Various communication systems may benefit from appropriate configuration of when a device is required to be active. For example, enhanced machine type communication radio resource management requirements regarding device activity can be aligned with machine type communication physical downlink control channel monitoring.
In Rel-13 enhanced machine type communication (eMTC), the MTC physical downlink control channel (MPDCCH) search space is designed such that a user equipment (UE) may be configured to monitor MPDCCH in a discontinuous manner even when discontinuous reception (DRX) is not configured. This may enable power saving for eMTC UEs whose traffic is delay tolerant, and for whom battery life is more important than latency. With the MPDCCH design, UE is allowed to switch off its radio frequency (RF) chain in subframes where the UE is not required to monitor MPDCCH.
However, in Rel-13 the radio resource management (RRM)/radio link monitoring (RLM) requirements for eMTC are defined without considering that the UE may be configured to monitor MPDCCH in a discontinuous manner As a result, even if the UE is allowed to switch off the UE's own RF chain from MPDCCH monitoring point of view, it cannot do so because otherwise it will not be able to meet the RRM/RLM requirements.
In 3 GPP TS36.213, the MPDCCH search space is specified as follows. For MPDCCH UE-specific search space, Type 0 common search space, and Type 2 common search space locations of starting subframe k are given by k=kb where kb is the bth consecutive BL/CE DL subframe from subframe k0 , and b=u·rj, and
and j ∈{1,2,3,4}, where subframe k0 is a subframe satisfying the condition (10nf+L└ns/2┘)modT=0, where T=rmax ·G For MPDCCH UE-specific search space, Type 0 common search space G is given by the higher layer parameter mPDCCH-startSF-UESS. For Type2-common search space, G is given by the higher layer parameter mPDCCH-startSF-CSS-RA-r13. Additionally, rmax is given by higher layer parameter mPDCCH-NumRepetition, and r1, r2, r3, r4 are given in Table 9. 1.5−3 of 3GPP TS36.213.
A BL/CE UE is not expected to be configured with values of rmax and G that result in non-integer values of T. The expected UE behavior when DRX is not configured is illustrated in
Thus,
When DRX is not configured, if G is configured as 1, UE will monitor MPDCCH continuously in all sub frames. When G is configured larger than 1, however, UE needs only to monitor MPDCCH in the window of rmax subframes, and the UE may turn off its transceiver for power saving.
When DRX is configured, UE will turn on its transceiver only during DRX active time. It may turn off transceiver for power saving during the reset of time in a configured DRX cycle. Thus, when DRX is configure, UE is expected to monitor MPDCCH only during DRX Active time (defined without considering MPDCCH monitoring configurations) AND when UE is required to monitoring MPDCCH (
Currently, the eMTC UE RRM/RLM requirements are defined in TS 36.133, covering the scenarios of without DRX and without DRX. These requirements, however, do not consider the impact of discontinuous monitoring of MPDCCH. As an example, the RRM requirements for coverage enhancement (CE) Mode A can be found, for example, at Table 8.13.2.1.1.1-1 and Table 8.13.2.1.1.2-1.
In the requirements, the UE is assumed to monitor MPDCCH continuously when DRX is not configured, and only during DRX OnDuration when DRX is configured. The MPDCCH monitoring window and period is not considered.
As a result, even if a UE is allowed to switch off the UE's own RF chain from MPDCCH monitoring point of view, the UE cannot do so because otherwise it will not be able to meet the RRM/RLM requirements.
According to certain embodiments, a method can include determining a discontinuous reception usage state of a user equipment. The method can also include selecting a monitoring performance requirement from a plurality of monitoring performance requirements based on the determined discontinuous reception usage stage. The method can further include power saving in accordance with the selected monitoring performance requirement.
In certain embodiments, an apparatus can include means for determining a discontinuous reception usage state of a user equipment. The apparatus can also include means for selecting a monitoring performance requirement from a plurality of monitoring performance requirements based on the determined discontinuous reception usage stage. The apparatus can further include means for power saving in accordance with the selected monitoring performance requirement.
An apparatus, according to certain embodiments, can include at least one processor and at least one memory including computer program code. The at least one memory and the computer program code can be configured to, with the at least one processor, cause the apparatus at least to determine a discontinuous reception usage state of a user equipment. The at least one memory and the computer program code can also be configured to, with the at least one processor, cause the apparatus at least to select a monitoring performance requirement from a plurality of monitoring performance requirements based on the determined discontinuous reception usage stage. The at least one memory and the computer program code can further be configured to, with the at least one processor, cause the apparatus at least to power save in accordance with the selected monitoring performance requirement.
