having a sulfur content of at least 3% by weight. In a particular embodiment, the combustion product is treated with quicklime. Advantageously, such bed ash passes the EPA's class I water quality standards for potable water supplies, as tested according to ASTM D3987-85.


Bed ash of this variety absorbs a large amount of water and, in doing so, undergoes an exothermic hydration reaction. As will be discussed more fully below, the heat released from the exothermic reaction decreases the cure time and enhances the high early strength of the concrete composition produced. In a particular embodiment, the bed ash absorbs at least its weight in water. In addition to absorbing a relatively high amount of water, the bed ash also absorbs the water quickly, which wicks the water into the matrix of the concrete composition. This wicking effect also enhances the high early strength of the concrete and decreases the cure time of the concrete composition produced. In an embodiment, the bed ash will absorb its weight of water in ten minutes or less. In another embodiment, the bed ash will absorb its weight in water in five minutes or less. During the absorption of the water, the bed ash swells, and the swelling provides two advantages. First, the swelling of the bed ash pre-stresses the matrix of the concrete composition, producing an overall stronger concrete composition. In embodiments, the bed ash swells at least 10% during hydration. In further embodiments, the bed ash swells at least 15% during hydration. Second, the swelling produces air spaces in the concrete, which enhances the flexibility of the concrete composition when put under high point loads, such as from heavy equipment hauling.


Having discussed the bed ash, attention is now turned to the cement. Portland cements are classified in categories defined by standard ASTM C150. Suitable portland cements for use in the dry mix include type I, type II, and type III cements, as well as combinations thereof. Type I cement is considered as a general purpose cement for use in most buildings, bridges, pavements, etc. and generally has a high tricalcium silicate (C3S in cement chemist notation) content for good early strength development. Type II cement is considered as having moderate sulfate resistance and is generally used in structures exposed to soil or water containing sulfate ions. Type III cement provides high early strength and may contain more C3S and be more finely ground than, e.g., type I and type II cements. While not classified under ASTM C150, the cement can also include calcium sulfoaluminate (CSA) cement in embodiments. Thus, suitable cements for use in the dry mix include type I cement, type II cement, type III cement, CSA cement, and combinations of two or more thereof.


In an embodiment, the bed ash is mixed with the cement in such a way that the cement coats the bed ash. In order to coat the bed ash, the cement is added in an amount sufficient to produce a ratio of bed ash to cement of from 3:1 to 5:1. In a specific embodiment, the ratio of bed ash to cement is 4:1. In another specific embodiment, the cement makes up from 18% to 20% by weight of the mixture of bed ash and cement. Advantageously, in the concrete composition made from the dry mix, the coating of the bed ash by the cement produces a bond between adjacent grains and the coarse aggregate further enhancing the flexibility of the concrete composition, especially when the concrete composition experiences heavy loads, such as in roadway applications.


Another component of the dry mix is the aggregate material. In an embodiment, the aggregate is rock having a typical cross-sectional dimension of from 1.5″ to 3″, i.e., the aggregate is 1.5″ rock to 3″ rock. In a particular embodiment, the aggregate is 2″×3″ rock, i.e., rock that passes through a 2″ mesh but is held by a 3″ mesh. In a more particular embodiment, the aggregate is limestone or another similar rock. In the concrete composition, the aggregate material provides early strength and driveability. That is, in embodiments, the concrete composition can be driven over immediately after the concrete composition is laid. Advantageously, immediate application of pressure to the concrete composition compacts the aggregate material so as to form a tight interlocking of the aggregate material, enhancing the strength. Further, in the concrete composition, the aggregate material provides long term strength throughout the matrix by spreading out loads and by providing good bonding surfaces for the bed ash and cement bonds. Moreover, the aggregate material provides excellent wear surface that is able to withstand heavy equipment that travels over the concrete composition.


The three components of the dry mix are provided in the following amounts. The aggregate material is provided in an amount of from 35% to 75% by weight. The bed ash is provided in an amount of from 30% to 50% by weight, and the cement is provided in an amount of from 5% to 15% by weight. In a specific embodiment, the dry mix has the following composition: 50% by weight of the aggregate material, 40% by weight of the bed ash, and 10% by weight of the cement. In a further embodiment, the dry mix also includes a catalyst of fluorite (CaF2). The fluorite can be present in an amount of up to 1% by weight. When included, the fluorite acts as a flux in the hydration and curing process, i.e., the fluorite acts as a cure accelerant to promote more rapid curing and/or hydration.


