The present invention relates generally to the field of communication systems, and more particularly, to call setup in communications equipment.
3GPP2 packet data standard TIA/EIA/IS835 CDMA 2000 Wireless IP Network Standard, (IS-835) and the IEEE 802.16-2005 standard herein referred to as WiMAX) communication standard, among other packet data communication systems, can specify an Active state and a Dormant (Idle) state for a wireless communication device, such as a mobile station (MS), during a packet data session. In the Active state, the MS is connected to infrastructure equipment via a dedicated RF connection. For example, in IS-835 the infrastructure provides a dedicated connection between a Base Transceiver Station (BTS) and a Packet Control Function (PCF). The PCF is connected to a Packet Data Service Node, which is connected to a packet network. A packet call is moved into the Active state when there is a burst of packet data to transmit. The packet call may transition between the Active state and the Dormant (Idle) state many times, depending on the bursty nature of the data and on the duration of the time period.
In the Dormant state, when the MS is not transmitting or receiving data, the dedicated Radio Frequency (RF) connection and the dedicated connection between the BTS and the PCF are released. The packet call transitions from the Active state to the Dormant state when there has been no data transmission for a predetermined time period. While the packet session is in the Dormant state, bearer data cannot be transmitted, and must be buffered. A network element is responsible for tracking the MS mobility, receiving packet data, and buffering it until the MS becomes active again. For example, the Packet Control Function is only useful when the mobile is Dormant. It keeps the context for the Dormant mobile and maintains a tunnel with the PDSN. When the data starts to flow from the network side, the PDSN forwards the packet to the PCF which causes the PCF to transmit a BS Service request to the MSC. The mobile is then paged and when it responds a traffic channel (TCH) and Selector are assigned to the mobile which then transitions from Dormant to Active state. In short, in order to transmit buffered data to the MS, the call must be assigned a dedicated RF connection, and a dedicated connection between the BTS and the PCF must be re-established. The delay incurred in order to re-establish a dedicated connection between the MS and the PCF (i.e. tunneling and detunneling across the A10 and A8 interfaces) has a negative impact on the quality of the data service. Moreover, during the Active state the PCF acts as nothing more than a conduit for the data between the MS and the PDSN. Thus, the PCF resources are unnecessary when the mobile is Active. A similar process occurs for WiMAX communications.
Current standards impose a high transaction cost on centralized processing elements for the time needed for Dormant (Idle) to Active transitions. The time needed has a potentially negative impact on a subscriber's perception of data service. These problems encourage configurations where the RF connection is maintained for a long period of time after transmission of a data burst, so that a subsequent data burst can immediately be transmitted. However, maintaining a connection for an unnecessarily long period of time is an inefficient use of RF resources. For example, if a channel is maintained for sixty seconds for transmission of a series of bursts of packet data, one channel can offer sixty Busy Hour Call Attempts (one channel*3600/60). If, however, the channel is maintained for only five seconds for transmission of a burst, one channel can offer 720 BHCA (1 channel*3600/5). In the latter case, Dormant to Active transitions (i.e. call attempts) will increase because the channel is maintained for a shorter period of time. In the former case, the long timeout period decreases the effective utilization of the dedicated channel, and increases the number of dedicated channels required to support the packet data service.
One prior art solution, provided in U.S. Pat. No. 6,965,588, introduces a Semi-Dormant state to address this problem. In this reference, for the Dormant state, the network element maintaining the connection to the PDSN is the PCF, and in the Semi-Dormant state, the network element maintaining the connection between to the PDSN is the Selection and Distribution Unit (SDU). In the Dormant state, the SDU is released, with the PCF maintaining the connection to the PDSN. When the MS is in the Semi-Dormant state, the network element maintaining the connection between the BS and the PDSN for the call is the SDU. When a mobile moves from the Active to the Semi-Dormant state, the traffic channel is released but the SDU stays assigned. A path exists between the SDU and the PDSN via the PCF. When the mobile is in the Semi-Dormant state, there are paths between the SDU to the PCF and the PCF to the PDSN. No traffic channel exists over the RF connection. Once the mobile transitions from the Dormant to the Active state, a traffic channel will exist from the MS to the SDU via the BTS. However, this results in the PCF always being present and utilized. The mobile is sent addresses of the serving element and the IP address of both the PCF and SDU are sent to the mobile, so that when the mobile goes Active both the SDU and PCF elements serving that mobile can be quickly identified. This solution, although effective requires a third, Semi-Dormant state to be coordinated, and still requires the PCF in the communication path while the mobile is Active, which wastes RF resources.
Therefore, there is a need for a method and apparatus for efficient transitions between operating states in a communication network, and in particular for transitioning a wireless communication device between the Dormant state and Active state by efficient connection of RF resources dependent upon whether there is bearer data to transmit.
The invention is pointed out with particularity in the appended claims. However, other features of the invention will become more apparent and the invention will be best understood by referring to the following detailed description in conjunction with the accompanying drawings in which:
Skilled artisans will appreciate that common but well-understood elements that are useful or necessary in a commercially feasible embodiment are typically not depicted or described in order to facilitate a less obstructed view of these various embodiments of the present invention.
