Dynamic uplink reuse in a C-RAN

Information

  • Patent Grant
  • 11304213
  • Patent Number
    11,304,213
  • Date Filed
    Wednesday, May 15, 2019
    5 years ago
  • Date Issued
    Tuesday, April 12, 2022
    2 years ago
Abstract
This disclosure is directed to techniques for implementing uplink spatial reuse in a C-RAN.
Description
BACKGROUND

A centralized radio access network (C-RAN) is one way to implement base station functionality. Typically, for each cell implemented by a C-RAN, a single baseband unit (BBU) interacts with multiple remote units (also referred to here as “radio points” or “RPs”) in order to provide wireless service to various items of user equipment (UEs).


As used here, “uplink reuse” refers to situations where separate uplink data is simultaneously transmitted from multiple UEs to a C-RAN base station on the Physical Uplink Shared Channel (PUSCH) using a C-RAN the same resource elements (that is, the same time-frequency resource). Typically, these situations arise when the UEs are sufficiently physically separated from each other so that the different uplink transmissions on the PUSCH do not interfere with each other when transmitted from UEs. This type of reuse is also referred to as “spatial uplink reuse.”


Conventional techniques for implementing spatial uplink reuse are often relatively simplistic or conservative, which can result in relatively few opportunities to employ spatial uplink reuse, in spatial uplink reuse being employed in inappropriate situations (for example, due to one or more of the UEs moving), and/or spatial uplink resource degrading overall system performance.


SUMMARY

One embodiment is directed to a system to provide wireless service. The system comprises a controller and a plurality of radio points. Each of the radio points is associated with at least one antenna and remotely located from the controller, wherein the plurality of radio points is communicatively coupled to the controller. The controller and the plurality of radio points are configured to implement a base station in order to provide wireless service to a plurality of user equipment (UEs) using a cell. The controller is communicatively coupled to a core network of a wireless service provider. The controller is configured to implement a scheduler to schedule uplink transmissions from the UEs. The controller is configured to implement a combining receiver to receive uplink transmissions from each UE, the combining receiver configured to combine data indicative of the uplink transmissions from each UE as received at each radio point included in a combining zone assigned to that UE and communicated to the controller. The controller is configured to assign, to each UE, a respective minimum combining zone comprising a respective minimum subset of the radio points for use as the combining zone of the combining receiver for receiving uplink transmission from that UE. The controller is configured to assign, to each UE, a respective signal zone comprising a respective subset of the radio points that can be included in the combining zone of the combining receiver for receiving uplink transmission from that UE. The scheduler is configured to determine if multiple UEs are able to make respective uplink transmissions during a respective same time-and-frequency resource based on the respective minimum combining zones and signal zones assigned to the UEs and allocate time-and-frequency resources to the UEs using the minimum combining zones assigned to the UEs. The scheduler is configured to, after allocating time-and-frequency resources to the UEs, attempt to expand the combining zones used for receiving uplink transmissions.


Another embodiment is directed to a system to provide wireless service. The system comprises a controller and a plurality of radio points. Each of the radio points is associated with at least one antenna and remotely located from the controller, wherein the plurality of radio points is communicatively coupled to the controller. The controller and the plurality of radio points are configured to implement a base station in order to provide wireless service to a plurality of user equipment (UEs) using a cell. The controller is communicatively coupled to a core network of a wireless service provider. The controller is configured to implement a scheduler to schedule uplink transmissions from the UEs. The scheduler is configured to determine if multiple UEs are able to make respective uplink transmissions during a respective same time-and-frequency resource, and, for any multiple UEs that are able to make respective uplink transmissions during the respective same time-and-frequency resource, schedule said multiple UEs to make respective uplink transmissions during the respective same time-and-frequency resource and assign respective UE-specific demodulation reference signal (DM-RS) cyclic shifts to said multiple UEs. Each of the UE-specific DM-RS cyclic shifts have an associated distance between that UE-specific DM-RS cyclic shift and each of the other UE-specific DM-RS cyclic shifts, wherein the DM-RS cyclic shifts are assigned to maximize the respective distances.


Another embodiment is directed to a system to provide wireless service. The system comprises a controller and a plurality of radio points. Each of the radio points is associated with at least one antenna and remotely located from the controller, wherein the plurality of radio points is communicatively coupled to the controller. The controller and the plurality of radio points are configured to implement a base station in order to provide wireless service to a plurality of user equipment (UEs) using a cell. The controller is communicatively coupled to a core network of a wireless service provider. The controller is configured to implement a scheduler to schedule uplink transmissions from the UEs. The scheduler is configured to determine if multiple UEs are able to make respective uplink transmissions during a respective same time-and-frequency resource, and, for any multiple UEs that are able to make respective uplink transmissions during the respective same time-and-frequency resource, schedule said multiple UEs to make respective uplink transmissions during the respective same time-and-frequency resource. The controller is configured to perform transmit power control for the uplink transmissions from the UEs using at least one of the following: a closed-loop UE-specific target SINR that is adapted for each UE based on a power headroom reported for that UE; and a closed-loop UE-specific measured SINR that uses: a signal power measurement based on uplink transmissions from that UE, and an interference-plus-noise measurement based on uplink transmissions from all scheduled UEs.


Another embodiment is directed to a system to provide wireless service. The system comprises a controller and a plurality of radio points. Each of the radio points is associated with at least one antenna and remotely located from the controller, wherein the plurality of radio points is communicatively coupled to the controller. The controller and the plurality of radio points are configured to implement a base station in order to provide wireless service to a plurality of user equipment (UEs) using a cell. The controller is communicatively coupled to a core network of a wireless service provider. The controller is configured to implement a scheduler to schedule uplink transmissions from the UEs. The scheduler is configured to determine if multiple UEs are able to make respective uplink transmissions during a respective same time-and-frequency resource, and, for any multiple UEs that are able to make respective uplink transmissions during the respective same time-and-frequency resource, schedule said multiple UEs to make respective uplink transmissions during the respective same time-and-frequency resource. The controller is configured to perform transmit power control for the uplink transmissions from the UEs using at least one of the following: a closed-loop UE-specific target signal-to-interference-plus-noise ratio (SINK) that is adapted for each UE based on a power headroom reported for that UE; and a closed-loop UE-specific measured SINR that uses: a signal power measurement based on uplink transmissions from that UE, and an interference-plus-noise measurement based on uplink transmissions from all scheduled UEs.





DRAWINGS


FIG. 1 is a block diagram illustrating one exemplary embodiment of a radio access network (RAN) system in which the dynamic reuse techniques described here can be implemented.



FIG. 2 comprises a flow chart illustrating one exemplary embodiment of a method of determining a minimum combining zone, a maximum combining zone, and a current combining zone for a UE in a C-RAN.



FIG. 3 comprises a flow chart illustrating one exemplary embodiment of a method of dynamically managing a minimum combining zone, a maximum combining zone, and a current combining zone for a UE over the course of a connection to a C-RAN.



FIG. 4 comprises a flow chart illustrating one exemplary embodiment of a method of scheduling UEs that are put into uplink reuse in a C-RAN.



FIG. 5 comprises a flow chart illustrating one exemplary embodiment of a method of assigning demodulation reference signals (DM-RSs) to UEs that are put into PUSCH reuse in a C-RAN.



FIG. 6 comprises a flow chart illustrating one exemplary embodiment of a method of controlling the PUSCH transmit power of a UE in a C-RAN.



FIG. 7 comprises a flow chart illustrating one exemplary embodiment of a method of PUSCH link adaption for a UE in a C-RAN.





Like reference numbers and designations in the various drawings indicate like elements.


DETAILED DESCRIPTION


FIG. 1 is a block diagram illustrating one exemplary embodiment of a radio access network (RAN) system 100 in which the dynamic reuse techniques described here can be implemented. The system 100 is deployed at a site 102 to provide wireless coverage and capacity for one or more wireless network operators. The site 102 may be, for example, a building or campus or other grouping of buildings (used, for example, by one or more businesses, governments, other enterprise entities) or some other public venue (such as a hotel, resort, amusement park, hospital, shopping center, airport, university campus, arena, or an outdoor area such as a ski area, stadium or a densely-populated downtown area).


In the exemplary embodiment shown in FIG. 1, the system 100 is implemented at least in part using a C-RAN (point-to-multipoint distributed base station) architecture that employs at least one baseband unit 104 and multiple radio points (RPs) 106 serve at least one cell 103. The system 100 is also referred to here as a “C-RAN system” 100. The baseband units 104 are also referred to here as “baseband controllers” 104 or just “controllers” 104. Each RP 106 includes or is coupled to one or more antennas 108 via which downlink RF signals are radiated to user equipment (UE) 110 and via which uplink RF signals transmitted by UEs 110 are received.


More specifically, in the example shown in FIG. 1, each RP 106 comprises two antennas 108. Each RP 106 can include or be coupled to a different number of antennas 108.


The system 100 is coupled to the core network 112 of each wireless network operator over an appropriate back-haul. In the exemplary embodiment shown in FIG. 1, the Internet 114 is used for back-haul between the system 100 and each core network 112. However, it is to be understood that the back-haul can be implemented in other ways.


The exemplary embodiment of the system 100 shown in FIG. 1 is described here as being implemented as a Long Term Evolution (LTE) radio access network providing wireless service using an LTE air interface. LTE is a standard developed by 3GPP standards organization. In this embodiment, the controller 104 and RPs 106 together are used to implement an LTE Evolved Node B (also referred to here as an “eNodeB” or “eNB”) that is used to provide user equipment 110 with mobile access to the wireless network operator's core network 112 to enable the user equipment 110 to wirelessly communicate data and voice (using, for example, Voice over LTE (VoLTE) technology).


Also, in this exemplary LTE embodiment, each core network 112 is implemented as an Evolved Packet Core (EPC) 112 comprising standard LTE EPC network elements such as, for example, a mobility management entity (MME) (not shown) and a Serving Gateway (SGW) (not shown) and, optionally, a Home eNodeB gateway (HeNB GW) (not shown) and a Security Gateway (SeGW) (not shown).


Moreover, in this exemplary embodiment, each controller 104 communicates with the MME and SGW in the EPC core network 112 using the LTE S1 interface and communicates with other eNodeBs using the LTE X2 interface. For example, the controller 104 can communicate with an outdoor macro eNodeB (not shown) via the LTE X2 interface.


Each controller 104 and the radio points 106 can be implemented so as to use an air interface that supports one or more of frequency-division duplexing (FDD) and/or time-division duplexing (TDD). Also, the controller 104 and the radio points 106 can be implemented to use an air interface that supports one or more of the multiple-input-multiple-output (MIMO), single-input-single-output (SISO), single-input-multiple-output (SIMO), multiple-input-single-output (MISO), and/or beam forming schemes. For example, the controller 104 and the radio points 106 can implement one or more of the LTE transmission modes. Moreover, the controller 104 and/or the radio points 106 can be configured to support multiple air interfaces and/or to support multiple wireless operators.


In the exemplary embodiment shown in FIG. 1, the front-haul that communicatively couples each controller 104 to the one or more RPs 106 is implemented using a standard ETHERNET network 116. However, it is to be understood that the front-haul between the controllers 104 and RPs 106 can be implemented in other ways.


Generally, one or more nodes in a C-RAN perform analog radio frequency (RF) functions for the air interface as well as digital Layer 1, Layer 2, and Layer 3 (of the Open Systems Interconnection (OSI) model) functions for the air interface.


In the exemplary embodiment shown in (L1) FIG. 1, each baseband controller 104 comprises Layer-3 (L3) functionality 120, Layer-2 (L2) functionality 122, and Layer-1 (L1) functionality 124 configured to perform at least some of the Layer-3 processing, Layer-2 processing, and Layer-1 processing, respectively, for the LTE air interface implemented by the RAN system 100, and each RP 106 includes (optionally) Layer-1 functionality (not shown) that implements any Layer-1 processing for the air interface that is not performed in the controller 104 and one or more radio frequency (RF) circuits (not shown) that implement the RF front-end functions for the air interface and the one or more antennas 108 associated with that RP 106.


Each baseband controller 104 can be configured to perform all of the digital Layer-3, Layer-2, and Layer-1 processing for the air interface, while the RPs 106 (specifically, the RF circuits) implement only the RF functions for the air interface and the antennas 108 associated with each RP 106. In that case, IQ data representing time-domain symbols for the air interface is communicated between the controller 104 and the RPs 106. Communicating such time-domain IQ data typically requires a relatively high data rate front haul. This approach (communicating time-domain IQ data over the front haul) is suitable for those implementations where the front-haul ETHERNET network 116 is able to deliver the required high data rate.


If the front-haul ETHERNET network 116 is not able to deliver the data rate needed to front haul time-domain IQ data (for example, where the front-haul is implemented using typical enterprise-grade ETHERNET networks), this issue can be addressed by communicating IQ data representing frequency-domain symbols for the air interface between the controllers 104 and the RPs 106. This frequency-domain IQ data represents the symbols in the frequency domain before the inverse fast Fourier transform (IFFT) is performed. The time-domain IQ data can be generated by quantizing the IQ data representing the frequency-domain symbols without guard band zeroes or any cyclic prefix and communicating the resulting compressed, quantized frequency-domain IQ data over the front-haul ETHERNET network 116. Additional details regarding this approach to communicating frequency-domain IQ data can be found in U.S. patent application Ser. No. 13/762,283, filed on Feb. 7, 2013, and titled “RADIO ACCESS NETWORKS,” which is hereby incorporated herein by reference.


Where frequency-domain IQ data is front-hauled between the controllers 104 and the RPs 106, each baseband controller 104 can be configured to perform all or some of the digital Layer-3, Layer-2, and Layer-1 processing for the air interface. In this case, the Layer-1 functions in each RP 106 can be configured to implement the digital Layer-1 processing for the air interface that is not performed in the controller 104. For example, in this exemplary embodiment, each controller 104 implements a receiver 105 and a scheduler 107 for the cell 103.