The embodiments of the dry mix described above can be used to form a concrete composition with the addition of water. In particular embodiments, four parts of dry mix are combined with one to two parts of water. Advantageously, the water does not need to be “clean,” i.e., free of substantial particulate, dust, and other suspended solids. For example, in certain roadway applications, especially in the context of underground coal mining, muddy ruts, or mud-holes, will develop in the roadway. After the mud is dug out of the rut, “black water” still typically remains in the hole. The black water generally contains coal, clay, and limestone dust. Instead of having to remove this water before laying the concrete composition, the dry mix, in embodiments, is added directly to the black water with the black water serving as the water component, or as part of the water component, of the concrete composition. Despite using the black water in the concrete composition, the cure time and strength of the concrete composition are not diminished. Indeed, the suspended solids can, in some circumstances, even enhance the strength of the concrete composition.


As discussed herein, the concrete composition produced from the mixture of bed ash, cement, and aggregate material is particularly suitable for underground mining applications, especially underground coal mining application. Indeed, the high early strength decreases down time when, for example, roads in the underground mine degrade to the point of repair, which can be a frequent occurrence resulting from the movement of heavy equipment over such roads. Not only does the high early strength help prevent such degradation, but also when repairing the road, the uncured concrete composition beneficially experiences strengthen when driven over immediately after laying of the concrete composition. Further, as mentioned above, the concrete composition contains bed ash that meets the EPA's class I quality standards, which is especially important for underground mining applications. Notwithstanding the benefits of using the concrete composition in the mining industry, the concrete composition can also be used in other applications where high early strength is desired.


Besides repair of roadways, the dry mix is also especially suitable for repairing soil slips. A soil slip is essentially a slab of earth that slides down a slope. Often these are caused by a weakness in the soil on the slope that causes cracking of the soil at the end of the slab at higher elevation. These cracks may then fill with water, such as from a heavy rain, and the accumulation of weight at the top of the soil slab causes the slab to break away along a slip plane and slide down the slope. In some instances, a soil slip can be instigated under the influence of gravity alone on a crack. Initial cracks in the slope can be caused by the movement of heavy machinery over a slope, removal of trees or other vegetation from the slope, blasting, or the construction of structures, such as pipelines, in or along the slope. Regardless of the cause, it is often desirable to repair the soil slip to prevent erosion and future soil slips and/or for aesthetic reasons.



FIG. 1 depicts a soil slip 10 on a slope 20 near a roadway 30. As can be seen, the soil slip 10 runs horizontally across the slope 20, defining a slip plane 40 from which earth 50 separates and slides down the slope 20. In a first step of the slip repair method, the slope 20 is excavated to a depth deeper than the slip plane 40. In embodiments, especially for large soil slips 10, the excavation leaves keyways or benches in the slope 20 such that the slope 20 has a stepped structure. FIG. 2 depicts an excavated slope 60 in which the soil slip 10 has essentially been removed. As can be seen in FIG. 2, the excavated slope 60 does not feature horizontal keyways. As will be understood by a person of ordinary skill in the art, the need for such keyways as well as the number and specific configuration will vary on a job-by-job basis and is generally left to the discretion of the site manager/engineer.


After the excavation step, dry mix 70 is added to the earth 50 from the excavated slope 60 (FIG. 3) to form an augmented soil 80 (FIG. 4). In embodiments, the dry mix contains bed ash, cement, and (optionally) aggregate and can be any of the dry mix embodiments discussed herein. In general, the bed ash and the cement are provided together with the aggregate, and in other embodiments, the bed ash and cement are provided separately from the aggregate, which may instead be locally sourced. In the latter embodiment, advantageously, the shipping weight and/or cost of the dry mix 70 may be lower. Further, in some embodiments, e.g., where the earth contains particularly rocky soil, the dry mix 70 does not contain separate aggregate. Additionally, in some embodiments, the augmented soil 80 need not contain any aggregate.


As discussed above, the bed ash and cement are provided in a ratio of bed ash to cement of from 3:1 to 5:1, more particularly at 4:1, and still more particularly, the cement is 18% to 20% by weight of the total amount of bed ash and cement. Further, for soil slip repair in which aggregate is used, the aggregate may be in the form of 2″×3″ crushed stone (i.e., the crushed stones pass through a 3″ screen but are held by a 2″ screen). In embodiments, the aggregate may be added in equal volume to the bed ash and cement. In embodiments, the dry mix 70 (with or without aggregate) is added to earth 50 in an amount of 5% to 40% by weight of the augmented soil 80. In certain embodiments, the dry mix 70 (with or without aggregate) is added to the earth in an amount of 10% to 15% by weight of the augmented soil 80.