The present invention provides a method and apparatus for efficient transitions between operating states in a communication network, and in particular for transitioning a wireless communication device between a Dormant or Idle state and an Active state by efficient connection of RF resources dependent upon whether there is bearer data to transmit.
In the prior art, a wireless communication device such as a mobile station (MS) can be in a call with Base Site (BS) equipment. The call connection is supported by an RF bearer function, such as a BS and a Selector through to a Paging Control Function, such as a Packet Control Function (PCF), and on to an IP Routing Function, such as a Packet Data Service Node (PDSN). When the call (connection) is released between the MS and BS, the BS provides the MS with the equipment identifiers of the network elements that maintain the connection with the Packet Data Service Node (PDSN), and disconnects the RF Bearer. The MS retains the identifiers and sends the appropriate identifier to the BS when requesting reactivation (transition to Active state). In the Dormant or Idle state (or Inactive state as used herein), the network element maintaining the connection to the PDSN is the PCF because the RF Bearer has been released and disconnected. When the BS receives the reactivation request from the MS, it connects the PCF to the RF Bearer path that is established to the MS.
In accordance with the present invention, the PCF is bypassed when re-establishing an Active state. Instead of re-connection through the PCF, when the BS receives the reactivation request from the MS, it connects the RF Bearer Function directly to the IP Routing Function. Advantageously, this can be done without network hardware modifications. Details of the invention will now be described with reference to the figures.
In this first embodiment (as shown), the system 100 is an IS-835 communication network, wherein the IP Router 106 is a PDSN, the PCF 108 is a Packet Control Function and the RF Bearer Function 111 includes the Selector 110 and BTSs 112, 114, 116. In this embodiment, the PDSN communicates to the PCF over an A10/A11 interface. The PCF provides buffering for data received from the PDSN. The PCF is connected to the Selector for the BTSs over an A8/A9 interface. In this embodiment, the present invention is operable over a layer 3 bearer.
In a second embodiment, as shown in
The IP Routing function 106 may be an FA or it may be a simple off the shelf router for non-mobile stations. The Paging Controller 108 is included in the bearer path only when an MS is idle. The Paging Controller 108 is removed from the bearer path when the MS is active. The Paging Controller 108 contains a location register in the CAPC that tracks the paging area a mobile has gone idle within. The Paging Controller 108 has the ability to queue incoming packets from the network. The serving access point (AP) makes up the RF bearer function 111. APs are grouped into paging areas, and mobiles that are idle can move anywhere within a paging area without performing a location update with the location registrar in the CAPC.
Returning to the example of the first embodiment for an IS-835 network in
The Selector is also connected to a Mobility Manager (MM) 120 via a control link. The MM 120 provides control functions for calls connected on the BS equipment 109. For example, the MM 120 monitors the state of a call and determines when the call should be released, decides when soft handoff should occur, and decides which BTSs should be added or dropped in soft handoff, etc. The MM 120 is connected to a Mobile Switching Center (MSC) 122 over an A1 interface (as specified in IS-835). The MSC 122 interfaces the MM 120 to the Public Switch Telephone Network (PSTN) 126. The MSC 122 is also connected to a Home Location Register/Visitor Location Register (HLR/VLR) 124 over an IS-41 interface. When the MS 118 is in its home network, the HLR 124 determines the location of the MS 118 and provides information to the MSC 122. When the MS 118 is in a visitor network, the VLR 124 obtains a copy of the HLR information and provides it to a MSC, such as MSC 123, in the visitor network. MSC 122 and MSC 123 are connected via an IS-41 interface. It should be recognized that the Location Register and paging functions can be implemented in different network elements based on technology and network architecture. In the CDMA network, the PCF has the ability to store data for the mobile and works in cooperation with BSC and MSC to page the mobile.
The elements and interfaces shown in
The present invention provides a solution for tunneling and de-tunneling delays wherein the PCF resources are no longer wasted when the mobile is in Active state. By having the RF Bearer directly connect with the IP Router, delay in packet transfer is greatly reduced which is a significant advantage to realtime services that require low latency.
Referring to
For example, in the IS-835 embodiment, when a mobile becomes Active the bearer path A10 context is transferred from the PCF to the Selector. The Selector then uses A11 Inter-PCF handoff procedures with the PDSN and creates an A10 tunnel between itself and the PDSN. The A10/A11 standards are not impacted. To the PDSN the Selector will appear as a PCF and have a security context for A11 communications. This approach will decrease the call set up time than if the call is processed in the same sequence as in the prior art.
In the CDMA case, the present invention is applicable to both cases of where; a) the network has packet data to be transferred to the MS, or b) the MS is initiating a packet data transfer. In the WiMAX case, the present invention is applicable to the case where an MS switches; a) from Active to Idle Mode, and b) from Idle to Active Mode.