A computer program product can, according to certain embodiments, encode instructions for performing a process. The process can include determining a discontinuous reception usage state of a user equipment. The process can also include selecting a monitoring performance requirement from a plurality of monitoring performance requirements based on the determined discontinuous reception usage stage. The process can further include power saving in accordance with the selected monitoring performance requirement.
A non-transitory computer-readable medium can, in certain embodiments, be encoded with instructions that, when executed in hardware, perform a process. The process can include determining a discontinuous reception usage state of a user equipment. The process can also include selecting a monitoring performance requirement from a plurality of monitoring performance requirements based on the determined discontinuous reception usage stage. The process can further include power saving in accordance with the selected monitoring performance requirement.
For proper understanding of the invention, reference should be made to the accompanying drawings, wherein:
A network may coordinate DRX and MPDCCH monitoring timing such that they are synchronized. The choice of DRX configuration and/or MPDCCH monitoring timing can be arranged such that the choice is not restricted on the network side. Likewise, the choice can be arranged to avoid restricting UE power saving due to RLM/RRM measurements.
In certain embodiments, a set of RRM/RLM requirements can enable UE power saving when the UE is configured to monitor MPDCCH in a discontinuous manner The RRM/RLM requirements according to certain embodiments can cover scenarios in which the UE is not configured with DRX and can also cover scenarios in which the UE is configured with DRX.
Certain embodiments address RRM/RLM measurement behavior and correspondingly a set of RRM/RLM requirements that take UE MPDCCH monitoring behavior into account. In the following, measurement gaps are discussed as some implementations may also use gap assistance for measurement although other implementation may not use gap assistance.
The following discussed embodiments include options for defining a set of RRM/RLM requirements for taking UE MPDCCH monitoring into account for the same UE RRM/RLM measurement behavior.
According to a first approach, a definition can represent the UE MPDCCH monitoring states for defining the RRM/RLM performance requirements for machine type communication user equipment or Cat-M1 UE as described in Release 13. The UE MPDCCH monitoring behavior can be defined by two states, namely, “no MPDCCH DRX is used” and “MPDCCH DRX is used.”
The UE can be considered to be in the state of “no MPDCCH DRX is used” if MPDCCH G is configured as 1 or G is configured larger than 1, and some further condition is met.
In a first alternative, the further condition can be that the current subframe is within the first rmax subframes in the MPDCCH monitoring time period T=rmax * G (G ≥1), where the UE is required to perform MPDCCH detection. In addition, the further condition can be that the current subframe is within any subframes after the first rmax subframes in which the UE is required to conduct uplink transmission or downlink reception after successful MPDCCH detection in the first rmax subframes in the monitoring time period as defined in TS 36.321 and TS 36.213.
In a second alternative, the condition can be whether the UE is required to conduct uplink transmission or downlink reception after successful MPDCCH detection in the first rmax subframes in the monitoring time period as defined in TS 36.321 and TS 36.213.
Otherwise, in either of the first or second alternatives, the UE can be considered to be in the state “MPDCCH DRX is used.” More particularly, with the first alternative, UE can be considered to be in the state of “no MPDCCH DRX is used” in the subframes of an MPDCCH monitoring window and in the state of “MPDCCH DRX is used” in the subframes outside the MPDCCH monitoring window if the UE is not required to conduct uplink transmission or downlink reception.
With the second alternative, the UE can be considered to be in the state of “MPDCCH DRX is used” in all subframes unless the UE is required to conduct uplink transmission or downlink reception. With the second alternative, the first approach can be largely the same as the second approach, discussed below.
The RRM/RLM requirements can be defined based on consideration of a UE's DRX states, for example whether the state is “DRX is used” or “DRX is not used.” These states are defined in TS 36.133. The RRM/RLM requirements can also be defined based on consideration of the UE's MPDCCH DRX states, for example whether the state is “MPDCCH DRX is used” and “MPDCCH DRX is not used.” The impact of a measurement gap can also be considered, if it is configured.
If a UE is in the states of “DRX is not used” and “MPDCCH DRX is not used,” then the UE can follow non-DRX RRM/RLM performance requirements defined in TS 36.133 for both measurement gap configured or not configured cases.
If a UE is in the states of “DRX is not used” and “MPDCCH DRX is used,” then the UE can follow the DRX RRM/RLM performance requirements defined in TS 36.133, with the DRX cycle in the existing requirements being replaced by MPDCCH monitoring time period for both measurement gap configured and not configured cases. For example, for the existing requirements defined based on the consideration both configured measurement gap and the DRX cycle, the requirements can be re-used by considering both configured measurement gap and the MPDCCH monitoring time period by simply replacing the DRX cycle with the MPDCCH monitoring time period without further changing the way that the measurement gap is considered in the existing requirements.
