Elevator group control apparatus for multiple elevators in a single elevator shaft

Abstract
An elevator group control apparatus for controlling operations of an elevator system with multiple cars moving within a single elevator shaft with improved efficiency without a collision between the cars. When an elevator-hall call is registered, first and second times at which individual cars are expected to arrive at individual floors where the elevator-hall call is registered are computed. The probability of occurrence of a collision between the cars is computed, determining whether a remaining car in the shaft must be shunted. A shunting floor is designated if necessary.
Description




BACKGROUND OF THE INVENTION




1. Field of the Invention




The present invention relates to an apparatus for group control of a plurality of elevators moving in a single elevator shaft.




2. Background Art




A plurality of elevators installed side by side are usually operated through group control. In an ordinary elevator, as is well known, one car moves in one elevator shaft. In association with an increase in the height of recent buildings, as shown in

FIG. 2

, for example, moving a plurality of cars within a single elevator shaft has been proposed in order to improve the operating efficiency of the elevator and service to the user. In

FIG. 2

, two cars are moving within each of four elevator shafts; namely, cars A


1


and A


2


are moving within an elevator shaft #A; cars B


1


and B


2


are moving within an elevator shaft #B; cars C


1


and C


2


are moving within an elevator shaft #C; and cars D


1


and D


2


are moving within an elevator shaft #D.




The most significant point of difference between the case where group control is applied to an ordinary elevator in which one car moves within an elevator shaft and the case where a group control is applied to an elevator in which a plurality of cars move within a single elevator shaft is that the plurality of cars moving within a single elevator must be controlled so as to prevent a collision therebetween.




A group control system taking into consideration the aforementioned problem is described in Japanese Patent Application Laid-open No. Hei-8-133611, which provides a safety measure for preventing collision between the cars. Under this system, for each car there is designated a segment of the shaft into which another car is prohibited from entering, and the other car is controlled so as not to enter the designated segment.




In the group control apparatus that controls the elevators in which a plurality of cars move within each single elevator shaft, car entry prohibition segments are designated to thereby prevent a car from colliding with another. Therefore, such a group control apparatus may be said to be adequate in terms of preventing collision between cars, but must be said to be inadequate in terms of attaining more efficient group control.




The present invention has been conceived to solve the problem described above, and the object of the present invention is to provide an elevator group control apparatus which enables prevention of collision between a plurality of cars within each single elevator shaft and an improvement in operating efficiency.




SUMMARY OF THE INVENTION




According to one aspect of the present invention, an elevator group control apparatus is provided which controls a plurality of cars moving in each single elevator shaft and which determines a car to respond to an elevator-hall call when the elevator-hall call is registered and outputs an operation instruction to the thus-assigned car. The apparatus comprises shunting determination means, shunting planning means and operation control means.




Shunting determination means computes the probability of occurrence of a collision between the cars within the single elevator shaft when the elevator-hall call is registered and determines whether or not the remaining car other than the thus-assigned car must be shunted. Shunting planning means designates a shunting floor when the remaining car is determined to be shunted. Further, operation control means outputs a shunting instruction to the remaining car within the single elevator shaft such that the remaining car moves aside to the thus-designated shunting floor.




According to another aspect of the present invention, an elevator group control apparatus is provided which controls operations of a plurality of cars moving within each single elevator shaft. The apparatus comprises the followings.




Expected arrival time computation means computes expected times at which individual cars arrive at individual floors when an elevator-hall call is registered. Shunting determination means computes the probability of occurrence of a collision between the cars within the single elevator shaft from the positions, states, and expected arrival times of the individual cars within the single elevator shaft and determines whether or not the individual car must be shunted. Shunting planning means designates a shunting floor when the individual car is determined to be shunted and computes a possible shunting start time. Modified expected arrival time computation means modifies the expected arrival times on the basis of the result of the computation performed by the shunting planning means and computes modified times at which the individual cars are expected to arrive at the individual floors when the individual car is shunted. Car-to-be-assigned determination means determines a car to be assigned the elevator-hall call by evaluation of operation conditions of the individual cars being assigned the elevator-hall call, on the basis of the modified expected arrival times. Further, operation control means outputs a shunting instruction to the car to be shunted on the basis of the result of the computation performed by the shunting planning means and outputs an operation instruction to the car assigned the elevator-hall call on the basis of the result of the computation performed by the car-to-be-assigned determination means.




