This application claims priority to Chinese Patent Application No. 202110455679.3, filed on Apr. 26, 2021, the contents of which are incorporated herein by reference in the entirety.
The present application refers to the field of electrical energy technology, and in particular to an electric power supply method and an electric power supply system.
Hydraulic fracturing technology is an important technology commonly used in shale gas, shale oil, tight gas, tight oil, coalbed methane wells, etc. A mixture is obtained by mixing water, sand, chemical additives, etc. through a mixing device, and then the mixture is injected into a well under high pressure by a pumping system to form fractures. The fractures form channels through which gas and oil can be efficiently discharged. In conventional fracturing operations, the power source for the mixing device, water supply device, and sand supply device is diesel fuel, which is not environmentally friendly or economical.
Embodiments of the present application provide an electric power supply method and an electric power supply system, which supply power to downstream target power-consuming system for operating based on electric energy. This resolves the environmentally unfriendly and uneconomical problems due to using the traditional diesel as the power source, and possesses the characteristics of a high degree of integration and less interference etc.
In a first aspect, an embodiment of the present application provides an electric power supply method, including: acquiring an electrical energy parameter of electrical energy delivered by an upstream power supply system; determining, based on the electrical energy parameter, whether a preset power supply condition for supplying power to a downstream target power-consuming system is met; determining a target distribution port corresponding to the target power-consuming system from a plurality of preset distribution ports when the preset power supply condition is met; controlling a supply of electric power to the target power-consuming system through the target distribution port.
In a second aspect, an embodiment of the present application provides an electric power supply system, including: a power supply controller, a main transformer, a rectifier filter unit and a control transformer; the power supply controller being connected to the main transformer, the rectifier filter unit and the control transformer, and being configured for acquiring an electrical energy parameter of electrical energy delivered by an upstream power supply system, determining, based on the electrical energy parameter, whether a preset power supply condition for supplying power to a downstream target power-consuming system is met; determining a target distribution port corresponding to the target power-consuming system from a plurality of preset distribution ports when the preset power supply condition is met, and sending a first power supply signal to the main transformer, the rectifier filter unit and the control transformer; the main transformer, the rectifier filter unit and the control transformer being configured for supplying electric power to the target power-consuming system through the corresponding target distribution port upon receiving the first power supply signal sent by the power supply controller.
Electric power supply methods and electric power supply systems are provided in the embodiments of the present application. In various embodiments, an electrical energy parameter of electrical energy delivered by an upstream power supply system is acquired, and when it is determined based on the electrical energy parameter that a preset power supply condition for supplying power to a downstream target power-consuming system is met, a target distribution port corresponding to the target power-consuming system is determined from a plurality of preset distribution ports; and the supply of power to the target power-consuming system through the target distribution port is controlled. As a result, the target power-consuming system can operate based on electric energy, which not only solves the environmentally unfriendly and uneconomical problems due to using the traditional diesel as the power source, but also makes it possible to supply power to multiple target power-consuming systems simultaneously with a high degree of integration and less interference.
In order to more clearly illustrate the technical solution in one or more embodiments of the present application or in prior art, the following is a brief description of the drawings required for use in the description of the embodiments or prior art, it is clear that the drawings in the following description are only some of the embodiments recorded in the present application, and it is also possible for a person of ordinary skill in the art to obtain other drawings based on these drawings without creative labor.
In order to enable a person in the art to better understand the technical solutions in the embodiments of this application, the technical solutions in the embodiments of this application will be clearly and completely described below in conjunction with the drawings of the embodiments of this application, and it is clear that the described embodiments are only a part of the embodiments of this application, and not all of them. Based on the embodiments of the present application, all other embodiments obtained by a person of ordinary skill in the art without creative labor shall fall within the scope of protection of the present application.
Step S102 includes acquiring an electrical energy parameter of electrical energy delivered by an upstream power supply system;
The electric power supply method provided in the embodiments of the present application can be performed by a power supply controller in an electric power supply system. In one example, after the electric power supply system is connected to the upstream power supply system, the upstream power supply system delivers electrical energy to the electric power supply system; the power supply controller acquires the electrical energy parameter of the electrical energy delivered by the upstream power supply system.
The electric power supply system may also include a main transformer, a rectifier filter unit, etc. Since the main transformer is an inductive load, it may cause a huge shock to the upstream power supply system in the process of receiving the electrical energy delivered by the upstream power supply system. In order to avoid such shock, the electric power supply system, in one or more embodiments of this application, may also include a power-up buffer device, which may pre-magnetize the main transformer based on the electrical energy delivered by the upstream power supply system, thus avoiding the shock to the upstream power supply system. Accordingly, the above-mentioned electrical energy parameter may include status information of the pre-magnetization of the main transformer performed by the power-up buffer device and an output voltage of the electric power supply system. The upstream power supply system can be a generator, a utility system, etc., which can be set according to the needs in practice. The specific structure of the electric power supply system can be described later.
Step S104 includes determining, based on the electrical energy parameter, whether a preset power supply condition for supplying power to a downstream target power-consuming system is met.
