This U.S. patent application claims priority under the Paris Convention and 35 U.S.C. 119 (a) through (d) from a Russian patent application RU2013151538 filed on 20 Nov. 2013 hereby entirely incorporated by reference.
The invention relates to marine survey geophysics, in particular, to the equipment for prognosis of hydrocarbon deposits under the seabed with the help of bottom stations.
Nowadays, there are known a variety of methods for research of influence of seismic waves or electromagnetic field impulses upon a seabed, a subsequent registration of changes of near-bottom strata parameters, and analysis of thus obtained data for a detection of existing anomalies and a determination of their nature. These methods are widely employed for survey of seabed hydrocarbons deposits. The surveys are executed with the help of various research equipment complexes (e.g., taught in RU2236028, 2004; SU1122998, 1984; SU1798666, 1996; SU1434385, 1988; U.S. Pat. No. 4,298,840, 1981; U.S. Pat. No. 4,617,518, 1986, RU2324956, 2007). Recently, a trend in marine geophysics has been developed for the use of bottom stations (also known as bottom systems), herein further referred to as ‘BS’, for gathering information on seabed strata, including both self-emerging BS, and BS without self-emerging capacity.
The type and configuration of BSs used are determined by survey specifics, as well as by the seabed relief, in particular, by the depths in the marine survey zone. At the same time, for obtaining a reliable prognosis, it's necessary to keep a range of conditions, in particular, deployment of the BSs at a certain distance from each other and obtaining accurate information on the locations of BSs on the seabed.
In this connection, the equipment, ensuring the placement of BS on the seabed and their return on the ship's board, becomes particularly important.
For providing a fixed placement of seismic BSs on the seabed, a company named Sea Bird (see D. E. LEVASHOV Modern ships and ship equipment for fishing researches, VNIRO, 2010 p. 197-200) used a specifically equipped underwater remotely operated vehicle (ROV). Such a method ensures high accuracy of the BSs placement; however, it is extremely unproductive and very expensive. Moreover, it requires a ship of significant dimensions and allows for working only with relatively compact seismic stations.
Typically, at the majority of ships used for placement of the BSs, various trawl and auxiliary winches, as well as cargo cranes are employed (D. E. LEVASHOV Modern ships and ship equipment for fishing researches, VNIRO, 2010 p. 197-271). However this equipment is bulky, requires a large space, and doesn't provide for a precise placement of the BSs.
For increasing the efficiency of BS operations, especial cargo-grasping devices were designed (e.g. RU 2034767, 1995; RU 2025427, 1994), comprising a case provided with rotational jaws and a mechanism for operating thereof. However, such devices have the following deficiencies: they are slow-working, in particular, in tossing conditions; and it's difficult to adjust the rotational jaws at clamp places of the cargo.
For deployment of electrical survey BSs, the instant inventors have developed a manipulator device (RU90006, 2009), comprising a frame, jaws hingedly coupled with the frame, a drive for closing the jaws, and a mechanism for suspension of the frame and coupling thereof to the manipulator's boom, also supplied with a damper, allowing for rotation of the frame relative to the boom in the vertical plane of the manipulator's movement and in the plane of rotation of the frame relative to the boom. The manipulator device ensured a deployment of BSs with a complicated design, but it wasn't sufficiently efficient for mass deployments.
There is known a patent application publication US 2011/0051550 A1, teaching an equipment complex, wherein a number of seismic stations, each including two connection links, are placed on the seabed with the help of connecting elements made of a cable, rope, or halyard, and having, at their ends, connecting parts of a spring hook (carabine) type. The distance between seismic receivers on the sea bottom is determined by the length of the connecting element. During deployment of the seismic BSs, they are placed on a frame assembly and are preliminary connected with freely coiled connecting elements. Such complex and deployment system ensure a sufficiently accurate placement (2% of the sea depth) of the BSs on the sea bottom for works at depths not exceeding 50 m. However, it is not satisfactory at greater sea depths, wherein a ratio of the distance between the BSs and the connecting element length decreases nonlinearly. Moreover, in this complex's configuration, at lifting BSs with two fastening points, difficulties arise due to a tension on the connecting elements.