Other and further objects, features and advantages of the invention will appear more fully from the following description.











BRIEF DESCRIPTION OF THE DRAWINGS





FIGS. 1 through 6

show an elevator system according to a first embodiment of the present invention.





FIG. 1

is a block diagram showing the overall configuration of the elevator system.





FIG. 2

shows the layout of cars within the respective elevator shafts.





FIG. 3

is an operation flowchart.





FIG. 4

is a schematic representation for describing the operations of cars.





FIGS. 5A and 5B

are tables for describing computation of expected arrival times.





FIG. 6

is a table for describing computation for shunting operation.





FIGS. 7 through 10

show an elevator system according to a second embodiment of the present invention.





FIG. 7

is a block diagram showing the overall configuration of an elevator system.





FIG. 8

shows the layout of cars within respective elevator shafts.





FIGS. 9A and 9B

are tables for describing computation of expected arrival times.





FIG. 10

is a table for describing shunting computation.











DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS




First Embodiment





FIGS. 1 through 6

show an elevator system according to a first aspect of the present invention.

FIG. 1

is a block diagram showing the overall configuration of the elevator system;

FIG. 2

shows the layout of cars within the respective elevator shafts;

FIG. 3

is an operation flowchart;

FIG. 4

is a schematic representation for describing the operations of cars;

FIGS. 5A and 5B

are tables for describing computation of expected arrival times; and

FIG. 6

is a table for describing computation for shunting operation. Throughout the drawings, like reference numerals designate like elements.




In

FIG. 2

, #A to #D represent elevator shafts. A


1


and A


2


are cars provided in the elevator shaft #A, wherein A


1


represents a lower car and A


2


represents an upper car. B


2


and B


2


are cars provided in the elevator shaft #B, wherein B


1


represents a lower car and B


2


represents an upper car. C


1


and C


2


are cars provided in the elevator shaft #C, wherein C


1


represents a lower car and C


2


represents an upper car. D


1


and D


2


are cars provided in the elevator shaft #D, wherein D


1


represents a lower car and D


2


represents an upper car. E


3


represents a newly-registered elevator-hall UP call on the third floor. Although

FIG. 2

shows an example relating to four elevator shafts #A to #D, each of which comprises two cars, the number of elevator shafts and the number of cars are not limited thereto. Here, as described in, for example, Japanese Patent Application Laid-open No. Hei-8-133611, the cars A


1


to D


2


are driven by a linear motor or the like.




In light of the ease with which passengers enter the car at the elevator hall, the number of elevator shafts employed by the ordinary group control is about eight. However, group control per se does not impose any limitation on the number of elevator shafts. The number of cars within each of the elevator shafts #A to #D may be an appropriate number depending on the length of the elevator shaft, as required. For brevity, in the first embodiment, the number of cars provided in each elevator shaft is set to two.




In

FIG. 1

, reference numeral


1


designates a control apparatus for efficiently group-controlling a plurality of cars;


2


A


1


designates a controller for controlling the lower car A


1


provided in the elevator shaft #A;


2


A


2


designates a controller for controlling the upper car A


2


in the shaft #A;


2


B


1


designates a controller for controlling the lower car B


1


provided in the elevator shaft #B; and


2


B


2


designates a controller for controlling the upper car B


2


in the shaft #B. Similarly, there are also provided a controller


2


C


1


for controlling the lower car C


1


provided in the elevator shaft #C, a controller


2


C


2


for controlling the upper car C


2


in the shaft #C, a controller


2


D


1


for controlling the lower car D


1


provided in the elevator shaft #D, and a controller


2


D


2


for controlling the upper car D


2


in the shaft #D. These controllers


2


C


1


to


2


D


2


are omitted from FIG.


