This invention pertains to the field of pre-stressed pre-tensioned precast concrete slabs to be used for paving in areas subject to vehicular traffic.
Prestressed concrete is a mode of construction that overcomes concrete's inherent weakness in tension. When concrete is prestressed using one of three means available, longer spans can be created as measured against ordinary reinforced concrete. Traditional reinforced concrete uses steel rebar or other reinforcement material disposed within the concrete to reinforce it. Typically a swimming pool bottom is made in this manner. Prestressed concrete employs cables or strands to provide a clamping load which produces a compressive stress that can balance the tension stress that the concrete member would otherwise exhibit due to a bending load.
Pre-stressed concrete can be either pre-tensioned, or post tensioned. Pre-tensioned concrete is cast around already tensioned tendons. The concrete is poured around the pre-tensioned cables or tendons, and the concrete adheres to the tendons or cables as the concrete hardens during the curing process. When the tension is released from the tendons/cables this tension is transferred to the hardened concrete and compression by static friction thus creating concrete in compression. To achieve the pre-tensioning, anchor points are attached on opposite ends of the casting bed, between which, the tendons or wires are stretched in a straight line. When the tension is released, the tension is transferred to the hardened concrete unit by static friction.
Post-tensioned concrete is the mode for applying compression after the pouring and curing in situ of the concrete. There are two modes of doing so, one is called Bonded and the other is called Un-bonded.
In the bonded version, plastic, steel, or aluminum ducts, or tubes are laid out in a finite area, and the concrete is poured over and around the series of parallel tubes. Post tension cables are deployed through the tubes. Once the concrete hardens, the tendons are anchored at one end and tensioned at the other end using hydraulic jacks or rams that now react against the hardened concrete. After reviewing the design specification to confirm that adequate tension has been placed on the tendons, the jacks are removed such that the tension is now applied directly to the concrete member. The ducts or tubes are then grouted closed to protect the tendons from corrosion and decomposition. Concrete slabs prepared in this manner are usually used for bridges and house construction for slabs on grade in areas where the soil is expansive.
In the unbonded system each individual cable has freedom of movement relative to the concrete at all times. Each individual tendon is coated with a grease, often lithium based, and perhaps molybdenum sulfide would work also. Then the tendons are covered by an extruded plastic sheathing. The tension transfer arises from the tendons being connected to anchors embedded in the perimeter of the cast concrete slab. While the generalized discussion of post-tensioning serves as an introduction to the topic, more information can be obtained from the Post-tensioning institute which in the year 2011 is located at 8601 North Black Canyon Highway in Phoenix Ariz.
Pre-stressed, Pre-tensioned concrete can not only be used for buildings, but is used today in Bridge work and the manufacture of roads. Pre-stressed paving slabs can be laid into position during off-peak hours on nights and weekends. This minimizes lane closures, which can cause huge traffic backups, especially on highly traveled interstate freeways. The big advantage of using pre-stressed concrete slabs, is the relative speed of placement on site, less cracking, and the ability to use relatively thinner and longer slabs. Longer slabs reduce the number of joints that must be maintained. Basically whereas standard construction can take weeks for a project, the same project can be carried out in days using pre-stressed, pre-cast concrete slabs.
Numerous patents that relate to a method of forming, installing and a system for attaching prefabricated pavement slab to a subbase, and to the pavement slab itself have been issued to Peter J. Smith and said patents have been assigned to the Fort Miller Group, Inc. of Greenwich, N.Y. Some of these patents include:
Another inventor in this technology is Alfred A. Yee, whose two patents are assigned to Kwik Slab, LLC of Honolulu, Hi. His patents are U.S. Pat. No. 7,134,805 which issued on Nov. 14, 2006 and the published application 2005/0220539.
The Fort Miller Group product(s) are sold under the brand Super Slab, whereas the Yee products are sold under the brand Kwik Slab. It is believed that none of the aforementioned eight references singly or in combination disclose or render obvious the invention of this current patent application.
The reason that this assertion can be made is that the invention of this patent application relates to an entirely new technique for pre-stressing, pre-tensioning concrete slabs in 2 directions, not just one direction as has been the case with the prior art techniques.
As hinted above, the invention herein relates to a procedure for pre-stressing, pre-tensioning concrete slabs both longitudinally and transversely. The process further relates to the utilization of these bi-directionally pre-stressed, pre-tensioned slabs in the laying of roadways.
In order to better understand this invention it is necessary to lay the foundation—no pun intended—of the general technique for making roadway sections. As noted above, pre-stressing can be accomplished by pre-tensioning or post tensioning. Pre-tensioning is done in the concrete casting bed, prior to the pouring of concrete, while post tensioning is done after concrete is poured and sufficiently hardened. Most concrete roadways are normally laid in up to 224 foot lengths between expansion joints. These sections are made of a plurality of slabs 12 feet wide and 8 foot long. These slabs can be connected by a variant of a tongue and groove connection or some other type of joint. The joints are then grouted or otherwise treated to form a complete section of concrete roadway. This means that in this 224 foot span there will be 28 grout joints. 8 feet long×28=224 feet.