In one example, if it is determined that the status information in the electrical energy parameter indicates the completion of pre-magnetization and the output voltage in the electrical energy parameter reaches a preset voltage, it is thus determined that the preset power supply condition for supplying power to the downstream target power-consuming system is met. The target power-consuming system may be connected to the electric power supply system before the upstream power supply system delivers electrical energy to the electric power supply system; the target power-consuming system may include one or more of a DC power-consuming system, an AC power-consuming system, etc.
Step S106 includes determining a target distribution port corresponding to the target power-consuming system from a plurality of preset distribution ports when the preset power supply condition is met.
The electric power supply system in the embodiments of the present application is provided with a plurality of distribution ports, capable of accessing a plurality of power-consuming systems simultaneously and supplying electric power to the plurality of power-consuming systems simultaneously, i.e. with a high degree of integration and high power supply efficiency. By determining the target distribution port corresponding to the target power-consuming system, electric power is supplied to each target power-consuming system through the target distribution port simultaneously.
Step S108, controlling a supply of electric power to the target power-consuming system through the target distribution port.
In the embodiments of the present application, an electrical energy parameter of electrical energy delivered by an upstream power supply system is acquired, and when it is determined based on the electrical energy parameter, that a preset power supply condition for supplying power to a downstream target power-consuming system is met, a target distribution port corresponding to the target power-consuming system is determined from a plurality of preset distribution ports; and the supply of electric power to the target power-consuming system through the target distribution port is controlled. As a result, the target power-consuming system can operate based on electric energy, which not only solves the environmentally unfriendly and uneconomical problems due to using the traditional diesel as the power source, but also makes it possible to supply power to multiple target power-consuming systems simultaneously with a high degree of integration, high power supply efficiency, and less interference.
In order to avoid damage to the downstream target power-consuming system due to unexpected conditions such as a sudden increase in current or a short circuit during the supply of power to the target power-consuming system, in one or more embodiments of the present application, in step S104, after determining that the preset power supply condition is met, the method may further include: acquiring a power consumption parameter of the target power-consuming system, generating a protection parameter of the target power-consuming system according to the acquired power consumption parameter in a preset manner; performing a protecting processing for the target power-consuming system based on the protection parameter.
In one example, a power and a rated voltage of the target power-consuming system input by the user are received, a rated current of the target power-consuming system is determined according to the relationship among a preset power, the rated voltage, and the rated current; the rated current is determined as the protection parameter of the target power-consuming system, and the circuit is disconnected when it is determined that the supply current is greater than the rated current, to play a protective role for the target power-consuming system. Alternatively, the power supply controller determines the rated voltage and the rated current as protection parameters of the target power-consuming system, and disconnects the circuit when it is determined that the supply voltage is greater than the rated voltage, or the supply current is greater than the rated current, in order to play a protective role for the target power-consuming system.
Considering that in practical applications, such as well sites, coal mines, and other operational scenarios, multiple types of system such as DC power-consuming system, AC power-consuming system, etc. are often presented, in order to be able to effectively supply power to the target power-consuming system, in one or more embodiments of the present application, as shown in
Step S106-2 includes determining a target DC distribution port corresponding to a DC electrical interface of the target power-consuming system from a plurality of preset DC distribution ports when the preset power supply condition is met.
In one or more embodiments of the present application, the target DC distribution port may be determined by detecting a current signal. In one example, the step S106-2 of determining a target DC distribution port corresponding to a DC electrical interface of the target power-consuming system from a plurality of preset DC distribution ports may include: detecting whether a current signal corresponding to a respective DC distribution port meets a preset condition, and if yes, determining a corresponding DC distribution port as a target DC distribution port corresponding to a DC electrical interface of the target power-consuming system. Detecting whether a current signal corresponding to a respective DC distribution port meets a preset condition may include determining whether a detected current signal indicates the presence of a current, and if yes, determining that the preset condition is met, and if not, determining that the preset condition is not met.
In one or more embodiments of the present application, a target DC distribution port may also be determined by recording historical power supply information. In one example, the step S106-2 of determining a target DC distribution port corresponding to a DC electrical interface of the target power-consuming system from a plurality of preset DC distribution ports may include: acquiring an identification information of a target DC distribution port recorded during a previous power supply, displaying a prompt information based on the acquired identification information; determining whether a confirmation information generated by a user's confirmation operation of the prompt information is acquired, and if yes, the recorded target DC distribution port is determined to be the target DC distribution port corresponding to a DC electrical interface of the current target power-consuming system; if not, the DC distribution port corresponding to a received identification information inputted by the user is determined to be the target DC distribution port corresponding to a DC electrical interface of the current target power-consuming system.
Step S106-4 includes determining a target AC distribution port corresponding to an AC electrical interface of the target power-consuming system from a plurality of preset AC distribution ports.
Each AC distribution port is provided with a circuit breaker correspondingly, and the corresponding circuit breaker may be operated to conduct the circuit when the user connects an AC power-consuming system of the target power-consuming system to the electric power supply system. Accordingly, step S106-4 may include determining whether a closing signal is detected, and if yes, determining an AC distribution port corresponding to the closing signal as a target AC distribution port corresponding to an AC power interface of the target power-consuming system. The closing signal is a signal generated when the user operates the circuit breaker to conduct a circuit.