Where the front-haul ETHERNET network 116 is not able to deliver the data rate need to front haul (uncompressed) time-domain IQ data, the time-domain IQ data can be compressed prior to being communicated over the ETHERNET network 116, thereby reducing the data rate needed communicate such IQ data over the ETHERNET network 116.


Data can be front-hauled between the controllers 104 and RPs 106 in other ways (for example, using front-haul interfaces and techniques specified in the Common Public Radio Interface (CPRI) and/or Open Base Station Architecture Initiative (OBSAI) family of specifications).


Each controller 104 and RP 106 (and the functionality described as being included therein) can be implemented in hardware, software, or combinations of hardware and software, and the various implementations (whether hardware, software, or combinations of hardware and software) can also be referred to generally as “circuitry” or a “circuit” configured to implement at least some of the associated functionality. When implemented in software, such software can be implemented in software or firmware executing on one or more suitable programmable processors. Such hardware or software (or portions thereof) can be implemented in other ways (for example, in a field programmable gate array (FPGA), application specific integrated circuit (ASIC), etc.). Also, the RF functionality can be implemented using one or more RF integrated circuits (RFICs) and/or discrete components. Each controller 104 and RP 106 can be implemented in other ways.


In the exemplary embodiment shown in FIG. 1, a management system 118 is communicatively coupled to the controllers 104 and RPs 106, for example, via the Internet 114 and ETHERNET network 116 (in the case of the RPs 106).


In the exemplary embodiment shown in FIG. 1, the management system 118 communicates with the various elements of the system 100 using the Internet 114 and the ETHERNET network 116. Also, in some implementations, the management system 118 sends and receives management communications to and from the controllers 104, each of which in turn forwards relevant management communications to and from the RPs 106.


As noted above, “uplink reuse” refers to situations where separate uplink data is simultaneously transmitted from for two (or more) different UEs 110 over the Physical Uplink Shared Channel (PUSCH) using the same resource elements. Typically, these situations will arise when the UEs 110 are sufficiently physically separated from each other so that the different uplink transmissions do not interfere with each other when transmitted from the different UEs 110. Also, as noted above, this type of reuse is also referred to as “spatial uplink reuse.”


In this exemplary embodiment, each controller 104 implements an interference-rejection combining (IRC) receiver 105 for the PUSCH. In the following description, each UE 110 served by the controller 104 has an associated “combining zone.” The combining zone of a UE 110 is the set of RPs 106 that forward received PUSCH Layer-1 data for that UE 110 to the associated controller 104, where the PUSCH IRC receiver 105 implemented by that controller 104 for that UE 110 combines the Layer-1 data to detect the Transport Blocks (TBs) transmitted by that UE 110. In one implementation, the PUSCH Layer-1 data comprises quantized frequency-domain PUSCH IQ samples.


Increasing the combining zone increases the received signal power for the UE 110, provides greater macro diversity against small-scale fading, and greater protection against interference (from UEs 110 that are in uplink reuse with that UE 110 or UEs that are connected to a different cell), and reduces the frequency of connection drops due to movement of the UEs 110. However, a larger combining zone also proportionally increases the required front-haul (Ethernet) link capacity between switches of the front-haul network 116 and at the controller 104 and increases the processing load in the controller 104. Therefore, it is desirable that the combining zone of each UE 110 be chosen to achieve a good trade-off between performance, front-haul link utilization, and controller processing load.


The “current” combining zone for each UE 110 is the combining zone that is currently being used by the PUSCH IRC receiver 105 for that UE 110. For each UE 110, there is a configurable minimum number of RPs 106 that should be in the combining zone for that UE 110 (for example, one RP 106) and the corresponding combining zone is referred to here as the “minimum combining zone” for that UE 110. Likewise, for each UE 110, there is a configurable maximum number of RPs 106 permitted in the combining zone for that UE 110 (for example, two or three RPs 106) and the corresponding combining zone is referred to here as the “maximum combining zone” for that UE 110.


In the exemplary embodiment described here in connection with FIG. 1, the combining zone for each UE 110 is determined by the serving controller 104 using a “signature vector” (SV) associated with that UE 110. In this embodiment, a signature vector is determined for each UE 110. The signature vector is determined based on receive power measurements made at each of the RPs 106 serving the cell 103 for uplink transmissions from the UE 110.


When a UE 110 makes initial LTE Physical Random Access Channel (PRACH) transmissions to access the cell 103, each RP 106 will receive those initial PRACH transmissions and a signal reception metric indicative of the power level of the PRACH transmissions received by that RP 106 is measured (or otherwise determined). One example of such a signal reception metric is a signal-to-noise plus interference ratio (SNIR). The signal reception metrics that are determined based on the PRACH transmissions are also referred to here as “PRACH metrics.”


Each signature vector is determined and updated over the course of that UE's connection to the cell 103 based on Sounding Reference Signals (SRS) transmitted by the UE 110. A signal reception metric indicative of the power level of the SRS transmissions received by the RPs 106 (for example, a SNIR) is measured (or otherwise determined). The signal reception metrics that are determined based on the SRS transmissions are also referred to here as “SRS metrics.”


Each signature vector is a set of floating point signal-to-interference-plus-noise ratio (SINR) values (or other metric), with each value or element corresponding to a RP 106 used to serve the cell 103.


The signature vector can be used to determine the RP 106 having the best signal reception metric by scanning or sorting the elements of the signature vector to find the element having the best signal reception metric. The RP 106 that corresponds to that “best” element is also referred to here as the “primary RP 106” for the UE 110.


The minimum combining zone for a UE 110 contains those RPs 106 having the best signal reception metrics in the current SV for that UE 110, where the number of those RPs 106 is equal to the configurable minimum number of RPs 106 for the minimum combining zone for that UE 110. For example, where the minimum number of RPs 106 is equal to one, the minimum combining zone for a UE 110 contains only the primary RP 106 for that UE 110 (that is, the RP 106 having the best signal reception metric in the current SV for that UE 110). Likewise, the maximum combining zone for a UE 110 contains those RPs 106 having the best signal reception metrics in the current SV for that UE 110, where the number of those RPs 106 is equal to the configurable maximum number of RPs 106 for the maximum combining zone for that UE 110. For example, where the maximum number of RPs 106 is equal to three, the maximum combining zone for a UE 110 contains only the three RPs 106 having three best signal reception metrics in the current SV for that UE 110.


As used herein, a “quantized signature vector” (QSV) for a given UE 110 of interest is a vector that includes an element for each RP 106, where each element has one of a finite set of values.


In this exemplary embodiment, the “signal zone” for each UE 110 is the maximum combining zone—that is, the combining zone for that UE 110 that includes the maximum number of RPs 106 having the best SV signal reception metrics for that UE 110. All the other RPs 106 not in the signal zone for the UE 110 are also referred to here as being in the “interference zone” of the UE 110.



FIG. 2 comprises a flow chart illustrating one exemplary embodiment of a method 200 of determining a minimum combining zone, a maximum combining zone, and a current combining zone for a UE in a C-RAN. The embodiment of method 200 shown in FIG. 2 is described here as being implemented in the C-RAN system 100 of FIG. 1, though it is to be understood that other embodiments can be implemented in other ways.


The blocks of the flow diagram shown in FIG. 2 have been arranged in a generally sequential manner for ease of explanation; however, it is to be understood that this arrangement is merely exemplary, and it should be recognized that the processing associated with method 200 (and the blocks shown in FIG. 2) can occur in a different order (for example, where at least some of the processing associated with the blocks is performed in parallel and/or in an event-driven manner).


Method 200 is described here as being performed for each UE 110 connected to the cell 103 if the system is configured to allow uplink reuse. Also, method 200 is performed when called for in the lifecycle of a UE's connection as described below in connection with FIG. 3. The particular UE 110 for which method 200 is being performed is referred to here as the “current” UE 110.


Method 200 is performed using the signature vector SV for the current UE 110, which is sorted to create an ordered list of RPs 106. The RPs 106 are sorted from the RP 106 having the best signal reception metric for the UE 110 to the RP 106 having the worst signal reception metric for the UE 110. Method 200 is also performed using the “current prospective average RP load vector” L for cell 103. The current prospective average RP load vector L for the cell 103 is a Nrp×1 vector, where the jth element of the vector Lj is a weighted average number of resource blocks allocated for UEs 110 having that RPj in their minimum combining zone or their signal zone averaged over the N most recent transmission time intervals (TTIs). Each such weighted average is determined before the prospective load contribution due to the UE 110 of interest is added and where the previous load contribution due to the UE 110 of interest is removed and where Nrp is the number RPs 106 serving that cell 103.


For a given UE 110, a candidate zone p′ is the set containing the indices for the J RPs 106 having the J best signal reception metrics in the current signature vector for that UE 110, or equivalently,







ρ
J

=

arg







max

{


ρ
:


ρ



=
J

}







j





ϵ





ρ




sv

u
,
j









where 1≤J≤Nrp. That is, there are Nrp candidate zones ρJ for a UE 110.


Method 200 comprises determining the minimum combining zone for the current UE 110 (block 202). In this exemplary embodiment, the minimum combining zone for the current UE 110 is determined by selecting the smallest candidate zone ρJ (that is, the candidate zone with the minimum size J) for which:

10 log10j∈ρJsvu,jjsvu,j)≥γ


where γ is a configurable minimum combining zone threshold value and J is capped by a configurable maximum minimum combing zone value. In one exemplary embodiment, γ is selected from the set {1 dB, 2 dB, 3 dB} and the value of J is capped so that it may not exceed 3 RPs 106.


Method 200 further comprises determining a provisional signal zone for the current UE 110 (block 204). In this exemplary embodiment, the provisional signal zone for the current UE 110 is determined based on the current prospective average RP load vector L for the serving cell 103. The provisional signal zone is selected as the candidate zone ρJ having the largest J for which no RP 106 would have a resulting load greater than a configurable maximum load Lmax. That is, the candidate zone ρJ where

J{circumflex over ( )}=max{J:Lj≥Lmax,∀j∈ρJ}


where Lj in the above expression is the weighted average described above.


Method 200 further comprises determining a minimum signal zone and a maximum signal zone for the current UE 110 (blocks 206 and 208). In this exemplary embodiment, the minimum signal zone is determined in order to provide isolation between reuse partners and is determined by selecting the candidate zone ρJ having the smallest J such the following is satisfied:

10 log(svu,1/svu,Jmin)>βmin dB


where βmin is a configurable minimum size threshold (for example, 15-20 dB). This resulting minimum signal zone has a size Jmin and is also referred to simply as “Jmin.”


In this exemplary embodiment, the maximum signal zone is determined in order to try to avoid scenarios where uplink reuse becomes disallowed due to some loading scenarios and is determined by selecting the candidate zone having the smallest J (referred to here as “Jmax”) that is equal to either (1) a configurable maximum value; or (2) the smallest Jmax that satisfies the following:

10 log(svu,1/svu,Jmax)>βmax dB


where βmax is a configurable maximum size threshold (for example, 30-40 dB). This resulting maximum signal zone has a size Jmax and is also referred to simply as “Jmax”.


Method 200 further comprises determining the current combining zone as a function of the provisional signal zone, the minimum signal zone, and the maximum signal zone (block 210). This resulting current combining zone has a size J* and is also referred to simply as “J*.” In this exemplary embodiment, the current combing zone J* is determined by selecting the smaller of either the maximum signal zone Jmax or the larger of the minimum signal zone Jmin or the provisional signal zone J{circumflex over ( )}. That is, the current combining zone J* is:

J*=min{Jmax,max{Jmin,J{circumflex over ( )}}}


That is the current combining zone J* is selected by bounding the provisional signal zone J{circumflex over ( )} with a minimum signal zone Jmin and a maximum signal zone Jmax.



FIG. 3 comprises a flow chart illustrating one exemplary embodiment of a method 300 of dynamically managing a minimum combining zone, a maximum combining zone, and a current combining zone for a UE over the course of a connection to a C-RAN. The embodiment of method 300 shown in FIG. 3 is described here as being implemented in the C-RAN system 100 of FIG. 1, though it is to be understood that other embodiments can be implemented in other ways.


The blocks of the flow diagram shown in FIG. 3 have been arranged in a generally sequential manner for ease of explanation; however, it is to be understood that this arrangement is merely exemplary, and it should be recognized that the processing associated with method 300 (and the blocks shown in FIG. 3) can occur in a different order (for example, where at least some of the processing associated with the blocks is performed in parallel and/or in an event-driven manner).


Method 300 is described here as being performed for each UE 110 when it attaches to the cell 103 and establishes an RRC connection. The particular UE 110 for which method 300 is being performed is referred to here as the “current” UE 110.


In this exemplary embodiment, at the end of each RRC connection by a given UE 110 with the serving cell 103, the current signature vector (SV) for that current UE 110 is stored for possible use with the UE's next RRC connection.


When the current UE 110 establishes a new RRC connection with the cell 103 (block 302), a signal reception metric (such as the SINR) is determined from the associated PRACH transmissions at each RP 106 (block 304).


If the serving controller 104 has a stored SV for the current UE 110 and there is a sufficient match between the stored SV and the determined PRACH metrics (block 306), the current SV is initialized using the stored SV (block 308) and the minimum combining zone, maximum combining zone, and current combining zone are determined using the current SV as described above in connection with FIG. 2 (block 310).


For example, the current UE's SAE-Temporary Mobile Subscriber Identity (S-TMSI) can be used to check if there is a stored SV for the current UE 110 and retrieve that stored SV if there is one.