Generally pre-stressing in the concrete casting bed of a 12 foot length is carried out by pre-tensioning in the 12 foot direction prior to the pouring of the concrete and post-tensioning through the use of tendons or wires in a duct system after installation. But the pre-tensioning in the prior art techniques is in only one direction, longitudinally. The process of this invention is pre-stressing, pre-tensioning the concrete in both directions, longitudinally and laterally using a pre-tension technique longitudinally and laterally. Optional post-tensioning may also be applied. This allows for the preparation of longer slabs, potentially up to 60 feet in length, thereby minimizing the number of joints to be grouted and maintained in each roadway section, and thus speeding up the installation process.
The invention accordingly comprises the apparatus (casting bed) and the device (dual direction, pre-stressed, pre-tensioned) concrete slab and the process of making the device, each of which possesses the features, properties, the selection of components which are amplified in the following detailed disclosure, and the scope of the application of which will be indicated in the appended claims.
The invention herein pertains to a process for bi-directionally pre-stressing, pre-tensioning concrete slabs of varying lengths for use in the repair of and creation of new areas subject to vehicular traffic, such as roadways and driveways. Individual slabs of a nominal 12 foot width, or of a width as may be required or dictated by the specific job requirement or specification are poured in varying lengths, possibly up to 60 foot long to suit site conditions and to meet the specification for the locations of expansion joints between adjacently positioned slabs. For the purpose of demonstrating this invention individual slabs 12 foot wide×36 foot long were poured. Whereas the prior art pours 12 feet long slabs only 8 feet wide, pre-tensioned only in the 12 foot direction and then the prior art positions multiple pieces rotated 90 degrees to achieve the 12 foot wide roadway section; the process of this invention utilizes 12 foot wide casts of varying lengths, pre-tensioned in both directions having been poured in the same direction as the job site positioning (non-rotated).
It is well known in patent law that merely changing a dimension is not alone a patentable improvement. But his invention involves more than just a new dimension or a new casting technique. The pre-stressing of this application is done by pre-tensioning in both the longitudinal and the transverse direction prior to pouring the concrete with the optional post tension procedure after installation at the job site.
Prior to the concrete pour the metal multi-strand wire for the pre-tensioning step are laid in place both longitudinally and transversely. The location at or near the mid-height of the slab to be poured for the wire positions, as well as strand size and pre-stressing force of the longitudinal strands are determined by the design criteria-specification. Transverse strands are laid out in the mid-section of the slab to be at heights that can vary a few inches up or down from this mid-point to allow for the optional placement of ducts for a post-tensioning step at the job site. If the design does call for job site post-tensioning procedure, then the post-tensioning duct is also laid within the slab at this time. Tension is applied to the strand, both the longitudinal and the transverse, and maintained. Any additional reinforcing steel that may be required, and any other embeds, inserts, sleeves, boxes or block-outs are also placed in the slab at this stage. The concrete pour is carried out, required surface finish is done, and the poured slab is allowed to cure in the casting bed. Conventional or accelerated curing aids can be employed. Thirty-six foot long spans were chosen specifically to be able to ship one slab per flat bed truck without exceeding the permit load limits.
Once a poured slab has attained sufficient strength per specifications and design criteria, the pre-tensioned, pre-stressed strand in both directions is cut, and the slab is removed to storage for further curing and final dressing up for shipping to the job site. A slab poured and cured in this manner is a slab that is pre-stressed, pre-tensioned in both directions, the subject of this new invention, with the option of post-tensioning conventional procedure to be carried out at the job site.
It is of course to be recognized that in order to carry to the bi-directional pre-tensioning, pre-stressing of this invention, it was first necessary to create a new type of casting bed. This new casting bed provided the capability to pre-tension the strand in both directions, longitudinally and transversely.
Let us now turn to
The cast 010 has been made in the casting zone 109 of
In
As has been noted earlier, the transverse wires can be above, below or both above and below the longitudinal direction pre-tension wires. All three layouts are within the scope of this invention. But the other two need not be illustrated as they are readily understood.
It has now been shown that extended length precast concrete slabs, can be prepared which have been pre-tensioned in both directions. The term pre-tensioning actually refers to the tensioning wires or cables utilized to apply tension to the concrete. This tensioning of the wires in both directions is done before the slab is cast, and the tension is transferred to the load once the cement cast is cured, when the stressing chucks that hold the tension to the wire are removed. In another sense, the designation pre-tensioning is meant to indicate that the tensioning is done before the slab is placed in location on a roadbed. After the cast and often at the job site, any further tensioning is termed POST-tensioning. In roadway construction, post tensioning takes place as the abutting sections of roadway are joined together by grouting.
By pre-tensioning in both directions at the factory before the cast is made, both labor and material costs are significantly reduced. Manufacturing costs are reduced because the wire placed in the cast slab prior to the cast is much lower in price than the wire that normally needs to be specially coated to protect it against corrosion inside the ducts within the cast after the cast has been made for traditional tensioning procedures.
It is seen that by building a special casting bed with tensioning capability built into the side walls of the casting bed that 36 foot long casts can be made, which will thereby permit the use of less seams and joints in assembling a road section thereby reducing costs for the contractor. Since certain changes may be made in the above described apparatus-(casting bed) and the product thereof, -bidirectional pre-tensioned extended length concrete sections, without departing from the scope of the invention herein involved, it is intended that all matter contained in the above description and in the accompanying drawings, shall be interpreted as illustrative only and not in a limiting sense.