The nearest to the claimed solution is U.S. Pat. No. 7,649,803, teaching an equipment complex mounted on a special ship, which complex ensures a deployment of a number of seismic BSs on the seabed, and their lifting onto the ship's board after the completion of sea works. The complex comprises a line located on a winch; wherein the line includes BS fastening knots of a split ring type, connected with one another by load-bearing units, while the length of the line ensures placement of the seismic BSs along the entire survey profile. The load-bearing units can be made of a non-stretched halyard, rope, or isolated cable, having negative floatation.
The aforementioned complex is highly technologically effective at deploying and lifting BSs, and ensures uniformity of their placement on the seabed. However, it's employable only on specialized ships and is destined only for works with a certain type of seismic stations.
The present invention proposes an equipment complex capable of operating on regular (non-specialized) ships, including ones of a small size, with different kinds of BSs, including self-emerging ones, as well as placement of different types of BSs within one survey profile on the seabed.
The invention contemplates an equipment complex for deploying (i.e. submerging from the ship's board and securing/installation on the seabed) and recovering (i.e. extracting and lifting onto the ship's board) of marine geophysical bottom stations of different types, including electric-survey BSs or seismic BSs; wherein the equipment complex comprises: at least two turntables for placement of sectioned load-bearing units; at least one power device of a “capstan” type; a number of technological devices for deploying the bottom stations, each including at least one roll; at least one work platform for placement of the bottom stations with a navigation system indicator equipped with a photo-camera; a magnetic mark reader; and a limit switch.
Preferred embodiments of the inventive equipment complex are illustrated in drawings attached hereto, wherein:
While the invention may be susceptible to embodiment in different forms, there are shown in the drawings, and will be described in detail herein, specific embodiments of the present invention, with the understanding that the present disclosure is to be considered an exemplification of the principles of the invention, and is not intended to limit the invention to that as illustrated and described herein.
In the drawings, the following reference numerals are used for denoting respective equipment elements of preferred embodiments of the present invention:
1—a capstan (also called a deploying-recovering device of a ‘capstan’ type, which generally means a broad revolving cylinder with a vertical axis used for winding a rope or cable, powered by a motor; herein, the capstan is used as a main power means for recovering BSs); 2 and 3—turntables; 4 and 5—rolls (passive revolving cylinder); 6—a work platform (it's capable of supporting a BS placed thereon); 7—a magnetic mark reader; 8—a photo-register (wherein the reader 7 and the photo-register 8 are used for the identification of the BS, and recording its parameters into a database); 9—a limit switch (it is mounted on the work platform 7, and it's switched into an ‘on’ position when a BS is placed on the work platform, and switched into an ‘off’ position when a BS is removed from the work platform); 10—a GPS (DGPS) receiver/indicator for determination and registration of coordinates of BSs; 11—a frame; 12—a geared motor-reducer; 13—a base; 14—a conical drum; 15—a removable lid-restrictor; 16—a load-bearing unit; 17—a damping load; 18—a buoy; 19—a damping halyard; 20—a bottom station; 21—a sealed (electrical) connector (used only for electrical survey BSs); 22—a power (mechanical) link of the bottom station; 23—a fastening element of the BS; 24—an attachment unit; 25—a split ring; 26—a loop, or halyard, or rope; 27—a protective tube; and 28—a clamp.
Depending on the size of the ship's stern, the capstan 1 is located at a distance of 3-5 meters from the roll 4 in a substantially diametrical plane. The turntables 2 and 3 are located symmetrically relative to the capstan 1 at a distance of 2-3 meters from the capstan 1.
According to a preferred embodiment of the present invention,
The load-bearing unit 16—(a) may be designed as an electric-conductive receiving line made of a cable with electrodes, if the inventive equipment is used for operating electric-survey BSs; or —(b) may be made of a halyard with negative floatation or of a rope, if the inventive equipment is used for operating seismic BSs. The length of the load-bearing unit 16 may vary in a range from several hundred meters up to 1-2 km, depending on the used ship and the distance between the BSs.
It should be noted that, for the option (a), the process of deploying and recovering electric-survey BSs requires providing not only a mechanical connection, but also an electrical contact of the BS with the load-bearing unit (the receiving line), which is made by using the electrical seal connector 21.