In one implementation, a stored SV for the current UE 110 is sorted in descending order, where SVj denotes the jth element of the current UE's stored SV and RPj denotes the RP 106 corresponding to the jth element of the current UE's stored SV. In this implementation, the serving controller 104 determines that there is a sufficient match between the stored SV and the PRACH metrics if all of the following are true:


(A) The elapsed time since the last update of the stored SV during the current UE's previous RRC connection is less than a configurable setting (referred to here as “StoredSvMaxAge”);


(B) The PRACH transmission is detected by the primary RP 106 of the stored SV (for example, the PRACH signal reception metric for the primary RP 106 is above a predetermined threshold);


(C) The PRACH transmission is detected by the RP 106 having the next best reception metric in the stored SV (the “second” RP 106), if the difference between the reception metric for the primary RP 106 and the reception metric for the second RP 106 is less than a configurable value (referred to here as “deltaSvForPrachMatch”); and


(D) When at least two RPs 106 detect the PRACH transmission, the two RPs 106 with the highest PRACH reception metric must be among the RPs 106 having the top three reception metrics in the stored SV.


If these conditions are all true, it is determined that there is a sufficient match between the stored SV and the PRACH metrics and the current SV is initialized using the stored SV.


If the serving controller 104 does not have a stored signature vector (SV) for the current UE 110 or if there is not a sufficient match between the stored SV and the determined PRACH metrics, then the minimum combining zone, maximum combining zone, and current combining zone are determined using the PRACH signal reception metrics (block 312). In this exemplary embodiment, this done by setting the minimum combining zone and the maximum combining zone to include all RPs 106 used to serve the cell 103 and setting the current combining zone to the set of RPs 106 that received the PRACH transmission subject to a configurable maximum number and where the RPs 106 with the best signal reception metric are used if more than the configurable maximum number of RPs 106 received the PRACH transmission.


Then, the minimum combining zone, maximum combining zone, and current combining zone are updated when the first SRS transmission is received for the current UE 110 (block 314). More specifically, the current signature vector for the current UE 110 is updated based on the first SRS transmission and then the updated current signature vector is used to determine the minimum combining zone, maximum combining zone, and current combining zone for the current 110 as described above in connection with FIG. 2.


After the first SRS transmission is received for the current UE 110, the minimum combining zone, maximum combining zone, and current combining zone are updated periodically (block 316). More specifically, each time a configurable number of SRS transmissions have been received for the current UE 110 since the last update, the current signature vector is used to determine the minimum combining zone, maximum combining zone, and current combining zone for the current 110 as described above in connection with FIG. 2.



FIG. 4 comprises a flow chart illustrating one exemplary embodiment of a method 400 of scheduling UEs 110 that are put into uplink reuse in a C-RAN. The embodiment of method 400 shown in FIG. 4 is described here as being implemented in the C-RAN system 100 of FIG. 1, though it is to be understood that other embodiments can be implemented in other ways.


The blocks of the flow diagram shown in FIG. 4 have been arranged in a generally sequential manner for ease of explanation; however, it is to be understood that this arrangement is merely exemplary, and it should be recognized that the processing associated with method 400 (and the blocks shown in FIG. 4) can occur in a different order (for example, where at least some of the processing associated with the blocks is performed in parallel and/or in an event-driven manner).


Method 400 comprises, during scheduling the PUSCH for a given a transmission time interval (TTI), identifying groups of UEs 110 that can be put into uplink reuse (block 402). In this exemplary embodiment, two UEs 110 can put into uplink reuse if the minimum combining zone of the first UE 110 does not include any RPs 106 that are in the signal zone of the second UE 110 and if the minimum combining zone of the second UE 110 does not include any RPs 106 that are in the signal zone of the first UE 110. If these conditions are satisfied, the two UEs 110 are referred to here as being “mutually orthogonal” to each other.


Method 400 further comprises initially allocating PUSCH resource blocks for the current TTI assuming each scheduled UE 110 put into uplink reuse uses its respective minimum combining zone as its current combining zone (block 404).


Method 400 further comprises, after initial resource block allocation, attempting to expand the current combining zone for one or more of the UEs 110 put into reuse (block 406).


In this exemplary embodiment, for a given UE 110 that is put into uplink reuse, if any RP 106 in the minimum combining zone of any other UE 110 in uplink reuse with that given UE 110 is in the signal zone of that given UE 110, then the current combining zone for that given UE 110 is expanded to include any such RP 106. The signal zone for a UE 110 is determined as described above in connection with FIG. 2 and takes into account the ability of including a RP 106 to benefit that UE 110 while ensuring that there are sufficient processing resources to do so. This expansion of the current combining causes no additional demand on the fronthaul as the uplink data provided by any added RP 106 is already sent on the fronthaul as a result of being in the minimum combining zone of the other UE 110 in reuse.


Also, in this exemplary embodiment, if the total number of resource blocks allocated for the current TTI will result in less than the total available front-haul network capacity being used, then the current combining zone for one or more of the scheduled UEs 110 can be expanded in order to use the additional front-haul capacity. Various criteria can be used to select which UEs 110 should have their combining zones expanded in such situations, such as highest scheduling priority, largest individual SINR improvement, largest overall SINR improvement, etc. This expansion is temporary and occurs after the Layer 2 scheduling of the current TTI is performed. This expansion does not affect the ability of the UE 110 to be put in reuse in the current TTI or subsequent TTIs. The additional RPs 106 provided by the expansion of the combining zone are useful in Layer 1 combining where in general they improve the SINR at the output of the IRC combiner.


As a result of the processing associated with methods 200, 300, and 400, a unique minimum combining zone for each UE 110 is assigned and updated based on the current channel conditions experienced by that UE 110 (as reflected in the SV). This minimum combining zone can be used to efficiently determine situations where uplink spatial reuse can be used, while at the same time taking into account processing load at the RPs 106 and the front-haul link capacity. That is, uplink spatial reuse can be deployment more efficiently and intelligently.



FIG. 5 comprises a flow chart illustrating one exemplary embodiment of a method 500 of assigning demodulation reference signals (DM-RSs) to UEs 110 that are put into PUSCH reuse in a C-RAN. The embodiment of method 500 shown in FIG. 5 is described here as being implemented in the C-RAN system 100 of FIG. 1, though it is to be understood that other embodiments can be implemented in other ways.


The blocks of the flow diagram shown in FIG. 5 have been arranged in a generally sequential manner for ease of explanation; however, it is to be understood that this arrangement is merely exemplary, and it should be recognized that the processing associated with method 500 (and the blocks shown in FIG. 5) can occur in a different order (for example, where at least some of the processing associated with the blocks is performed in parallel and/or in an event-driven manner).


In LTE, for the PUSCH, the serving controller 104 assigns each UE 110 a DM-RS resource during scheduling. The UE 110 transmits the DM-RS in the fourth OFDM symbol of each slot in the RBs allocated to it. The IRC receiver 105 in the serving controller 104 uses the DM-RS assigned to the UE 110 to estimate the frequency-domain channel response.


In general, the DM-RS resource assigned to each UE 110 is determined by multiplying a common DM-RS base sequence by a DM-RS cyclic shift. When multiple UEs 110 are put into uplink PUSCH reuse and are assigned the same RB, it is desirable to minimize interference between the DM-RSs sent by the UEs 110 since such interference may raise the channel estimation error, which in turn can degrade the SINR seen by the IRC receiver 105. Method 500 is configured to minimize interference between the DM-RSs sent by UEs 110 put into PUSCH reuse.


Method 500 comprises the serving controller 104, as a part of scheduling the PUSCH, selecting a common DM-RS base sequence used by all scheduled UEs 110 (block 502) and, for any UEs 110 that are put into PUSCH reuse with each other (checked in block 504), selecting different UE-specific DM-RS cyclic shifts for those UEs 110 that maximize the distance between the selected different UE-specific DM-RS cyclic shifts (block 506). The UE-specific DM-RS cyclic shifts for UEs 110 that are not put into uplink PUSCH reuse are selected in the conventional way (block 508).


Appropriate indexes for the selected common DM-RS base sequence and UE-specific cyclic shifts are communicated to each UE 110 (in a Downlink Control Information (DCI) 0 message in this example) (block 510). Each UE 110 uses the indexes communicated to it to determine the selected common DM-RS base sequence and UE-specific cyclic shifts and determine the assigned UE-specific DM-RS by multiplying the common DM-RS base sequence with the UE-specific DM-RS cyclic shift (block 512). Each UE 110 transmits its UE-specific DM-RS in the fourth OFDM symbol of each slot in the RBs allocated to it (block 514). The IRC receiver 105 in the controller 104 uses the UE-specific DM-RS to estimate the frequency-domain channel response.


To ensure the orthogonality of DM-RSs, the RB allocations of the UEs 110 that have been put into uplink PUSCH may be perfectly aligned (that is, the UEs 110 that are in reuse with each other only transmit on the PUSCH during exactly the same RBs).


In the exemplary embodiment described here, the PUSCH DM-RS used by each UE 110 is derived from a single common DM-RS base sequence ru,v(n) by multiplying it by a phase shift sequence ejαn, where α is a cyclic shift parameter defined below. In this embodiment, the index n goes from 0 to 12M−1, where M is the number of RBs assigned to the UE 110 and each value of n corresponds to 1 Resource Element (RE).


In this embodiment, where uplink PUSCH reuse is used without frequency hopping, for the single common DM-RS base sequence ru,v(n), v is equal to 0 and the controller 104 chooses one common DM-RS base sequence ru,0(n) among 30 possible base sequences, indicated by index u, for each uplink allocation length:

u=(Cell-ID+Δss)[mod 30],


where Δss is a cell-specific parameter between 0-29 signaled in a system information block (SIB) message. The base sequence is derived from a Zadoff-Chu sequence for greater than 2 RBs and uses different special sequences for 1 or 2 RBs.


When group hopping and sequence hopping are enabled, reference signals used in different cells can be varied between slots to prevent persistent interference conditions. Both hopping schemes are based on the Cell-ID and help randomize any interference between the C-RAN network 100 and any neighboring macro or small cell networks. Group hopping or sequence hopping will typically not be helpful in randomizing DM-RS interference between UEs in the C-RAN network 100.


The cyclic shift parameter α is defined as:

α=2πnCS/12.


where nCS is an integer between 0 and 11 given by:

nCS=nDMRS(1)+nDMRS(2)+nPRS(ns)(mod 12),


where nDMRS(1) is a semi-static cell-specific value signaled in a SIB message and nPRS(ns) is a cell-specific per-slot hopping pattern that depends on the Cell-ID and the parameter Δss described above. The parameter nDMRS(2) is a user-specific value, that is chosen by the scheduler 107 in the controller 104, and is indicated in the DCI message sent to the UE 110 for uplink resource allocation. In one implementation, the values of nDMRS(1) and nDMRS(2) are chosen from the set {0, 2, 3, 4, 6, 8, 9, 10}, where the values of 1, 5, 7 and 11 are not supported. In non-adaptive retransmissions, the UE 110 uses the same cyclic shift value as in the first transmission.


By assigning different UEs 110 in reuse different values of nDMRS(2), the scheduler 107 in the controller 104 will ensure that UEs 110 in reuse will never use the same DM-RS cyclic shift. Therefore, UEs 110 in PUSCH reuse should avoid the bias interference problem that tends to occur with downlink PDSCH reuse, as long as UEs 110 sharing the same allocation of RBs use different DM-RS cyclic shifts.


When two UEs 110 are assigned different DM-RS sequences in the same cell 103 and use exactly the same set of RBs, there will be no mutual interference between these DM-RS sequences if the following conditions are all met:


(A) The channel response seen by the UEs 110 is flat within a RB;


(B) There is no significant time-delay between the arrivals of the two UE's 110 signals at the RPs 106;


(C) The UEs are assigned different UE-specific cyclic shift indices nDMRS(2).


When the UEs 110 are perfectly synchronized to the downlink with timing advance chosen for perfect alignment at the closest RPs 106, there could be a time delay of 1 microsecond for every propagation distance difference of 300 meters. This is still a very small fraction of the symbol time and should not significantly impact orthogonality.


To minimize the possibility of interference due to frequency selectivity within a RB, two UEs 110 in uplink PUSCH reuse should be assigned nDMRS(2) values in the pair set {(0, 6), (2, 8), (3, 9), (4, 10)}. This maximizes the distance between “cyclic shifts” used by the two UEs 110 and reduces susceptibility to interference. Similarly, in four-way reuse, using the values in the set {(0, 3, 6, 9)} minimizes mutual interference. In one implementation of the embodiment, nDMRS(2) values of {0, 6, 3, 9} are used.


Since UEs have different data demand and possibly different link-adapted rates, forcing them to use the same number of RBs will lead to inefficiencies. Therefore, in one embodiment, RB alignment between UEs 110 in uplink PUSCH reuse is not required. When the DM-RS used by the desired and interfering UEs 110 are not orthogonal, there can be some leakage which will contribute some additional estimation error, however, simulations have shown that such errors do not have a significant impact on the IRC receiver 105 performance, especially when the cross-correlation between the DM-RS is low. Correlation between DM-RS varies depending on many factors, including the RB allocation, and can sometimes be high, but on average the impact of DM-RS non-orthogonality on the IRC receiver 105 performance is expected to be small.


When uplink PUSCH reuse is used, since the controller 104 knows the DM-RS of the interfering UEs 110, it can jointly estimate the desired UE's 110 and the interferer UE's 110 channel responses in the combining zone of the desired UE 110.



FIG. 6 comprises a flow chart illustrating one exemplary embodiment of a method 600 of controlling the PUSCH transmit power of a UE 110 in a C-RAN. The embodiment of method 600 shown in FIG. 6 is described here as being implemented in the C-RAN system 100 of FIG. 1, though it is to be understood that other embodiments can be implemented in other ways.


The blocks of the flow diagram shown in FIG. 6 have been arranged in a generally sequential manner for ease of explanation; however, it is to be understood that this arrangement is merely exemplary, and it should be recognized that the processing associated with method 600 (and the blocks shown in FIG. 6) can occur in a different order (for example, where at least some of the processing associated with the blocks is performed in parallel and/or in an event-driven manner).