In some embodiments, the operation sequence of determining the target DC distribution port and determining the target AC distribution port can be interchanged and can also be executed simultaneously. A target distribution port may include only one of a target DC distribution port and a target AC distribution port. When it is determined that there is no target DC distribution port, i.e., the target distribution port includes only a target AC distribution port, the target power-consuming system is indicated as an AC power-consuming system; when it is determined that there is no target AC distribution port, i.e., the target distribution port includes only a target DC distribution port, the target power-consuming system is indicated as a DC power-consuming system.
Corresponding to steps S106-2 and S106-4 above, step S108, as shown in
Step S108-2 includes determining a first supply parameter of the target DC distribution port and/or a second supply parameter of the target AC distribution port.
To enable quick determination of the first supply parameter, in one or more embodiments of the present application, an association relationship between identification information of each DC distribution port and a corresponding power supply parameter is preset. Accordingly, determining a first supply parameter of the target DC distribution port may include: acquiring an associated power supply parameter from a preset association relationship between identification information and a power supply parameter according to identification information of the target DC distribution port, and determining the acquired power supply parameter as a first supply parameter of the target DC distribution port. Where, the first supply parameter can be a power supply voltage, a power supply current, etc.
In order to safely and efficiently supply power to each AC power-consuming system in the target power-consuming systems, in one or more embodiments of the present application, a maximum power that the electric power supply system can support is preset. Accordingly, determining a second supply parameter of the target AC distribution port may include: determining a power of each AC power-consuming system in the target power-consuming system, and determining the second supply parameter of the target AC distribution port based on the power. In one example, a power of each AC power-consuming system input by a user is received; or a power acquisition request is sent to each AC power-consuming system and a power sent by each AC power-consuming system is received. The received respective power is summed and processed to obtain a total power; if it is determined that the total power is less than the preset maximum power, the total power is determined as the second supply parameter. If it is determined that the total power is not less than the preset maximum power, the preset maximum power is determined as the second supply parameter.
Step S108-4 includes configuring a power supply parameter for the target DC distribution port according to the first supply parameter and/or configuring a power supply parameter for the target AC distribution port according to the second supply parameter.
Step S108-6 includes controlling the target DC distribution port and/or the target AC distribution port to supply power to the target power-consuming system based on the corresponding power supply parameter.
In some embodiments, when it is determined in step S106 that the target distribution port includes a target DC distribution port and a target AC distribution port, a first supply parameter of the target DC distribution port and a second supply parameter of the target AC distribution port are determined in step S108-2; accordingly, a configuration of power supply parameter for the target DC distribution port based on the first supply parameter and a configuration of power supply parameter for the target AC distribution port based on the second supply parameter are carried out; and in step S108-6, the target DC distribution port and the target AC distribution port are controlled to supply power to the target power-consuming system based on the corresponding power supply parameters. When it is determined in step S106 that the target distribution port includes one of a target DC distribution port and a target AC distribution port, only the corresponding power supply parameter is determined and configured in step S108, and the corresponding distribution port is controlled to supply power. In practical application, the above-mentioned operations can be performed according to the determined type of the target distribution port.
Thus, by determining the target distribution port and configuring the power supply parameter, each target distribution port can be powered safely and effectively based on the corresponding power supply parameter.
Considering that in practical applications, the upstream power supply system may fail and suddenly stop delivering electrical energy, in order to avoid that the target power-consuming system cannot operate normally or is damaged when the upstream power supply system suddenly stops supplying power, in one or more embodiments of this application, the electric power supply system further includes an energy storage device. Accordingly, the method further includes controlling the energy storage device of the electric power supply system to storage energy if a preset energy storage condition is determined to be met.
In some embodiments, the energy storage condition may be set according to the needs in the actual application, for example, acquiring a charge amount of electric energy currently stored by the energy storage device, and if it is determined that the acquired charge amount is less than a preset charge amount, it is determined that the preset energy storage condition is met. For another example, detecting an operation state of the target power-consuming system, and if the detected operation state indicates that the target power-consuming system is in a non-operation state, it is determined that the preset energy storage condition is met. For another example, detecting a supply power of the upstream power supply system and an operating power of the downstream target power-consuming system separately, and if the supply power is greater than the operating power, the preset energy storage condition is determined to be met.
Further, considering that in practical applications not all of the target power-consuming systems will be affected by a sudden cessation of power supply from an upstream power supply system, on this basis, in one or more embodiments of the present specification, the method further includes: determining a critical power-consuming system in the target power-consuming system and marking a first distribution port corresponding to the critical power-consuming system in target distribution ports; and, if it is determined that a preset emergency power supply condition is met, controlling the energy storage device to supply power to the critical power-consuming system through the first distribution port.
