This application is based on and claims priority under 35 U.S.C. § 119 from Japanese Patent Application No. 2018-241195 filed on Dec. 25, 2018, the contents of which are incorporated herein by reference.
The present invention generally relates to an engineering support system and an engineering support method.
Conventional plants or factories (simply “plants” hereinbelow when referring to these generally) are constructed with a process control system of controlling various states and quantities (such as pressure, temperature, and flow rate) in an industrial process, and in such conventional plants, advanced automatic operations are performed. For example, a controller forming the core of the process control system acquires detection results of a plurality of sensors (such as a flowmeter and a thermometer), seeks an actuation amount of an actuator (such as a valve) according to these detection results, and actuates the actuator according to this actuation amount to control the various states and quantities above.
Most engineering for the construction, management, maintenance, repair, and the like of such a process control system is performed by a plurality of engineers using a large variety of design drawings, specifications, and the like (“design drawings and the like”). As these design drawings and the like, for example, a P&ID (piping and instrument diagram), a PFD (process flow diagram), a device list, device setting information, a CAD (computer-aided design) drawing, a control logic diagram, a simulation model, and a graphic drawing can be mentioned. Note that above, “engineering” refers to work relating to the construction, modification, maintenance, and the like of the system.
In the process control system, a plurality of components is closely associated, such that when a portion of the components changes, other components may also need to be changed. As such, for efficient engineering of the process control system, it is crucial to share design drawings and the like that reflect actual conditions (such as an actual configuration and actual settings) of the process control system among the engineers involved in the engineering. Patent literature 1 below discloses a maintenance and management system that enables central management of maintenance and management work of a plant. Moreover, patent literature 2 below discloses a maintenance information management support device that supports workers by accurately and speedily grasping implementation conditions by managing implementation conditions of modification construction relating to plant facilities.
Patent Literature 1: JP 2859407 B2
Patent Literature 2: JP 3445470 B2
For efficient engineering of the process control system, as above, it is ideal to share the design drawings and the like reflecting the actual conditions of the process control system among the engineers involved in the engineering in a usable form. However, in reality, the design drawings and the like reflecting the actual conditions of the process control system are not sufficiently shared among the engineers involved in the engineering, and reusing these is cumbersome; currently, it is hard to say that this work is very efficient.
One or more embodiments of the invention provide an engineering support system and an engineering support method whereby working efficiency can be significantly improved by associating and integrating various information used in engineering.
An engineering support system according to one or more embodiments provides an engineering support system (1) that supports engineering of a process control system, provided with a transformation unit (10) that transforms design drawings and the like (DD) used in engineering the process control system into a semantic model (M) expressed by first information indicating elements included in the design drawings and the like and second information indicating a relationship between the elements and a combined semantic model generation unit (31) that generates a combined semantic model (CM) that combines a plurality of semantic models based on a degree of similarity between a plurality of semantic models.
Furthermore, an engineering support system of one or more embodiments is further provided with a similarity calculation unit (32) that calculates the degree of similarity, wherein the combined semantic model generation unit generates the combined semantic model based on the degree of similarity calculated by the similarity calculation unit.
Furthermore, in an engineering support system of one or more embodiments, the degree of similarity indicates a degree of similarity between the first information included in the plurality of semantic models and a degree of similarity between the second information included in the plurality of semantic models.
Furthermore, in an engineering support system of one or more embodiments, the first information includes information indicating names of the elements and information indicating properties of the elements.
Furthermore, an engineering support system of one or more embodiments is further provided with a semantic model information extraction unit (34) that extracts an extracted semantic model according to an instruction from the combined semantic model, wherein the transformation unit transforms the extracted semantic model (EM) extracted by the semantic model information extraction unit into the design drawings and the like.
Furthermore, an engineering support system of one or more embodiments is further provided with a first database (33) that stores calculation rules of the similarity, wherein the similarity calculation unit calculates the degree of similarity between the plurality of semantic models according to the calculation rules stored in the first database.
Furthermore, an engineering support system of one or more embodiments is further provided with a second database (12) that stores rules for transformation between the design drawings and the like and the semantic model, wherein the transformation unit transforms the design drawings and the like into the semantic model and transforms the semantic model into the design drawings and the like according to the transformation rules stored in the second database.
Furthermore, an engineering support system of one or more embodiments is further provided with a third database (35) that stores extraction rules for extracting the semantic model from the combined semantic model, wherein the semantic model information extraction unit extracts a semantic model necessary to create design drawings and the like of an instructed type in an instructed range according to the extraction rules stored in the third database.
Furthermore, an engineering support system of one or more embodiments is further provided with an application unit (40) that corrects the semantic model, supports correction of the semantic model, or compares a plurality of semantic models or a plurality of combined semantic models.
Furthermore, an engineering support system of one or more embodiments is further provided with a storage unit (20) that stores the semantic model and the combined semantic model.
An engineering support method of one or more embodiments is an engineering support method of supporting engineering of a process control system, having a first transformation step (S11) of transforming design drawings and the like (DD) used in engineering the process control system into a semantic model (M) expressed by first information indicating elements included in the design drawings and the like and second information indicating a relationship between the elements and a combined semantic model generation step (S12) of generating a combined semantic model (CM) that combines a plurality of semantic models based on a degree of similarity between a plurality of semantic models.