1


. Reference numeral


3


designates a hall button which comprises UP and DOWN buttons and is provided on each elevator hall.




Reference numeral


4


designates a communications interface which establishes communication and data transmission between the hall button


3


and each of the controllers


2


A


1


to


2


D


2


; and


5


represents first computation means for computing expected arrival time (hereinafter may be referred to as simple “first computation means”). In a case where an elevator-hall call is registered by the hall button


3


, on the assumption that the elevator-hall call will be assigned to a certain car, the first computation means


5


calculates a time at which the car will arrive at an individual floor (hereinafter referred to as a “expected arrival time”).




Reference numeral


6


designates second computation means for computing a time at which the car is expected to arrive at the individual floor, in a case where the elevator-hall call is not assigned to any car (hereinafter may be referred to as simply “second computation means”);


7


designates shunting determination means for determining whether or not a car must be shunted in order to prevent a collision within the same elevator shaft, on the basis of the positions and states (e.g., a stationary state or a moving state) of the cars within the same elevator shaft and computation results received from the expected arrival time first and second computation means


5


and


6


; and


8


designates shunting planning means for designating a floor to which a car must be shunted, as well as for computing a possible shunting start time if the shunting determination means


7


has determined that shunting is necessary.




Reference numeral


9


designates third computation means for computing a time at which the car is expected to arrive at each floor when the car is shunted (hereinafter may be referred to as “third computation means”), by modification of the computation results yielded by the first and second computation means


5


and


6


, on the basis of the result of the shunting planning means


8


;


10


designates car allocation means for determining a car to be allocated by comprehensive evaluation of state of service, on the basis of the computation results yielded by one of the first, second, and third computation means


5


,


6


, and


9


; and


11


designates operation control means for outputting an operation instruction to each of the cars according to the computation results yielded by the shunting planning means


8


and the car allocation means


10


.




The operation of the elevator system according to the first embodiment will now be described by reference to

FIGS. 3 through 6

.




As shown in

FIG. 4

, the lower cars A


1


to D


1


are situated on the first floor (


1


F); and the upper car A


2


is stationary on the tenth floor (


10


F); and the upper car B


2


is stationary on the fifth floor (


5


F). The upper car C


2


is passing the fifth floor (


5


F) from below, and the upper car D


2


is passing the fourth floor (


4


F) from below. Reference numeral FC


7


designates an in-car destination call which designates the seventh floor registered in the upper car C


2


; and FD


6


and FD


7


respectively designate in-car destination calls specifying the sixth and seventh floors registered in the upper car D


2


.




Both the upper and lower cars can move over the range from the first floor (


1


F) to the tenth floor (


10


F). Only the lower cars A


1


to D


1


can move to the underground floor (B


1


F) at the lower end of the building, and only the upper cars A


2


to D


2


can move to the eleventh floor (


11


F). In some case, these floors (B


1


F) and (


11


F) are used as shunting positions.




When an elevator-hall call is issued in step S


1


(FIG.


3


), a traffic status, such as the status of each of the cars and call registrations, is entered in step S


2


by way of the communications interface


4


.




Processing operations relating to steps S


3


and S


4


for the respective cars will now be described. A round of these steps will be described by reference to

FIGS. 4 through 6

.




When the new elevator-hall call E


3


is temporarily assigned to a car, times at which the car is expected to arrive at the individual floors are calculated in step S


3


. Similarly, when the new elevator-hall call E


3


is not assigned to a car, times at which the car is expected to arrive at the individual floors are calculated in step S


4


. Computation of an expected arrival time per se has conventionally been used in elevator group control and is well known. Therefore, the computation of an expected arrival time is described only briefly.