If a UE is in the states of “DRX is used” and “MPDCCH DRX is not used,” then the UE can follow the existing DRX RRM/RLM performance requirements defined in TS 36.133 for both measurement gap configured or not configured cases. Moreover, if a UE is in the states of “DRX is used” and “MPDCCH DRX is used,” then the UE can follow the existing DRX RRM/RLM performance requirements defined in TS 36.133, with the DRX cycle in the existing requirements being replaced by max{MPDCCH monitoring time period, DRX cycle} for both measurement gap configured or not configured cases. For example, for the existing requirements defined based on the consideration both configured measurement gap and the DRX cycle, the requirements can be re-used by considering DRX cycle, configured measurement gap and the MPDCCH monitoring time period with simply replacing the DRX cycle with the max{MPDCCH monitoring time period, DRX cycle} without changing the way that the measurement gap is considered in the existing requirements.
According to a second approach, a UE not in need of gaps can apply rules for shortest gap repetition period, for example, 40 ms. In this approach if G=1 or G*R≤MGRP (measurement gap repetition period, which may be, for example, 40 or 80 ms), existing RRM/RLM requirements can be reused. Otherwise, namely if G*R>MGRP, then following can take place. R can be a maximum reception level of machine type communication physical downlink control channel
If UE is not in DRX state, and if UE is in monitoring state, that is the UE does not detect that the UE is scheduled by MPDCCH, then the UE can perform RRM/RLM measurement according to measurement gap configuration if configured, and according to MPDCCH monitoring configuration. The RRM/RLM requirements can be defined assuming UE performing RRM/RLM measurement at least once per max{MGRP, MPDCCH monitoring period}.
If UE is not in DRX state, and if UE is not in monitoring state, that is the UE detects it is scheduled by MPDCCH, then the UE can perform RRM/RLM measurement according to measurement gap configuration. Existing RRM/RLM requirements can be reused.
If UE is in DRX state, the UE can perform RRM/RLM measurement according to a measurement gap configuration if configured, as well as according to MPDCCH monitoring and DRX configuration. The RRM/RLM requirements can be defined assuming UE performing RRM/RLM measurement at least once per max{MGRP, MPDCCH monitoring period, DRX cycle}. The UE can always be in monitoring state if the UE is in DRX state. One condition for UE being in DRX state can be that the UE is not scheduled. In such a case the UE can be in MPDCCH monitoring state as defined in the second approach. If the UE is not in MPDCCH monitoring state because the UE is scheduled, then the UE will consequently not be in DRX state.
In addition, when (G−1)*R>MGRP and no PDSCH or PUSCH scheduling is detected during the MPDCCH monitoring window, the need for measurement gap can be avoided by requiring the UE to perform RRM/RLM measurement in the sleep time of a MPDCCH monitoring period.
The proposed UE RRM/RLM measurement behavior can be implemented by, for example, specifying related measurement requirements in 36.133 and configuring the UE and other devices in a network to operate in accordance with modified version of 36.133.
For example,
There can be four possibilities given consideration of the above-listed discontinuous reception usage states: DRX is not used and MPDCCH is not used; DRX is not used and MPDCCH is used; DRX is used and MPDCCH is not used; and DRX is used and MPDCCH is used.
The method can also include, at 420, selecting a monitoring performance requirement from a plurality of monitoring performance requirements based on the determined discontinuous reception usage stage. The monitoring performance requirements can be requirements for monitoring for radio resource management (RRM), radio link monitoring (RLM), or both. The specific requirements for each set can be preconfigured to the user equipment by a manufacturer, network, or other operator.
When it is determined that that the user equipment is in the general discontinuous reception state and is in the machine type communication physical downlink control channel discontinuous reception state, the selecting can include selecting a requirement for the user equipment to follow standard monitoring performance requirements modified to replace the discontinuous reception cycle with the greater of a discontinuous reception cycle time period and a machine type communication physical downlink control channel monitoring time period. These standard monitoring performance requirements can correspond to the requirements defmed in 3GPP TS 36.133 (for example, v. 10.4.0). The DRX cycle in those standard requirements, however, can be replaced by max{MPDCCH monitoring time period, DRX cycle} for both measurement gap configured or not configured cases. For example, for the requirements defmed based on the consideration both configured measurement gap and the DRX cycle, the requirements can be re-used by considering DRX cycle, configured measurement gap and the MPDCCH monitoring time period with simply replacing the DRX cycle with the max{MPDCCH monitoring time period, DRX cycle} without changing the way that the measurement gap is considered in the requirements.