In some embodiments, determining a critical power-consuming system in the target power-consuming system and marking a first distribution port corresponding to the critical power-consuming system in target distribution ports, may include: sending a system type acquisition request to the target power-consuming system, and receiving a system type information sent by each target power-consuming system, determining a critical power-consuming system based on the system type information, and marking a distribution port corresponding to the critical power-consuming system as a first distribution port; or, receiving identification information of a distribution port input by a user, determining a power-consuming system connected to the distribution port corresponding to the identification information as a critical power-consuming system, and marking the distribution port corresponding to the identification information as a first distribution port; or predetermining identification information of each distribution port corresponding to a critical power-consuming system, matching identification information of each target distribution port currently determined with the preset identification information, marking a target distribution port corresponding to the successfully matched identification information as a first distribution port, and determining a corresponding target power-consuming system as the critical power-consuming system. The critical power-consuming system may include a system that cannot be suddenly disconnected during operation, and a system that is susceptible to the adverse effects of sudden disconnection, such as DC sand mixing system at the fracturing operation site, etc. The type of the critical power-consuming system can be set according to the needs in the actual application.
Further, determining that a preset emergency power supply condition is met may include detecting a supply voltage of the upstream power supply system, and if the supply voltage is less than a first preset voltage, determining that a preset emergency power supply condition is met; or, detecting an output voltage of the electric power supply system, and determining that a preset emergency power supply condition is met if the output voltage is less than a second preset voltage. The first preset voltage and the second preset voltage can be the same or different, the emergency power supply condition can be set in accordance with the needs of the actual application.
Further, in order to make the user aware of the emergency status and thus adjust the operating state of the target power-consuming system in a timely manner, one or more embodiments of the present application may also include: broadcasting an emergency power supply information when the power supply controller determines that the preset emergency power supply condition is met.
Thus, by controlling the energy storage device to store energy and determining the critical power system, the critical power system can be continuously powered based on the electrical energy stored in the energy storage device in the event of a sudden power failure due to an unforeseen situation at the upstream power supply system, which not only avoids the negative impact of the sudden power failure on the operation progress of the critical power system, but also protects the critical power system to avoid the damage of the critical power system caused by the sudden power failure.
With the electric power supply method provided in the embodiments of the present application, an electrical energy parameter of electrical energy delivered by an upstream power supply system is acquired, and when it is determined, based on the electrical energy parameter, that a preset power supply condition for supplying power to a downstream target power-consuming system is met, a target distribution port corresponding to the target power-consuming system is determined from a plurality of preset distribution ports; and the supply of electric power to the target power-consuming system through the target distribution port is controlled. As a result, the target power-consuming system can operate based on electric energy, which not only solves the environmentally unfriendly and uneconomical problems due to using the traditional diesel as the power source, but also makes it possible to supply power to multiple target power-consuming systems simultaneously with a high degree of integration, high power supply efficiency and less interference.
Corresponding to the electric power supply method described above, based on the same technical idea, embodiments of the present application also provide an electric power supply system. As shown in
The power supply controller 201 is connected to the main transformer 202, the rectifier filter unit 203, and the control transformer 204 and is configured for acquiring an electrical energy parameter of electrical energy delivered by an upstream power supply system, determining, based on the acquired electrical energy parameter, whether a preset power supply condition for supplying power to a downstream target power-consuming system is met; determining a target distribution port corresponding to the target power-consuming system from a plurality of preset distribution ports when the preset power supply condition is met, and sending a first power supply signal to the main transformer 202, the rectifier filter unit 203, and the control transformer 204.
The main transformer 202, the rectifier filter unit 203, and the control transformer 204 are configured for supplying electric power to the target power-consuming system through the corresponding target distribution port upon receiving the first power supply signal sent by the power supply controller 201.
With the electric power supply system provided in the embodiments of the present application, the power supply controller is configured for, acquiring an electrical energy parameter of electrical energy delivered by an upstream power supply system, and determining a target distribution port corresponding to the target power-consuming system from a plurality of preset distribution ports when it is determined based on the electrical energy parameter, that a preset power supply condition for supplying power to a downstream target power-consuming system is met; and controlling the supply of electric power to the target power-consuming system through the target distribution port. As a result, the target power-consuming system can operate based on electric energy, which not only solves the environmentally unfriendly and uneconomical problems due to using the traditional diesel as the power source, but also makes it possible to supply power to multiple target power-consuming systems simultaneously with a high degree of integration, high power supply efficiency, and less interference.
Optionally, the main transformer 202 is further connected to a plurality of AC power-consuming systems in the downstream power-consuming systems, and is configured for delivering AC power to the AC power-consuming systems.
The rectifier filter unit 203 is further connected to the main transformer 202 and a plurality of DC power-consuming systems in the downstream power-consuming systems, and is configured for converting the AC power delivered by the main transformer 202 to DC power and delivering the DC power to the connected DC power-consuming systems.
The control transformer 204 is further connected to an instrumentation system in the downstream power-consuming systems, and is configured for controlling the supply of power to the instrumentation system.
Optionally, in one or more embodiments of the present application, the electric power supply system further includes: a high voltage device 205.