FIG. 5A

shows an example of computation result of expected arrival times for the case where the new elevator-hall UP call E


3


from the third floor is temporarily assigned to the lower car A


1


of the elevator shaft #A. In

FIG. 5A

, expected times at which the car will arrive at the individual floors are calculated on the assumption that the lower car A


1


moves to the third floor (


3


F), where passengers enter the car; further moves to the highest floor, i.e., the tenth floor (


10


F); and then reverses direction. Here, the computation is based on the assumption that moving the car from one floor to another floor takes two seconds and that the car stops for ten seconds per floor.




Expected arrival times must be precisely computed in consideration of speed, acceleration, inter-floor distance, and passenger congestion on individual floors. However, such computation is not directly relevant to the gist of the invention, and hence simplified computation means is described. Passenger(s) who entered the car at the third floor (


3


F) will exit at any of the seven floors from the fourth floor (


4


F) to the tenth floor (


10


F). At this point in time, the floor(s) at which the passenger(s) will exit are unknown. Therefore, the time required for the passenger(s) to exit the car (a stop time of 10 sec.), i.e., 1.43 sec. (10/7=1.43) per floor, is added to the expected arrival time of each of the seven floors from the fourth floor (


4


F) to the tenth floor (


10


F). For instance, provided that the passenger will exit at the fifth floor (


5


F), there will be required a time of 20.86 sec.=17.43 sec. (the time required for the car to travel to the fourth floor)+2 sec. (required for the car to travel over one floor)+1.43 sec.





FIG. 5B

shows expected arrival times when the new elevator-hall call E


3


is not temporarily assigned a car. In this case, since the lower car A


1


is not assigned any call, the lower car A


1


can move toward any floor. Therefore, the expected arrival times corresponding to a DOWN elevator-hall call are set so as to become identical with the expected arrival times relating to an UP elevator-hall call.




Expected arrival times of the lower cars B


1


to D


1


of the elevator shafts #B to #D also assume the same expected arrival times.




As mentioned previously, in steps S


3


and S


4


, expected arrival times of each car are computed for both the case where the new elevator-hall call is temporarily assigned to a car and the case where the new elevator-hall call is not temporarily assigned to a car. In a case where the new elevator-hall call is temporarily assigned to each of the cars, a determination is made as to whether or not the remaining car in each shaft must be shunted at step


5


. If shunting is not required, processing jumps to step S


8


. In contrast, if shunting is required, processing proceeds to step S


6


.




As shown in

FIG. 4

, if the new elevator-hall UP call E


3


at the third floor is registered and is assigned to any one of the upper cars A


2


to D


2


of the elevator shafts #A to #D, the thus-assigned car moves upward after having stopped at the third floor (


3


F), thereby eliminating a necessity for shunting. In contrast, if the new elevator-hall UP call E


3


is assigned to any one of the lower cars A


1


to D


1


, a passenger who has entered the thus-assigned car may go to the highest floor. Therefore, the car is determined to be shunted. With regard to a case where a car must be shunted, steps S


6


and S


7


will now be described with reference to FIG.


6


.




In step S


6


, a shunting floor and a possible shunting start time are computed. First, when the new elevator-hall UP call E


3


is temporarily assigned to the lower car A


1


, the shunting floor of the upper car A


2


is set to the eleventh floor (


11


F). The reason for this is that the destination of a passenger who is waiting for a car and has registered the new elevator-hall UP call E


3


from the third floor is unknown at this point in time. Further, the upper car A


2


is not assigned any call at this time and, hence, assumes a possible shunting start time of 0. Subsequently, on the assumption that the upper car A


2


has started moving to the eleventh floor (


11


F), the expected arrival time of the upper car A


2


is modified in step S


7


, thereby calculating 12 seconds (=2 seconds for traveling +10 seconds for halt) as a shunting travel time.




