Claims
- 1. A toasting machine comprising: heating means for toasting food products during a toasting cycle;
- switch means for initiating the toasting cycle;
- toast colour selection means for setting a selected time period for the toasting cycle;
- a timing circuit arranged to measure an elapsed time since a previous toasting cycle, the timing circuit including time booster means for providing a boost time period during a current toasting cycle;
- connection means for connecting the toasting machine to an electrical power supply so as to supply power to the heating means on initiation of the toasting cycle by the switch means;
- a temperature measuring device arranged to measure a temperature within the toasting machine and to provide a signal indicative thereof; and
- control means for controlling the time period of the current toasting cycle, the control means being connected to the toast colour selection means, the timing circuit, and the temperature measuring device, so that the current toasting cycle time period is increased over the selected time period by the boost time period both if the elapsed time since a previous toast cycle exceeds a predetermined elapsed time and on the first toasting cycle after connection of the connection means to the power supply, except that if the temperature as measured by the temperature measuring device exceeds a predetermined temperature then the control means acts in response to said signal so that it does not increase the selected time period by the boost time period.
- 2. A toasting machine according to claim 1 in which the control means is arranged to increase the toasting cycle time period by a first boost period if the toasting machine has not been used for a first predetermined elapsed time, by a second boost period longer than the first period if the toasting machine has not been used for a second elapsed time longer than the first elapsed time, and by a third boost period longer than the second boost period if the toasting machine has not been used for a third elapsed time longer than the second elapsed time.
- 3. A toasting machine according to claim 2 in which the control means is arranged to increase the selected time period by the third boost period on the first toasting cycle connection of the connection means to a power supply.
- 4. A toasting machine according to claim 2 in which the control means is arranged to cut out all the first, second and third boost periods if the predetermined temperature is exceeded.
- 5. A toasting machine according to claim 1 in which the predetermined temperature is greater than approximately 30.degree. C.
- 6. A toasting machine according to claim 1 in which the boost period is in the range 5 to 40 seconds.
- 7. A toasting machine according to claim 1 in which the range of time periods which can be set by the toast colour selection means, is in the range 30 seconds to 240 seconds.
- 8. A toasting machine according to claim 2 in which the first boost period is about 5 seconds and the first elapsed time about 10 minutes, the second boost period is about 10 seconds and the second elapsed time about 20 minutes, and the third boost period is about 20 seconds and the third elapsed time about 30 minutes.
- 9. A toasting machine comprising:
- a heating element;
- switch means for initiating a toasting cycle;
- toast colour selection means for setting a selected time period for the toasting cycle;
- a timing circuit arranged to measure the elapsed time since a previous toasting cycle, the timing circuit including time booster means for providing a boost time period during a current toasting cycle;
- connection means for connecting the toasting machine to an electrical power supply so as to supply power to the heating element on initiation of the toasting cycle by the switch means; and
- control means for controlling the time period of the current toasting cycle, the control means being connected to the toast colour selection switch and to the timing circuit, so that the toasting cycle time period is increased over the selected time period by a first boost time period if the toasting machine has not been used for a first predetermined elapsed time, by a second boost time period longer than the first boost time period if the toasting machine has not been used for a second elapsed time longer than the first elapsed time, by a third boost time period longer than the second boost time period if the toasting machine has not been used for a third elapsed time longer than the second elapsed time, and by the third boost time period on the first toasting cycle after connection of the connection means to the power supply.
Priority Claims (2)
Number |
Date |
Country |
Kind |
9223846 |
Nov 1992 |
GBX |
|
9302670 |
Feb 1993 |
GBX |
|
Parent Case Info
This application is a continuation in part of application Ser. No. 08/152866 filed Nov. 12th 1993 now pending.
US Referenced Citations (15)
Foreign Referenced Citations (2)
Number |
Date |
Country |
86624 |
Aug 1993 |
EPX |
WO9007899 |
Jul 1990 |
WOX |
Continuation in Parts (1)
|
Number |
Date |
Country |
Parent |
152866 |
Nov 1993 |
|