The high voltage device 205 is connected to the upstream power supply system, the power supply controller 201, the main transformer 202, and the control transformer 204, and is configured for receiving the electrical energy delivered by the upstream power supply system, controlling the electric power supply system's power-up state and power-down state, and controlling the safety of the electric power supply system based on a preset protection parameter of the electric power supply system. For example, the high voltage device 205 disconnects from the upstream power supply system when it detects that the voltage of the electrical energy delivered by the upstream power supply system is greater than a preset protection voltage of the electric power supply system, in order to protect the electric power supply system, etc.
Optionally, in one or more embodiments of the present application, the electric power supply system further includes: a power-up buffer device 206.
The power-up buffer device 206 is connected to the power supply controller 201, the high voltage device 205, and the main transformer 202, and is configured for pre-magnetizing the main transformer 202 based on the electrical energy delivered by the high voltage device 205 upon receiving a pre-magnetization control signal sent by the power supply controller 201.
Optionally, in one or more embodiments of the present application, the electric power supply system further includes: an energy device which includes an electrical energy management device 207 and an energy storage device 208.
The energy management device 207 is connected to the power supply controller 201, and is configured for sending a second energy storage signal to the energy storage device 208 upon receiving a first energy storage signal sent by the power supply controller 201; and sending a third power supply signal to the energy storage device 208 upon receiving a second power supply signal sent by the power supply controller 201.
The energy storage device 208 is connected to the high voltage device 205, the main transformer 202 and the electrical energy management device 207, and is configured for storing the electrical energy delivered by the high voltage device 205 upon receiving the second energy storage signal sent by the electrical energy management device 207; and supplying power to a corresponding target power-consuming system via the main transformer 202 based on the stored electrical energy, upon receiving the third power supply signal sent by the electrical energy management device 207.
In one embodiment, as shown in
Further, the power-up controller 201 further determines the critical power-consuming system in the target power-consuming system; and, when the power-up controller 201 determines that the preset energy storage condition is met, it sends a first energy storage signal to the electrical energy management device 207, and the electrical energy management device 207 sends a second energy storage signal to the energy storage device 208 based on the received first energy storage signal; the energy storage device 208 stores the electrical energy delivered by the high voltage device 205 according to the received second energy storage signal. When the power-up controller 201 determines that the preset emergency power supply condition is met, it sends a second power supply signal to the electrical energy management device 207, and the electrical energy management device 207 sends a third power supply signal to the energy storage device 208 based on the received second power supply signal; the energy storage device 208 supplies power to the above-mentioned critical power-consuming system via the main transformer 202 based on the received third power supply signal.
Since the output voltage of the main transformer 202 is usually large enough to meet the voltage required by the connected AC power-consuming system, and the output voltage of the control transformer 204 is also able to meet the voltage required by the instrumentation system, while the output voltage of the rectifier filter unit 203 may be less than the voltage required by the connected DC power-consuming system, the above-mentioned power supply controller 201 acquiring the output voltage of the electric power supply system may include acquiring the output voltage of the rectifier filter unit 203; and, when the power supply controller 201 determines that the acquired status information of the pre-magnetization indicates the completion of the pre-magnetization and determines that the acquired output voltage of the rectifier filter unit 203 reaches the preset voltage, it determines that the preset power supply condition is met. In some embodiments, the power supply controller 201 may also acquire the output voltage of the rectifier filter unit 203, the output voltage of the main transformer 202, and the output voltage of the control transformer 204, and determine that the preset power supply condition is met when it is determined that the acquired status information of the pre-magnetization indicates the completion of the pre-magnetization, and when it is determined that each of the acquired output voltages reaches the corresponding preset voltage.
A detailed diagram of the structure of the energy device in one or more embodiments of the present application may be seen in
Further, in order to reduce the cumbersome wiring connection and improve convenience, in one or more embodiments of the present application, the main transformer 202 may be connected to multiple AC power-consuming systems through a DC bus to supply power to the multiple AC power-consuming systems simultaneously; the rectifier filter unit 203 may be connected to multiple DC power-consuming systems through a DC bus to supply power to the multiple DC power-consuming systems simultaneously; the control transformer 204 may be connected to multiple instrumentation systems through the DC bus to supply power to the multiple instrumentation systems simultaneously. As an example, the rectifier filter unit 203 is connected to multiple DC power-consuming systems via the DC bus and the electric power supply system is used in a fracturing well site, as illustrated in
In some embodiments, by using a common DC bus for power supply, each motor that needs speed regulation does not need to be powered separately, which can reduce the complexity of the wiring, thus reducing the footprint of the system and improving convenience. As an example, the sand mixing system 1 in
With the electric power supply system provided in the embodiments of the present application, the power supply controller is configured for, acquiring an electrical energy parameter of electrical energy delivered by an upstream power supply system, and when it is determined based on the electrical energy parameter, that a preset power supply condition for supplying power to a downstream target power-consuming system is met, determining a target distribution port corresponding to the target power-consuming system from a plurality of preset distribution ports; and controlling the supply of electric power to the target power-consuming system through the target distribution port. As a result, the target power-consuming system can operate based on electric energy, which not only solves the environmentally unfriendly and uneconomical problems due to taking the traditional diesel as the power source, but also makes it possible to supply power to multiple target power-consuming systems simultaneously with a high degree of integration, high power supply efficiency, and less interference. In addition, by supplying power to the downstream power-consuming system through the common DC bus, it reduces the complexity of line connection, reduces footprint, and improves convenience.