In this case, if the upper car A


2


starts moving at time 0, the car A


2


will not collide with the lower car A


1


. Hence, the expected arrival time of the lower car A


1


does not need to be modified.




Next, if the elevator-hall call E


3


is temporarily assigned to the lower car B


1


, the modification of the expected arrival time of the upper car B


2


and computation of a shunting travel time of the same can be carried out, through the same steps used for computing the shunting travel time of the lower car A


1


. Even in this case, the expected arrival time of the lower car B


1


does not need to be modified.




In a case where the elevator-hall call E


3


is temporarily assigned to the lower car C


1


, the upper car C


2


becomes ready to be shunted after having responded to the destination call FC


7


specifying the seventh floor. Consequently, in this case, the possible shunting start time is 14 seconds (=4 seconds required for the car to travel two floors+10 seconds for halt). If the upper car C


2


starts moving at time 14, the car C


2


will be prevented from colliding with the lower car C


1


. In other respects, the same procedure used in modifying the expected arrival time and the shunting travel time of the lower car A


1


is followed.




In a case where the elevator-hall call E


3


is temporarily assigned to the lower car D


1


, the upper car D


2


responds to the destination call FD


6


specifying the sixth floor, as well as to the destination call FD


7


specifying the seventh floor. Thereafter, the upper car D


2


becomes ready to be shunted. In this case, the time at which the upper car D


2


is expected to arrive at the sixth floor (


6


F) is four seconds, and the time at which the lower car D


2


is expected to arrive at the seventh floor (


7


F) is sixteen seconds. Therefore, the possible shunting start time is 26 sec. (=6 seconds required for the car to travel three floors+20 seconds for stopping at two floors). Modification of the expected arrival time of the upper car D


2


and a shunting travel time of the same can be computed in the same manner as employed previously.




In this case, the time at which the upper car D


2


will be shunted from the seventh floor (


7


F) is 26 sec, and the time at which the lower car D


1


is expected to arrive at the seventh floor (


7


F) is 27.72, as shown in FIG.


5


A. In order to ensure prevention of a collision between the upper car D


2


and the lower car D


1


moving within the same elevator shaft #D, a certain difference must be provided between the time at which one car leaves at a certain floor and the time at which another car stops at the same floor. Provided that the time difference is 5 seconds, in this case only a time of 1.72 seconds is available.




For this reason, in order to prevent the lower car D


1


from colliding with the upper car D


2


, the lower car D


1


is determined to make a temporary stop at the fourth floor (


4


F). To ensure the stop, 10 seconds (corresponding to one stop) are added to the shunting travel time of the lower car D


1


, and the expected arrival time of the lower car D


1


is also modified.




Processing proceeds to step S


8


. Various performance indices are computed on the basis of the expected arrival times calculated so far. Conceivable performance indices comprise waiting time evaluation values, the probability of failure to meet expectation, or the like. However, such performance indices are well known in the field of elevator group control technique, and hence their detailed explanations are omitted here.




In step S


9


, a car to be assigned the new elevator-hall call is finally determined on the basis of various performance indices including the shunting travel times computed in the steps through step S


8


. For example, an evaluation function F(e) provided below is used in determining the car to be assigned the new elevator-hall call, and the car which yields an optimum value by means of the evaluation function F(e) is determined to be a car to be assigned the new elevator-hall call.




F(e)=W


1


×(wait time evaluation value)+W


2


×(an evaluation value relating to failure to meet expectation)+ . . . +Wn×(shunting travel time evaluation value) where W


1


, W


2


, . . . , Wn represent weighting coefficients.




When the car to be assigned the new elevator-hall call is determined in the manner as described above, an assignment instruction and a shunting instruction associated with the assignment instruction are output in step S


10


.




