The present disclosure relates to engineering change orders in the design of integrated circuits.
Engineering change orders (ECOs) are an important step in the design of integrated circuits. ECOs are additions or changes to an integrated circuit design that occur late in the design process. Most of the integrated circuit may already be completed or nearly completed, meaning that most requirements (constraints) on the design have already been satisfied when an ECO request is made. For example, the ECO may be to fix one of the remaining constraint violations in the design.
However, the ECO step can be complicated and time-consuming since constraints can affect each other. Fixing a violation of one constraint can cause a new violation of another constraint as an unintended consequence. For example, fixing a timing hold violation on one timing path can create timing setup violations on other related timing paths. This is further complicated due to the more complex timing graph structures and larger variations present in advanced nodes.
In certain embodiments, a method for implementing ECOs includes the following steps. An engineering change order (ECO) is accessed. The ECO is for fixing a violation of a target constraint on a portion of an integrated circuit (the target netlist). A constraint on a related netlist of the integrated circuit is identified. The identified constraint is adversely affected by fixing the violation of the target constraint. A processor concurrently both modifies the target netlist to fix the violation of the target constraint and modifies the related netlist to prevent violation of the adversely affected constraint.
Other aspects include components, devices, systems, improvements, methods, processes, applications, computer readable mediums, and other technologies related to any of the above.
The disclosure will be understood more fully from the detailed description given below and from the accompanying figures of embodiments of the disclosure. The figures are used to provide knowledge and understanding of embodiments of the disclosure and do not limit the scope of the disclosure to these specific embodiments. Furthermore, the figures are not necessarily drawn to scale.
Aspects of the present disclosure relate to engineering change orders (ECOs) with consideration of adversely affected constraints. Engineering change orders may involve fixing currently-violated constraints on the design of an integrated circuit. However, fixing one constraint for one part of the integrated circuit design may create a new violation of another constraint for a different but related part of the integrated circuit design.
In one approach, the target constraint is fixed even though it may create new violations elsewhere in the design. These new violations are then fixed in a next ECO step. However, this approach may converge slowly or fail to converge as each fix creates new violations in a possibly never ending cycle. In another approach, the target constraint is fixed, but subject to the requirement that no new violations may be created. In this approach, it may be unnecessarily difficult to fix the target constraint because the ECO solution space is over constrained.
In the approaches described in this disclosure, the target constraint and constraints that may be adversely affected or violated as a result of fixing the target constraint are considered together. Fixing the target constraint on one netlist of the integrated circuit may adversely affect or create violations of other constraints on related netlists of the integrated circuit. Therefore, the target netlist is modified to fix the violation of the target constraint while concurrently modifying the related netlists to prevent violation of the adversely affected constraints on those netlists. This may be referred to as “concurrent” or “in-situ” because the target netlist and the related netlists are considered together, rather than separately, as part of the process of fixing the violation of the target constraint.
This in-situ approach provides a larger solution space for fixing the target constraint, because the related netlists are also allowed to vary while considering possible fixes for the target constraint. This can result in an improved Quality of Result (QoR) for the solution, better convergence and faster runtimes. This, in turn, can reduce memory usage, networking bandwidth, and processor usage.
The process shown in
A hold violation occurs when the signal propagation is too fast compared to the clock speed. Hold violations typically are fixed by adding delay to the timing path, for example by modifying the existing combinational logic circuits u1-u3 or by adding additional buffers or other types of delay along the timing path. Without additional information, adding a delay of 30 to either u1 or to u2 or to u3 would all fix the hold violation. However, these solutions are not equally acceptable, as they may have different secondary effects on other timing paths.
However, the setup constraints may be adversely affected. In
For example,
In
The description above used timing setup and hold constraints as the target constraint on the target netlist and as the adversely affected constraint on the related netlists. However, the approach is not limited to these constraints. For example, within timing, DRC (design rule check) constraints such as maximum capacitance, maximum transition time, maximum fanout, and noise, may be used. Maximum transition time and maximum capacitance are similar to timing setup, in that these constraints typically will move opposite to a timing hold constraint. Thus, fixing a timing hold violation on a target path may introduce violations of maximum transition time or maximum capacitance on side paths, and vice versa.
The in-situ approach may also be used with non-timing constraints or situations that mix timing constraints with non-timing constraints. Power constraints is one example. Making circuits faster (e.g., fixing setup violations) may increase power consumption, resulting in the violation of power constraints. Conversely, if a circuit is downsized to reduce power consumption, the setup constraint may be adversely affected or even violated if there was not enough setup slack to begin with. Thus, in one approach, the setup slack on other parts of the netlist is increased concurrently with downsizing cells to meet power constraints. This is yet another example where additional flexibility in the timing constraint broadens the solution space for fixing power violations.
