The present invention relates to refrigeration systems that can be operated in a cooling cycle, a heating/defrost cycle, a pump-down cycle and a null cycle, and wherein an economizer circuit is incorporated into the system to provide augmented performance and enhanced control.
In one embodiment, the invention provides a refrigeration system having a cooling circuit, a heating circuit, a pressurizing receiver tank circuit, a pilot circuit and a liquid injection circuit wherein the hot gas line includes a solenoid valve that connects an outlet of a compressor to an outlet of a receiver tank, and wherein the liquid injection circuit includes a liquid injection solenoid that connects the outlet of the receiver tank to an outlet of an economizer heat exchanger.
In another embodiment, the invention provides a refrigeration system operable to run in a cooling cycle, a heating cycle and a null cycle, the refrigeration system having a compressor having a suction port and an output port, said compressor configured to receive refrigerant from the suction port, compress the refrigerant, and discharge the refrigerant through the output port. The refrigeration system also includes a condenser selectively connected to the output port and configured to selectively receive the compressed refrigerant from the compressor and condense the compressed refrigerant, and an economizer having a hot section and a cooling section, the hot section and cooling section being in thermodynamic contact with each other, said hot section being connected to the condenser and selectively receiving at least one of the condensed refrigerant from the condenser and the compressed refrigerant from the compressor, said cooling section receiving a first portion of refrigerant which has passed through the hot section and a first expansion device. Furthermore, the refrigeration system has a second expansion device connected to the hot section of the economizer and configured to receive a second portion of refrigerant which is not passed to the cooling section of the economizer, an evaporator connected to the second expansion device and configured to receive refrigerant from at least one of the second expansion device and the compressor output port, and a first solenoid valve fluidly connected to the output port of the compressor, said first solenoid valve selectively allowing the compressed refrigerant to pass through the solenoid valve to the cooling portion of the economizer to allow the refrigeration system to at least one of run the null cycle and generate additional mass flow into the compressor during the heating cycle. Finally, the invention further includes a second solenoid valve configured to receive condensed refrigerant which has passed through the condenser, said second solenoid valve selectively allowing the condensed refrigerant to pass through the second solenoid valve to the suction port of the compressor to at least one of lower the discharge temperature of the compressed refrigerant being discharged through the output port and lower the suction superheat of the compressor.
Yet another embodiment of the invention is a method of operating a refrigeration system in a null cycle, the method including compressing refrigerant using a compressor, passing a portion of the compressed refrigerant from the compressor through a first solenoid valve to reduce the pressure of the compressed refrigerant to a middle pressure, receiving a remaining portion of the compressed refrigerant from the compressor in a condenser to condense the compressed refrigerant, and receiving the condensed refrigerant from the condenser in a hot portion of the economizer. The invention further includes passing the condensed refrigerant from the hot portion of the economizer through an expansion device to reduce the condensed refrigerant to a middle pressure, combining the portion of medium pressure refrigerant with the remaining portion of refrigerant which has been condensed and reduced to a middle pressure, and receiving the combined refrigerant portions in a cooling section of an economizer. Finally, the invention also includes receiving the combined portions of refrigerant from the cooling section in a suction port of the compressor to allow the refrigeration system to run in the null cycle.
Another embodiment of the invention is a method of controlling the charge of a heating circuit, the method including compressing refrigerant using a compressor, receiving a first portion of the compressed refrigerant from the compressor in an evaporator, transferring heat from the first portion of the compressed refrigerant in the evaporator to a medium to be heated, reducing the first portion to a middle/low pressure, receiving the first portion middle/low pressure refrigerant from the evaporator in a suction port of the compressor, and receiving a second portion of the compressed refrigerant from the compressor in a hot section of an economizer. The embodiment also includes expanding the second portion using a first expansion device to lower the pressure to a middle pressure, receiving a third portion of the compressed refrigerant from the compressor in a liquid injection solenoid, expanding the third portion using the liquid injection solenoid receiving the third portion from the liquid injection solenoid in an auxiliary suction port of the compressor, and expanding the remaining portion of the compressed refrigerant from the compressor using a second expansion device to reduce the compressed refrigerant to a middle pressure. Finally, the embodiment further includes combining the remaining portion of compressed refrigerant that has been expanded with the second portion of refrigerant that has been expanded to form a combined refrigerant, receiving the combined refrigerant in a cooling section of the economizer, and receiving the combined refrigerant from the cooling section in a second suction port of the compressor.