In the above operation of the elevator system, each step is carried out by each means of the elevator group control apparatus shown in

FIG. 1

as follows. That is the step


1


is carried out by expected arrival time first computation means


5


; step


2


, by expected arrival time second computation means


6


; step


5


, by shunting determination means


7


; step


6


, by shunting planning means


8


; expected arrival time computation in step


7


, by expected arrival time third computation means


9


. Further, shunting travel time computation in step


7


, and step


8


and step


9


, by car allocation means


10


; and step


10


, by operation control means


11


.




As mentioned previously, from the positions and states of the individual cars within the same elevator shaft, the expected arrival times and the possibility of a collision between the cars are computed. If the car is determined to be shunted, the floor to which the car must be shunted and the possible shunting start time are computed. Further, the expected arrival time in a case where the car is shunted is computed by modification of the expected arrival time. On the basis of results of such computation, operating conditions at the time of a car being assigned to a newly-registered elevator-hall call are evaluated, thereby determining a car to be assigned the new elevator-hall call. As a result, an operation efficiency can be improved without involvement of useless travel required for shunting, while a collision between the cars is prevented.




Second Embodiment





FIGS. 7 through 10

relate to a second embodiment of the present invention.

FIG. 7

is a block diagram showing the overall configuration of an elevator system;

FIG. 8

shows the layout of cars within respective elevator shafts;

FIGS. 9A and 9B

are tables for describing computation of expected arrival times; and

FIG. 10

is a table for describing shunting computation.

FIG. 3

is also used for the second embodiment.




In

FIG. 7

, reference numeral


13


designates an elevator hall/destination floor button one of which is provided on the elevator hall of each floor and comprising destination buttons. This elevator hall/destination button enables simultaneous registration of an elevator-hall call and a destination call. In other respects, the elevator system shown in

FIG. 7

is the same as that shown in FIG.


1


.




The operation of the elevator system according to the second embodiment will now be described by reference to

FIGS. 8 through 10

. The flow of operation of the elevator system is substantially identical with that of the first embodiment.




If an elevator-hall call is issued in step S


1


, a traffic status is entered in step S


2


(See FIG.


3


). At this time, in the case of a new elevator-hall call, a destination floor is entered at this point in time. The example shown in

FIG. 8

is the same as that shown in FIG.


4


. In

FIG. 8

, the destination floor of the new elevator-hall call E


3


from the third floor (


3


F) is the sixth floor (


6


F) and is entered at the time of registration of a call. In steps S


3


and S


4


, the expected arrival times are computed for both the case where the new elevator-hall call E


3


is temporarily assigned to a car and the case where the new elevator-hall call E


3


is not temporarily assigned to any car.




The steps with which the expected arrival times are computed are substantially the same as those employed in the first embodiment. Since the destination floor of the elevator-hall call E


3


is determined to be the sixth floor (


6


F), for example, the lower car A


1


will assume the expected arrival times shown in

FIGS. 9A and 9B

. In

FIG. 9A

, the lower car A


1


is not assigned any call after the sixth floor (


6


F), the lower car A


1


is deemed to be able to reverse direction at the sixth floor (


6


F). For this reason, the expected arrival times of the lower car A


1


when it moves in the downward direction after the seventh floor (


7


F) to the ninth floor (


9


F) are the same as those of the lower car A


1


when it moves in the upward direction. In the first embodiment, 1.43 seconds/floor are added to each of the expected arrival times, because the destination(s) of the passenger(s) are unknown. In contrast, in the second embodiment, since the destination is known, there is no need to add 1.43 seconds/floor to the expected arrival times.




Subsequently, a determination is made in step S


5


as to whether or not shunting is necessary. In the example shown in

FIG. 8

, the passenger waiting on the third floor (


3


F) is determined to travel to the sixth floor (


6


F). If the elevator-hall call E


3


is temporarily assigned to the lower car A


1


, the shunting of the lower car A


2


is obviously unnecessary. If the elevator-hall call E


3


is temporarily assigned to the lower car C


1


or D


1


, the upper cars C


2


and D


2


travel to the seventh floor (


7


F) according to in-car destination calls. Therefore, the upper cars C


2


and D


2


are not required to be shunted.




