The present invention relates to the field of elevator systems. In particular, the present invention relates to a power system for driving an elevator hoist motor from an irregular power source.
A regenerative drive for an elevator hoist motor typically includes a converter connected to an inverter via a DC bus. The inverter is connected to the hoist motor and the converter is connected to an AC power supply, such as from a power utility. When the elevator hoist motor is motoring, power from the AC power supply powers the converter, which converts the AC power to DC power for the DC bus. The inverter then converts the DC power on the DC bus to AC power for driving the hoist motor. In regenerative mode, the load in the elevator drives the motor so it generates AC power as a generator. The inverter converts the AC power from the hoist motor to DC power on the DC bus, which the converter then converts back to AC power for delivery to the AC power supply.
The drive is typically designed to operate over a specific input voltage range from the AC power supply. This range is commonly specified as a nominal operating voltage with a tolerance band (e.g., 480 VAC±10%). Thus, the components of the drive have voltage and current ratings that allow the drive to continuously operate while the AC power supply remains within the designed input voltage range. However, in certain markets the utility network is less reliable, where persistent utility voltage sags or brownout conditions (i.e., voltage conditions below the tolerance band of the drive) are prevalent. When utility voltage sags occur, the drive draws more current from the AC power supply to maintain uniform power to the hoist motor. In conventional systems, when excess current is being drawn from the AC power supply, the drive will shut down to avoid damaging the components of the drive. As a result, elevator service is unavailable until the AC power supply returns to the nominal operating voltage range.
The subject invention is directed to a system for continuously driving a hoist motor for an elevator from an irregular power supply. The system includes a regenerative drive for delivering power between the power supply and the hoist motor. A controller measures a power supply voltage in response to a detected change in the power supply voltage and controls the regenerative drive to adjust a nominal motion profile of the elevator in proportion with an adjustment ratio of the measured power supply voltage to a normal power supply voltage.
Power system 10 includes controller 11, line reactors 28, power converter 30, smoothing capacitor 32, and power inverter 34. Power converter 30 and power inverter 34 are connected by DC power bus 36. Smoothing capacitors 32 is connected across DC power bus 36. Controller 11 includes thermal observer 40, phase locked loop 42, converter control 44, DC bus voltage regulator 46, inverter control 48, power supply voltage sensor 50, elevator motion profile control 52, and position, speed, and current control 54. In one embodiment, controller 11 is a digital signal processor (DSP), and each of the components of controller 11 are functional blocks that are implemented in software executed by controller 11.
Thermal observer 40 is connected between line reactors 28 and power converter 30, and provides a fan control signal as its output. Phase locked loop 42 receives the three-phase signal from power supply 16 as an input, and provides an output to converter control 44, DC bus voltage regulator 46, and power supply voltage sensor 50. Converter control 44 also receives an input from DC bus voltage regulator and provides an output to power converter 30. Power supply voltage sensor 50 provides an output to elevator motion profile control 52, which in turn provides an output to position, speed, and current control 54. DC bus voltage regulator 46 receives signals from phase locked loop 42 and position, speed, and current control 54, and monitors the voltage across DC power bus 36. Inverter control 48 also receives a signal from position, speed, and current control 54 and provides a control output to power inverter 34.
Power supply 16, which is a three-phase AC power supply from the commercial power source, provides electrical power to power converter 30. Power converter 30 is a three-phase power inverter that is operable to convert three-phase AC power from power supply 16 to DC power. In one embodiment, power converter 30 comprises a plurality of power transistor circuits including parallel-connected transistors 56 and diodes 58. Each transistor 56 may be, for example, an insulated gate bipolar transistor (IGBT). The controlled electrode (i.e., gate or base) of each transistor 56 is connected to converter control 44. Converter control 44 controls the power transistor circuits to rectify the three-phase AC power from power supply 16 to DC output power. The DC output power is provided by power converter 30 on DC power bus 36. Smoothing capacitor 32 smoothes the rectified power provided by power converter 30 on DC power bus 36. It should be noted that while power supply 16 is shown as a three-phase AC power supply, power system 10 may be adapted to receive power from any type of power source, including a single phase AC power source and a DC power source.