Method 600 is described here as being performed for each UE 110 connected to the cell 103 if the system is configured to allow uplink reuse. The particular UE 110 for which method 600 is being performed is referred to here as the “current” UE 110.


In this embodiment, the transmit power of the current UE 110 is set independent of the UE rate. In other words, the parameter deltaMCS, which is used in closed-loop power control, is disabled. Instead, the UE rate is adjusted through link adaptation.


Method 600 comprises determining, for the current UE 110, a target SINR to be used with PUSCH power control (block 602). The target SINR is selected based on the power head room reported for the current UE 110. The primary purpose of transmit power control is to compensate for differences in channel gain experienced by different UEs 110, taking into account each UE's Power Head-Room (PHR). In the absence of any interference, the PUSCH closed-loop power control would adapt a UE's transmit power level to achieve a target signal-to-interference-plus-noise ratio (SINR). To achieve a given target SINR, an UE 110 near an RP 106 will generally transmit at a much lower power compared to an UE 110 that is away from the RP 106 (multi-RP combining will tend to reduce this effect somewhat). When the path loss experienced by a UE 110 is large, it will be limited in the number of RBs it can transmit within its transmit power limit. This will limit the UE's achievable throughput. For such UEs 110, achievable throughput can be increased by reducing the power control target SINR. So, the method 600 uses a different target SINR for each UE 110, and this target SINR is adapted based on UE's reported power headroom.


The initial target SINR for the PUSCH power control is set to provide a signal-to-noise ratio that is sufficient to achieve the targeted initial modulation and coding scheme (MCS) (for example, the maximum MCS). This setting is done using knowledge of the RP's receiver noise figure.


Method 600 further comprises determining the measured signal power for the current UE 110 at each antenna 108 of each RP 106 in the current UE's minimum combining zone based on the most recent PUSCH DM-RS (block 604). This is done on a per-UE basis. That is, for the current UE k, the signal power at each antenna m of each RP x in the current UE's minimum combining zone is computed for each RB scheduled for the current UE k from the corresponding DM-RS sequence, and the resulting signal powers for all scheduled RBs are summed and then normalized to 1 PRB, where the resulting measured signal power for the current UE k at each antenna m of each RP x in the current UE's minimum combining zone is denoted as the following: (where t is the current TTI):

Ŝx,m,k(t)


This computation is done for the RBs that are scheduled for the current UE 110.


Method 600 further comprises determining the measured average interference-plus-noise at each antenna 108 of each RP 106 in the current UE's minimum combining zone for several TTIs (block 606). As used here, “used RBs” for a given RP 106 refer to all RBs that are scheduled to be used by any UE 110 that includes that RP 106 in its minimum combining zone, not just the current UE 110. Any interference that is determined for such used RBs is indicative of “total” interference—that is, both “external” interference, which is interference resulting from transmission from external UEs that are connected to other cells, and “internal” interference (also referred to here as “reuse” interference), which is interference resulting from UEs 110 that are also connected to the serving cell 103 and that are in reuse during that RB.


For this measured average interference-plus-noise determination, the interference-plus-noise power at each antenna m of each RP x in the minimum combining zone of the current UE k is computed for all used RBs for that RP x, and the resulting signal powers for all used RBs are summed and then normalized to 1 PRB. This can be represented as follows. Let Ix,m,k(t) represent the interference-plus-noise estimate for UE k at antenna m of RP x for TTI t, where the interference-plus-noise estimate is determined from the diagonal term of the pre-IRC interference matrix. Then, the average total-interference-plus-noise estimate for all used RBs for TTI t at antenna m of RP x is represented by:

Ix,m(t)=sum(Ix,m,k(t))/sum(Nk)


where Ix,m,k(t) is summed across all UEs k that include that RP x in their minimum combining zones, where Nk is the number of RBs scheduled for each such UE k, and Nk is summed across all UEs k that include that RP x in their minimum combining zones. If there are no used RBs in given TTI t at a given antenna m of an RP x, then the average external interference power estimate Ī0,x,m(t) for that TTI t is used instead. Then, the average of the total interference-plus-noise at antenna m of RP x for TTI t across all used RBs, normalized per 1 PRB, is computed as a moving average as follows:

Ix,m(t)=αĪx,m(t−1)+(1−α)Ix,m(t)


where α a configurable smoothing factor.


Method 600 further comprises determining the measured average external-interference-plus-noise (INR) at each antenna 108 of each RP 106 in the current UE's minimum combining zone for several TTIs (block 608). As used here, “unused RBs” refer to all RBs that are not scheduled to be used by any UE 110. Any interference that is measured for such unused RBs is indicative of external interference. In one embodiment, the scheduler 107 in the serving controller 104 is configured so that at least some subframes include unused RBs that can be used to determine the average external-interference-plus-noise determination at each RP 106. For this average external interference-plus-noise determination, the interference-plus-noise power at each antenna m of each RP x in the minimum combining zone of the current UE k is computed for all unused RBs, and the resulting signal powers for all used RBs are summed and then normalized to 1 PRB. The interference-plus-noise estimate can be determined from the diagonal term of the pre-IRC interference matrix and can be represented as I0,x,m(t). Then, the average of the external interference-plus-noise at antenna m of RP x for TTI t across all unused RBs, normalized to one PRB, is computed as a moving average as follows:

Ī0,x,m(t)=α2Ī0,x,m(t−1)+(1−α2)I0,x,m(t)


where α2 is a configurable smoothing factor.


Method 600 further comprises determining, for the current UE 110, a “modified” SINR for the current TTI (block 610). A “modified” signal-to-interference-plus-noise ratio (SINR) for the current UE 110 is computed at each antenna m for each RP x in the current UE's minimum combining zone Z(k) and the resulting modified SINR values are summed to get the final modified SINR for the current TTI t. That is, the modified SINR Qk(t) can be represented as follows:








Q
k



(
t
)


=




x


Z


(
k
)









m
=
0

1






S
^


x
,
m
,
k




(
t
)





I
_


x
,
m




(
t
)









These SINR values are “modified” in the sense that signal part of the ratio is determined on a per-UE basis (that is, for the RBs scheduled for use with the current UE 110) whereas the interference-plus-noise of the ratio is determined for all used RBs (regardless of which UE 110 that is scheduled for use with each such RB).


Then, the average modified SINR for the current UE k is computed as a moving average as follows:

Qk(t)=α1Qk(t−1)+(1−α1)Qk(t)


where α1 is a configurable smoothing factor.


Method 600 further comprises determining, for the current UE 110, an external interference-based threshold power ThresholdPower1 (block 612).


The external interference-based threshold power ThresholdPower1 is used to suppress outgoing interference with external cells caused by transmissions from the current UE 110 and is computed whenever a new measurement report is received from the current UE 110. The current UE 110 is configured to send measurement reports (that include a reference signal received power (RSPR) measurement) for its serving cell 103 and for neighboring cells i. For example, such measurement reports can be based on event A3 where the following condition is true:

neighbor-cell RSRP−serving cell RSRP>Offset


where Offset is a configurable offset. More than one measurement event can be configured (for example, one for each power class of neighboring cells).


The serving controller 104 uses the sniffing mechanism (that is, UE receiver mode) in the RPs 106 to periodically look for neighboring cells and decode their SIB1/SIB2 information. This provides the serving controller 104 with the transmit power (EPRE) Pi of cell i. The pathgain Gi between the current UE k and its neighbor cell i is then determined as Gk,i=Ri/Pi, where Ri is the received power at the UE k for transmissions from the neighbor cell i as reflected in the RSRP measured by the UE k for that neighbor cell i and Pi is the transmit power reported by the neighbor cell i in the decoded SIB1/SIB2 information. The transmit power required from the current UE k in order to generate an interference power PextinterfThresholdk,i at neighbor cell i at a configurable outgoing interference threshold OutgoingInterferenceThreshold is determined as:

PextinterfThresholdk,i=OutgoingInterferenceThreshold/Gk,i


The lowest of all such power thresholds PextinterfThresholdk,i across all neighbor cells i is used as maximum power allowed for UE k, denoted as PextinterfThresholdk and is used as the external interference-based threshold power ThresholdPower1 for the current UE 110.


If there are no detected neighbor cells i, then the external interference-based threshold power ThresholdPower1 for the current UE 110 is set to the maximum UE transmit power.


Method 600 further comprises determining, for the current UE 110, an internal interference-based threshold power ThresholdPower2 (block 614).


The internal interference-based threshold power ThresholdPower2 is used to suppress interference with any other UE 110 in reuse that is caused by transmissions from the current UE 110. The internal interference-based threshold power ThresholdPower2 is computed whenever the minimum combing zone and signal zone for the current UE 110 is updated.


As noted above, the current UE 110 is configured to send measurement reports (that include the RSPR measurement) for its serving cell 103.


The pathgain Gk,s between the current UE k and the serving cell s is then determined as Gk,s=Rs/Ps, where Rs is the received power at the UE k from the serving cell s as reflected in the RSRP measured by the UE k and Ps is the transmit power from the serving cell s for that UE k.


Then, the ratio so between the signature vector entry for each RP 106 that is not included in the minimum combining zone of the current UE k and the signature vector entry for the primary RP 106 for the current UE k. This ratio so is also equal to the pathloss gain gk,o between the current UE k and each RP 106 that is not included in the minimum combining zone of the current UE k and the pathloss gain gk,p between the current UE k and the primary RP 106 for the current UE k. That is, the ratio so=gk,o/gk,p.


Then, the transmit power required from the UE k in order to generate a combined interference power at all of the RPs that are not included in the minimum combining zone of the current UE k is given by:

PreuseinterfThresholdk=ReuseInterferenceThreshold/(ΣoGk,sso)


where ReuseInterferenceThreshold is a configurable internal reuse interference threshold. This PreuseinterfThresholdk is used as the internal interference-based threshold power ThresholdPower2 for the current UE k.


If the minimum combining zone for the current UE k includes all of the RPs 106 for the cell 103, then the maximum UE transmit power is used as the internal interference-based threshold power ThresholdPower2 for the current UE


Method 600 further comprises performing PUSCH transmit power control for the current UE 110 using the determined target SINR and modified SINR for the current UE 110 while also using with the determined external and internal interference-based threshold powers ThresholdPower1 and ThresholdPower2 (block 616). Specifically, in this example, four power adjustment values are calculated. The first power adjustment value is:

δmaxMCS_SINR(t)=SINR(max MCS)−Qk(t)


where SINR(max MCS) is the determined target SINR and Qk(t) is the modified SINR for the current UE k for the current TTI t.


The second and third power adjustment values are:

δext_interference(t)=ThresholdPower1,k−(Tx power/PRB)(k,t)
δreUse_interference(t)=ThresholdPower2,k−(Tx power/PRB)(k,t)


where (Tx power/PRB)(k,t) is the current transmit power for setting for the current UE k for the current TTI t.


The fourth power adjustment value is:

δk(t)=min{δmaxMCS_SINR(t),δext_interference(t),δreUse_interference(t)}


A provisional transmit power command (TPC) is determined as follows. If the fourth power adjustment value δk(t) is less than or equal to an upper hysteresis value−Hystupper, then the provisional TPC is set to −1 dB. Otherwise, if the fourth power adjustment value δk(t) is greater than the upper hysteresis value−Hystupper and is greater than or equal to a lower hysteresis value Hystlower, then the provisional TPC is set to 0 dB (that is, there is no change). Otherwise, if the fourth power adjustment value δk(t) is less than the lower hysteresis value Hystlower, then the provisional TPC is set to +1 dB.


The provisional TPC is then subjected to other standard LTE PUSCH TPC command processing, where the result is applied as the PUSCH TPC command.



FIG. 7 comprises a flow chart illustrating one exemplary embodiment of a method 700 of PUSCH link adaption for a UE 110 in a C-RAN. The embodiment of method 700 shown in FIG. 7 is described here as being implemented in the C-RAN system 100 of FIG. 1, though it is to be understood that other embodiments can be implemented in other ways.


The blocks of the flow diagram shown in FIG. 7 have been arranged in a generally sequential manner for ease of explanation; however, it is to be understood that this arrangement is merely exemplary, and it should be recognized that the processing associated with method 700 (and the blocks shown in FIG. 7) can occur in a different order (for example, where at least some of the processing associated with the blocks is performed in parallel and/or in an event-driven manner).


Method 700 is described here as being performed for each UE 110 connected to the cell 103 if the system is configured to allow uplink reuse. The particular UE 110 for which method 700 is being performed is referred to here as the “current” UE 110.


Method 700 comprises determining the average modified SINR for the current UE 110 (block 702). The average modified SINR Qk(t) can be calculated as described above in connection with block 610 of FIG. 6. If the combining zone for the current UE 110 is reduced for a particular TTI due to temporary reasons (for example, high loading in an RP 106), then a backoff can be applied to the average modified SINR.


Method 700 further comprises determining an augmented average SINR for the current UE 110 by applying an adaptation loop variable (block 704). The average modified SINR can be augmented by applying an adaptation loop variable θk(t) as follows:

{circumflex over (Q)}k(t+1)=Qk(t)−θk(t)


where the adaptation loop variable θk(t) is determined as follows:








θ
k



(

t
+
1

)


=

{







θ
k



(
t
)


+

Δ
UP


,




CRC





pass








θ
k



(
t
)


-

Δ
DN





CRC





fail









and, where ΔUP and ΔDN are configurable upward and downward adjustment parameters, respectively. That is, when a new PUSCH transport block (TB) is received from the current UE 110 and decoded, if the TB passes the cyclic redundancy check (CRC), the adaptation loop variable is determined based on the previous value of the adaptation loop variable plus the upward adjustment parameter ΔUP. If the TB fails the CRC, the adaptation loop variable is determined based on the previous value of the adaptation loop variable minus the downward adjustment parameter ΔDN. The checking of the CRC is done in connection with processing acknowledgement or negative acknowledgement messages (ACK/NACK) for the TB.