While the establishment of the A10 tunnel can be accomplished in nearly the same time as the traditional establishment of A8, the context and data transfer to the Selector is an additional step. Therefore, for real time applications where call setup time is crucial, such as Push-to-Talk (PTT), the Selector will be assigned after the PCF receives data for the Dormant MS and ahead of the page response from the MS. When the MS enters Dormant mode, the Selector will notify the PCF and allow the PCF to move the tunnel back to itself. Once again inter-PCF handoff techniques are used to accomplish the tunnel transfer.
The network between the Router/FA, CAPC and the AP is a Layer 2 Ethernet network. The bearer is redirected easily by sending an Ethernet control packet from either the AP or the CAPC to the Router/FA. The Ethernet frames include the Media Access Control (MAC) address of the MS's so each MS has its own data path through the Layer 2 network. The layer 2 switches update which the ports from which packets with a given MAC address arrive at so that packets in the reverse direction follow the same path back down through the network.
It should be noted that in the present invention, a system operator can tune the operation of Active and Dormant (or Idle) state transitions in order to strike an optimal balance between quality of the data service from a subscriber perspective, RF channel utilization, battery power, and access channel capacity. This tuning can be achieved by modifying the time that the MS is in the Dormant (Idle) state.
The present invention has broad applications in new wireless architectures that are IP based, such as WiMAX, CDMA-1X and EvDO architectures. In any wireless network, not all powered-on mobiles can be using the available RF resources at all times. The concept of Idle, Dormant and Active states are universal to wireless networks. When the mobiles are Dormant they have established a session context. When the mobile becomes Active, BTS and BSC resources are assigned. In the present invention, the network entity that keeps this session context does not need to be in the path of the bearer data just because it keeps the context. The present invention takes advantage of the already established Inter-PCF handoff techniques in a new way to eliminate the PCF from the bearer path when the mobile becomes active
The sequences and methods shown and described herein can be carried out in a different order than those described. The particular sequences, functions, and operations depicted in the drawings are merely illustrative of one or more embodiments of the invention, and other implementations will be apparent to those of ordinary skill in the art. The drawings are intended to illustrate various implementations of the invention that can be understood and appropriately carried out by those of ordinary skill in the art. Any arrangement, which is calculated to achieve the same purpose, may be substituted for the specific embodiments shown.
The invention can be implemented in any suitable form including hardware, software, firmware or any combination of these. The invention may optionally be implemented partly as computer software running on one or more data processors and/or digital signal processors. The elements and components of an embodiment of the invention may be physically, functionally and logically implemented in any suitable way. Indeed the functionality may be implemented in a single unit, in a plurality of units or as part of other functional units. As such, the invention may be implemented in a single unit or may be physically and functionally distributed between different units and processors.
Although the present invention has been described in connection with some embodiments, it is not intended to be limited to the specific form set forth herein. Rather, the scope of the present invention is limited only by the accompanying claims. Additionally, although a feature may appear to be described in connection with particular embodiments, one skilled in the art would recognize that various features of the described embodiments may be combined in accordance with the invention. In the claims, the term comprising does not exclude the presence of other elements or steps.
Furthermore, although individually listed, a plurality of means, elements or method steps may be implemented by e.g. a single unit or processor. Additionally, although individual features may be included in different claims, these may possibly be advantageously combined, and the inclusion in different claims does not imply that a combination of features is not feasible and/or advantageous. Also the inclusion of a feature in one category of claims does not imply a limitation to this category but rather indicates that the feature is equally applicable to other claim categories as appropriate.
Furthermore, the order of features in the claims do not imply any specific order in which the features must be worked and in particular the order of individual steps in a method claim does not imply that the steps must be performed in this order. Rather, the steps may be performed in any suitable order. In addition, singular references do not exclude a plurality. Thus references to “a”, “an”, “first”, “second” etc do not preclude a plurality.
Number | Name | Date | Kind |
---|---|---|---|
6965588 | Schmidt et al. | Nov 2005 | B2 |
7043249 | Sayeedi | May 2006 | B2 |
7324499 | Borella et al. | Jan 2008 | B1 |
7466675 | Hart et al. | Dec 2008 | B2 |
20030045293 | Lee et al. | Mar 2003 | A1 |
20030211847 | Jang et al. | Nov 2003 | A1 |
20040114553 | Jiang et al. | Jun 2004 | A1 |
20050073969 | Hart et al. | Apr 2005 | A1 |
20050089008 | Choo et al. | Apr 2005 | A1 |
20050094601 | Hsu et al. | May 2005 | A1 |
20050174939 | Willey et al. | Aug 2005 | A1 |
20050207425 | Choo | Sep 2005 | A1 |
20050276273 | Oprescu-Surcobe et al. | Dec 2005 | A1 |
20060056361 | Jiang et al. | Mar 2006 | A1 |
20060126589 | Sayeedi | Jun 2006 | A1 |
20070047562 | Sayeedi et al. | Mar 2007 | A1 |
Number | Date | Country | |
---|---|---|---|
20080144574 A1 | Jun 2008 | US |