The embodiment of the electric power supply system in this application is based on the same inventive concept as the embodiment of the electric power supply method in the present application, so the specific implementation of the embodiment can be referred to the implementation of the corresponding electric power supply method as mentioned above, and the repetition is not repeated.
Each embodiment in the present application is described in a progressive manner, and the embodiments can be referred to for the same and similar parts of each embodiment, and each embodiment is focused on the differences from other embodiments. In particular, for the system embodiment, since it is basically similar to the method embodiment, the description is relatively simple, and the relevant parts can be found in the method embodiment.
The above description is only an example of the present application, and is not intended to limit the present application. For a person skilled in the art, the present application may have various changes and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present application shall be included in the scope of the claims of the present application.
Number | Date | Country | Kind |
---|---|---|---|
202110455679.3 | Apr 2021 | CN | national |
Number | Name | Date | Kind |
---|---|---|---|
1711979 | Helmut | May 1929 | A |
2015745 | Max | Oct 1935 | A |
3035222 | Stone | May 1962 | A |
3378755 | Sawyer | Apr 1968 | A |
3453443 | Stoeckly | Jul 1969 | A |
3794377 | Wachsmuth et al. | Feb 1974 | A |
3815965 | Ostwald | Jun 1974 | A |
4136432 | Melley, Jr. | Jan 1979 | A |
4201523 | Olofsson | May 1980 | A |
4336485 | Stroud | Jun 1982 | A |
4720645 | Stroud | Jan 1988 | A |
4793775 | Peruzzi | Dec 1988 | A |
4904841 | English | Feb 1990 | A |
4992669 | Parmley | Feb 1991 | A |
5274322 | Hayashi et al. | Dec 1993 | A |
5517822 | Haws et al. | May 1996 | A |
5614799 | Anderson et al. | Mar 1997 | A |
5691590 | Kawai et al. | Nov 1997 | A |
5714821 | Dittman | Feb 1998 | A |
5751150 | Rippel | May 1998 | A |
5821660 | Anderson | Oct 1998 | A |
5846056 | Dhindsa et al. | Dec 1998 | A |
5994802 | Shichijyo et al. | Nov 1999 | A |
6121707 | Bell et al. | Sep 2000 | A |
6134878 | Amako et al. | Oct 2000 | A |
6281610 | Kliman et al. | Aug 2001 | B1 |
6331760 | Mclane, Jr. | Dec 2001 | B1 |
6388869 | Fauteux et al. | May 2002 | B1 |
6417592 | Nakamura et al. | Jul 2002 | B2 |
6450133 | Bernard et al. | Sep 2002 | B1 |
6455974 | Fogarty | Sep 2002 | B1 |
6552463 | Oohashi et al. | Apr 2003 | B2 |
6704993 | Fogarty | Mar 2004 | B2 |
6765304 | Baten et al. | Jul 2004 | B2 |
6784583 | Umeda | Aug 2004 | B2 |
6786051 | Kristich et al. | Sep 2004 | B2 |
6893487 | Alger et al. | May 2005 | B2 |
6895903 | Campion | May 2005 | B2 |
7007966 | Campion | Mar 2006 | B2 |
7016207 | Yamanaka et al. | Mar 2006 | B2 |
7075206 | Chen | Jul 2006 | B1 |
7081682 | Campion | Jul 2006 | B2 |
7112891 | Johnson et al. | Sep 2006 | B2 |
7122913 | Witten et al. | Oct 2006 | B2 |
7221061 | Alger et al. | May 2007 | B2 |
7245032 | Willets et al. | Jul 2007 | B2 |
7291954 | Kashihara et al. | Nov 2007 | B2 |
7372174 | Jones et al. | May 2008 | B2 |
7511385 | Jones et al. | Mar 2009 | B2 |
7608934 | Hunter | Oct 2009 | B1 |
7615877 | Willets et al. | Nov 2009 | B2 |
7619319 | Hunter | Nov 2009 | B1 |
7635926 | Willets et al. | Dec 2009 | B2 |
7656052 | Jones et al. | Feb 2010 | B2 |
7667342 | Matsumoto et al. | Feb 2010 | B2 |
7692321 | Jones et al. | Apr 2010 | B2 |
7755209 | Jones et al. | Jul 2010 | B2 |
7921914 | Bruins et al. | Apr 2011 | B2 |
8159082 | Gemin et al. | Apr 2012 | B2 |
8294285 | Hunter | Oct 2012 | B2 |
8294286 | Hunter | Oct 2012 | B2 |