Method 700 further comprises selecting a modulation and coding scheme (MCS) for the PUSCH data and uplink control information (UCI) transmitted by the current UE 100 during the next TTI based on the determined augmented average SINR (block 706).


Method 700 can be used to implement a relatively simple link adaptation mechanism where the UE rate is determined based on the average modified SINR determined for transmit power control. That is, link adaptation is performed for uplink transmissions from the current UE 110 by selecting a MCS for the current UE 110 based on a measured SINR for the current UE 110 and a sequence of acknowledgement and negative acknowledgement (ACK/NACK) messages associated with the uplink transmissions from that UE 110.


The methods and techniques described here may be implemented in digital electronic circuitry, or with a programmable processor (for example, a special-purpose processor or a general-purpose processor such as a computer) firmware, software, or in combinations of them. Apparatus embodying these techniques may include appropriate input and output devices, a programmable processor, and a storage medium tangibly embodying program instructions for execution by the programmable processor. A process embodying these techniques may be performed by a programmable processor executing a program of instructions to perform desired functions by operating on input data and generating appropriate output. The techniques may advantageously be implemented in one or more programs that are executable on a programmable system including at least one programmable processor coupled to receive data and instructions from, and to transmit data and instructions to, a data storage system, at least one input device, and at least one output device. Generally, a processor will receive instructions and data from a read-only memory and/or a random access memory. Storage devices suitable for tangibly embodying computer program instructions and data include all forms of non-volatile memory, including by way of example semiconductor memory devices, such as EPROM, EEPROM, and flash memory devices; magnetic disks such as internal hard disks and removable disks; magneto-optical disks; and DVD disks. Any of the foregoing may be supplemented by, or incorporated in, specially-designed application-specific integrated circuits (ASICs).


A number of embodiments of the invention defined by the following claims have been described. Nevertheless, it will be understood that various modifications to the described embodiments may be made without departing from the spirit and scope of the claimed invention. Accordingly, other embodiments are within the scope of the following claims.


EXAMPLE EMBODIMENTS

Example 1 includes a system to provide wireless service comprising: a controller; and a plurality of radio points; wherein each of the radio points is associated with at least one antenna and remotely located from the controller, wherein the plurality of radio points is communicatively coupled to the controller; wherein the controller and the plurality of radio points are configured to implement a base station in order to provide wireless service to a plurality of user equipment (UEs) using a cell; wherein the controller is communicatively coupled to a core network of a wireless service provider; wherein the controller is configured to implement a scheduler to schedule uplink transmissions from the UEs; wherein the controller is configured to implement a combining receiver to receive uplink transmissions from each UE, the combining receiver configured to combine data indicative of the uplink transmissions from each UE as received at each radio point included in a combining zone assigned to that UE and communicated to the controller; wherein the controller is configured to assign, to each UE, a respective minimum combining zone comprising a respective minimum subset of the radio points for use as the combining zone of the combining receiver for receiving uplink transmission from that UE; wherein the controller is configured to assign, to each UE, a respective signal zone comprising a respective subset of the radio points that can be included in the combining zone of the combining receiver for receiving uplink transmission from that UE; wherein the scheduler is configured to determine if multiple UEs are able to make respective uplink transmissions during a respective same time-and-frequency resource based on the respective minimum combining zones and signal zones assigned to the UEs and allocate time-and-frequency resources to the UEs using the minimum combining zones assigned to the UEs; and wherein the scheduler is configured to, after allocating time-and-frequency resources to the UEs, attempt to expand the combining zones used for receiving uplink transmissions.


Example 2 includes the system of Example 1, wherein the controller is configured to assign to each UE a respective interference zone comprising a respective subset of the radio points that cannot be included in the combining zone of the combining receiver for receiving uplink transmission from that UE.


Example 3 includes the system of Example 2, wherein the scheduler is configured to determine if multiple UEs are able to make respective uplink transmissions during the same time-and-frequency resource based on the respective minimum combining zones assigned to the UEs by: determining if the minimum combining zone of a first UE does not include any radio points that are in the signal zone of a second UE and if the minimum combining zone of the second UE does not include any radio points that are in the signal zone of the first UE.


Example 4 includes the system of any of the Examples 2-3, wherein the scheduler is configured to attempt to expand the combining zones used for receiving uplink transmissions for any multiple UEs that are scheduled to make respective uplink transmissions during the same time-and-frequency resource by expanding the combining zone of a first of the multiple UEs to include one or more additional radio points.


Example 5 includes the system of Example 4, wherein the scheduler is configured to attempt to expand the combining zones used for receiving uplink transmissions for the multiple UEs by expanding the combining zone of the first of the multiple UEs to include any radio point in the minimum combining zone of a second of the multiple UEs that is in the signal zone of the first of the multiple UEs.


Example 6 includes the system of any of the Examples 2-5, wherein the controller is configured to assign the respective signal zone for each UE as a function of an ability of including each radio point in the respective combining zone of that UE to benefit the receiving of uplink transmissions from that UE.


Example 7 includes the system of any of the Examples 1-6, wherein the scheduler is configured to attempt to expand the combining zones used for receiving uplink transmissions for a transmission time interval (TTI) by expanding the combining zone of one or more of the UEs if less than a total front-haul capacity for communicating data between the one or more radio points and the controller is not being used for the TTI.


Example 8 includes the system of any of the Examples 1-7, wherein the controller is communicatively coupled to the radio points using a switched ETHERNET network.


Example 9 includes the system of any of the Examples 1-8, wherein the uplink transmissions comprise Physical Uplink Shared Channel (PUSCH) transmissions.


Example 10 the system of any of the Examples 1-9, wherein the scheduler is configured to, for any multiple UEs that are scheduled to make respective uplink transmissions during the same time-and-frequency resource, assign respective UE-specific demodulation reference signal (DM-RS) cyclic shifts to the multiple UEs, each of the UE-specific DM-RS cyclic shifts having an associated distance between that UE-specific DM-RS cyclic shift and each of the other UE-specific DM-RS cyclic shifts, wherein the DM-RS cyclic shifts are assigned to maximize the respective distances.


Example 11 includes the system of any of the Examples 1-10, wherein the controller is configured to perform transmit power control for the uplink transmissions from the UEs using a closed-loop UE-specific target SINR that is adapted for each UE based on a power headroom reported for that UE.


Example 12 includes the system of any of the Examples 1-11, wherein the controller is configured to perform transmit power control for the uplink transmissions from the UEs using a closed-loop UE-specific measured SINR that uses: a signal power measurement based on uplink transmissions from that UE; and an interference-plus-noise measurement based on uplink transmissions from all scheduled UEs.


Example 13 includes the system of any of the Examples 1-12, wherein the controller is configured to perform transmit power control for a UE as a function of external interference caused by the uplink transmissions from that UE and of internal interference caused by uplink transmission from that UE.


Example 14 includes the system of any of the Examples 1-13, wherein the scheduler is configured to perform link adaptation for uplink transmissions from the UEs by selecting a modulation and coding scheme (MCS) for each UE based on a measured signal-to-interference-plus-noise ratio (SINK) for the UE and a sequence of acknowledgement and negative acknowledgement (ACK/NACK) messages associated with the uplink transmissions from the UE.


Example 15 includes a system to provide wireless service comprising: a controller; and a plurality of radio points; wherein each of the radio points is associated with at least one antenna and remotely located from the controller, wherein the plurality of radio points is communicatively coupled to the controller; wherein the controller and the plurality of radio points are configured to implement a base station in order to provide wireless service to a plurality of user equipment (UEs) using a cell; wherein the controller is communicatively coupled to a core network of a wireless service provider; wherein the controller is configured to implement a scheduler to schedule uplink transmissions from the UEs; wherein the scheduler is configured to determine if multiple UEs are able to make respective uplink transmissions during a respective same time-and-frequency resource, and, for any multiple UEs that are able to make respective uplink transmissions during the respective same time-and-frequency resource, schedule said multiple UEs to make respective uplink transmissions during the respective same time-and-frequency resource and assign respective UE-specific demodulation reference signal (DM-RS) cyclic shifts to said multiple UEs; and wherein each of the UE-specific DM-RS cyclic shifts have an associated distance between that UE-specific DM-RS cyclic shift and each of the other UE-specific DM-RS cyclic shifts, wherein the DM-RS cyclic shifts are assigned to maximize the respective distances.


Example 16 includes the system of Example 15, wherein the controller is configured to implement a combining receiver to receive the uplink transmissions from each UE, the combining receiver configured to combine data indicative of the uplink transmissions from each UE as received at each radio point included in a combining zone assigned to that UE and communicated to the controller; wherein the controller is configured to assign, to each UE, a respective minimum combining zone comprising a respective minimum subset of the radio points for use as the combining zone of the combining receiver for receiving uplink transmissions from that UE; wherein the controller is configured to assign, to each UE, a respective signal zone comprising a respective subset of the radio points that can be included in the combining zone of the combining receiver for receiving uplink transmission from that UE; wherein the scheduler is configured to determine if multiple UEs are able to make respective uplink transmissions during a respective same time-and-frequency resource based on the respective minimum combining zones and signal zones assigned to the UEs; wherein the scheduler is configured to allocate time-and-frequency resources to the UEs using the minimum combining zones assigned to the UEs; and wherein the scheduler is configured to, after allocating time-and-frequency resources to the UEs, attempt to expand the combining zones used for receiving uplink transmissions.


Example 17 includes the system of Example 16, wherein the controller is configured to assign to each UE a respective interference zone comprising a respective subset of the radio points that cannot be included in the combining zone of the combining receiver for receiving uplink transmission from that UE.


Example 18 includes the system of Example 17, wherein the scheduler is configured to determine if multiple UEs are able to make respective uplink transmissions during the same time-and-frequency resource based on the respective minimum combining zones assigned to the UEs by: determining if the minimum combining zone of a first UE does not include any radio points that are in the signal zone of a second UE and if the minimum combining zone of the second UE does not include any radio points that are in the signal zone of the first UE.


Example 19 includes the system of any of the Examples 17-18, wherein the scheduler is configured to attempt to expand the combining zones used for receiving uplink transmissions for any multiple UEs that are scheduled to make respective uplink transmissions during the same time-and-frequency resource by expanding the combining zone of a first of the multiple UEs to include one or more additional radio points.


Example 20 includes the system of Example 19, wherein the scheduler is configured to attempt to expand the combining zones used for receiving uplink transmissions for the multiple UEs by expanding the combining zone of the first of the multiple UEs to include any radio point in the minimum combining zone of a second of the multiple UEs that is in the signal zone of the first of the multiple UEs.


Example 21 includes the system of any of the Examples 17-20, wherein the controller is configured to assign the respective signal zone for each UE as a function of an ability of including each radio point in the respective combining zone of that UE to benefit the receiving of uplink transmissions from that UE.


Example 22 includes the system of any of the Examples 16-21, wherein the scheduler is configured to attempt to expand the combining zones used for receiving uplink transmissions for a transmission time interval (TTI) by expanding the combining zone of one or more of the UEs if less than a total front-haul capacity for communicating data between the one or more radio points and the controller is not being used for the TTI.


Example 23 includes the system of any of the Examples 15-22, wherein the controller is communicatively coupled to the radio points using a switched ETHERNET network.


Example 24 includes the system of any of the Examples 15-23, wherein the uplink transmissions comprise Physical Uplink Shared Channel (PUSCH) transmissions.


Example 25 includes the system of any of the Examples 15-24, wherein the controller is configured to perform transmit power control for the uplink transmissions from the UEs using a closed-loop UE-specific target SINR that is adapted for each UE based on a power headroom reported for that UE.


Example 26 includes the system of any of the Examples 15-25, wherein the controller is configured to perform transmit power control for the uplink transmissions from the UEs using a closed-loop UE-specific measured SINR that uses: a signal power measurement based on uplink transmissions from that UE; and an interference-plus-noise measurement based on uplink transmissions from all scheduled UEs.


Example 27 includes the system of any of the Examples 15-26, wherein the controller is configured to perform transmit power control for a UE as a function of external interference caused by the uplink transmissions from that UE and of internal interference caused by uplink transmission from that UE.


Example 28 includes the system of any of the Examples 15-27, wherein the scheduler is configured to perform link adaptation for uplink transmissions from the UEs by selecting a modulation and coding scheme (MCS) for each UE based on a measured signal-to-interference-plus-noise ratio (SINR) for the UE and a sequence of acknowledgement and negative acknowledgement (ACK/NACK) messages associated with the uplink transmissions from the UE.


Example 29 includes a system to provide wireless service comprising: a controller; and a plurality of radio points; wherein each of the radio points is associated with at least one antenna and remotely located from the controller, wherein the plurality of radio points is communicatively coupled to the controller; wherein the controller and the plurality of radio points are configured to implement a base station in order to provide wireless service to a plurality of user equipment (UEs) using a cell; wherein the controller is communicatively coupled to a core network of a wireless service provider; wherein the controller is configured to implement a scheduler to schedule uplink transmissions from the UEs; wherein the scheduler is configured to determine if multiple UEs are able to make respective uplink transmissions during a respective same time-and-frequency resource, and, for any multiple UEs that are able to make respective uplink transmissions during the respective same time-and-frequency resource, schedule said multiple UEs to make respective uplink transmissions during the respective same time-and-frequency resource; and wherein the controller is configured to perform transmit power control for the uplink transmissions from the UEs using at least one of the following: a closed-loop UE-specific target SINR that is adapted for each UE based on a power headroom reported for that UE; and a closed-loop UE-specific measured SINR that uses: a signal power measurement based on uplink transmissions from that UE, and an interference-plus-noise measurement based on uplink transmissions from all scheduled UEs.