More generally, when it is determined that that the user equipment is in the general discontinuous reception state and is in the machine type communication physical downlink control channel discontinuous reception state, the selecting can include selecting a requirement for the user equipment to follow defined assuming the user equipment performs radio measurement at least once per the greatest of a minimum measurement interval, a machine type communication physical downlink control channel monitoring time period, and a discontinuous reception cycle. The machine type communication physical downlink control channel monitoring time period can be G*R. G can be a configured parameter for controlling a machine type communication physical downlink control channel, and R can be a maximum reception level of machine type communication physical downlink control channel.
When it is determined that that the user equipment is in the general discontinuous reception state and is not in the machine type communication physical downlink control channel discontinuous reception state, the selecting can include selecting a requirement for the user equipment to follow standard monitoring performance requirements. These can be the unmodified requirements defmed in 3GPP TS 36.133 (for example, v. 10.4.0).
More generally, when it is determined that that the user equipment is in the general discontinuous reception state and is not in the machine type communication physical downlink control channel discontinuous reception state, the selecting can include selecting a requirement for the user equipment to follow defined assuming the user equipment performs radio measurement at least once per the greater of a minimum measurement interval and a discontinuous reception cycle.
When it is determined that that the user equipment is not in the general discontinuous reception state and is in the machine type communication physical downlink control channel discontinuous reception state, the selecting can include selecting a requirement for the user equipment to follow standard monitoring performance requirements modified to replace the discontinuous reception cycle with a machine type communication physical downlink control channel monitoring time period. These standard monitoring performance requirements can correspond to the requirements defmed in 3GPP TS 36.133 (for example, v. 10.4.0). The DRX cycle in those standard requirements, however, can be replaced by MPDCCH monitoring time period for both measurement gap configured and not configured cases. For example, for the requirements defmed based on the consideration both configured measurement gap and the DRX cycle, the requirements can be re-used by considering DRX cycle, configured measurement gap and the MPDCCH monitoring time period with simply replacing the DRX cycle with the MPDCCH monitoring time period without changing the way that the measurement gap is considered in the requirements.
More generally, when it is determined that that the user equipment is not in the general discontinuous reception state and is in the machine type communication physical downlink control channel discontinuous reception state, the selecting can include selecting a requirement for the user equipment to follow defined assuming the user equipment performs radio measurement at least once per the greater of a minimum measurement interval and a machine type communication physical downlink control channel monitoring time period. As in the previous example, the machine type communication physical downlink control channel monitoring time period can be G*R. G can be a configured parameter for controlling a machine type communication physical downlink control channel R can be a maximum reception level of machine type communication physical downlink control channel
When it is determined that that the user equipment is not in the general discontinuous reception state and is not in the machine type communication physical downlink control channel discontinuous reception state, the selecting can include selecting a requirement for the user equipment to follow standard monitoring performance requirements. These can be the unmodified requirements defined in 3GPP TS 36.133 (for example, v. 10.4.0).
More generally, when it is determined that that the user equipment is not in the general discontinuous reception state and is not in the machine type communication physical downlink control channel discontinuous reception state, the selecting can include selecting a requirement for the user equipment to follow defined assuming the user equipment performs radio measurement at least once per a minimum measurement interval.
The method can further include, at 430, power saving in accordance with the selected monitoring performance requirement. The power saving can involve, for example, at an appropriate time switching off an RF chain, or otherwise operating in a lower power mode. The power saving can also involve, at another appropriate time switching the RF chain back on, or otherwise operating at a higher power mode. Generally, the power saving can include using a power saving technique or disabling the power saving technique.
The method can also include, at 440, determining whether a measurement gap is configured for the user equipment. The selecting at 420 can be further based on the determination of measurement gap configuration of the user equipment.
The discontinuous reception state can refer broadly to any discontinuous reception state, which can be considered a general discontinuous reception state or more specifically can refer to a machine type communication physical downlink control channel discontinuous reception state. Both a general and a machine type communication physical downlink control channel discontinuous reception state can be taken into account in the state determination. General discontinuous reception can include the states defined in TS 36.133 and discussed above.
The method can include, at 412, determining that the user equipment is not in the machine type communication physical downlink control channel discontinuous reception state when G is equal to 1, wherein G is a configured parameter for controlling a machine type communication physical downlink control channel
The method can additionally include, at 414, determining that the user equipment is not in the machine type communication physical downlink control channel discontinuous reception state when G is greater than 1, and a further predetermined condition is met.