The process of deploying electric-survey BSs by the inventive equipment complex is shown in
The first load-bearing unit 16 (i.e. a ‘receiving line’, in case of electric-survey BSs) is placed on the turntable 3 (as shown in
In this embodiment, the inventive equipment complex operates as follows (
In the course of movement of the ship along the survey profile, slipping the first damping halyard 19 occurs, and, when the last 3-4 turns remain on the turntable 2, the lid-restrictor 15 is taken away from the turntable, the remaining turns are taken away from the conical drum 14, and the fastening element 23 of first BS 20 is connected to the bitter end of damping halyard 19.
During a further movement of the ship, the first BS 20 is automatically pulled out from the work platform 6 that ensures reversing the limit switch 9 into the ‘OFF’ position, and a registration of coordinates of the drop point of the first BS 20 by the GPS receiver 10. The slipping of the first receiving line 16 from the turntable 3 begins, while the next (second) receiving line 16 is placed on the turntable 2.
The next (second) BS 20 is placed on the work platform 6; the second BS 20 is then connected to the bitter end of the first receiving line 16 and to the slack end of the second receiving line 16 (unwinding from the turntable 2), while this slack end is threaded upon (and guided by) the roll 4. The second BS 20 is automatically pulled out from the work platform 6 that ensures reversing the limit switch 9 into the ‘OFF’ position, and a registration of coordinates of the drop point of the second BS 20 by the GPS receiver 10. The slipping of the second receiving line 16 from the turntable 2 begins, and the next (third) receiving line 16 is placed on the turntable 3. Further, the process is repeated until all the BSs 20 on the survey profile will be installed and deployed. At the end of the profile, the second (ending) buoy 18 with the second (ending) damping load 17 and the second (ending) halyard 19 are installed as shown on
The process of recovering the BSs (shown in
The proposed equipment complex allows for deployment of other types of geophysical bottom stations. For instance, for deployment of seismic bottom stations without a self-emerging system, the load-bearing unit 16 can be made as a rope or halyard with negative floatation, with the attachment units 24 (for fastening the BSs) arranged on the rope/halyard.
Various design options of the attachment units 24 are depicted on
The process of deployment of seismic BSs on the seabed begins from the installation of the damping load 17 with the buoy 18 and the damping halyard 19, similar to the one described above for electric survey BSs and illustrated on
During the slipping out of the damping halyard 19, its bitter end is connected to the beginning part (front end) of the load-bearing unit 16. At coming of the first attachment unit 24 to the roll 5, the first BS 20, earlier placed on the work platform 6, is connected to the first attachment unit 24 by means of the fastening element 23.
During a further movement, the first BS 20 is automatically pulled out from the work platform 6, that ensures triggering the limit switch 9 and a registration of the drop point coordinates of the first BS 20 by the GPS receiver 10. The next (second) BS 20 is then placed on the work platform 6 and the process repeats till the end of load-bearing unit 16.
During the process of deploying BSs 20, the next load-bearing unit 16 (factually, its front end) is connected to the previous load-bearing unit 16 (factually, to its rear end) at its unwinding; thereafter, the next load-bearing unit 16 is placed on the turntable 2. Such operation ensures a continuity of deployment of the BSs 20 on the profile, and the next load-bearing unit 16 is then placed on the turntable 3. The above-described process is illustrated by
The inventive technology of deployment of BSs 20 on the seabed utilizes the unwinding of the load-bearing unit 16 that occurs due to the movement of the ship and the action of own weight of BS 20, which ensures deployment of the BSs along the survey profile with an interval approximately equal to the distance between the attachment units 24 on the sea depths not exceeding 50 meters. On greater depths, it's necessary to measure the distance between the attachment units in accordance with changes of the sea depth on the survey profile using the clamp 28.
The claimed equipment complex also allows for deployment of combined seismic-electrical profiles, contemplating the installation of seismic BSs on the survey profile with a step, for example, of 50-100 meters, and the installation of electric-surveying BSs with a step of 500-1000 meters.