Example 30 includes the system of Example 29, wherein the controller is configured to perform transmit power control for a UE as a function of external interference caused by the uplink transmissions from that UE and of internal interference caused by uplink transmission from that UE.


Example 31 includes the system of any of the Examples 29-30, wherein the controller is configured to implement a combining receiver to receive the uplink transmissions from each UE, the combining receiver configured to combine data indicative of the uplink transmissions from each UE as received at each radio point included in a combining zone assigned to that UE and communicated to the controller; wherein the controller is configured to assign, to each UE, a respective minimum combining zone comprising a respective minimum subset of the radio points for use as the combining zone of the combining receiver for receiving uplink transmission from that UE; wherein the controller is configured to assign, to each UE, a respective signal zone comprising a respective subset of the radio points that can be included in the combining zone of the combining receiver for receiving uplink transmission from that UE; wherein the scheduler is configured to determine if multiple UEs are able to make respective uplink transmissions during a respective same time-and-frequency resource based on the respective minimum combining zones and signal zones assigned to the UEs; wherein the scheduler is configured to allocate time-and-frequency resources to the UEs using the minimum combining zones assigned to the UEs; and wherein the scheduler is configured to, after allocating time-and-frequency resources to the UEs, attempt to expand the combining zones used for receiving uplink transmissions.


Example 32 includes the system of Example 31, wherein the controller is configured to assign to each UE a respective interference zone comprising a respective subset of the radio points that cannot be included in the combining zone of the combining receiver for receiving uplink transmission from that UE.


Example 33 includes the system of Example 32, wherein the scheduler is configured to determine if multiple UEs are able to make respective uplink transmissions during the same time-and-frequency resource based on the respective minimum combining zones assigned to the UEs by: determining if the minimum combining zone of a first UE does not include any radio points that are in the signal zone of a second UE and if the minimum combining zone of the second UE does not include any radio points that are in the signal zone of the first UE.


Example 34 includes the system of any of the Examples 32-33, wherein the scheduler is configured to attempt to expand the combining zones used for receiving uplink transmissions for any multiple UEs that are scheduled to make respective uplink transmissions during the same time-and-frequency resource by expanding the combining zone of a first of the multiple UEs to include one or more additional radio points.


Example 35 includes the system of Example 34, wherein the scheduler is configured to attempt to expand the combining zones used for receiving uplink transmissions for the multiple UEs by expanding the combining zone of the first of the multiple UEs to include any radio point in the minimum combining zone of a second of the multiple UEs.


Example 36 includes the system of any of the Examples 32-35, wherein the controller is configured to assign the respective signal zone for each UE as a function of an ability of including each radio point in the respective combining zone of that UE to benefit the receiving of uplink transmissions from that UE.


Example 37 includes the system of any of the Examples 31-36, wherein the scheduler is configured to attempt to expand the combining zones used for receiving uplink transmissions for a transmission time interval (TTI) by expanding the combining zone of one or more of the UEs if less than a total front-haul capacity for communicating data between the one or more radio points and the controller is not being used for the TTI.


Example 38 includes the system of any of the Examples 29-37, wherein the controller is communicatively coupled to the radio points using a switched ETHERNET network.


Example 39 includes the system of any of the Examples 29-38, wherein the uplink transmissions comprise Physical Uplink Shared Channel (PUSCH) transmissions.


Example 40 includes the system of any of the Examples 29-39, wherein the scheduler is configured to, for any multiple UEs that are scheduled to make respective uplink transmissions during the same time-and-frequency resource, assign respective UE-specific demodulation reference signal (DM-RS) cyclic shifts to the multiple UEs, each of the UE-specific DM-RS cyclic shifts having an associated distance between that UE-specific DM-RS cyclic shift and each of the other UE-specific DM-RS cyclic shifts, wherein the DM-RS cyclic shifts are assigned to maximize the respective distances.


Example 41 includes the system of any of the Examples 29-40, wherein the scheduler is configured to perform link adaptation for uplink transmissions from the UEs by selecting a modulation and coding scheme (MCS) for each UE based on a measured signal-to-interference-plus-noise ratio (SINR) for the UE and a sequence of acknowledgement and negative acknowledgement (ACK/NACK) messages associated with the uplink transmissions from the UE.


Example 42 includes a system to provide wireless service comprising: a controller; and a plurality of radio points; wherein each of the radio points is associated with at least one antenna and remotely located from the controller, wherein the plurality of radio points is communicatively coupled to the controller; wherein the controller and the plurality of radio points are configured to implement a base station in order to provide wireless service to a plurality of user equipment (UEs) using a cell; wherein the controller is communicatively coupled to a core network of a wireless service provider; wherein the controller is configured to implement a scheduler to schedule uplink transmissions from the UEs; wherein the scheduler is configured to perform link adaptation for uplink transmissions from the UEs by selecting a modulation and coding scheme (MCS) for each UE based on a measured signal-to-interference-plus-noise ratio (SINR) for the UE and a sequence of acknowledgement and negative acknowledgement (ACK/NACK) messages associated with the uplink transmissions from the UE.


Example 43 includes the system of Example 42, wherein selecting the MCS for each UE based on the SINR for the UE and the sequence of ACK/NACK messages associated with the uplink transmissions from the UE comprises: determining an average modified SINR for each UE; determining an augmented average SINR for each UE by applying an adaptation loop variable for the UE to the average modified SINR for the UE; and selecting the MCS for each UE based on the determined augmented average SINR for the UE.