Furthermore, the engineering support method of one or more further has a semantic model information extraction step (S13) of extracting an extracted semantic model according to an instruction from the combined semantic model and a second transformation step (S14) of transforming the extracted semantic model extracted at the semantic model information extraction step into the design drawings and the like.
An engineering support system that supports engineering of a process control system according to one or more embodiments includes a storage and a processor connected to the storage. The processor transforms design drawings into a plurality of semantic models and outputs the plurality of semantic models to the storage and generates a combined semantic model that combines the plurality of semantic models based on a degree of similarity among the plurality of semantic models and outputs the combined semantic model to the storage. Each of the plurality of semantic models is expressed by first information indicating elements included in the design drawings and second information indicating a relationship between the elements.
One or more embodiments significantly improve working efficiency by associating and integrating various information used in engineering.
An engineering support system and an engineering support method of one or more embodiments are described in detail below with reference to the drawings. Hereinbelow, first, an overview of one or more embodiments is described. Next, details of one or more embodiments are described.
One or more embodiments may enable significantly improving working efficiency by automatically performing at least a portion of associating and integrating various information used in engineering. Here, as above, there is a large variety of design drawings and the like used in the engineering, beginning with a P&ID and a PFD. Moreover, in engineering a process control system, a perspective and an approach when working of an engineer differ according to each component such that necessary design drawings and the like also differ.
For example, an engineer engineering a human-machine interface (HMI: Human Machine Interface), a control device, a network, or the like works from a perspective of logical connections (connections between functions) and as such requires design drawings and the like illustrating logical connections. In contrast, an engineer performing instrumentation maintenance or facility maintenance works from a perspective of physical connections (connections between devices) and as such requires design drawings and the like illustrating physical connections.
In this manner, because there is a large variety of design drawings and the like and necessary design drawings and the like may differ according to each engineer involved in the engineering, it is hard to say that simply centrally managing the design drawings and the like amounts to sharing the design drawings and the like in a usable form among the engineers involved in the engineering. This is because even if design drawings and the like required by one engineer are updated, design drawings and the like required by another engineer are not necessarily updated as well. In these conditions, it is often the case that an effect that a change in a portion of the components has on other components cannot be grasped directly.
Furthermore, an operation period of a plant is long—for example, thirty years or longer. During this period, it is anticipated that setting changes, additions, and the like will arise for the process control system due to modification or expansion of plant facilities. At that time, it is also possible for engineering tools per se used to engineer the setting changes, additions, and the like of the process control system to be changed. For example, an engineering tool may be improved in function or changed to another engineering tool. In such a situation, sharing information of the engineering tool from before the change becomes difficult after the change.
Furthermore, according to characteristics of the engineering tools used in the engineering, the knowledge and experience of the engineers performing the engineering, and the like, idiosyncrasies, individual characteristics, and the like arise in the design drawings and the like that are created. As such, it is difficult for an engineer to accurately understand design drawings and the like whose creation and the like they were not involved in and design drawings and the like created using an engineering tool they have no experience using. As a result, difficulties arise when, for example, an engineer other than the engineer who created the design drawings and the like attempts to utilize the existing design drawings and the like.
In one or more embodiments, the design drawings and the like used in engineering the process control system are transformed into a semantic model expressed by first information, indicating elements included in the design drawings and the like, and second information, indicating relationships between the elements. Moreover, based on a degree of similarity between a plurality of semantic models, a combined semantic model combining the plurality of semantic models is generated. In this manner, working efficiency can be significantly improved by associating and integrating various information (design drawings and the like) used in the engineering.
The engineering support system 1 manages the design drawings and the like DD according to instructions from a terminal device TM. The terminal device TM is a device that is connected wirelessly non-wirelessly to the engineering support system 1 and operated by a user. This terminal device TM is provided with input devices such as a keyboard and a pointing device and a display device such as a liquid-crystal display device. The terminal device TM sends instructions input by the user operating an input device to the engineering support system 1. Moreover, the terminal device TM displays various information sent from the engineering support system 1 on the display device.
Here, the design drawings and the like DD managed by the engineering support system 1 are any design drawings, specifications, and the like used in the engineering. For example, a P&ID, a PFD, a device list, device setting information, a control logic diagram, a simulation model, a graphic drawing, and a CAD drawing or the like (including a 3D drawing) can be mentioned. Note that the design drawings and the like DD may also be data or, as long as data reading is possible, printed on a paper medium. Moreover, the engineering support system 1 manages any number and any type of design drawings and the like DD.
The transformation unit 10 transforms the design drawings and the like DD used in engineering the process control system into a semantic model M expressed by information indicating elements included in the design drawings and the like DD (first information) and information indicating relationships between the elements (second information). For example, when a plurality of devices provided in a plant is included as elements of design drawings and the like DD, the transformation unit 10 generates a semantic model M expressed by information indicating these devices and information indicating connection relationships of these devices.