As a final example, physical implementation tools must meet constraints on the physical layout of the integrated circuit. For example, constraints in the placement process include the following. There can be no overlap between cells. The placement cannot be too congested for routing—if cells are placed too close to each other, it is hard to route those due to limited routing resource. There are physical spacing rules (e.g., a certain pair of cells cannot be placed next to each other). The placement tool selects the best location for a cell considering all these physical constraints in addition to timing/DRC constraints. However, a placement that is best for physical constraints or that fixes a violation of physical constraints could adversely affect timing/DRC constraints. For example, in
Specifications for a circuit or electronic structure may range from low-level transistor material layouts to high-level description languages. A high-level of abstraction may be used to design circuits and systems, using a hardware description language (‘HDL’) such as VHDL, Verilog, SystemVerilog, SystemC, MyHDL or OpenVera. The HDL description can be transformed to a logic-level register transfer level (‘RTL’) description, a gate-level description, a layout-level description, or a mask-level description. Each lower abstraction level that is a less abstract description adds more useful detail into the design description, for example, more details for the modules that include the description. The lower levels of abstraction that are less abstract descriptions can be generated by a computer, derived from a design library, or created by another design automation process. An example of a specification language at a lower level of abstraction language for specifying more detailed descriptions is SPICE, which is used for detailed descriptions of circuits with many analog components. Descriptions at each level of abstraction are enabled for use by the corresponding tools of that layer (e.g., a formal verification tool). A design process may use a sequence depicted in
During system design 614, functionality of an integrated circuit to be manufactured is specified. The design may be optimized for desired characteristics such as power consumption, performance, area (physical and/or lines of code), and reduction of costs, etc. Partitioning of the design into different types of modules or components can occur at this stage.
During logic design and functional verification 616, modules or components in the circuit are specified in one or more description languages and the specification is checked for functional accuracy. For example, the components of the circuit may be verified to generate outputs that match the requirements of the specification of the circuit or system being designed. Functional verification may use simulators and other programs such as testbench generators, static HDL checkers, and formal verifiers. In some embodiments, special systems of components referred to as ‘emulators’ or ‘prototyping systems’ are used to speed up the functional verification.
During synthesis and design for test 618, HDL code is transformed to a netlist. In some embodiments, a netlist may be a graph structure where edges of the graph structure represent components of a circuit and where the nodes of the graph structure represent how the components are interconnected. Both the HDL code and the netlist are hierarchical articles of manufacture that can be used by an EDA product to verify that the integrated circuit, when manufactured, performs according to the specified design. The netlist can be optimized for a target semiconductor manufacturing technology. Additionally, the finished integrated circuit may be tested to verify that the integrated circuit satisfies the requirements of the specification.
During netlist verification 620, the netlist is checked for compliance with timing constraints and for correspondence with the HDL code. During design planning 622, an overall floor plan for the integrated circuit is constructed and analyzed for timing and top-level routing.
During layout or physical implementation 624, physical placement (positioning of circuit components such as transistors or capacitors) and routing (connection of the circuit components by multiple conductors) occurs, and the selection of cells from a library to enable specific logic functions can be performed. As used herein, the term ‘cell’ may specify a set of transistors, other components, and interconnections that provides a Boolean logic function (e.g., AND, OR, NOT, XOR) or a storage function (such as a flipflop or latch). As used herein, a circuit ‘block’ may refer to two or more cells. Both a cell and a circuit block can be referred to as a module or component and are enabled as both physical structures and in simulations. Parameters are specified for selected cells (based on ‘standard cells’) such as size and made accessible in a database for use by EDA products.
During analysis and extraction 626, the circuit function is verified at the layout level, which permits refinement of the layout design. During physical verification 628, the layout design is checked to ensure that manufacturing constraints are correct, such as DRC constraints, electrical constraints, lithographic constraints, and that circuitry function matches the HDL design specification. During resolution enhancement 630, the geometry of the layout is transformed to improve how the circuit design is manufactured.
During tape-out, data is created to be used (after lithographic enhancements are applied if appropriate) for production of lithography masks. During mask data preparation 632, the ‘tape-out’ data is used to produce lithography masks that are used to produce finished integrated circuits.
A storage subsystem of a computer system (such as computer system 700 of
The machine may be a personal computer (PC), a tablet PC, a set-top box (STB), a Personal Digital Assistant (PDA), a cellular telephone, a web appliance, a server, a network router, a switch or bridge, or any machine capable of executing a set of instructions (sequential or otherwise) that specify actions to be taken by that machine. Further, while a single machine is illustrated, the term “machine” shall also be taken to include any collection of machines that individually or jointly execute a set (or multiple sets) of instructions to perform any one or more of the methodologies discussed herein.
The example computer system 700 includes a processing device 702, a main memory 704 (e.g., read-only memory (ROM), flash memory, dynamic random access memory (DRAM) such as synchronous DRAM (SDRAM), a static memory 706 (e.g., flash memory, static random access memory (SRAM), etc.), and a data storage device 718, which communicate with each other via a bus 730.