The power transistor circuits of power converter 30 also allow power on DC power bus 36 to be inverted and provided to power supply 16. In one embodiment, controller 11 employs pulse width modulation (PWM) to produce gating pulses so as to periodically switch the transistors 56 of power converter 30 to provide a three-phase AC power signal to power supply 16. This regenerative configuration reduces the demand on power supply 16. Line reactors 28 are connected between power supply 16 and power converter 30 to control the current passing between power supply 16 and power converter 30. In another embodiment, power converter 30 comprises a three-phase diode bridge rectifier.
Power inverter 34 is a three-phase power inverter that is operable to invert DC power from DC power bus 36 to three-phase AC power. Power inverter 26 comprises a plurality of power transistor circuits including parallel-connected transistors 60 and diodes 62. Each transistor 60 may be, for example, an insulated gate bipolar transistor (IGBT). In one embodiment, the controlled electrode (i.e., gate or base) of each transistor 60 is controlled by inverter control 48 to invert the DC power on DC power bus 36 to three-phase AC output power. The three-phase AC power at the outputs of power inverter 34 is provided to hoist motor 12. In one embodiment, inverter control 48 employs PWM to produce gating pulses to periodically switch transistors 60 of power inverter 34 to provide a three-phase AC power signal to hoist motor 12. Inverter control 48 may vary the speed and direction of movement of elevator 14 by adjusting the frequency and magnitude of the gating pulses to transistors 60.
In addition, the power transistor circuits of power inverter 34 are operable to rectify power that is generated when elevator 14 drives hoist motor 12. For example, if hoist motor 12 is generating power, inverter control 34 deactivates transistors 60 in power inverter 34 to allow the generated power to be rectified by diodes 62 and provided to DC power bus 36. Smoothing capacitor 32 smoothes the rectified power provided by power inverter 34 on DC power bus 36.
Hoist motor 12 controls the speed and direction of movement between elevator cab 20 and counterweight 22. The power required to drive hoist motor 12 varies with the acceleration and direction of elevator 14, as well as the load in elevator cab 20. For example, if elevator 14 is being accelerated, run up with a load greater than the weight of counterweight 22 (i.e., heavy load), or run down with a load less than the weight of counterweight 22 (i.e., light load), a maximal amount of power is required to drive hoist motor 12. If elevator 14 is leveling or running at a fixed speed with a balanced load, it may be using a lesser amount of power. If elevator 14 is being decelerated, running down with a heavy load, or running up with a light load, elevator 14 drives hoist motor 12. In this case, hoist motor 12 generates three-phase AC power that is converted to DC power by power inverter 34 under the control of inverter control 30. The converted DC power is accumulated on DC power bus 36.
In accordance with the present invention, controller 11 monitors power supply 16 for changes in its voltage level and controls power system 10 to continuously operate hoist motor 12 through a change in the voltage of power supply 16. The three-phase output of power supply 16 is provided to phase locked loop 42. Phase locked loop 42 provides the phase and the magnitude of power supply 16 to converter control 44, DC bus voltage regulator 46, and power supply voltage sensor 50. Power supply voltage sensor 50 continuously monitors the voltage magnitude of power supply 16 and generates a signal when the voltage of power supply 16 changes. For example, power supply voltage sensor 50 may generate a signal when the power supply voltage sags outside of the tolerance band (e.g., 10% below the nominal voltage) of power system 10. This signal, which includes information about the new voltage level of power supply 16, is provided to elevator motion profile control 52.
Elevator motion profile control 52 generates a signal that is used to control the motion of elevator 14. In particular, automatic elevator operation involves the control of the velocity of elevator 12 during an elevator trip. The time change in velocity for a complete trip is termed the “motion profile” of elevator 14. Thus, elevator motion profile control 52 generates an elevator motion profile that sets the maximum acceleration, the maximum steady state speed, and the maximum deceleration of elevator 14. The particular motion profile and motion parameters generated by elevator motion profile control 52 represent a compromise between the desire for “maximum” speed and the need to maintain acceptable levels of comfort for the passengers.