The further predetermined condition can include whether a subframe is within a configured maximum machine type communication physical downlink control channel repetition level of the user equipment, or within that maximum plus any scheduled subframes. Alternatively, the further predetermined condition can include whether the user equipment is required to conduct an uplink transmission or downlink reception.
The method can also include, at 416, determining that the user equipment is in the machine type communication physical downlink control channel discontinuous reception state in a subframe outside a maximum machine type communication physical downlink control channel monitoring window; and determining that the user equipment is not in the machine type communication physical downlink control channel discontinuous reception state in a subframe within a maximum machine type communication physical downlink control channel monitoring window.
Similarly, the method can further include, at 418, determining that the user equipment is not in the machine type communication physical downlink control channel discontinuous reception state when the user equipment detects that the user equipment is scheduled by machine type communication physical downlink control channel; and determining that the user equipment is in the machine type communication physical downlink control channel discontinuous reception state when the user equipment detects that the user equipment is not scheduled by machine type communication physical downlink control channel
The selecting a monitoring performance requirement can be further contingent on whether G*R is greater than a configured measurement gap repetition period, wherein G is a configured parameter for controlling a machine type communication physical downlink control channel, and R is a maximum reception level of machine type communication physical downlink control channel
Transceivers 516 and 526 may each, independently, be a transmitter, a receiver, or both a transmitter and a receiver, or a unit or device that may be configured both for transmission and reception. The transmitter and/or receiver (as far as radio parts are concerned) may also be implemented as a remote radio head which is not located in the device itself, but in a mast, for example. It should also be appreciated that according to the “liquid” or flexible radio concept, the operations and functionalities may be performed in different entities, such as nodes, hosts or servers, in a flexible manner. In other words, division of labor may vary case by case. One possible use is to make a network element to deliver local content. One or more functionalities may also be implemented as a virtual application that is provided as software that can run on a server.
A user device or user equipment 520 may be a mobile station (MS) such as a mobile phone or smart phone or multimedia device, a computer, such as a tablet, provided with wireless communication capabilities, personal data or digital assistant (PDA) provided with wireless communication capabilities, portable media player, vehicle, digital camera, pocket video camera, navigation unit provided with wireless communication capabilities or any combinations thereof. The user device or user equipment 520 may be a sensor or smart meter, or other device that may usually be configured for a single location.
In an exemplifying embodiment, an apparatus, such as a node or user device, may include means for carrying out embodiments described above in relation to
Processors 514 and 524 may be embodied by any computational or data processing device, such as a central processing unit (CPU), digital signal processor (DSP), application specific integrated circuit (ASIC), programmable logic devices (PLDs), field programmable gate arrays (FPGAs), digitally enhanced circuits, or comparable device or a combination thereof. The processors may be implemented as a single controller, or a plurality of controllers or processors. Additionally, the processors may be implemented as a pool of processors in a local configuration, in a cloud configuration, or in a combination thereof.
For firmware or software, the implementation may include modules or units of at least one chip set (e.g., procedures, functions, and so on). Memories 515 and 525 may independently be any suitable storage device, such as a non-transitory computer-readable medium. A hard disk drive (HDD), random access memory (RAM), flash memory, or other suitable memory may be used. The memories may be combined on a single integrated circuit as the processor, or may be separate therefrom. Furthermore, the computer program instructions may be stored in the memory and which may be processed by the processors can be any suitable form of computer program code, for example, a compiled or interpreted computer program written in any suitable programming language. The memory or data storage entity is typically internal but may also be external or a combination thereof, such as in the case when additional memory capacity is obtained from a service provider. The memory may be fixed or removable.
The memory and the computer program instructions may be configured, with the processor for the particular device, to cause a hardware apparatus such as network element 510 and/or UE 520, to perform any of the processes described above (see, for example,
Furthermore, although
Certain embodiments may have various benefits and/or advantages. For example, in certain embodiments the UE measurement behavior can be aligned with MPDCCH monitoring behavior. Moreover, power saving can be enabled in the time period when UE is not required to monitor MPDCCH.
One having ordinary skill in the art will readily understand that the invention as discussed above may be practiced with steps in a different order, and/or with hardware elements in configurations which are different than those which are disclosed. Therefore, although the invention has been described based upon these preferred embodiments, it would be apparent to those of skill in the art that certain modifications, variations, and alternative constructions would be apparent, while remaining within the spirit and scope of the invention.
Filing Document | Filing Date | Country | Kind |
---|---|---|---|
PCT/US16/54653 | 9/30/2016 | WO | 00 |