The above information indicating the devices includes information indicating device names and information indicating device properties. For example, the properties can include, in addition to features and properties unique to a device (for example, a capacity of a tank or the like, a diameter of piping, a device maker, or handling method), setting values, parameters, and the like set for each device according to a system configuration or simulation conditions. Note that the semantic model M may be generated using so-called ontology technology. Moreover, the transformation unit 10 can also transform an extracted semantic model EM (see
The converter 11 transforms the design drawings and the like DD into the semantic model M according to transformation rules stored in the transformation rule database 12. For example, the converter 11 transforms design drawings and the like DD1 into a semantic model M1 and transforms design drawings and the like DD2 into a semantic model M2. Moreover, the converter 11 transforms an extracted semantic model EM (see
The transformation rule database 12 stores rules for transformation between the design drawings and the like DD and the semantic model M (extracted semantic model EM) (transformation rules). This transformation rule database 12 stores, for example, the above transformation rules according to type of design drawings and the like DD. This transformation rule database 12 may store correction rules for correcting a difference in transformation method according to a difference in engineering tool or vendor used to create and change the design drawings and the like DD. Note that depending on the type of design drawings and the like DD, transformation rules for generating a semantic model M in a format conforming to standardized specifications such as IEC 61360-2 (list of devices used) and IEC 62832 (device setting information) may be included.
The parts library database 13 stores unique parts necessary for transformation when the converter 11 transforms an extracted semantic model EM (see
The semantic model database 20 stores, for reuse or as history, semantic models M transformed by the transformation unit 10 and a combined semantic model CM (details described below) obtained by combining semantic models M. Note that the semantic model database 20 may store an extracted semantic model EM (see
The combined semantic model management unit 30 manages the combined semantic model CM stored in the semantic model database 20. Specifically, the combined semantic model management unit 30 generates the combined semantic model CM by combining a plurality of semantic models M transformed by the transformation unit 10. Here, the combined semantic model management unit 30 generates the combined semantic model CM based on a degree of similarity between a plurality of semantic models M. Moreover, the combined semantic model management unit 30 extracts an extracted semantic model EM according to instructions from the terminal device TM from the combined semantic model CM.
The combined semantic model generation unit 31 generates the combined semantic model CM by combining a plurality of semantic models M. Specifically, the combined semantic model generation unit 31 is provided with a matching unit 32 (similarity calculation unit) and a matching rule database 33 (first database) and generates the combined semantic model CM by combing a plurality of semantic models M based on a degree of similarity calculated by the matching unit 32. Note that as with a calculation example of the degree of similarity between the plurality of semantic models M, a generation example of the combined semantic model CM is described below.
The matching unit 32 calculates the degree of similarity between the plurality of semantic models M. Specifically, the matching unit 32 calculates the above similarity according to matching rules stored in the matching rule database 33. The matching rule database 33 stores matching rules (calculation rules) necessary to calculate the above similarity.
Here, as above, the semantic model M is expressed by the information indicating the elements included in the design drawings and the like DD (first information) and the information indicating the relationships between the elements (second information). As such, the matching rules include rules for calculating a degree of similarity between the first information included in the plurality of semantic models M and rules for calculating a degree of similarity between the second information included therein. Accordingly, the degree of similarity calculated by the matching unit 32 indicates the degree of similarity between the first information included in the plurality of semantic models M and the degree of similarity between the second information included therein. Note that the calculation example of the degree of similarity between the plurality of semantic models M is described below.
The semantic model information extraction unit 34 extracts an extracted semantic model EM according to instructions from the terminal device TM from the combined semantic model CM according to the extraction rules stored in the extraction rule database 35. Here, instructions necessary for the semantic model information extraction unit 34 to extract the extracted semantic model EM are an instruction specifying the type of the design drawings and the like DD to be created (type of semantic model to extract) and an instruction specifying a range of the design drawings and the like DD to be created. As such, the semantic model information extraction unit 34 extracts an extracted semantic model EM necessary to create the design drawings and the like DD of the instructed type in the instructed range from the combined semantic model CM. Note that as the instructions necessary to extract the extracted semantic model EM, a condition may be necessary in addition to the type of design drawings and the like DD to be created. An extraction example of the extracted semantic model EM is described below.
The extraction rule database 35 stores the extraction rules for extracting the extracted semantic model EM from the combined semantic model CM. The extraction rules stored in the extraction rule database 35 define what manner of information needs to be extracted from the combined semantic model CM to create the design drawings and the like DD. The extraction rule database 35 stores the extraction rules according to type of design drawings and the like DD.
The application unit 40 provides functions useful for the engineering support system 1 to manage the design drawings and the like DD based on instructions from the terminal device TM. For example, the application unit 40 provides a function of correcting the semantic model M, the combined semantic model CM, and the extracted semantic model EM and a function of supporting correction of the semantic model M, the combined semantic model CM, and the extracted semantic model EM. Moreover, the application unit 40 provides a function of comparing a plurality of semantic models M, a function of comparing a plurality of combined semantic models CM, and a function of comparing a plurality of extracted semantic models EM.