Other aspects of the invention will become apparent by consideration of the detailed description and accompanying drawings.
Before any embodiments of the invention are explained in detail, it is to be understood that the invention is not limited in its application to the details of construction and the arrangement of components set forth in the following description or illustrated in the following drawings. The invention is capable of other embodiments and of being practiced or of being carried out in various ways.
The cooling circuit 48 includes a 3-way valve 68 configured to receive compressed high pressure refrigerant from the compressor 24. A condenser coil 72 is configured to receive high pressure refrigerant from an output of the 3-way valve 68. A condenser check valve 76 is configured to receive high pressure refrigerant from the condenser coil 72. A receiver tank 80 is configured to receive high pressure refrigerant from at least one of the condenser check valve 76 and the pressurizing receiver tank circuit 58. The receiver tank 80 is connected to the economizer heat exchanger 108 and the liquid injection circuit 62. The economizer heat exchanger 108 is connected to the economizer line 56 and to a liquid line solenoid 84, the liquid line solenoid 84 being part of the cooling circuit 48. A thermostatic expansion valve 88 is configured to receive high pressure refrigerant from the liquid line solenoid 84. An evaporator coil 92 is configured to receive at least one of low pressure refrigerant from the thermostatic expansion valve 88 and high pressure refrigerant from the heating circuit 52. The evaporator coil 92 is connected to the suction port 32 of the compressor 24. In some embodiments, at least one of an accumulator 96 and an electronic throttle valve 100 are disposed between the evaporator coil 92 and the compressor 24.
The heating circuit 52 receives compressed high pressure refrigerant from the 3-way valve 68. Upon leaving the 3-way valve 68, the high pressure refrigerant goes to at least one of a pressurizing receiver tank circuit check valve 104 and the cooling circuit 48 at a point between the thermostatic expansion valve 88 and the evaporator coil 92. High pressure refrigerant leaves the pressurizing receiver tank circuit check valve 104 and is sent to the cooling circuit 48 at a point between the condenser check valve 76 and the receiver tank 80.
The economizer line 56 is located at a point between the economizer heat exchanger 108 and the liquid line solenoid 84 of the cooling circuit 48. An economizer heat exchanger 108 includes a hot section 112 and a cooling section 116 which are in thermodynamic contact with each other. The hot section 112 receives high pressure refrigerant from the receiver tank 80. The high pressure refrigerant exits the hot section 112, where a portion of the high pressure refrigerant may enter the liquid line solenoid 84. A portion of the high pressure refrigerant exiting the hot section 112 may be directed toward an economizer thermostatic expansion valve 120 and ultimately into the cooling section 116. Refrigerant exits the cooling section 116 and moves to the auxiliary suction inlet 36 which allows for refrigerant to enter the compressor 24 from the economizer heat exchanger 108. The liquid injection circuit 62 may also be used during the heat or defrost cycle to push refrigerant into the heat cycle if it is determine that the cycle is undercharged.