For such deployment, the length of the load-bearing units 16 is chosen to provide a step of installation of the electrical-surveying BSs with the receiving lines having such lengths, which do not interfere with a predetermined step of installation of the seismic BSs. At deploying, the receiving line 16, depending on its length, may be located on the ship's deck or on an additional turntable.
During deployment of self-emerging seismic BSs, one of the main difficulties is to provide an accurate (i.e. as exact as possible) installation of the BSs on the survey profile. A free dropping off of the BSs at prescribed points of the profile leads to a great deviation of positioning the BSs on the seabed due to hydrology and hydrodynamic characteristics of the BSs themselves, which diminishes accuracy.
The proposed equipment complex allows for executing a high-accuracy deployment of self-emerging BSs on the seabed for great sea depths in accordance with the above-described technology. In inventive embodiments employed for installation of self-emerging BSs, the load-bearing unit 16, via the attachment units 24, is connected to anchors. The anchors are made of concrete or another heavy material that are placed on the seabed. After receiving a command for self-emerging, the load-bearing unit 16 stays connected to the anchors, and they both are left on the seabed. Since the load-bearing unit 16 remains together with the anchors on the seabed after surveying the profile is finished, the strength requirements to the unit 16 can be significantly lowered, and it may be even made of a fast-corroding or dissoluble material.
The recovering of seismic BSs 20 on board is illustrated on
The process of recovering the BSs begins from pulling the damping load 17 and halyard 19 using one of the turntables 2 or 3 via the capstan 1 as described above. Then the first load-bearing unit 16 via, for example, the roll 4, is put on the capstan 1, ensuring a force necessary for lifting the BS. During a movement of the ship, the capstan 1, winding the first load-bearing unit 16 on the turntable 2, pulls the first load-bearing unit 16 up; the first BS 20 of the first load-bearing unit 16 is then recovered. After the first BS 20 of the first load-bearing unit 16 passes the roll 4, the fastening element 23 thereof is disconnected from the corresponding attachment unit 24 of the first load-bearing unit 16.
Pulling the first load-bearing unit 16 continues until all the BSs 20 are disconnected from the first load-bearing unit 16, and, when the link between the first unit 16 and the second unit 16 passes the capstan 1, the first unit 16 is disconnected from the second unit 16. The released slack end (unloaded after the capstan 1) of the first load-bearing unit 16 is wound onto the turntable 2.
After pulling up the first load-bearing unit 16 on the turntable 2, this unit 16 is disconnected from the pulled up chain of units 16, and the pulled up chain begins winding onto the turntable 3. The turntable 2 is thus released from the first unit 16 for a subsequent receiving of the next (third) load-bearing unit 16.
During a movement of the ship, the capstan 1, winding the second load-bearing unit 16 on the turntable 3, pulls the second load-bearing unit 16 up; the first BS 20 of the second load-bearing unit 16 is then recovered. After the first BS 20 of the second load-bearing unit 16 passes the roll 4, the fastening element 23 thereof is disconnected from the corresponding attachment unit 24 of the second load-bearing unit 16. Pulling the second load-bearing unit 16 continues until all the BSs 20 are disconnected from the second load-bearing unit 16. The released slack end (unloaded after the capstan 1) of the second unit 16 is wound onto the turntable 3.
Such switching the turntables 2 and 3 allows for participation of both the turntables in the recovering process, which provides for a more efficient recovery of the BSs. The above process is repeated for all load bearing units 16 and BSs 20, until the last BS 20 is recovered.
Number | Date | Country | Kind |
---|---|---|---|
2013151538 | Nov 2013 | RU | national |
Number | Name | Date | Kind |
---|---|---|---|
2924328 | Lidderdale | Feb 1960 | A |
3216636 | Kothe | Nov 1965 | A |
3911690 | Gracia | Oct 1975 | A |
4313392 | Guenther et al. | Feb 1982 | A |
5197716 | Zibilich et al. | Mar 1993 | A |
5199659 | Zibilich, Jr. | Apr 1993 | A |
5655753 | Berges et al. | Aug 1997 | A |
7883292 | Thompson et al. | Feb 2011 | B2 |
8021080 | Frivik et al. | Sep 2011 | B2 |
8087848 | Thompson et al. | Jan 2012 | B2 |