The rule database correction unit 41 corrects the transformation rule database 12 provided in the transformation unit 10, the matching rule database 33 provided in the combined semantic model management unit 30, and the extraction rule database 35 provided in the combined semantic model management unit 30 based on instructions from the terminal device TM. The semantic model correction unit 42 corrects the semantic model M and the extracted semantic model EM stored in the semantic model database 20 based on instructions from the terminal device TM. Note that correction by the rule database correction unit 41 and the semantic model correction unit 42 is performed when, for example, the degree of similarity between the plurality of semantic models M is calculated by the matching unit 32 illustrated in
The similar pattern extraction unit 43 searches the semantic model database 20 and extracts a pattern similar to design drawings and the like DD or a semantic model M instructed from the terminal device TM, including a vicinity thereof. For example, if there is a semantic model M needing correction, the similar pattern extraction unit 43 searches from the semantic model database 20 a pattern similar to this semantic model M. Note that a similar pattern is a portion (pattern) wherein elements (nodes) included in this semantic model M and the vicinity thereof and relationships between elements (nodes) are similar.
When a location needing correction is present in a transformed semantic model M, a combined semantic model CM, or the like (“semantic model M or the like”), the suggestions for correction presentation unit 44 extracts and presents, automatically or as instructed by an engineer, this semantic model M or the like needing correction or the location therein requiring correction. Moreover, to assist correction of the semantic model M or the like by an engineer, the suggestions for correction presentation unit 44 may extract, by the similar pattern extraction unit 43, a pattern similar to the presented semantic model M or the like or a presentation location therein (location needing correction) from models stored in the system and present (display) this as reference.
At this time, the suggestions for correction presentation unit 44 may present patterns with higher similarity to the semantic model M or the like to be corrected (patterns with greater similarity) and present these ordered according to similarity. The suggestions for correction presented by the suggestions for correction presentation unit 44 and the similar pattern to serve as reference in correcting such are displayed on the terminal device TM. By being presented with a correction target and a similar reference semantic model as a comparison target, an engineer can more easily correct a part needing correction.
The semantic model comparison unit 45 compares a plurality of combined semantic models CM and extracts a difference based on instructions from the terminal device TM. An extraction result of the semantic model comparison unit 45 is sent to the terminal device TM. The semantic model comparison unit 45 may compare a newest semantic model M and a past semantic model M.
The transformation support unit 46 supports a transformation process when the transformation unit 10 performs transformation (including both transformation from design drawings and the like DD to a semantic model M and transformation from an extracted semantic model EM to design drawings and the like DD). For example, when the transformation unit 10 performs conversion, the transformation support unit 46 performs detection of excess or insufficient elements, new elements, or the like and detection of a transformation error or the like and outputs detection results thereof to the terminal device TM.
When the semantic model M needs to be corrected, the user corrects the semantic model M via the terminal device TM. When this becomes a new rule (when a current rule is to be corrected), the rule database correction unit 41 causes this corrected rule to be reflected in the transformation rule database 12. By such repair being performed, the detected new element, excess or insufficient element, transformation error, or the like is resolved. Note that when the transformation rule database 12 is corrected by the user, the corrected (new) rule may be automatically applied to a target semantic model M. In this situation, if any one among the semantic model M and the transformation rule database 12 is corrected, this correction is automatically reflected in the other among these.
When the flowchart illustrated in
More specifically, the P&ID (design drawings and the like DD11) is read into the converter 11 and transformation rules for transforming a P&ID into a semantic model are read into the converter 11 from the transformation rule database 12. Then, according to the read transformation rules, the converter 11 performs a process of transforming the P&ID (design drawings and the like DD11) into a P&ID semantic model M11. Similarly, the PFD (design drawings and the like DD12) is read into the converter 11 and transformation rules for transforming a PFD into a semantic model are read into the converter 11 from the transformation rule database 12. Then, according to the read transformation rules, the converter 11 performs a process of transforming the PFD (design drawings and the like DD12) into a PFD semantic model M12.
Furthermore, the P&ID illustrated in
The P&ID semantic model M11 illustrated in
For example, the node illustrating the tank 101 is tied to “E-1” as information indicating a name (hasName) and “Diameter” and “Height” as information indicating properties (hasProperty). The node illustrating the tank 101 is tied to information indicating the node of the piping 112 as information indicating a connection destination (isconnectedto). Moreover, the node illustrating the piping 112 is tied to “P-2” as information indicating a name (hasName) and “Caliber” and “Length” as information indicating properties (hasProperty). The node illustrating the piping 112 is tied to information indicating the node of the valve 102 as information indicating a connection destination (isconnectedto).
Moreover, the node illustrating the piping 113 is tied to “P-3” as information indicating a name (hasName) and “Caliber” and “Length” as information indicating properties (hasProperty). The node illustrating the piping 113 is tied to information indicating the node of the reactor 103 as information indicating a connection destination (isconnectedto). Moreover, the node illustrating the reactor 103 is tied to “E-2” as information indicating a name (hasName) but is not tied to information indicating properties (hasProperty). This is because the P&ID illustrated in
Furthermore, the PFD illustrated in
The PFD semantic model M12 illustrated in
For example, the node illustrating the tank 101 is not tied to information indicating a name (hasName) and information indicating properties (hasProperty). The node illustrating the tank 101 is tied to information indicating the node of the flow 122 as information indicating a connection destination (isconnectedto). Moreover, the node illustrating the flow 122 is tied to “S-2” as information indicating a name (hasName) and “Pressure value” and “Flow Rate” as information indicating properties (hasProperty). The node illustrating the flow 122 is tied to information indicating the node of the reactor 103 as information indicating a connection destination (isconnectedto).