In order to activate the dry mix 70, water is pulled from the excavated earth 50 and/or from the ground by the wicking action of the bed ash. Thus, in embodiments, only as much augmented soil 80 as can be replaced on the same day as mixing is created because otherwise the bed ash and cement will prematurely react with the water in the excavated earth 50 and harden before it is able to be replaced in the excavated slope 60. However, in embodiments where the excavated earth 50 is particularly dry, more augmented soil 80 can be created than can be replaced on the same day as mixing because the concern of premature hardening of the augmented soil 80 is lessened.


After mixing, the augmented soil 80 is replaced on the excavated slope 60 as shown in FIG. 4. In embodiments, the augmented soil 80 is replaced in horizontal lifts that are under 24″ in thickness. Further, each lift is compacted with a compactor, such as a dozer 90 or a sheep's foot compactor. Thus, for example, in a deep soil slip 10, the depth of the soil slip 10 is filled no more than 24″ at a time, and after each 24″ lift, the augmented soil 80 is compacted. FIG. 5 depicts the filled soil slip 100 that is being compacted with a dozer 90. In embodiments, one or more horizontal catchments are provided for silt and runoff. For example, a horizontal catchment can be in the form of a ditch placed between the filled soil slip 100 or slope 20 and the roadway 30. As with the keyways above, the number and placement of any horizontal catchments will vary on a job-by-job basis and is generally left to the discretion of the site manager/engineer as is understood by a person of ordinary skill in the art.


The dry mix 70 will pull water from the earth 50 or from deeper in the ground of the slope 20. As discussed above, the bed ash draws water to the cement and helps initiate hydration reaction with the cement. Thus, the augmented soil 80 does not need to be watered for the purpose of triggering the hardening reaction. However, water can be minimally applied to prevent dust from being stirred up in the wind.


As described above, the dry mix 70 (with or without aggregate) is especially suitable for repairing soil slips because the bed ash contained in the dry mix 70 is able to dry out the slip very quickly on account of the bed ash's ability to rapidly absorb large amounts of water as described above. Indeed, the dry mix 70 allows for the efficient and stable repair of soil slips 10 in which the dry mix 70 is able to be mixed with the excavated earth 50 and be replaced in the soil slip 10.


Unless otherwise expressly stated, it is in no way intended that any method set forth herein be construed as requiring that its steps be performed in a specific order. Accordingly, where a method claim does not actually recite an order to be followed by its steps or it is not otherwise specifically stated in the claims or descriptions that the steps are to be limited to a specific order, it is in no way intended that any particular order be inferred. In addition, as used herein, the article “a” is intended to include one or more than one component or element, and is not intended to be construed as meaning only one.


It will be apparent to those skilled in the art that various modifications and variations can be made without departing from the spirit or scope of the disclosed embodiments. Since modifications, combinations, sub-combinations and variations of the disclosed embodiments incorporating the spirit and substance of the embodiments may occur to persons skilled in the art, the disclosed embodiments should be construed to include everything within the scope of the appended claims and their equivalents.

Claims
  • 1. A method of repairing a soil slip on a slope, the method comprising the steps of: excavating earth from the soil slip to a depth below a slip plane of the soil slip;mixing the earth with a dry mix to create an augmented soil, the dry mix comprising bed ash and cement;replacing the augmented soil in the soil slip; andcompacting the augmented soil.
  • 2. The method of claim 1, wherein the weight ratio of bed ash to cement in the dry mix is from 3:1 to 5:1.
  • 3. The method of claim 2, wherein the weight ratio of bed ash to cement in the dry mix is about 4:1.
  • 4. The method of claim 1, wherein the dry mix comprises 18% to 20% by weight of the cement.
  • 5. The method of claim 1, wherein the dry mix further comprises aggregate.
  • 6. The method of claim 5, wherein the dry mix comprises substantially equal volumes of aggregate and of bed ash and cement.
  • 7. The method of claim 5, wherein the aggregate is 2″×3″ crushed stone.
  • 8. The method of claim 1, wherein the step of excavating further comprises forming one or more keyways in the slope.
  • 9. The method of claim 1, wherein the augmented soil comprises 5% to 40% by weight of the dry mix.
  • 10. The method of claim 9, wherein the augmented soil comprises from 10% to 15% by weight of the dry mix.
  • 11. The method of claim 1, wherein the step of replacing the augmented soil in the soil slip further comprises filling the soil slip in lifts of no more than 24″.
  • 12. The method of claim 11, wherein the compacting step is performed after each lift.
  • 13. The method of claim 1, further comprising the step of forming at least one horizontal catchment on the slope.
  • 14. The method of claim 13, wherein a horizontal catchment of the at least one horizontal catchment is located at a base of the slope between the slop and a roadway.
  • 15. The method of claim 1, wherein the method does not comprise a step of adding water to the augmented soil.
CROSS REFERENCE TO RELATED PATENT APPLICATIONS

This application is a divisional of U.S. application Ser. No. 16/137,163, filed Sep. 20, 2018, now U.S. Pat. No. 10,981,831, which claims the benefit of priority to U.S. Provisional Application No. 62/561,556, filed Sep. 21, 2017, and to U.S. Provisional Application No. 62/641,838, filed Mar. 12, 2018, which are incorporated herein by reference in their entireties.