Claims
  • 1. A system to provide wireless service comprising: a controller; anda plurality of radio points;wherein each of the radio points is associated with at least one antenna, wherein the plurality of radio points is communicatively coupled to the controller;wherein the controller and the plurality of radio points are configured to implement at least a part of a base station in order to provide wireless service to a plurality of user equipment (UEs) using a cell;wherein the controller is configured to implement a scheduler to schedule uplink transmissions from the UEs;wherein the controller is configured to implement a combining receiver to receive uplink transmissions from each UE, the combining receiver configured to combine data indicative of the uplink transmissions from each UE as received at each radio point included in a combining zone assigned to that UE and communicated to the controller;wherein the controller is configured to assign, to each UE, a respective minimum combining zone comprising a respective minimum subset of the radio points for use as the combining zone of the combining receiver for receiving uplink transmission from that UE;wherein the controller is configured to assign, to each UE, a respective signal zone comprising a respective subset of the radio points suitable for inclusion in the combining zone of the combining receiver for receiving uplink transmission from that UE;wherein the scheduler is configured to identify any groups of multiple UEs suitable for making respective uplink transmissions during a respective same time-and-frequency resource based on the respective minimum combining zones and signal zones assigned to the UEs and allocate time-and-frequency resources to the UEs using the minimum combining zones assigned to the UEs; andwherein the scheduler is configured to, after allocating time-and-frequency resources to the UEs, attempt to expand the combining zones used for receiving uplink transmissions.
  • 2. The system of claim 1, wherein the controller is configured to assign to each UE a respective interference zone comprising a respective subset of the radio points that are not suitable for inclusion in the combining zone of the combining receiver for receiving uplink transmission from that UE.
  • 3. The system of claim 2, wherein the scheduler is configured to identify any groups of multiple UEs suitable for making respective uplink transmissions during the same time-and-frequency resource based on the respective minimum combining zones assigned to the UEs by: determining if the minimum combining zone of a first UE does not include any radio points that are in the signal zone of a second UE and if the minimum combining zone of the second UE does not include any radio points that are in the signal zone of the first UE.
  • 4. The system of claim 2, wherein the scheduler is configured to attempt to expand the combining zones used for receiving uplink transmissions for any group of multiple UEs that are scheduled to make respective uplink transmissions during the same time-and-frequency resource by expanding the combining zone of a first of the multiple UEs to include one or more additional radio points.
  • 5. The system of claim 4, wherein the scheduler is configured to attempt to expand the combining zones used for receiving uplink transmissions for the multiple UEs by expanding the combining zone of the first of the multiple UEs to include any radio point in the minimum combining zone of a second of the multiple UEs that is in the signal zone of the first of the multiple UEs.
  • 6. The system of claim 2, wherein the controller is configured to assign the respective signal zone for each UE as a function of an ability of including each radio point in the respective combining zone of that UE to benefit the receiving of uplink transmissions from that UE.
  • 7. The system of claim 1, wherein the scheduler is configured to attempt to expand the combining zones used for receiving uplink transmissions for a transmission time interval (TTI) by expanding the combining zone of one or more of the UEs if less than a total front-haul capacity for communicating data between the one or more radio points and the controller is not being used for the TTI.
  • 8. The system of claim 1, wherein the controller is communicatively coupled to the radio points using a switched ETHERNET network.
  • 9. The system of claim 1, wherein the uplink transmissions comprise Physical Uplink Shared Channel (PUSCH) transmissions.
  • 10. The system of claim 1, wherein the scheduler is configured to, for any group of multiple UEs that are scheduled to make respective uplink transmissions during the same time-and-frequency resource, assign respective UE-specific demodulation reference signal (DM-RS) cyclic shifts to the multiple UEs, each of the UE-specific DM-RS cyclic shifts having an associated distance between that UE-specific DM-RS cyclic shift and each of the other UE-specific DM-RS cyclic shifts, wherein the DM-RS cyclic shifts are assigned to maximize the respective distances.
  • 11. The system of claim 1, wherein the controller is configured to perform transmit power control for the uplink transmissions from the UEs using a closed-loop UE-specific target that is adapted for each UE based on a power headroom reported for that UE.
  • 12. The system of claim 1, wherein the controller is configured to perform transmit power control for the uplink transmissions from the UEs using a closed-loop UE-specific measured signal-to-interference-plus-noise ratio (SINR) that uses: a signal power measurement based on uplink transmissions from that UE; and an interference-plus-noise measurement based on uplink transmissions from all scheduled UEs.
  • 13. The system of claim 1, wherein the controller is configured to perform transmit power control for a UE as a function of external interference caused by the uplink transmissions from that UE and of internal interference caused by uplink transmission from that UE.
  • 14. The system of claim 1, wherein the scheduler is configured to perform link adaptation for uplink transmissions from the UEs by selecting a modulation and coding scheme (MCS) for each UE based on a measured signal-to-interference-plus-noise ratio (SINR) for the UE and a sequence of acknowledgement and negative acknowledgement (ACK/NACK) messages associated with the uplink transmissions from the UE.
  • 15. A system to provide wireless service comprising: a controller; anda plurality of radio points;wherein each of the radio points is associated with at least one antenna, wherein the plurality of radio points is communicatively coupled to the controller;wherein the controller and the plurality of radio points are configured to implement at least a part of a base station in order to provide wireless service to a plurality of user equipment (UEs) using a cell;wherein the controller is configured to implement a scheduler to schedule uplink transmissions from the UEs;wherein the scheduler is configured to identify any groups of multiple UEs suitable for making respective uplink transmissions during a respective same time-and-frequency resource, and, for any group of multiple UEs suitable for making respective uplink transmissions during the respective same time-and-frequency resource, schedule said multiple UEs to make respective uplink transmissions during the respective same time-and-frequency resource and assign respective UE-specific demodulation reference signal (DM-RS) cyclic shifts to said multiple UEs; andwherein each of the UE-specific DM-RS cyclic shifts have an associated distance between that UE-specific DM-RS cyclic shift and each of the other UE-specific DM-RS cyclic shifts, wherein the DM-RS cyclic shifts are assigned to maximize the respective distances.
  • 16. The system of claim 15, wherein the controller is configured to implement a combining receiver to receive the uplink transmissions from each UE, the combining receiver configured to combine data indicative of the uplink transmissions from each UE as received at each radio point included in a combining zone assigned to that UE and communicated to the controller; wherein the controller is configured to assign, to each UE, a respective minimum combining zone comprising a respective minimum subset of the radio points for use as the combining zone of the combining receiver for receiving uplink transmissions from that UE;wherein the controller is configured to assign, to each UE, a respective signal zone comprising a respective subset of the radio points suitable for inclusion in the combining zone of the combining receiver for receiving uplink transmission from that UE;wherein the scheduler is configured to identify any groups of multiple UEs suitable for making respective uplink transmissions during a respective same time-and-frequency resource based on the respective minimum combining zones and signal zones assigned to the UEs;wherein the scheduler is configured to allocate time-and-frequency resources to the UEs using the minimum combining zones assigned to the UEs; andwherein the scheduler is configured to, after allocating time-and-frequency resources to the UEs, attempt to expand the combining zones used for receiving uplink transmissions.
  • 17. The system of claim 16, wherein the controller is configured to assign to each UE a respective interference zone comprising a respective subset of the radio points that are not suitable for inclusion in the combining zone of the combining receiver for receiving uplink transmission from that UE.
  • 18. The system of claim 17, wherein the scheduler is configured to identify any groups of multiple UEs suitable for making respective uplink transmissions during the same time-and-frequency resource based on the respective minimum combining zones assigned to the UEs by: determining if the minimum combining zone of a first UE does not include any radio points that are in the signal zone of a second UE and if the minimum combining zone of the second UE does not include any radio points that are in the signal zone of the first UE.
  • 19. The system of claim 17, wherein the scheduler is configured to attempt to expand the combining zones used for receiving uplink transmissions for any group of multiple UEs that are scheduled to make respective uplink transmissions during the same time-and-frequency resource by expanding the combining zone of a first of the multiple UEs to include one or more additional radio points.
  • 20. The system of claim 19, wherein the scheduler is configured to attempt to expand the combining zones used for receiving uplink transmissions for the multiple UEs by expanding the combining zone of the first of the multiple UEs to include any radio point in the minimum combining zone of a second of the multiple UEs that is in the signal zone of the first of the multiple UEs.
  • 21. The system of claim 17, wherein the controller is configured to assign the respective signal zone for each UE as a function of an ability of including each radio point in the respective combining zone of that UE to benefit the receiving of uplink transmissions from that UE.
  • 22. The system of claim 16, wherein the scheduler is configured to attempt to expand the combining zones used for receiving uplink transmissions for a transmission time interval (TTI) by expanding the combining zone of one or more of the UEs if less than a total front-haul capacity for communicating data between the one or more radio points and the controller is not being used for the TTI.
  • 23. The system of claim 15, wherein the controller is communicatively coupled to the radio points using a switched ETHERNET network.
  • 24. The system of claim 15, wherein the uplink transmissions comprise Physical Uplink Shared Channel (PUSCH) transmissions.
  • 25. The system of claim 15, wherein the controller is configured to perform transmit power control for the uplink transmissions from the UEs using a closed-loop UE-specific target signal-to-interference-plus-noise ratio (SINR) that is adapted for each UE based on a power headroom reported for that UE.
  • 26. The system of claim 15, wherein the controller is configured to perform transmit power control for the uplink transmissions from the UEs using a closed-loop UE-specific measured signal-to-interference-plus-noise ratio (SINK) that uses: a signal power measurement based on uplink transmissions from that UE; and an interference-plus-noise measurement based on uplink transmissions from all scheduled UEs.
  • 27. The system of claim 15, wherein the controller is configured to perform transmit power control for a UE as a function of external interference caused by the uplink transmissions from that UE and of internal interference caused by uplink transmission from that UE.
  • 28. The system of claim 15, wherein the scheduler is configured to perform link adaptation for uplink transmissions from the UEs by selecting a modulation and coding scheme (MCS) for each UE based on a measured signal-to-interference-plus-noise ratio (SINR) for the UE and a sequence of acknowledgement and negative acknowledgement (ACK/NACK) messages associated with the uplink transmissions from the UE.
  • 29. A system to provide wireless service comprising: a controller; anda plurality of radio points;wherein each of the radio points is associated with at least one antenna, wherein the plurality of radio points is communicatively coupled to the controller;wherein the controller and the plurality of radio points are configured to implement at least a part of a base station in order to provide wireless service to a plurality of user equipment (UEs) using a cell;wherein the controller is configured to implement a scheduler to schedule uplink transmissions from the UEs;wherein the scheduler is configured to identify any groups of multiple UEs suitable for making respective uplink transmissions during a respective same time-and-frequency resource, and, for any multiple UEs that are able to make respective uplink transmissions during the respective same time-and-frequency resource, schedule said multiple UEs to make respective uplink transmissions during the respective same time-and-frequency resource; andwherein the controller is configured to perform transmit power control for the uplink transmissions from the UEs using at least one of the following:a closed-loop UE-specific target signal-to-interference-plus-noise ratio (SINR) that is adapted for each UE based on a power headroom reported for that UE; anda closed-loop UE-specific measured SINR that uses: a signal power measurement based on uplink transmissions from that UE, and an interference-plus-noise measurement based on uplink transmissions from all scheduled UEs.
  • 30. The system of claim 29, wherein the controller is configured to perform transmit power control for a UE as a function of external interference caused by the uplink transmissions from that UE and of internal interference caused by uplink transmission from that UE.
  • 31. The system of claim 29, wherein the controller is configured to implement a combining receiver to receive the uplink transmissions from each UE, the combining receiver configured to combine data indicative of the uplink transmissions from each UE as received at each radio point included in a combining zone assigned to that UE and communicated to the controller; wherein the controller is configured to assign, to each UE, a respective minimum combining zone comprising a respective minimum subset of the radio points for use as the combining zone of the combining receiver for receiving uplink transmission from that UE;wherein the controller is configured to assign, to each UE, a respective signal zone comprising a respective subset of the radio points suitable for inclusion in the combining zone of the combining receiver for receiving uplink transmission from that UE;wherein the scheduler is configured to identify any groups of multiple UEs suitable for making respective uplink transmissions during a respective same time-and-frequency resource based on the respective minimum combining zones and signal zones assigned to the UEs;wherein the scheduler is configured to allocate time-and-frequency resources to the UEs using the minimum combining zones assigned to the UEs; andwherein the scheduler is configured to, after allocating time-and-frequency resources to the UEs, attempt to expand the combining zones used for receiving uplink transmissions.
  • 32. The system of claim 31, wherein the controller is configured to assign to each UE a respective interference zone comprising a respective subset of the radio points that are not suitable for inclusion in the combining zone of the combining receiver for receiving uplink transmission from that UE.
  • 33. The system of claim 32, wherein the scheduler is configured to identify any groups of multiple UEs suitable for making respective uplink transmissions during the same time-and-frequency resource based on the respective minimum combining zones assigned to the UEs by: determining if the minimum combining zone of a first UE does not include any radio points that are in the signal zone of a second UE and if the minimum combining zone of the second UE does not include any radio points that are in the signal zone of the first UE.
  • 34. The system of claim 32, wherein the scheduler is configured to attempt to expand the combining zones used for receiving uplink transmissions for any groups of multiple UEs that are scheduled to make respective uplink transmissions during the same time-and-frequency resource by expanding the combining zone of a first of the multiple UEs to include one or more additional radio points.
  • 35. The system of claim 34, wherein the scheduler is configured to attempt to expand the combining zones used for receiving uplink transmissions for the multiple UEs by expanding the combining zone of the first of the multiple UEs to include any radio point in the minimum combining zone of a second of the multiple UEs.
  • 36. The system of claim 32, wherein the controller is configured to assign the respective signal zone for each UE as a function of an ability of including each radio point in the respective combining zone of that UE to benefit the receiving of uplink transmissions from that UE.
  • 37. The system of claim 31, wherein the scheduler is configured to attempt to expand the combining zones used for receiving uplink transmissions for a transmission time interval (TTI) by expanding the combining zone of one or more of the UEs if less than a total front-haul capacity for communicating data between the one or more radio points and the controller is not being used for the TTI.
  • 38. The system of claim 29, wherein the controller is communicatively coupled to the radio points using a switched ETHERNET network.
  • 39. The system of claim 29, wherein the uplink transmissions comprise Physical Uplink Shared Channel (PUSCH) transmissions.
  • 40. The system of claim 29, wherein the scheduler is configured to, for any group of multiple UEs that are scheduled to make respective uplink transmissions during the same time-and-frequency resource, assign respective UE-specific demodulation reference signal (DM-RS) cyclic shifts to the multiple UEs, each of the UE-specific DM-RS cyclic shifts having an associated distance between that UE-specific DM-RS cyclic shift and each of the other UE-specific DM-RS cyclic shifts, wherein the DM-RS cyclic shifts are assigned to maximize the respective distances.
  • 41. The system of claim 29, wherein the scheduler is configured to perform link adaptation for uplink transmissions from the UEs by selecting a modulation and coding scheme (MCS) for each UE based on a measured signal-to-interference-plus-noise ratio (SINR) for the UE and a sequence of acknowledgement and negative acknowledgement (ACK/NACK) messages associated with the uplink transmissions from the UE.
  • 42. A system to provide wireless service comprising: a controller; anda plurality of radio points;wherein each of the radio points is associated with at least one antenna, wherein the plurality of radio points is communicatively coupled to the controller;wherein the controller and the plurality of radio points are configured to implement at least a part of a base station in order to provide wireless service to a plurality of user equipment (UEs) using a cell;wherein the controller is configured to implement a scheduler to schedule uplink transmissions from the UEs;wherein the scheduler is configured to perform link adaptation for uplink transmissions from the UEs by selecting a modulation and coding scheme (MCS) for each UE based on a measured signal-to-interference-plus-noise ratio (SINR) for the UE and a sequence of acknowledgement and negative acknowledgement (ACK/NACK) messages associated with the uplink transmissions from the UE.
  • 43. The system of claim 42, wherein selecting the MCS for each UE based on the SINR for the UE and the sequence of ACK/NACK messages associated with the uplink transmissions from the UE comprises: determining an average modified SINR for each UE;determining an augmented average SINR for each UE by applying an adaptation loop variable for the UE to the average modified SINR for the UE; andselecting the MCS for each UE based on the determined augmented average SINR for the UE.
  • 44. The system of claim 1, wherein the combining receiver comprises an interference-rejection combining (IRC) receiver.
  • 45. The system of claim 16, wherein the combining receiver comprises an interference-rejection combining (IRC) receiver.
  • 46. The system of claim 31, wherein the combining receiver comprises an interference-rejection combining (IRC) receiver.
  • 47. The system of claim 1, wherein each of the radio points is remotely located from the controller.
  • 48. The system of claim 15, wherein each of the radio points is remotely located from the controller.
  • 49. The system of claim 29, wherein each of the radio points is remotely located from the controller.
  • 50. The system of claim 42, wherein each of the radio points is remotely located from the controller.
CROSS-REFERENCE TO RELATED APPLICATION

This application claims the benefit of U.S. Provisional Patent Application Ser. No. 62/672,396, filed on May 16, 2018, and titled “DYNAMIC UPLINK REUSE IN A C-RAN”, which is hereby incorporated herein by reference.