In order to allow power system 10 to continuously drive hoist motor 12 when the voltage of power supply 16 strays outside of the tolerance band of power system 10, elevator motion profile control 52 adjusts the elevator motion profile based on the change in the voltage of power supply 16. More specifically, when the voltage of power supply 16 sags, power system 10 would normally draw more current from power supply 16 if the elevator motion profile remained unchanged. In order to maintain the current drawn from power supply 16 within the current rating of the components of power system 10, elevator motion profile control 52 adjusts the elevator motion profile in proportion to the change in the power supply voltage. Thus, the normal acceleration, steady state speed, and deceleration of the elevator motion profile are adjusted by the ratio of the measured voltage of power supply 16 to the nominal voltage of power supply 16. An adjust signal is provided to elevator motion profile control 52 related to this adjustment ratio. In one embodiment, power system 10 adjusts the elevator motion profile when the voltage of power supply 10 sags at least about 15% below the nominal power supply voltage. The motion profile adjustment may be performed a plurality of times depending on the severity and length of the voltage sag. When the voltage of power supply 16 returns to the nominal operating range (e.g., 480 VAC±10%), elevator motion profile control 52 adjusts the elevator motion profile for normal operating conditions.
In addition, when the voltage of power supply 16 sags below a threshold voltage that would make further operation impractical (e.g., 30% below the nominal power supply voltage), elevator motion profile control 52 generates a motion profile that reduces the speed, acceleration, and deceleration to zero. When this motion profile is generated, power system 10 operates hoist motor 12 until all active elevator runs are completed, and ignores any further dispatch requests until the voltage of power supply 16 returns to nominal operating range.
The motion profile output of elevator motion profile control 52 is provided to position, speed, and current control 54. The motion profile includes reference signals related to the adjusted speed, position, and motor current for hoist motor 12 that are in accordance with the adjusted motion profile. These signals are compared with actual feedback values of the motor position (posm), motor speed (vm), and motor current (Im) by position, speed, and current control 54 to determine an error signal related to the difference between the actual operating parameters of hoist motor 12 and the target operating parameters of the adjusted motion profile. For example, position, speed, and current control 54 may include proportional and integral amplifiers to provide determine this error signal from the actual and desired adjusted motion parameters. The error signal is provided by position, speed, and current control 54 to inverter control 48 and DC bus voltage regulator 46.
Based on the error signal from position, speed, and current control 54, inverter control 48 calculates signals to be provided to power inverter 34 to drive hoist motor 12 pursuant to the motion profile when hoist motor 12 is motoring. As described above, inverter control 48 may employ PWM to produce gating pulses to periodically switch transistors 60 of power inverter 34 to provide a three-phase AC power signal to hoist motor 12. Inverter control 48 may vary the speed and direction of movement of elevator 14 by adjusting the frequency and magnitude of the gating pulses to transistors 60. Thus, in the event of voltage sag when hoist motor 12 is motoring, inverter control 48 changes the PWM gating signals to transistors 60 so as to reduce the speed of elevator 14 in proportion to the reduction in power supply voltage.
Referring back to
When the speed of hoist motor 12 is reduced due to voltage sag in power supply 16, the voltage across DC power bus 36 must accordingly be reduced. If the same voltage were maintained across DC power bus 36, the difference in the voltage across DC power bus 36 and the voltage from power supply 16 would result in switching losses in power converter 30 and ripple current in line reactors 28. Thus, outputs from phase locked loop 42 and position, speed, and current control 54 are provided to DC bus voltage regulator 46. In addition, an adjust signal is provided to phase locked loop 42 and DC bus voltage regulator 46 to adjust the control gains of DC bus voltage regulator 46 and phase locked loop 42 by the adjustment ratio of the reduced operating voltage of power supply 16 and the nominal operating voltage of power supply 16. Based on these signals, DC bus voltage regulator 46 adjusts the voltage maintained across DC power bus 36 in proportion to the decrease in speed of hoist motor 12. When the voltage of power supply 16 returns to the nominal operating range, the voltage across DC power bus 36 is returned to the normal maintained voltage.