8362638 | Gemin et al. | Jan 2013 | B2 |
8495869 | Beissler et al. | Jul 2013 | B2 |
8519591 | Nishimura | Aug 2013 | B2 |
8587136 | Williams | Nov 2013 | B2 |
8670260 | Wang et al. | Mar 2014 | B2 |
8731793 | Barbir et al. | May 2014 | B2 |
8773876 | Kuboyama et al. | Jul 2014 | B2 |
8789601 | Broussard et al. | Jul 2014 | B2 |
8796899 | Imazawa et al. | Aug 2014 | B2 |
8811048 | Zhang et al. | Aug 2014 | B2 |
9103193 | Coli et al. | Aug 2015 | B2 |
9140110 | Coli et al. | Sep 2015 | B2 |
9166495 | Guan | Oct 2015 | B2 |
9209704 | Huang | Dec 2015 | B2 |
9534473 | Morris et al. | Jan 2017 | B2 |
9562420 | Morris et al. | Feb 2017 | B2 |
9577545 | Tan et al. | Feb 2017 | B2 |
9641112 | Harknett et al. | May 2017 | B2 |
10184397 | Austin et al. | Jan 2019 | B2 |
10411635 | Takahashi | Sep 2019 | B2 |
10523130 | Bax et al. | Dec 2019 | B2 |
10584671 | Tunzini et al. | Mar 2020 | B2 |
10648311 | Oehring et al. | May 2020 | B2 |
10855142 | Cory | Dec 2020 | B2 |
10865624 | Cui et al. | Dec 2020 | B1 |
10914155 | Oehring et al. | Feb 2021 | B2 |
11035214 | Cui et al. | Jun 2021 | B2 |
11109508 | Yeung et al. | Aug 2021 | B1 |
11125066 | Yeung et al. | Sep 2021 | B1 |
11208878 | Oehring et al. | Dec 2021 | B2 |
11220895 | Yeung et al. | Jan 2022 | B1 |
11378008 | Yeung et al. | Jul 2022 | B2 |
11391136 | Coli et al. | Jul 2022 | B2 |
11434737 | Oehring et al. | Sep 2022 | B2 |
11459863 | Robinson et al. | Oct 2022 | B2 |
20030030246 | Campion | Feb 2003 | A1 |
20030033994 | Campion | Feb 2003 | A1 |
20030057704 | Baten et al. | Mar 2003 | A1 |
20030064858 | Saeki et al. | Apr 2003 | A1 |
20030079479 | Kristich et al. | May 2003 | A1 |
20040081561 | Iwanami et al. | Apr 2004 | A1 |
20040104577 | Alger et al. | Jun 2004 | A1 |
20040174723 | Yamanaka et al. | Sep 2004 | A1 |
20050093496 | Tokunou et al. | May 2005 | A1 |
20060066105 | Johnson et al. | Mar 2006 | A1 |
20060066108 | Willets et al. | Mar 2006 | A1 |
20060080971 | Smith et al. | Apr 2006 | A1 |
20060208594 | Kashihara et al. | Sep 2006 | A1 |
20060260331 | Andreychuk | Nov 2006 | A1 |
20070108771 | Jones et al. | May 2007 | A1 |
20070121354 | Jones et al. | May 2007 | A1 |
20070216452 | Matsumoto et al. | Sep 2007 | A1 |
20090146426 | Jones et al. | Jun 2009 | A1 |
20090146500 | Jones et al. | Jun 2009 | A1 |
20090147549 | Jones et al. | Jun 2009 | A1 |
20090308602 | Bruins et al. | Dec 2009 | A1 |
20100060076 | Gemin et al. | Mar 2010 | A1 |
20100084922 | Gollentz et al. | Apr 2010 | A1 |
20100135840 | Fujimoto et al. | Jun 2010 | A1 |
20120002454 | Kuboyama et al. | Jan 2012 | A1 |
20120065787 | Broniak | Mar 2012 | A1 |
20120175947 | Gemin et al. | Jul 2012 | A1 |
20120248922 | Imazawa et al. | Oct 2012 | A1 |
20120255734 | Coli et al. | Oct 2012 | A1 |
20130063070 | Zhang et al. | Mar 2013 | A1 |
20130182468 | Guan | Jul 2013 | A1 |
20130229836 | Wang et al. | Sep 2013 | A1 |
20130234522 | Tan et al. | Sep 2013 | A1 |
20130255153 | Sasaki et al. | Oct 2013 | A1 |
20140096974 | Coli et al. | Apr 2014 | A1 |
20140138079 | Broussard et al. | May 2014 | A1 |
20140174717 | Broussard et al. | Jun 2014 | A1 |
20140210213 | Campion et al. | Jul 2014 | A1 |
20140219824 | Burnette | Aug 2014 | A1 |
20140312823 | Huang | Oct 2014 | A1 |
20150027712 | Vicknair et al. | Jan 2015 | A1 |
20150068754 | Coli et al. | Mar 2015 | A1 |
20150252661 | Glass | Sep 2015 | A1 |
20150300145 | Coli et al. | Oct 2015 | A1 |
20150314255 | Coli et al. | Nov 2015 | A1 |
20160041066 | Patenaude et al. | Feb 2016 | A1 |
20160075387 | Fong et al. | Mar 2016 | A1 |
20160105022 | Oehring et al. | Apr 2016 | A1 |
20160177675 | Morris et al. | Jun 2016 | A1 |
20160177678 | Morris et al. | Jun 2016 | A1 |