Furthermore, the node illustrating the reactor 103 is not tied to information indicating a name (hasName) and is tied to “Chemical reaction formula” as information indicating properties (hasProperty). The node illustrating the reactor 103 is tied to information indicating the node of the flow 123 as information indicating a connection destination (isconnectedto).
In this manner, both the P&ID semantic model M11 obtained by transforming the P&ID (design drawings and the like DD11) and the PFD semantic model M12 obtained by transforming the PFD (design drawings and the like DD12) are expressed as nodes by abstracting the elements included in the design drawings and the like DD11, DD12. Moreover, each node is tied to information indicating that node (first information) and information indicating relationships between the nodes (second information). Note that this information may be omitted when not included in the P&ID and the PFD. In this manner, despite being design drawings and the like of different types, the semantic models generated by transformation by the transformation unit 10 are expressed by information indicating the elements included in the design drawings and the like (first information) and information indicating the relationships between the elements (second information).
Note that in
Furthermore, when the process of step S11 illustrated in
Next, the combined semantic model management unit 30 performs a process of combining semantic models to generate a combined semantic model (step S12: combined semantic model generation step). Specifically, the matching unit 32 performs a process of calculating a degree of similarity between a plurality of semantic models according to the matching rules stored in the matching rule database 33 of the combined semantic model management unit 30. Then, based on the degree of similarity calculated by the matching unit 32, the combined semantic model generation unit 31 performs a process of generating a combined semantic model by combining a plurality of semantic models.
More specifically, the P&ID semantic model M11 and the PFD semantic model M12 are read into the matching unit 32 and matching rules necessary to calculate the degree of similarity between these semantic models are read into the matching unit 32 from the matching rule database 33. Then, according to the read matching rules, the matching unit 32 performs a process of calculating a degree of similarity between the P&ID semantic model M11 and the PFD semantic model M12. Afterward, the P&ID semantic model M11 and the PFD semantic model M12 are read into the combined semantic model generation unit 31 and the degree of similarity calculated by the matching unit 32 is read into the combined semantic model generation unit 31. Then, based on the read similarity, the combined semantic model generation unit 31 performs a process of combining the P&ID semantic model M11 and the PFD semantic model M12 to generate a combined semantic model CM1.
Here, in the P&ID semantic model M11 illustrated in
Furthermore, in the P&ID semantic model M11 illustrated in
By the P&ID semantic model M11 and the PFD semantic model M12 being combined by the combined semantic model generation unit 31 based on the above degree of similarity, the combined semantic model CM1 illustrated in
Meanwhile, the node of the valve 102 appearing between the node of the tank 101 and the node of the reactor 103 in the P&ID semantic model M11 is not present in the PFD semantic model M12. However, from being present between two nodes determined to be identical (the node of the tank 101 and the node of the reactor 103) and an overall relationship and degree of matching (of nodes in a vicinity), a position of the node of the valve 102 is specified to be between the node of the tank 101 and the node of the reactor 103. Note that the combined semantic model CM1 illustrated in
The combined semantic model CM1 illustrated in
Note that in the above integration, the combined semantic model CM1 may have information had by each of the combined semantic models. For example, the combined semantic model CM1 may have both information on “piping” in the P&ID and information on “flow” in the PFD.
When integrating nodes included in a plurality of semantic models, as above, integration may be by a method of integrating a node included in one semantic model into a node included in another semantic model or by another method. For example, among nodes included in a plurality of semantic models, nodes having similar meanings may be integrated by a method of integrating these into a new node having a meaning that includes these meanings. For example, the node of the piping 111 included in the P&ID semantic model M11 and the node of the flow 121 included in the PFD semantic model M12 may be integrated into a new node having a meaning of “tank input.”
Note that in
Furthermore, when the process of step S12 illustrated in
The combined semantic model CM1 may be generated in unit units of facilities provided in the plant, area units of a partial region of the plant, or plant units of an entirety of the plant. Generating the combined semantic model CM1 in such units enables imparting meaning to and aggregating information (design drawings and the like) needed by a plurality of engineers involved in engineering.
Next, the semantic model information extraction unit 34 performs a process of extracting a semantic model according to instructions from the combined semantic model (step S13: semantic model information extraction step). Specifically, the semantic model information extraction unit 34 performs a process of extracting an extracted semantic model EM according to instructions from the terminal device TM from the combined semantic model CM1 according to the extraction rules stored in an extraction rule database 35 of the combined semantic model management unit 30.
More specifically, an instruction specifying a simulation model to be created (design drawings and the like DD13) and an instruction specifying a range of the simulation model to be created (design drawings and the like DD13) (for example, an instruction to use certain units as the range) are sent from the terminal device TM. When the engineering support system 1 receives these instructions, extraction rules necessary to extract the simulation model extracted semantic model EM1 are read from the extraction rule database 35 into the semantic model information extraction unit 34. Note that the above simulation model extracted semantic model EM1 is a semantic model necessary to create the simulation model instructed from the terminal device TM (design drawings and the like DD13). Then, according to the read extraction rules, the semantic model information extraction unit 34 performs a process of extracting the simulation model extracted semantic model EM1 necessary to create the instructed simulation model (design drawings and the like DD13) in the instructed range from the combined semantic model CM1.