In addition to controlling the voltage across DC power bus 36, DC bus voltage regulator 46 provides a signal to converter control 44 related to the proportionate change in voltage across DC power bus 36. Converter control 44 also receives a signal from phase locked loop 42 related to the magnitude of the voltage of power supply 16 and a current feed forward signal from the connection between line reactors 28 and power converter 30. With these inputs, converter control 44 calculates signals to be provided to power converter 30 to rectify power from power supply 16. As described above, converter control 44 may employ PWM to produce gating pulses to periodically switch transistors 56 of power converter 30 to rectify the three-phase AC power signal from power supply 16 to DC power for DC power bus 36. In addition, converter control 44 regulates the current through line reactors 28 by comparing the signal from DC bus voltage regulator 46 and comparing it to the current feed forward signal. Converter control 44 operates power converter 30 to adjust the current between line reactors 28 and power converter 30 in accordance with the reference signal.
Because power system 10 is designed to operate over prolonged runs at reduced speeds, line reactors 28 and heat sinks for power converter 30 and power inverter 34 may experience thermal overload. Thermal observer 40 monitors the temperature of line reactors 28 and uses fan control to prevent conditions like line reactor over temperature and heat sink over temperature. To accomplish this, thermal observer 40 monitors the current between line reactors 28 and power converter 30. When this current reaches a threshold level relative to the continuous rating of line reactors 28 (e.g., 90%), thermal observer 40 sends a fan control signal to run cooling fans on line reactors 28, power converter 30, and power inverter 34 at full speed. This avoids the possibility of needing to shut down power system 10 due to thermal overload.
In summary, the present invention is directed to a system for continuously driving a hoist motor for an elevator from an irregular power supply. The system includes a regenerative drive for delivering power between the power supply and the hoist motor. A controller measures a power supply voltage in response to a detected change in the power supply voltage and controls the regenerative drive to adjust a nominal motion profile of the elevator in proportion with an adjustment ratio of the measured power supply voltage to a normal power supply voltage. This allows the elevator to continuously operate when the power supply voltage sags without drawing excessive current from the power supply. As a result, damage to the components of the hoist motor drive is prevented, and the elevator operates consistently with reduced delays due to shut down of the hoist motor drive.
Although the present invention has been described with reference to examples and preferred embodiments, workers skilled in the art will recognize that changes may be made in form and detail without departing from the spirit and scope of the invention.
Filing Document | Filing Date | Country | Kind | 371c Date |
---|---|---|---|---|
PCT/US2005/042833 | 11/23/2005 | WO | 00 | 7/30/2009 |
Publishing Document | Publishing Date | Country | Kind |
---|---|---|---|
WO2007/061419 | 5/31/2007 | WO | A |
Number | Name | Date | Kind |
---|---|---|---|
4902954 | Oshima et al. | Feb 1990 | A |
5229558 | Hakala | Jul 1993 | A |
5712456 | McCarthy et al. | Jan 1998 | A |
6315081 | Yeo | Nov 2001 | B1 |
6474447 | Tajima et al. | Nov 2002 | B2 |
6522099 | Tominaga et al. | Feb 2003 | B2 |
6732838 | Okada et al. | May 2004 | B1 |
6742630 | Eilinger | Jun 2004 | B2 |
7106023 | Ota et al. | Sep 2006 | B2 |
7681694 | Aulanko et al. | Mar 2010 | B2 |
20010008195 | Tajima et al. | Jul 2001 | A1 |
20050006182 | Hall et al. | Jan 2005 | A1 |
20070084673 | Smith et al. | Apr 2007 | A1 |
20100006378 | Blasko | Jan 2010 | A1 |
20100044160 | Agirman et al. | Feb 2010 | A1 |
20100065380 | Chen et al. | Mar 2010 | A1 |
20110226559 | Chen et al. | Sep 2011 | A1 |
Number | Date | Country |
---|---|---|
0426056 | May 1991 | EP |
2168829 | Jun 1986 | GB |
6077624 | May 1985 | JP |
6422774 | Jan 1989 | JP |
3074198 | Mar 1991 | JP |
3198691 | Aug 1991 | JP |
11299290 | Oct 1999 | JP |
2001171920 | Jun 2001 | JP |
Number | Date | Country | |
---|---|---|---|
20090301819 A1 | Dec 2009 | US |