US Referenced Citations (152)
Number Name Date Kind
4250134 Minnick Feb 1981 A
5545297 Andersen et al. Aug 1996 A
5549859 Andersen et al. Aug 1996 A
5580378 Shulman Dec 1996 A
5622556 Shulman Apr 1997 A
5658624 Anderson et al. Aug 1997 A
5725652 Shulman Mar 1998 A
5772752 Liskowitz et al. Jun 1998 A
5797496 Kirchen et al. Aug 1998 A
5798151 Andersen et al. Aug 1998 A
5849075 Hopkins et al. Dec 1998 A
5851282 Odler Dec 1998 A
6277189 Chugh Aug 2001 B1
6293731 Studer Sep 2001 B1
6334895 Bland Jan 2002 B1
6468345 Zhu et al. Oct 2002 B1
6517631 Bland Feb 2003 B1
6521037 Hurt et al. Feb 2003 B1
6528547 Shulman Mar 2003 B2
6554888 Chugh Apr 2003 B1
6638355 Shulman Oct 2003 B2
6669773 Malloy et al. Dec 2003 B2
6802898 Liskowitz et al. Oct 2004 B1
6808562 Bland Oct 2004 B2
6890507 Chen et al. May 2005 B2
7077203 Roddy et al. Jul 2006 B1
7174962 Roddy et al. Feb 2007 B1
7204307 Roddy et al. Apr 2007 B2
7213646 Roddy et al. May 2007 B2
7335252 Roddy et al. Feb 2008 B2
7344592 Setliff et al. Mar 2008 B2
7485184 Hill et al. Feb 2009 B2
7507083 Comrie Mar 2009 B2
7582158 Pike et al. Sep 2009 B2
7658796 Nordmeyer Feb 2010 B2
7674442 Comrie Mar 2010 B2
7704907 Guenther et al. Apr 2010 B2
7758827 Comrie Jul 2010 B2
7776301 Comrie Aug 2010 B2
7812209 Jacquemmoz et al. Oct 2010 B2
7823858 Matsufuji et al. Nov 2010 B2
7837787 De La Roij Nov 2010 B2
7850776 Gartner et al. Dec 2010 B2
7892349 Hill et al. Feb 2011 B2
7892350 Hill et al. Feb 2011 B2
7897831 Birdwell Mar 2011 B2
7901505 Hill et al. Mar 2011 B2
7955577 Comrie Jun 2011 B2
7981375 Ramberg et al. Jul 2011 B2
7985324 Whellock Jul 2011 B2
7988939 Comrie Aug 2011 B2
7993449 de la Roij Aug 2011 B2
8007581 Scott et al. Aug 2011 B2
8092753 Dynan et al. Jan 2012 B2
8097220 Dynan et al. Jan 2012 B2
8114368 Comrie Feb 2012 B2
8118927 Price Feb 2012 B2
8193115 Birdwell Jun 2012 B2
8215079 Sinclair Jul 2012 B2
8216955 Guenther et al. Jul 2012 B2
8221694 Dynan et al. Jul 2012 B2
8226913 Comrie Jul 2012 B2
8236098 Muehlfeld et al. Aug 2012 B2
8257486 Snehasis et al. Sep 2012 B2
8313323 Comrie Nov 2012 B2
8361406 Dynan et al. Jan 2013 B2
8361420 Dynan et al. Jan 2013 B2
8501128 Comrie Aug 2013 B2
8545778 Comrie Oct 2013 B2
8551216 Dynan et al. Oct 2013 B2
8617308 Douglas et al. Dec 2013 B1
8617438 Douglas et al. Dec 2013 B1
8623287 Dynan et al. Jan 2014 B2
8627888 Santra et al. Jan 2014 B2
8641819 Takayasu et al. Feb 2014 B2
8658115 Comrie Feb 2014 B2
8703081 Comrie Apr 2014 B2
8709150 Snehasis et al. Apr 2014 B2
8741054 Fried Jun 2014 B2
8747549 Douglas et al. Jun 2014 B1
8795428 Hill et al. Aug 2014 B1
8821803 Ramberg et al. Sep 2014 B2
8881909 Quadrio Curzio Nov 2014 B2
8901023 Guenther et al. Dec 2014 B2
8920158 Comrie Dec 2014 B2
8945300 Al-Mehthel et al. Feb 2015 B2
8961684 Fried Feb 2015 B2