Note that in the example illustrated in
Furthermore, in the extracted simulation model extracted semantic model EM1, a node illustrating a boundary condition (Boundary Condition) 130 is added on an upstream side of the flow 131. This is because when performing a simulation using the simulation model, conditions of the raw material supplied as the flow 131 need to be defined. The node illustrating the boundary condition 130 is tied to “Pressure value (Pressure Value)” and “Composition (Composition)” as information indicating properties (hasProperty).
Note that in
When the process of step S13 illustrated in
Next, the transformation unit 10 performs a process of transforming the extracted semantic model into design drawings and the like (step S14: second transformation step). Specifically, the converter 11 provided in the transformation unit 10 performs a process of using parts stored in the parts library database 13 to transform the simulation model extracted semantic model EM1 into a simulation model (design drawings and the like DD13) according to the transformation rules stored in the transformation rule database 12 of the transformation unit 10.
More specifically, the simulation model extracted semantic model EM1 is read into the converter 11 and the transformation rules for transforming the simulation model extracted semantic model EM1 into the simulation model (design drawings and the like DD13) are read into the converter 11 from the transformation rule database 12. Then, the converter 11 performs a process of reading, as necessary, the parts stored in the parts library database 13 to convert the simulation model extracted semantic model EM1 into a simulation model (design drawings and the like DD13) according to the read transformation rules.
Referring to
When the process of step S14 illustrated in
<Applied Operation Examples of Engineering Support System>
In
When the user operates the terminal device TM and, for example, instructs a comparison between the combined semantic model CM21 and the combined semantic model CM22, this instruction is sent from the terminal device TM to the engineering support system 1. When the engineering support system 1 receives the instruction from the terminal device TM, based on the instruction from the terminal device TM, the semantic model comparison unit 45 provided in the application unit 40 performs a process of comparing the combined semantic model CM21 and the combined semantic model CM22 an extracting a difference. Information indicating the difference extracted by the semantic model comparison unit 45 is sent to the terminal device TM and displayed.
In this manner, in the present operation example, when comparing “Graphic” (design drawings and the like DD21) and “Graphic” (design drawings and the like DD22) created at different times, the following comparison is performed. That is, “Graphic” (design drawings and the like DD21) and “Graphic” (design drawings and the like DD22) are not directly compared, and the combined semantic model CM21 and the combined semantic model CM22 are compared. As such, even if, for example, target ranges of “Graphic” (design drawings and the like DD21) and “Graphic” (design drawings and the like DD22) are different, an appropriate comparison result can be obtained. Moreover, even if “Graphic” (design drawings and the like DD21) and “Graphic” (design drawings and the like DD22) are created by different engineering tools, an appropriate comparison result can be obtained.
<<Second Applied Operation Example>>
In
When the user operates the terminal device TM to specify a P&ID to be created (design drawings and the like DD32) and specifies a range of the P&ID to be created (design drawings and the like DD32) to instruct creation of the design drawings and the like, this instruction is sent from the terminal device TM to the engineering support system 1. Then, in the combined semantic model management unit 30 of the engineering support system 1, the semantic model information extraction unit 34 (see
When the P&ID extracted semantic model EM3 is extracted, the transformation rules for the P&ID and semantic model created by the engineering tool of company B are read into the converter 11 from the transformation rule database 12 of the transformation unit 10. Then, according to the read transformation rules, the converter 11 performs a process of transforming the extracted P&ID extracted semantic model EM3 into a P&ID that can be used by the engineering tool of company B (design drawings and the like DD32).
In this manner, in the present operation example, when transforming the P&ID created by the engineering tool of company A (design drawings and the like DD31) into a P&ID that can be used by the engineering tool of company B (design drawings and the like DD32), the design drawings and the like DD31 are not directly transformed into the design drawings and the like DD32, and transformation is performed by the following process. That is, a semantic model (P&ID extracted semantic model EM3) necessary to generate the design drawings and the like DD32 is extracted from the combined semantic model CM3 (combined semantic model generated from the semantic models of the design drawings and the like DD31 and the like). Then, the extracted P&ID extracted semantic model EM3 is transformed into a P&ID (design drawings and the like DD32) that can be used by the engineering tool of company B. As such, even if a target range of the P&ID (design drawings and the like DD32) is narrower or wider than a target range of the P&ID (design drawings and the like DD31), an appropriate P&ID (design drawings and the like DD32) can be generated.
<<Third Applied Operation Example>>
In
When the user operates the terminal device TM and, for example, instructs transformation of the P&ID (design drawings and the like DD41), this instruction is sent from the terminal device TM to the engineering support system 1. When the engineering support system 1 receives the instruction from the terminal device TM, based on the instruction from the terminal device TM, the transformation unit 10 performs a process of transforming the P&ID (design drawings and the like DD41) into a P&ID semantic model M4. Moreover, the combined semantic model management unit 30 performs a process of combining the transformed P&ID semantic model M4 to the combined semantic model CM4.