Processing device 702 represents one or more processors such as a microprocessor, a central processing unit, or the like. More particularly, the processing device may be complex instruction set computing (CISC) microprocessor, reduced instruction set computing (RISC) microprocessor, very long instruction word (VLIW) microprocessor, or a processor implementing other instruction sets, or processors implementing a combination of instruction sets. Processing device 702 may also be one or more special-purpose processing devices such as an application specific integrated circuit (ASIC), a field programmable gate array (FPGA), a digital signal processor (DSP), network processor, or the like. The processing device 702 may be configured to execute instructions 726 for performing the operations and steps described herein.
The computer system 700 may further include a network interface device 708 to communicate over the network 720. The computer system 700 also may include a video display unit 710 (e.g., a liquid crystal display (LCD) or a cathode ray tube (CRT)), an alphanumeric input device 712 (e.g., a keyboard), a cursor control device 714 (e.g., a mouse), a graphics processing unit 722, a signal generation device 716 (e.g., a speaker), graphics processing unit 722, video processing unit 728, and audio processing unit 732.
The data storage device 718 may include a machine-readable storage medium 724 (also known as a non-transitory computer-readable medium) on which is stored one or more sets of instructions 726 or software embodying any one or more of the methodologies or functions described herein. The instructions 726 may also reside, completely or at least partially, within the main memory 704 and/or within the processing device 702 during execution thereof by the computer system 700, the main memory 704 and the processing device 702 also constituting machine-readable storage media.
In some implementations, the instructions 726 include instructions to implement functionality corresponding to the present disclosure. While the machine-readable storage medium 724 is shown in an example implementation to be a single medium, the term “machine-readable storage medium” should be taken to include a single medium or multiple media (e.g., a centralized or distributed database, and/or associated caches and servers) that store the one or more sets of instructions. The term “machine-readable storage medium” shall also be taken to include any medium that is capable of storing or encoding a set of instructions for execution by the machine and that cause the machine and the processing device 702 to perform any one or more of the methodologies of the present disclosure. The term “machine-readable storage medium” shall accordingly be taken to include, but not be limited to, solid-state memories, optical media, and magnetic media.
Some portions of the preceding detailed descriptions have been presented in terms of algorithms and symbolic representations of operations on data bits within a computer memory. These algorithmic descriptions and representations are the ways used by those skilled in the data processing arts to most effectively convey the substance of their work to others skilled in the art. An algorithm may be a sequence of operations leading to a desired result. The operations are those requiring physical manipulations of physical quantities. Such quantities may take the form of electrical or magnetic signals capable of being stored, combined, compared, and otherwise manipulated. Such signals may be referred to as bits, values, elements, symbols, characters, terms, numbers, or the like.
It should be borne in mind, however, that all of these and similar terms are to be associated with the appropriate physical quantities and are merely convenient labels applied to these quantities. Unless specifically stated otherwise as apparent from the present disclosure, it is appreciated that throughout the description, certain terms refer to the action and processes of a computer system, or similar electronic computing device, that manipulates and transforms data represented as physical (electronic) quantities within the computer system's registers and memories into other data similarly represented as physical quantities within the computer system memories or registers or other such information storage devices.
The present disclosure also relates to an apparatus for performing the operations herein. This apparatus may be specially constructed for the intended purposes, or it may include a computer selectively activated or reconfigured by a computer program stored in the computer. Such a computer program may be stored in a computer readable storage medium, such as, but not limited to, any type of disk including floppy disks, optical disks, CD-ROMs, and magnetic-optical disks, read-only memories (ROMs), random access memories (RAMs), EPROMs, EEPROMs, magnetic or optical cards, or any type of media suitable for storing electronic instructions, each coupled to a computer system bus.
The algorithms and displays presented herein are not inherently related to any particular computer or other apparatus. Various other systems may be used with programs in accordance with the teachings herein, or it may prove convenient to construct a more specialized apparatus to perform the method. In addition, the present disclosure is not described with reference to any particular programming language. It will be appreciated that a variety of programming languages may be used to implement the teachings of the disclosure as described herein.
The present disclosure may be provided as a computer program product, or software, that may include a machine-readable medium having stored thereon instructions, which may be used to program a computer system (or other electronic devices) to perform a process according to the present disclosure. A machine-readable medium includes any mechanism for storing information in a form readable by a machine (e.g., a computer). For example, a machine-readable (e.g., computer-readable) medium includes a machine (e.g., a computer) readable storage medium such as a read only memory (“ROM”), random access memory (“RAM”), magnetic disk storage media, optical storage media, flash memory devices, etc.
In the foregoing disclosure, implementations of the disclosure have been described with reference to specific example implementations thereof. It will be evident that various modifications may be made thereto without departing from the broader spirit and scope of implementations of the disclosure as set forth in the following claims. Where the disclosure refers to some elements in the singular tense, more than one element can be depicted in the figures and like elements are labeled with like numerals. The disclosure and drawings are, accordingly, to be regarded in an illustrative sense rather than a restrictive sense.
This application claims the benefit of U.S. Provisional Application No. 62/978,220, “Engineering Change Orders with In-Situ Refinement and Recovery,” filed Feb. 18, 2020, which is incorporated by reference in its entirety.
Number | Date | Country | |
---|---|---|---|
62978220 | Feb 2020 | US |