The hot gas line 60 provides a way for high pressure refrigerant from the compressor 24 to go directly to the cooling section 116 of the economizer heat exchanger 108. High pressure refrigerant leaves the cooling circuit 48 at a location between the 3-way valve 68 and the compressor 24, the high pressure refrigerant then passes through a hot gas solenoid valve 128. After passing through the hot gas solenoid valve 128, the high pressure refrigerant enters the cooling section 116. During the heat or defrost cycle if the heating capacity is low then the hot gas solenoid 128 can be opened to increase the mass flow of refrigerant into the auxiliary suction port 36 thereby increasing the discharge pressure which then increases the power consumption of the compressor 24 resulting in increasing the heating capacity output in the evaporator 92. The hot gas line 60 may also be used during the null cycle. In the null cycle, hot gas that is throttled from the hot gas solenoid 128 is mixed with cold 2-phase refrigerant coming from the economizer thermostatic expansion valve 120 to essentially produce a vapor outlet at the economizer heat exchanger 108 which is fed to the compressor 24 through the auxiliary suction port 36. During the null cycle, no refrigerant is fed to the evaporator 92 resulting in a true null cycle achieved with the compressor 24 running.
The pilot line 64 connects the 3-way valve 68 to the suction port 32 of the compressor 24. High pressure refrigerant leaves the 3-way valve 68 and then passes through a pilot solenoid 132. After passing through the pilot solenoid 132, the high pressure refrigerant enters the suction port 32. The pilot line 64 allows for the 3-way valve 68 to shift between the two positions on the valve. The operation of the 3-way valve 68 is such that it relies on a pressure difference across a piston which is connected to the suction port 32 on one side and the pilot line 64 on the other. When the pilot solenoid 132 is closed, the pressures on the piston are identical and the spring force located inside the 3-way valve 68 forces the piston to a first direction such that the output of the 3-way valve is to the condenser 72. When the pilot solenoid valve 132 is opened, the pressure on the side of the piston toward the pilot solenoid valve 132 is lost and thus the inlet pressure on the other side of the piston is greater than the pressure on the pilot solenoid valve side. This pressure differential creates a force that can overcome the pressure from the spring and thus forces the 3-way valve 132 to shift in a second direction and thus the output of the 3-way valve 68 is toward the evaporator 92.
The refrigeration system 20 is selectively operable in a cooling cycle to provide cooled refrigerant to the evaporator coil 92. The refrigeration system 20 is selectively operable in a heating cycle or defrost cycle to provide heated refrigerant to the evaporator coil 92. The refrigeration system 20 is selectively operable in a pump-down cycle which minimizes the possibility of liquid slugging at the compressor 24 prior to entering the heating or defrost cycles. The refrigeration system 20 is selectively operable in a null cycle which allows the refrigeration system 20 to achieve no heating or cooling capacity in evaporator 92. The refrigeration cycle includes unloader solenoids 40, 44 which actuate between closed and open positions to vary the capacity of the compressor and thus affecting the cooling or heating capacity.
When the refrigeration system 20 is run in the cooling cycle, as shown in
The portion of refrigerant that is passed toward the liquid line solenoid 84 passes through the liquid line solenoid 84, and then passes through the thermostatic valve 88 where the refrigerant is reduced to a low pressure, thus the refrigerant temperature drops. The refrigerant then passes through the evaporator coil 92, where it may absorb heat. After leaving the evaporator coil 92 the refrigerant is passed toward the suction port 32 of the compressor 24. In some embodiments, after passing through the evaporator coil 92, the refrigerant may pass through at least one of an accumulator 96 and an electronic throttle valve 100. In some embodiments the liquid injection solenoid 124 may close when the temperature of the refrigerant leaving the compressor 24 drops below a certain temperature. In other embodiments the liquid injection solenoid 124 may open when the temperature of the refrigerant leaving the compressor 24 meets or exceeds a certain temperature.