Next, when the user operates the terminal device TM to specify a type and conditions of the design drawings and the like DD to be created and specifies a range of the design drawings and the like DD to be created to instruct creation of the design drawings and the like, this instruction is sent from the terminal device TM to the engineering support system 1. In the example illustrated in
When the engineering support system 1 receives the instruction from the terminal device TM, a process is performed of extracting an extracted semantic model. Specifically, in the combined semantic model management unit 30 of the engineering support system 1, the semantic model information extraction unit 34 (see
When the simulation model extracted semantic model EM4 is extracted, transformation rules for the simulation model (design drawings and the like DD42) and semantic model suited to the simulator of company C and the transformation rules for the simulation model (design drawings and the like DD43) and semantic model suited to the simulator of company D are read into the converter 11 (see
In this manner, in the present operation example, when the P&ID (design drawings and the like DD41) are updated, the changed P&ID (design drawings and the like DD41) is transformed into the P&ID semantic model M4 to update the combined semantic model CM4. Then, a semantic model (simulation model extracted semantic model EM4) necessary to create a plurality of simulation models (design drawings and the like DD42, DD43) from the updated combined semantic model CM4 is extracted. Then, the extracted simulation model extracted semantic model EM4 is transformed into the simulation model suited to the simulator of company C (design drawings and the like DD42) and the simulation model suited to the simulator of company D (design drawings and the like DD43).
As such, in the present operation example, a plurality of different outputs (the simulation model suited to the simulator of company C [design drawings and the like DD42] and the simulation model suited to the simulator of company D [design drawings and the like DD43]) can be generated from one input (the changed P&ID [design drawings and the like DD41]). Moreover, if necessary, the above plurality of different outputs can also be generated simultaneously.
Note that in the present operation example, the type and range of the design drawings and the like DD to be created are specified after the combined semantic model CM4 is generated. However, a timing of specifying the type and range of the design drawings and the like DD to be created is not limited to after the combined semantic model CM4 is generated. For example, the type and range of the design drawings and the like DD to be created may be specified when, for example, inputting the design drawings and the like DD41 into the engineering support system 1.
<<Fourth Applied Operation Example>>
Note that here, to facilitate understanding, considered is a control system including a sensor, a PID control logic, and an actuator. That is, considered is a control system wherein a measurement result of a sensor is input to the PID control logic, the PID control logic computes an operation amount according to the measurement result of the sensor, and the actuator is operated based on a computation amount computed by the PID control logic.
A semantic model M51 illustrated in
In the example illustrated in
Here, considered is a situation of the user operating the terminal device TM referring to another semantic model similar to the semantic model M51 in setting the D control parameter tied to the PID control logic 202 of the semantic model M51. It is supposed that the user operating the terminal device TM uses a function of the similar pattern extraction unit 43 provided in the application unit 40 of the engineering support system 1 to instruct extracting a pattern similar to a pattern of the semantic model M51. It is supposed that as a result, a pattern included in a semantic model M52 illustrated in
The semantic model M52 includes a node illustrating a sensor 211, a node illustrating a PID control logic 212, and a node illustrating an actuator 213. Moreover, the node illustrating the PID control logic 212 is tied to a P control parameter, an I control parameter, and a D control parameter. The P control parameter is set with the value “10,” the I control parameter is set with the value “2,” and the D control parameter is set with the value “0.” Moreover, the P control parameter and the I control parameter are set with the flag “Fix” indicating that the set values are “confirmed,” and the D control parameter is set with a flag “Temp” indicating that the set value is “preliminary.”
The semantic model M53 includes a node illustrating a sensor 221, a node illustrating a PID control logic 222, and a node illustrating an actuator 223. Moreover, the node illustrating the PID control logic 222 is tied to a P control parameter, an I control parameter, and a D control parameter. The P control parameter is set with the value “10,” the I control parameter is set with the value “2,” and the D control parameter is set with the value “0.01.” Moreover, the P control parameter, the I control parameter, and the D control parameter are set with the flag “Fix” indicating that the set values are “confirmed.”0
Here, among the P control parameter, the I control parameter, and the D control parameter tied to the PID control logic 212 included in the extracted semantic model M52, the D control parameter is set with the flag “Temp” indicating that the set value is “preliminary.” In contrast, the P control parameter, the I control parameter, and the D control parameter tied to the PID control logic 222 included in the extracted semantic model M53 are all set with the flag “Fix” indicating that the set values are “confirmed.”
As such, on the terminal device TM, in a selection screen for selecting a suggestion for correction (suggestions for correction selection screen), for example, a suggestion for correction of the D control parameter tied to the PID control logic 202 of the semantic model M51, that of the semantic model M53 is displayed higher (with greater priority) than that of the semantic model M52. That is, the value “0.01” of the D control parameter tied to the PID control logic 222 of the semantic model M53 is displayed higher (with greater priority) than the value “0” of the D control parameter tied to the PID control logic 212 of the semantic model M52. The user of the terminal device TM can refer to such display to set parameter values and flags.