If the elevator-hall call is temporarily assigned to the lower car B


1


, the upper car B


2


must be shunted. However, the lower car B


1


does not travel beyond the sixth floor (


6


F). Therefore, the shunting floor for the upper car B


2


is set to the seventh floor (


7


F) in steps S


6


and S


7


. The shunting start time and the shunting travel time of each car are computed as shown in FIG.


10


. After completion of the computing operations relating to steps S


1


to S


7


for each car, a car to be assigned the elevator-hall call is determined, and an operation instruction is output. The procedures for determination of a car and output of an operation instruction have already been described, and hence repetition of their explanations is omitted here.




As mentioned above, the expected arrival times are computed on the basis of the elevator-hall call and the destination floor registered by the elevator hall/destination button


13


, thereby designating a shunting floor. When compared with an elevator equipped with an ordinary elevator hall button


3


(see FIG.


1


), the elevator according to the present embodiment enables more accurate computation of expected arrival times. Further, a shunting floor can be set to a position which minimizes the distance over which the car is to be shunted, thus rendering group control more efficient.




In the previous embodiments, a plurality of cars are disposed within each single elevator shaft. As in the case with the previous embodiments, the present invention may also be applied to an elevator whose elevator shaft is bifurcated, wherein only a specific car moves in each branch of the bifurcated shaft.




The effects and advantages of the present invention may be summarized as follows.




As has been described above, according to a first aspect of the present invention, when an elevator-hall call is registered, the probability of occurrence of a collision between cars is computed. A determination is made as to whether or not the remaining car must be shunted. If the remaining car is determined to be shunted, a shunting floor is designated. A shunting instruction is output such that the remaining car moves to the shunting floor, thereby enabling the car assigned the elevator-hall call to respond to the elevator-hall call without colliding with the remaining car.




According to a second aspect of the present invention, the expected times at which each car arrives at the individual floors are computed. The probability of occurrence of a collision between the cars is computed from the positions, states, and expected arrival times of the cars. A determination is made as to whether or not any car must be shunted. If the remaining car is determined to be shunted, a shunting floor is designated, and a possible shunting start time is computed. The expected arrival times are modified on the basis of result of such computation. Modified and expected times at which the individual cars arrive at the individual floors in a case where the remaining car is shunted are computed. On the basis of result of such computation, operation conditions at the time of assigning the elevator-hall call to each of the cars are evaluated, thereby determining a car to be assigned the elevator-hall call. Further, a shunting instruction is output to the remaining car, and an operation instruction is output to the thus-assigned car.




The assigned car can respond to the elevator-hall call without colliding with the remaining car, thus improving operating efficiency.




According to a third aspect of the present invention, an elevator hall/destination button is disposed on each floor, thereby enabling simultaneous registration of an elevator-hall call from a floor and a destination floor of the passenger. When compared with an elevator equipped with an ordinary elevator-hall button, the elevator according to the present invention enables more accurate computation of expected arrival times. Further, the shunting floor can be designated at a position which minimizes the distance over which the remaining car travels for shunting, thus rendering group control more efficient.




According to a fourth aspect of the present invention, a car to be assigned a call is determined on the basis of modified expected arrival times by comprehensive evaluation of operating conditions at the time of an elevator-hall call being assigned to each of the cars, as well as evaluation of the time required for the remaining car to move aside. As a result, useless travel of the car required to be shunted is eliminated, thereby improving operating efficiency.




According to a fifth aspect of the present invention, computation of expected arrival times is achieved by computation of times at which individual cars are expected to arrive at individual floors when an elevator-hall call is assigned to the car, and by computation of times at which individual cars are expected to arrive at the individual floors when the elevator-hall call is not assigned to any car. As a result, a highly precise determination can be made as to whether or not the remaining car must be shunted.