8974593 Guynn et al. Mar 2015 B2
9023149 Douglas et al. May 2015 B1
9090508 Gong et al. Jul 2015 B2
9102567 Hansen et al. Aug 2015 B1
9102870 Naguib Aug 2015 B1
9115026 Tanaka et al. Aug 2015 B2
9169453 Comrie Oct 2015 B2
9238591 Guynn et al. Jan 2016 B2
9272953 Guynn et al. Mar 2016 B2
9284219 Wilson et al. Mar 2016 B2
9284224 Sureshgiri et al. Mar 2016 B2
9302448 Dubey et al. Apr 2016 B2
9365451 Fried Jun 2016 B2
9410386 Cornelius et al. Aug 2016 B2
9416967 Comrie Aug 2016 B2
9468887 Ramberg et al. Oct 2016 B2
9566587 Warkentin et al. Feb 2017 B2
9663362 Van Mechelen et al. May 2017 B2
9670096 Zubrod Jun 2017 B1
9702554 Comrie Jul 2017 B2
9708217 Song et al. Jul 2017 B2
9725365 Zubrod Aug 2017 B1
10981831 Schane Apr 2021 B2
20010039902 Hedley Nov 2001 A1
20030116887 Scott Jun 2003 A1
20040040245 Schwartz Mar 2004 A1
20040144287 Tardif et al. Jul 2004 A1
20040217500 Sinclair Nov 2004 A1
20050066860 Logan et al. Mar 2005 A1
20060032408 Strabala Feb 2006 A1
20060037271 Sinclair, Sr. Feb 2006 A1
20060287197 Maslanka et al. Dec 2006 A1
20070011973 Schwartz et al. Jan 2007 A1
20070184394 Comrie Aug 2007 A1
20070219402 Butcher et al. Sep 2007 A1
20070266903 Gartner et al. Nov 2007 A1
20070277472 Sinclair Dec 2007 A1
20080050578 Sinclair, Sr. Feb 2008 A1
20080134943 Godfrey et al. Jun 2008 A1
20090010099 Maslanka et al. Jan 2009 A1
20090142143 Peters Jun 2009 A1
20090151292 Sinclair, Sr. Jun 2009 A1
20090200156 Whellock Aug 2009 A1
20090258777 Tardif et al. Oct 2009 A1
20090314185 Whellock Dec 2009 A1
20100006010 Hinczak Jan 2010 A1
20100189507 Hird Jul 2010 A1
20100282595 Whellock Nov 2010 A1
20110020199 Cornelius et al. Jan 2011 A1
20110174194 Hird Jul 2011 A1
20120118831 Cornelius et al. May 2012 A1
20120145046 Guynn et al. Jun 2012 A1
20130125791 Fried et al. May 2013 A1
20130125799 Fried et al. May 2013 A1
20130263758 Birdwell et al. Oct 2013 A1
20140353551 Dengler et al. Dec 2014 A1
20140374097 Morgan et al. Dec 2014 A1
20140374948 Vincent et al. Dec 2014 A1
20150107491 Ball et al. Apr 2015 A1
20160177209 Fried Jun 2016 A1
20160327265 Comrie Nov 2016 A1
20160340840 Yun Nov 2016 A1
20170106378 Warkentin et al. Apr 2017 A1
20170167421 Ramberg et al. Jun 2017 A1
20170241871 Mayelle et al. Aug 2017 A1
Foreign Referenced Citations (11)
Number Date Country
2012066997 Apr 2012 JP
2012066997 Apr 2012 JP
101706272 Feb 2017 KR
101706272 Feb 2017 KR
WO13156843 Oct 2013 WO
WO14013379 Jan 2014 WO
WO14013429 Jan 2014 WO
WO14013515 Jan 2014 WO
WO15090533 Jun 2015 WO
WO15093760 Jun 2015 WO
WO16107936 Jul 2016 WO
Related Publications (1)
Number Date Country
20210198145 A1 Jul 2021 US
Provisional Applications (2)
Number Date Country
62561556 Sep 2017 US
62641838 Mar 2018 US
Divisions (1)
Number Date Country
Parent 16137163 Sep 2018 US
Child 17201779 US