Note that when seeking a degree of similarity between semantic models or searching for a similar pattern, those set with the flag “Fix” indicating that the set value is “confirmed” may be used with priority. Moreover, depending on the element or parameter, a value that is optimal at operation commencement of the process control system may no longer be optimal due to operation over a long period. For such an element or parameter, the flag indicating “confirmed” may be set at operation commencement and the flag may afterward be automatically changed to “preliminary” when a pre-established time is elapsed. This information may be used in calculating a degree of similarity when, for example, refurbishing the plant or when prioritizing when searching for a similar pattern.
<Variation>
In the example illustrated in
Note that the combining order illustrated in
In the example illustrated in
The operation unit 51 is provided with input devices such as a keyboard and a pointing device and outputs to the computation unit 54 instructions according to an operation of a user using the engineering support system 1 (instructions for the engineering support system 1). The display unit 52 is provided with a display device such as a liquid-crystal display device and displays various information output from the computation unit 54. Note that the operation unit 51 and the display unit 52 may be physically separated or, as in a touch-panel liquid-crystal display device provided with both a display function and an operation function, physically integrated.
The input/output unit 53 inputs and outputs various information as controlled by the computation unit 54. For example, the input/output unit 53 may input and output various information by communicating with an external device or input and output various information by reading or writing various information from or onto a removable recording medium (for example, a nonvolatile memory). Note that communication with the external device may be any one among wired or wireless communication.
The computation unit 54 performs various computations based on instructions from the operation unit 51 and outputs computation results thereof to the display unit 52 or the input/output unit 53. This computation unit 54 is provided with the transformation unit 10, the combined semantic model management unit 30, and the application unit 40 that are the principal configurations of the engineering support system 1. The functions the computation unit 54 is provided with are realized by a program for realizing these functions being executed by hardware such as a CPU (central processing unit or processor). That is, the functions of the transformation unit 10, the combined semantic model management unit 30, and the application unit 40 are realized by cooperation between software and hardware resources.
The storage unit 55 is provided with an auxiliary storage device such as an HDD (hard disk drive) or an SSD (solid-state drive) and stores various information. For example, the storage unit 55 stores the semantic model database 20, which is an important configuration of the engineering support system 1. Semantic models transformed by the transformation unit 10 and combined semantic models generated by the combined semantic model management unit 30 are stored in the semantic model database 20.
The transformation server 61 is provided with the transformation unit 10 and provides a function of transforming design drawings and the like into semantic models and transforming semantic models into design drawings and the like. The semantic model database server 62 is provided with the semantic model database 20 and provides a function of storing semantic models and combined semantic models. The combined semantic model management server 63 is provided with the combined semantic model management unit 30 and provides a function of creating combined semantic models by combining semantic models and a function of extracting semantic models from combined semantic models. The application server 64 is provided with the application unit 40 and provides functions that are useful for the engineering support system 1 to manage the design drawings and the like DD. Note that details of these functions are already described and thus not described here.
Note that
As described above, in the present embodiments, design drawings and the like used in engineering a process control system are transformed into a semantic model expressed by first information indicating elements included in these design drawings and the like and second information indicating relationships between the elements, and a combined semantic model combining a plurality of semantic models is generated based on a degree of similarity between a plurality of semantic models. As such, design drawings and the like needed by a plurality of engineers involved in engineering can be imparted meaning and aggregated.
Furthermore, according to the present embodiments, a semantic model according to an instruction is extracted from a combined semantic model, and the extracted semantic model is transformed into design drawings and the like. This enables any design drawings and the like needed by an engineer involved in engineering to be obtained.
In this manner, in the present embodiments, design drawings and the like reflecting an actual state of a process control system are imparted meaning and integrated. This enables working efficiency to be significantly improved because it can be said that design drawings and the like used in engineering are sufficiently shared among engineers involved in engineering.
An engineering support system and an engineering support method of one or more embodiments are described above. However, one or more embodiments is not limited to the above embodiments and can be changed freely within the scope of one or more embodiments. For example, in the above operation examples of the engineering support system 1 (basic operation example and first to third applied operation examples), to facilitate understanding, specific design drawings and the like were illustrated in the description. However, design drawings and the like able to be handled in the operation examples of the engineering support system 1 are not limited to the illustrated design drawings and the like, and any design drawings and the like can be handled.
For example, in the second applied operation example, an example is described of transforming a P&ID created by an engineering tool of a company A (design drawings and the like DD31) into a P&ID useable by an engineering tool of a company B (design drawings and the like DD32), but transformation similar to that of the P&ID can be performed for any design drawings and the like other than a P&ID. Moreover, in the second applied operation example, the P&ID created by the engineering tool of company A can be output as a simulation model for a simulator made by company A, for which compatibility can be anticipated, or transformed into a simulation model for a simulator made by company B, for which compatibility cannot be anticipated.
Furthermore, the engineering support system 1 may be realized by cloud computing. Here, cloud computing may be computing matching the definitions described in the documents specified by the following URLs (Uniform Resource Locators) (definitions recommended by the National Institute of Standards and Technology):
Although the disclosure has been described with respect to only a limited number of embodiments, those skilled in the art, having benefit of this disclosure, will appreciate that various other embodiments may be devised without departing from the scope of the present invention. Accordingly, the scope of the invention should be limited only by the attached claims.
Number | Date | Country | Kind |
---|---|---|---|
2018-241195 | Dec 2018 | JP | national |