When the refrigeration system 20 is run in the pump-down cycle, as shown in
When the refrigeration system 20 is run in the heating or defrost cycle, as shown in
The portion of refrigerant that entered the heating circuit 52 and was passed toward the evaporator coil 92 passes through the evaporator coil 92, where heat is removed from the refrigerant thus changing the high pressure refrigerant to a middle/low pressure refrigerant. After passing through the evaporator coil 92, the middle/low pressure refrigerant is combined with refrigerant that passed through the pilot solenoid 132, and the combined refrigerant passes toward the suction port 32 of the compressor 24. In some embodiments the refrigerant that leaves the evaporator coil 92 passes through at least one of the accumulator 96 and the electronic throttle valve 100. In other embodiments the liquid injection solenoid 124 may open when suction superheat exceeds a certain amount meaning the cycle is low on refrigerant charge. In yet other embodiments the 3-way valve 68 may temporarily send refrigerant to the condenser coil 72 to remove charge from the heating circuit 52 if it is determined that the cycle is too high on refrigerant charge resulting in liquid refrigerant enter the suction port 32 (too low suction superheat). Yet other embodiments combine both of the aforementioned features and may further utilize at least one of the first unloader solenoid 40 and the second unloader solenoid 44 as well as opening and closing of the hot gas solenoid valve 128 to control the capacity in the heating circuit 52.
When the refrigeration system 20 is run in null cycle, as shown in
The refrigeration system 20 thus provides a way to combine a cooling circuit 48, a heating circuit 52, a pressurizing receiver tank circuit 58, a pilot circuit 64, and a liquid injection circuit 62. This combination gives the refrigeration system 20 improved charge control when the refrigeration system 20 is run in the heating or defrost cycle. The improved charge control combined with super-unloading and a null cycle makes it possible to run heating and defrost cycles without an accumulator 96 and electronic throttling valve 100. In some embodiments digital unloading or pulse-width modulation of a scroll compressor is used in place of super unloading. This combination also increases the heating capacity of the refrigeration system 20 and makes it possible to run a true null cycle. In some embodiments the heating capacity of the refrigeration system 20 is increased by using the hot gas line 60 for increased mass flow.
Thus, the invention provides, among other things, a refrigeration system 20.
Number | Name | Date | Kind |
---|---|---|---|
2104148 | Alexander et al. | Jan 1938 | A |
4258553 | Kelly et al. | Mar 1981 | A |
4850197 | Taylor et al. | Jul 1989 | A |
5095712 | Narreau | Mar 1992 | A |
5157933 | Brendel | Oct 1992 | A |
5189883 | Bradford | Mar 1993 | A |
5400609 | Sjoholm et al. | Mar 1995 | A |
5410889 | Sjoholm et al. | May 1995 | A |
5465587 | Sjoholm et al. | Nov 1995 | A |
5557941 | Hanson et al. | Sep 1996 | A |
5596878 | Hanson et al. | Jan 1997 | A |
6148632 | Kishita et al. | Nov 2000 | A |
6374631 | Lifson et al. | Apr 2002 | B1 |
6385981 | Vaisman | May 2002 | B1 |
6684650 | Weyna et al. | Feb 2004 | B2 |
6708510 | Sulc et al. | Mar 2004 | B2 |
6817205 | Lifson et al. | Nov 2004 | B1 |
6826921 | Uselton | Dec 2004 | B1 |
6892553 | Lifson et al. | May 2005 | B1 |
6941770 | Taras et al. | Sep 2005 | B1 |
6990826 | Lifson et al. | Jan 2006 | B1 |
7000423 | Lifson et al. | Feb 2006 | B2 |
7003975 | Feuerecker | Feb 2006 | B2 |
7137270 | Lifson et al. | Nov 2006 | B2 |
7143594 | Ludwig et al. | Dec 2006 | B2 |
7257955 | Lifson et al. | Aug 2007 | B2 |
7272948 | Taras et al. | Sep 2007 | B2 |
7523623 | Taras et al. | Apr 2009 | B2 |
20040084175 | Kranz et al. | May 2004 | A1 |
20080098760 | Seefeldt | May 2008 | A1 |
20090025405 | Yanik | Jan 2009 | A1 |
20090235678 | Taras et al. | Sep 2009 | A1 |
20090293515 | Lifson et al. | Dec 2009 | A1 |
20090320506 | Lifson et al. | Dec 2009 | A1 |
Entry |
---|
International Search Report and Written Opinion for Application No. PCT/US2012/070483 dated Apr. 8, 2013 (9 pages). |
Number | Date | Country | |
---|---|---|---|
20130174590 A1 | Jul 2013 | US |