20160369609 | Morris et al. | Dec 2016 | A1 |
20170104389 | Morris et al. | Apr 2017 | A1 |
20170154387 | Somers | Jun 2017 | A1 |
20170222409 | Oehring et al. | Aug 2017 | A1 |
20170285062 | Kim | Oct 2017 | A1 |
20170302135 | Cory | Oct 2017 | A1 |
20170305284 | Koh | Oct 2017 | A1 |
20180059754 | Shaikh | Mar 2018 | A1 |
20180080376 | Austin et al. | Mar 2018 | A1 |
20180080377 | Austin et al. | Mar 2018 | A1 |
20180156210 | Oehring et al. | Jun 2018 | A1 |
20180328157 | Bishop | Nov 2018 | A1 |
20190100989 | Stewart et al. | Apr 2019 | A1 |
20190128265 | Washio et al. | May 2019 | A1 |
20190157982 | Brueckner | May 2019 | A1 |
20190169971 | Oehring et al. | Jun 2019 | A1 |
20190195292 | Pan et al. | Jun 2019 | A1 |
20190229643 | Bax et al. | Jul 2019 | A1 |
20190319459 | Brathwaite | Oct 2019 | A1 |
20190331080 | Tunzini et al. | Oct 2019 | A1 |
20200040705 | Morris et al. | Feb 2020 | A1 |
20200040878 | Morris | Feb 2020 | A1 |
20200049136 | Stephenson | Feb 2020 | A1 |
20200109617 | Oehring et al. | Apr 2020 | A1 |
20200325760 | Markham | Oct 2020 | A1 |
20210040830 | Mu et al. | Feb 2021 | A1 |
20210095552 | Oehring et al. | Apr 2021 | A1 |
20210095648 | Buckley et al. | Apr 2021 | A1 |
20210102451 | Robinson et al. | Apr 2021 | A1 |
20210102530 | Pruitt et al. | Apr 2021 | A1 |
20210107616 | Pedersen | Apr 2021 | A1 |
20210199161 | Eto et al. | Jul 2021 | A1 |
20210301630 | Krippner et al. | Sep 2021 | A1 |
20210310341 | Sherman et al. | Oct 2021 | A1 |
20220018232 | Oehring et al. | Jan 2022 | A1 |
20220213777 | Cui et al. | Jul 2022 | A1 |
20220364448 | Oehring et al. | Nov 2022 | A1 |
Number | Date | Country |
---|---|---|
2908276 | Apr 2016 | CA |
101636901 | Jan 2010 | CN |
101639040 | Feb 2010 | CN |
101728860 | Jun 2010 | CN |
201570910 | Sep 2010 | CN |
102574475 | Jul 2012 | CN |
102602322 | Jul 2012 | CN |
102810909 | Dec 2012 | CN |
103310963 | Sep 2013 | CN |
104578389 | Apr 2015 | CN |
204386465 | Jun 2015 | CN |
105763337 | Jul 2016 | CN |
106711990 | May 2017 | CN |
107231000 | Oct 2017 | CN |
107240915 | Oct 2017 | CN |
207652040 | Jul 2018 | CN |
108900136 | Nov 2018 | CN |
110107490 | Aug 2019 | CN |
110118127 | Aug 2019 | CN |
110821464 | Feb 2020 | CN |
210183018 | Mar 2020 | CN |
111181159 | May 2020 | CN |
210780534 | Jun 2020 | CN |
111628519 | Sep 2020 | CN |
111769551 | Oct 2020 | CN |
212671744 | Mar 2021 | CN |
213027453 | Apr 2021 | CN |
112983382 | Jun 2021 | CN |
112993965 | Jun 2021 | CN |
113006757 | Jun 2021 | CN |
Entry |
---|
Written Opinion and International Search Report for PCT Application No. PCT/CN2022/076452 dated Jun. 1, 2022. |
Non-Final Office Action for U.S. Appl. No. 17/242,316 dated May 26, 2022. |
Search Report for Chinese Application No. 202110455679.3 dated May 28, 2022. |
International Preliminary Report on Patentability Chapter I for PCT Application No. PCT/CN2019/102811 dated Dec. 23, 2021. |
Wri ttten Opinion of the International Searching Authority and International Search Report for PCT Application No. PCT/CN2019/102811 dated Mar. 19, 2020. |
Non-Final Office Action for U.S. Appl. No. 16/834,446 dated Jun. 5, 2020. |
Non-Final Office Action for U.S. Appl. No. 16/834,446 dated Jan. 6, 2021. |
Written Opinion and International Search Report for PCT Application No. PCT/CN2021/132090 dated Jul. 7, 2022. |
Non-Final Office Action for U.S. Appl. No. 17/884,358 dated Dec. 8, 2022. |
Non-Final Office Action for U.S. Appl. No. 17/733,922 dated Sep. 21, 2022. |
Final Office Action for U.S. Appl. No. 17/733,922 dated Dec. 28, 2022. |
First Search for Chinese Application No. 202280000733.8 dated Mar. 14, 2023. |
Number | Date | Country | |
---|---|---|---|
20220345007 A1 | Oct 2022 | US |