US Referenced Citations (270)
Number Name Date Kind
6711144 Kim et al. Mar 2004 B1
6731618 Chung et al. May 2004 B1
6741862 Chung et al. May 2004 B2
6781999 Eyuboglu et al. Aug 2004 B2
6985451 Nattiv et al. Jan 2006 B1
7170871 Eyuboglu et al. Jan 2007 B2
7200391 Chung et al. Apr 2007 B2
7242958 Chung et al. Jul 2007 B2
7277446 Abi-Nassif et al. Oct 2007 B1
7299278 Ch'ng Nov 2007 B2
7415242 Ngan Aug 2008 B1
7515643 Chung Apr 2009 B2
7558356 Pollman et al. Jul 2009 B2
7558588 To et al. Jul 2009 B2
7603127 Chung et al. Oct 2009 B2
7626926 Abi-Nassif et al. Dec 2009 B2
7672682 Sharma et al. Mar 2010 B2
7715466 Oh et al. May 2010 B1
7729243 Ananthaiyer et al. Jun 2010 B2
7730189 Harikumar et al. Jun 2010 B2
7751835 Sharma et al. Jul 2010 B2
7801487 Mehrabanzad et al. Sep 2010 B2
7831257 Pollman et al. Nov 2010 B2
7835698 Eyuboglu et al. Nov 2010 B2
7843892 Mehrabanzad et al. Nov 2010 B2
7860513 Chung et al. Dec 2010 B2
7907571 Raghothaman et al. Mar 2011 B2
7907950 Ihm et al. Mar 2011 B2
7920541 To et al. Apr 2011 B2
7926098 Chinitz et al. Apr 2011 B2
7933619 Kim Apr 2011 B2
7934001 Harikumar et al. Apr 2011 B2
7953040 Harikumar et al. May 2011 B2
7983672 Humblet et al. Jul 2011 B2
7983708 Mehrabanzad et al. Jul 2011 B2
7995493 Anderlind et al. Aug 2011 B2
8023439 Rao Sep 2011 B2
8060058 Ch'ng et al. Nov 2011 B2
8078165 Mate et al. Dec 2011 B2
8085696 Garg et al. Dec 2011 B2
8094630 Garg et al. Jan 2012 B2
8099504 Cherian et al. Jan 2012 B2
8111253 Rao Feb 2012 B2
8130686 Rao et al. Mar 2012 B2
8140091 Chung et al. Mar 2012 B2
8145221 Garg et al. Mar 2012 B2
8160020 Eyuboglu et al. Apr 2012 B2
8160629 Mate et al. Apr 2012 B2
8160631 Raghothaman et al. Apr 2012 B2
8160829 Kalenine Apr 2012 B2
8165528 Raghothaman et al. Apr 2012 B2
8170598 Raghothaman et al. May 2012 B2
8176327 Xiong et al. May 2012 B2
8194597 Feder et al. Jun 2012 B2
8195187 Eyuboglu et al. Jun 2012 B2
8229397 Hou et al. Jul 2012 B2
8229498 Ch'ng et al. Jul 2012 B2
8259671 Raghothaman et al. Sep 2012 B2
8280376 Rajagopalan et al. Oct 2012 B2
8290527 Richardson Oct 2012 B2
8295256 Humblet et al. Oct 2012 B2
8295818 Palnati et al. Oct 2012 B2
8311570 Richardson Nov 2012 B2
8326342 Raghothaman et al. Dec 2012 B2
8340636 Yin et al. Dec 2012 B2
8345694 Den et al. Jan 2013 B2
8346220 Mate et al. Jan 2013 B2
8355727 Hoang et al. Jan 2013 B2
8358623 Samar et al. Jan 2013 B2
8379566 Gao et al. Feb 2013 B2
8379625 Humblet Feb 2013 B2
8385291 Richardson et al. Feb 2013 B2
8400989 Ch'ng et al. Mar 2013 B2
8402143 Ramaswamy et al. Mar 2013 B2
8428601 Samar et al. Apr 2013 B2
8452299 Raghothaman May 2013 B2
8457084 Valmikam et al. Jun 2013 B2
8503342 Richardson Aug 2013 B2
8520659 Humblet Aug 2013 B2
8532658 Knisely Sep 2013 B2
8542707 Hou et al. Sep 2013 B2
8543139 Samar et al. Sep 2013 B2
8554231 Jones Oct 2013 B2
8594663 Ch'ng et al. Nov 2013 B2
8599711 Hugl et al. Dec 2013 B2
8615238 Eyuboglu et al. Dec 2013 B2
8615593 Ch'ng et al. Dec 2013 B2
8619702 Garg et al. Dec 2013 B2
8639247 Ng et al. Jan 2014 B2
8676729 Keralapura et al. Mar 2014 B1
8688809 Ch'ng et al. Apr 2014 B2
8693987 Chiussi et al. Apr 2014 B2
8705483 Liu Apr 2014 B2
8718697 Srinivas et al. May 2014 B2
8731574 Ch'ng et al. May 2014 B2
8744374 Aue et al. Jun 2014 B2
8750271 Jones Jun 2014 B2
8774134 Raghothaman et al. Jul 2014 B2
8781483 Ch'ng Jul 2014 B2
8805371 Richardson et al. Aug 2014 B2
8843638 Garg et al. Sep 2014 B2
8873512 Richardson et al. Oct 2014 B2
8886249 Richardson Nov 2014 B2
8909278 Rao et al. Dec 2014 B2
8942136 Humblet Jan 2015 B2
8953566 Hegde et al. Feb 2015 B2
8958809 Nama et al. Feb 2015 B2
8982841 Srinivasan Mar 2015 B2
9078284 Richardson Jul 2015 B2
9380466 Eyuboglu et al. Jun 2016 B2
9414399 Eyuboglu et al. Aug 2016 B2
9877340 Park et al. Jan 2018 B1
9936470 Eyuboglu et al. Apr 2018 B2
9998310 Barbieri et al. Jun 2018 B2
10057916 Barabell et al. Aug 2018 B2
10064072 Eyuboglu et al. Aug 2018 B2
10097391 Fertonani et al. Oct 2018 B2
10149312 Yan et al. Dec 2018 B2
10292175 Eyuboglu et al. May 2019 B2
10355895 Barbieri et al. Jul 2019 B2
20020128009 Boch et al. Sep 2002 A1
20020154055 Davis et al. Oct 2002 A1
20020194605 Cohen et al. Dec 2002 A1
20040136373 Bareis Jul 2004 A1
20040143442 Knight Jul 2004 A1
20040146072 Farmwald Jul 2004 A1
20040224637 Silva et al. Nov 2004 A1
20050025160 Meier et al. Feb 2005 A1
20050073964 Schmidt et al. Apr 2005 A1
20050157675 Feder et al. Jul 2005 A1
20060056459 Stratton et al. Mar 2006 A1
20060056559 Pleasant et al. Mar 2006 A1
20060209752 Wijngaarden et al. Sep 2006 A1
20070023419 Ptasienski et al. Feb 2007 A1
20070058683 Futami et al. Mar 2007 A1
20070086487 Yasuda et al. Apr 2007 A1
20070140218 Nair et al. Jun 2007 A1
20070207838 Kuwahara et al. Sep 2007 A1
20070220573 Chiussi et al. Sep 2007 A1
20070230419 Raman et al. Oct 2007 A1
20070242648 Garg et al. Oct 2007 A1
20080003988 Richardson Jan 2008 A1
20080137606 Zuniga et al. Jun 2008 A1
20080200202 Montojo et al. Aug 2008 A1
20080233886 Kaminski et al. Sep 2008 A1
20080240034 Gollamudi Oct 2008 A1
20090097444 Lohr et al. Apr 2009 A1
20090135718 Yeo et al. May 2009 A1
20090149221 Liu et al. Jun 2009 A1
20090180423 Kroener Jul 2009 A1
20090180435 Sarkar Jul 2009 A1
20090265599 Chae et al. Oct 2009 A1
20090276542 Aweya et al. Nov 2009 A1
20090287976 Wang et al. Nov 2009 A1
20090300453 Sahara Dec 2009 A1
20090316626 Lee et al. Dec 2009 A1
20090327829 Yang et al. Dec 2009 A1
20100011269 Budianu et al. Jan 2010 A1
20100011271 Giancola et al. Jan 2010 A1
20100034135 Kim et al. Feb 2010 A1
20100037115 Zheng Feb 2010 A1
20100062768 Lindqvist et al. Mar 2010 A1
20100069112 Sun et al. Mar 2010 A1
20100115367 Hsu May 2010 A1
20100118777 Yamada et al. May 2010 A1
20100142494 Hsu Jun 2010 A1
20100167718 Chiussi et al. Jul 2010 A1
20100169732 Wu Jul 2010 A1
20100178875 Oh et al. Jul 2010 A1
20100185911 Cheng Jul 2010 A1
20100234035 Fujishima et al. Sep 2010 A1
20100246513 Lindskog et al. Sep 2010 A1
20100257419 Sung et al. Oct 2010 A1
20110081930 Shimonabe et al. Apr 2011 A1
20110134862 Huang et al. Jun 2011 A1
20110145672 Jongren et al. Jun 2011 A1
20110170517 Bakker et al. Jul 2011 A1
20110182255 Kim et al. Jul 2011 A1
20110194548 Feder et al. Aug 2011 A1
20110194630 Yang et al. Aug 2011 A1
20110207415 Luo et al. Aug 2011 A1
20110268007 Barany et al. Nov 2011 A1
20110268028 Stern-Berkowitz et al. Nov 2011 A1
20110287791 Fujishima et al. Nov 2011 A1
20110310802 Song et al. Dec 2011 A1
20120057572 Evans et al. Mar 2012 A1
20120127947 Usui May 2012 A1
20120140660 Kang et al. Jun 2012 A1
20120147815 Meyer et al. Jun 2012 A1
20120176884 Zhang et al. Jul 2012 A1
20120176966 Ling Jul 2012 A1
20120176980 Moon et al. Jul 2012 A1
20120176996 Kim et al. Jul 2012 A1
20120188929 Zhang et al. Jul 2012 A1
20120189074 Jin et al. Jul 2012 A1
20120195284 Mann et al. Aug 2012 A1
20120207105 Geirhofer et al. Aug 2012 A1
20120208581 Ishida et al. Aug 2012 A1
20120213109 Xu et al. Aug 2012 A1
20120250520 Chen et al. Oct 2012 A1
20120250740 Ling Oct 2012 A1
20120257570 Jang et al. Oct 2012 A1
20120264470 Bajj et al. Oct 2012 A1
20120281656 Hooli et al. Nov 2012 A1
20120300635 Jersenius et al. Nov 2012 A1
20120300766 Chen et al. Nov 2012 A1
20120322492 Koo et al. Dec 2012 A1
20130016686 Li et al. Jan 2013 A1
20130029711 Kang et al. Jan 2013 A1
20130034197 Aweya et al. Feb 2013 A1
20130100948 Irvine Apr 2013 A1
20130136053 Kim et al. May 2013 A1
20130136104 Samar et al. May 2013 A1
20130194985 Zetterman et al. Aug 2013 A1
20130223307 Ohlsson et al. Aug 2013 A1
20130223365 Choi et al. Aug 2013 A1
20130223391 Koo et al. Aug 2013 A1
20130229992 Yue et al. Sep 2013 A1
20130242837 Yang et al. Sep 2013 A1
20130242919 Koo et al. Sep 2013 A1
20130250869 Eriksson Sep 2013 A1
20130279452 Liu Oct 2013 A1
20130281049 Lee et al. Oct 2013 A1
20130294403 Srinivasan Nov 2013 A1
20140003389 Wang et al. Jan 2014 A1
20140031036 Koo et al. Jan 2014 A1
20140044057 Gaal et al. Feb 2014 A1
20140071868 Bergquist et al. Mar 2014 A1
20140086112 Stern-Berkowitz et al. Mar 2014 A1
20140126438 Zhu et al. May 2014 A1
20140161070 Chang et al. Jun 2014 A1
20140162664 Stapleton et al. Jun 2014 A1
20140177549 Knisely Jun 2014 A1
20140211690 Nama et al. Jul 2014 A1
20140212269 Kastner et al. Jul 2014 A1
20140219162 Eyuboglu et al. Aug 2014 A1
20140219255 Eyuboglu et al. Aug 2014 A1
20140219267 Eyuboglu et al. Aug 2014 A1
20150011219 Sally et al. Jan 2015 A1
20150085720 Gaal et al. Mar 2015 A1
20150172023 Yang et al. Jun 2015 A1
20150193282 Blocksome Jul 2015 A1
20150256297 Yang et al. Sep 2015 A1
20150304960 Yang et al. Oct 2015 A1
20150358982 Jeon et al. Dec 2015 A1
20160037550 Barabell et al. Feb 2016 A1
20160044548 Choi et al. Feb 2016 A1
20160227555 Haberland et al. Aug 2016 A1
20160302088 Eyuboglu et al. Oct 2016 A1
20160309347 Eyuboglu et al. Oct 2016 A1
20160345342 Eyuboglu et al. Nov 2016 A1
20170070961 Bharadwaj et al. Mar 2017 A1
20170077607 Han et al. Mar 2017 A1
20170163330 Raleigh et al. Jun 2017 A1
20170188368 Cariou et al. Jun 2017 A1
20170373890 Fertonani et al. Dec 2017 A1
20180034530 Tarlazzi et al. Feb 2018 A1
20180287696 Barbieri et al. Oct 2018 A1
20180309464 Mandegaran Oct 2018 A1
20190007246 Fertonani et al. Jan 2019 A1
20190069190 Eyuboglu et al. Feb 2019 A1
20190075576 Eyuboglu et al. Mar 2019 A1
20190104527 Raghothaman et al. Apr 2019 A1
20190116568 Fertonani et al. Apr 2019 A1
20190191464 Loehr Jun 2019 A1
20190200248 Basu Mallick Jun 2019 A1
20190208575 Barbieri et al. Jul 2019 A1
20200092901 Barabell et al. Mar 2020 A1
20200359383 Lemson et al. Nov 2020 A1
20210314975 Barabell et al. Oct 2021 A1
Foreign Referenced Citations (22)
Number Date Country
1719929 Jan 2006 CN
101534507 Sep 2009 CN
102111180 Jun 2011 CN
102340823 Feb 2012 CN
103369582 Oct 2013 CN
106797641 May 2017 CN
108541360 Sep 2018 CN
1134935 Sep 2001 EP
2352264 Aug 2011 EP
2693653 Feb 2014 EP
2787646 Oct 2014 EP
3094155 Nov 2016 EP
3269118 Jan 2018 EP
200814363 Mar 2009 WO
2010078811 Jul 2010 WO
2013036029 Mar 2013 WO
2014124160 Aug 2014 WO
2015191530 Dec 2015 WO
2016145371 Sep 2016 WO
2017070635 Apr 2017 WO
2017100096 Jun 2017 WO
2018017468 Jan 2018 WO
Non-Patent Literature Citations (18)
Entry
“3rd Generation Partnership Project; Technical Specification Group Radio Access Network; Evolved Universal Terrestrial Radio Access (E-UTRA); Requirements for support of radio resource management”, 3GPP, Mar. 2008, pp. 1-25, 3GPP Organizational Partners.
“3rd Generation Partnership Project; Technical Specification Group Radio Access Network; Evolved Universal Terrestrial Radio Access (E-UTRA); Base Station (BS) radio transmission and reception”, 3GPP, Dec. 2007, pp. 1-47, 3GPP Organizational Partners.
“Small Cell Virtualization Functional Splits and Use Cases”, Small Cell Forum, Jun. 2015, pp. 1-58, www.smallcellforum.com.
Belhouchet et al., “4G Wireless Systems, LTE Technology, Session 3: LTE Overview—Design Targets and Multiple Access Technologies”, ITU/BDT Arab Regional Workshop, 2010, pp. 1-82, ERT.
Dotsch, et al., “Quantitative Analysis of Split Base Station Processing and Determination of Advantageous Architectures for LTE”, Bell Labs Technical Journal, 2013, pp. 1-24, vol. 18, No. 1, Wiley Periodicals.
Garner, “IEEE 1588 Version 2”, ISPCS, Sep. 24, 2008, pp. 1-89.
Haberland et al., “Base Stations in the Cloud”, Alcatel-Lucent, Sep. 28, 2012, pp. 1-23, www.alcatel-lucent.com.
International Searching Authority, “International Search Report and Written Opinion from PCT Application No. PCT/US2018/053847 dated Feb. 1, 2019”, from Foreign Counterpart to U.S. Appl. No. 16/149,294, dated Feb. 1, 2019, pp. 1-11, Published: WO.
Ma et al., “Radiostar: Providing Wireless Coverage Over Gigabit Ethernet”, Bell Labs Technical Journal, 2009, pp. 1-18, vol. 14, No. 1, Wiley Periodicals.
Zhu et al., “Virtual Base Station Pool: Towards a Wireless Network Cloud for Radio Access Networks”, May 17, 2010, pp. 1-10.
International Searching Authority, “International Search Report and Written Opinion from PCT Application No. PCT/US2019/032508 dated Aug. 29, 2019”, from Foreign Counterpart to U.S. Appl. No. 16/413,360, pp. 1-21, Published: WO.
U.S. Patent and Trademark Office, “Office Action”, U.S. Appl. No. 16/149,294, dated Jan. 8, 2020, pp. 1-70, Published: US.
International Bureau, “International Preliminary Report on Patentability from PCT Application No. PCT/US2018/053847”, from Foreign Counterpart to U.S. Appl. No. 16/149,294, dated Apr. 16, 2020, pp. 1 through 7, Published: WO.
U.S. Patent and Trademark Office, “Final Office Action”, U.S. Appl. No. 16/149,294, dated Jul. 30, 2020, pp. 1 through 17, Published: US.
U.S. Patent and Tradmemark Office, “Advisory Action”, U.S. Appl. No. 16/149,294, dated Oct. 15, 2020, pp. 1 through 6, Published: US.
U.S. Patent and Trademark Office, “Notice of Allowance”, U.S. Appl. No. 16/149,294, dated Mar. 26, 2021, pp. 1 through 17, Published: US.
U.S. Patent and Trademark Office, “Notice of Allowance”, U.S. Appl. No. 16/149,294, dated Oct. 25, 2021, pp. 1 through 15, Published: US.
European Patent Office, “Extended European Search Report from EP Application No. 19803808.5”, from Foreign Counterpart to U.S. Appl. No. 16/413,360, dated Dec. 17, 2021, pp. 1 through 14, Published: EP.
Related Publications (1)
Number Date Country
20190357232 A1 Nov 2019 US
Provisional Applications (1)
Number Date Country
62672396 May 2018 US