Obviously many modifications and variations of the present invention are possible in the light of the above teachings. It is therefore to be understood that within the scope of the appended claims the invention may by practiced otherwise than as specifically described.




The entire disclosure of a Japanese Patent Application No. 11-25949, filed on Feb. 3, 1999 including specification, claims, drawings and summary, on which the Convention priority of the present application is based, is incorporated herein by reference in its entirety.



Claims
  • 1. An elevator group control apparatus for controlling a plurality of elevator cars moving up and down within a single elevator shaft, for assigning one of the elevator cars to respond to an elevator-hall call when the elevator-hall call is registered, and for outputting an operation instruction to the car so assigned, the apparatus comprising:shunting determination means for computing probability of a collision between elevator cars moving up and down within a single elevator shaft when an elevator-hall call is registered and determining whether a remaining car, not the car assigned to respond to the elevator-hall call, must be shunted to a floor within the single elevator shaft to avoid a collision; shunting planning means for designating a shunting floor within the single elevator shaft when the remaining car is to be shunted; and operation control means for outputting a shunting instruction to the remaining car within the single elevator shaft such that the remaining car moves to the shunting floor within the single elevator shaft.
  • 2. An elevator group control apparatus for controlling operations of a plurality of elevator cars moving up and down within a single elevator shaft, the apparatus comprising:expected arrival time computation means for computing expected times each of two individual cars moving up and down within a single elevator shaft will arrive at individual floors in response to registration of an elevator-hall call; shunting determination means for computing probability of a collision between the cars moving up and down within the single elevator shaft from positions, states, and the expected times the cars moving up and down within the single elevator shaft will arrive at individual floors and for determining whether one of the cars must be shunted to a floor within the single elevator shaft to avoid a collision; shunting planning means for designating a shunting floor within the single elevator shaft when one of the cars is to be shunted and for computing a possible shunting start time; modified expected arrival time computation means for modifying the expected times from the possible shunting start time and for computing modified times at which the respective cars are expected to arrive at the individual floors when one of the cars is shunted to a floor within the single elevator shaft; car-to-be-assigned determination means for assigning one of the cars to respond to the elevator-hall call by evaluation of operation conditions of the respective cars from the modified times; and operation control means for outputting a shunting instruction to the car to be shunted to a floor within the single elevator shaft from the shunting start time and outputting an operation instruction to the car assigned to respond to the elevator-hall call determined by the car-to-be-assigned determination means.
  • 3. The elevator group control apparatus as defined in claim 2, wherein an elevator hall/destination button is provided on each floor enabling simultaneous registration of an elevator-hall call from a floor and of a destination floor of a passenger.
  • 4. The elevator group control apparatus as defined in claim 2, wherein the car-to-be-assigned determination means determines the car to be assigned to respond to the elevator-hall call by evaluating operation conditions of the car assigned to respond to the elevator-hall call and the time required for the other cars to be shunted, from the modified times.
  • 5. The elevator group control apparatus as defined in claim 2, wherein the expected arrival time computation means comprises first computation means for computing times at which individual cars are expected to arrive at individual floors assuming the elevator-hall call is temporarily assigned to the individual cars when the elevator-hall call is registered, and second computation means for computing times at which the individual cars are expected to arrive at the individual floors assuming the elevator-hall call is not assigned to any car.
  • 6. The elevator group control apparatus as defined in claim 1, including only two elevator cars in the single elevator shaft.
  • 7. The elevator group control apparatus as defined in claim 2, including only two elevator cars in the single elevator shaft.
Priority Claims (1)
Number Date Country Kind
11-025949 Feb 1999 JP
US Referenced Citations (5)
Number Name Date Kind
5107962 Ekholm Apr 1992
5419414 Sakita May 1995
5663538 Sakita Sep 1997
5865274 Kiji et al. Dec 1999
5877462 Chenais Mar 1999
Foreign Referenced Citations (1)
Number Date Country
8133611 May 1996 JP