Claims
- 1. An electric arc furnace for continuous charging of ferrous materials and semicontinuous tapping of molten steel, comprising: (a) a body, having a central melting zone and at least two lateral shafts adjacent to said central melting zone, the base of said central melting zone being higher in elevation than the bases of said lateral shafts; (b) a roof over said body; (c) a central stack extending vertically from said roof above said central melting zone, said central stack having a means for charging ferrous materials into said central melting zone, having a means for removing exhaust gases from said central melting zone, and having a pivot point located below said means for charging; (d) a means for melting material charged into the furnace; (e) a means for tapping molten steel from the furnace; (f) a means for injecting refining aids into said lateral shafts; (g) at least one deslagging door positioned within said body; and (h) a means for tilting the furnace to alternatively tap said lateral shafts.
- 2. An electric arc furnace as set forth in claim 1, wherein said means for melting material charged into the furnace comprises a plurality of electrodes introduced through said roof into said body.
- 3. An electric arc furnace as set forth in claim 2, wherein there are at least two central electrodes introduced into said central melting zone of said body.
- 4. An electric arc furnace as set forth in claim 3, wherein the central electrodes are direct current electrodes.
- 5. An electric arc furnace as set forth in claim 2, wherein there is at least one lateral electrode introduced into each lateral shaft of said body.
- 6. An electric arc furnace as set forth in claim 2, wherein said means for charging ferrous materials is a conveyor belt connected with the top of said central stack.
- 7. An electric arc furnace as set forth in claim 1, wherein said means for charging ferrous materials includes a charge seal.
- 8. An electric arc furnace as set forth in claim 1, wherein said means for removing exhaust gases is an exhaust conduit connected to said central stack.
- 9. An electric arc furnace as set forth in claim 1, wherein said central stack includes a mechanical seal to prevent emissions from bypassing said exhaust conduit.
- 10. An electric arc furnace as set forth in claim 9, wherein said mechanical seal allows heat to rise up said central stack.
- 11. An electric arc furnace as set forth in claim 1, wherein said means for tapping molten steel comprises a plurality of tapping ports disposed into the bottom of said furnace body.
- 12. An electric arc furnace as set forth in claim 11, wherein at least one lateral tapping port is disposed into the bottom of each said lateral shaft for filling a plurality of ladles beneath said tapping ports.
- 13. An electric arc furnace in claim 11, wherein at least one central tapping port is disposed into the bottom of said central melting zone.
- 14. An electric arc furnace as set forth in claim 11, wherein said ladles are transported by ladle cars and ladle rails.
- 15. An electric arc furnace as set forth in claim 14, wherein at least one ladle having a ladle car and ladle rail is located beneath each lateral tapping port.
- 16. An electric arc furnace as set forth in claim 14, wherein at least one ladle having a ladle car and ladle rail is located beneath the central melting zone.
- 17. An electric arc furnace as set forth in claim 1, wherein said means for injecting refining aids are supersonic.
- 18. An electric arc furnace as set forth in claim 17, wherein said refining aids are selected from a group comprising solid fuel, gaseous fuel, liquid fuel and comburents.
- 19. An electric arc furnace as set forth in claim 18, wherein one of said refining aids is oxygen injected via supersonic means.
- 20. An electric arc furnace as set forth in claim 1, wherein said furnace roof comprises a plurality of charge ducts for charging ferrous materials into said furnace body.
- 21. An electric arc furnace as set forth in claim 20, wherein at least one charge duct is disposed into said central melting zone of said body.
- 22. An electric arc furnace as set forth in claim 20, wherein at least one charge duct is disposed into each lateral shaft of said body.
- 23. An electric arc furnace as set forth in claim 1, wherein said means for tilting comprises a base structure, support element with wheels and hydraulic actuator.
- 24. An electric arc furnace as set forth in claim 1, wherein said means for tilting enables the furnace to be tilted up to 15 degrees along the vertical axis of the furnace.
- 25. An electric arc furnace for continuous charging of ferrous materials and semicontinuous tapping of molten steel, comprising (a) a body, having a central melting zone and at least two lateral shafts adjacent to said central melting zone, the base of said central melting zone being higher in elevation than the bases of said lateral shafts; (b) a roof over said body; (c) a central stack extending vertically from said roof above said central melting zone, said central stack having a conveyor to charge materials and a charge seal, having a pivot point located below said conveyor, having an exhaust conduit to remove exhaust gases, and having a mechanical seal to prevent gases from bypassing said exhaust conduit; (d) at least two electrodes disposed through said roof into said central melting zone and at least one electrode disposed through said roof into each lateral shaft; (e) a plurality of charging ducts disposed through said roof into said body; (f) a least one tapping port disposed into said base of each lateral shaft and at least one ladle positioned beneath each said tapping port; (g) at least one deslagging door disposed into said body; (h) a supersonic means for injecting refining aids disposed through said roof into said lateral shaft; and (i) a support element with wheels and a hydraulic actuator positioned beneath each said lateral shaft of said body.
- 26. An electric arc furnace as set forth in claim 25, wherein said ladle is positioned on a ladle car.
- 27. An electric arc furnace as set forth in claim 26, wherein said ladle car is situated on a ladle rail.
- 28. An electric arc furnace as set forth in claim 25, wherein at least one tapping port is disposed into the base of said central melting zone.
- 29. An electric arc furnace as set forth in claim 25, wherein said body is positioned on a furnace car.
- 30. An electric arc furnace as set forth in claim 29, wherein said furnace car is situated on furnace rails.
- 31. An electric arc furnace as set forth in claim 25, wherein said support element with wheels and hydraulic actuator tilt the furnace up to 15 degrees along the vertical axis of the furnace.
- 32. A process for continuously charging, ferrous materials into, and semicontinuously tapping molten steel from, an electric arc furnace, comprising (a) continuously charging ferrous materials into a central stack extending from the furnace and leading into a central melting zone; (b) continuously melting said charged ferrous materials in said central melting zone; (c) intermittently tilting the furnace to pour molten steel into lateral shafts adjacent to said central melting zone; (d) refining molten steel in said lateral shafts; (e) intermittently tapping molten steel from the furnace; and (f) intermittently removing slag from the furnace.
- 33. The process as set forth in claim 32, wherein said step of intermittently tapping molten steel includes alternatively tapping molten steel from each of said lateral shafts.
- 34. The process as set forth in claim 32, wherein said step of refining molten steel includes additional melting in each of said lateral shafts.
- 35. The process as set forth in claim 32, wherein said step of refining molten steel includes using a refining aid selected from a group comprising solid fuel, gaseous fuel, liquid fuel and combustents.
- 36. The process as set forth in claim 32, wherein said step of intermittently tilting includes tilting the furnace at an angle of up to 15 degrees along its vertical axis.
- 37. The process as set forth in claim 31, wherein said step of continuously charging includes using charging ducts to charge materials into the furnace.
CLAIM OF PRIORITY
This application claims the benefit of a co-pending provisional application entitled “Melting Process in an Electric Arc Furnace Charged in Continuous with Ferrous Materials and Semicontinuous Tapping of Liquid Steel” that was filed in the United States Patent and Trademark Office on May 18, 1999, having Ser. No. 60/134,722.
US Referenced Citations (4)
Provisional Applications (1)
|
Number |
Date |
Country |
|
60/134722 |
May 1999 |
US |