The present invention relates to an equipment planning support system for a triple-deck elevator and, more particularly, to an equipment planning support system capable of proposing a suitable elevator equipment draft by the calculation of a practical transportation capacity.
In normally selecting elevator equipment (the number of elevators, velocity, and capacity), a calculation method referred to as “traffic calculation” is adopted. This is a method of calculating the number of passengers capable of being transported in a unit time (normally 5 minutes) with this elevator when specified building specification and cage specification (e.g., velocity and capacity) are given. The procedure of comparing this calculation result and the building resident population, and of determining the required number of elevators, is generally adopted. (For example, refer to the Japanese Patent Publication (unexamined) No. 75308/2004 (Patent Document 1))
Furthermore, in non-Patent Document 1, a calculation expression, in which this traffic calculation is extended to a double-deck elevator, is reported.
First, prior to description of the invention, the schematic procedure of traffic calculation to be applied in the case of a normal elevator system (SD) described in Patent Document 1 is described.
Normally, the traffic calculation is performed on the assumption that all passengers get on from the reference floor (1F), and do not get on from the other floor, for example, in the case of an office building when cage and building specifications such as cage velocity and acceleration, capacity (number of passengers), door-opening/closing time period, the number of building stories, the number of service floors, and story height, are given. This calculation is made for the purpose of obtaining the number of elevators capable of transporting a large number of passengers that are generated at the time of office-going hour (UP Peak) of the building.
First of all, a predicted number of being stopped S of the cage after it has started from the reference floor toward upper floors until it is moved back, and an average number of being moved back of the cage are calculated. Herein, a building of (N+1) stories in which the reference floor is the lowermost floor is supposed.
Where: S indicates the predicted number of being stopped, N indicates the number of service floors except for the reference floor, P indicates the number of passengers in the cage at the time of starting from the reference floor, and H indicates the average highlighted floor.
Next, on the basis of the above-mentioned Expressions (1) and (2), the total value of getting-on/off time periods of passengers, the total value of door-opening/closing time periods, and the total value of running time periods will be obtained as follows.
Total value of getting-on time periods=P×ton, total value of getting-off time periods=P×toff, total value of door-opening/closing time periods=(S+1)(to+tc)
total value of running time periods=(S+1)(tf(1)−tv(1))+2H×tv(1) (3)
Where: ton is a getting-on time period per person, toff is a getting-off time period per person, to is a door-opening time period, tc is a door-closing time period, tf(1) is a running time period per floor, and tv(1) is a passing time period per floor.
When calculating each value as described above, one going-round time period RTT will be calculated with the following expression as the total sum of these values.
RTT=P(ton+toff)+(S+1)(to+tc+tf(1)−tv(1))+H/2×tv(1) (4)
Furthermore, with this value, the transportation capacity per unit time HC of one elevator (the number of passengers capable of being transported per unit time) will be obtained with the following expression.
HC=300P/RTT (5)
From the expressions of traffic calculation as described above, on the supposition of, for example, HC=50 persons/5 minutes, that is, 300/50=6, thus the required number of elevators will be calculated to be 6.
In addition, now expressions of the traffic calculation of DD described in the above-mentioned non-Patent Document 1 is described. Herein, the operation in which the lower cage of DD is stopped only at the odd-numbered floor, and the upper cage thereof is stopped only at the even-numbered floor is assumed; and a building of 2(N+1) stories is supposed.
total value of getting-on time periods=P×ton,
total value of getting-off time periods=P(2−S/N)toff,
total value of door-opening/closing time periods=(Sd+1) (to+tc)
total value of running time periods=(Sd+1)(tf(2)−tv(2))+2H×tv(2),
tf(2): running time period per two floors, and
tv(2): passing time period per two floors.
When calculating each value as described above, one going-round time period RTTDD of DD will be calculated with the following expression as the total sum of these values.
RTT
DD
=Pt
on
+P(2−S/N)toff+(S(2−S/N)+1)(to+tc+tf(2)−tv(2))+H×tv(2) (7)
Furthermore, with this value, the transportation capacity per unit time HCDD of one DD (the number of passengers capable of being transported in unit time) will be obtained with the following expression.
[Expression 8]
HC
DD=300×2P/RTT (8)
patent Document 1: the Japanese Patent Publication (unexamined) No. 75308/2004
Non-Patent Document 1: G. T. Kavounas: Elevatoring Analysis with Double-deck Elevators, Elevator World, November, pp. 65-72 (1989)
However, the calculation method of the above-mentioned Patent Document 2 shows expressions of calculation to be strictly applied to a double-deck elevator (hereinafter referred to as DD), and cannot be applied to a triple-deck elevator (hereinafter, referred to as TD).
In the case of putting this TD in a practical building service, although the traffic calculation and the equipment planning method based thereon as in the case of a normal single deck elevator (hereinafter, referred to as SD) or DD are required, they have not been proposed.
The present invention was made in view of the above-mentioned requirement, and has an object of providing an equipment planning support system for a triple-deck elevator as a tool with which the traffic calculation and the equipment planning based thereon can be carried out in the same manner as in the case of SD or DD.
A triple-deck elevator equipment planning support system according to the invention comprises transportation capacity calculation means that includes: average stop number calculation means for calculating the average number of times of being stopped per going-round on the basis of a given building specification and cage specification data; getting-on/off time calculation means for calculating a total value of getting-on/off time periods of passengers based on the calculation result of mentioned average stop number calculation means; door-opening/closing time calculation means for likewise calculating a total value of door-opening/closing time periods; running time calculation means for calculating the total value of running time periods; going-round time calculation means for calculating a going-round time period of the elevator from the calculation result of each of these means; and practical transportation capacity calculation means for calculating a practical transportation capacity per triple-deck elevator based on the calculation result of mentioned going-round time calculation means.
As described above, according to the invention, on the basis of a given building specification and cage specification data, the average number of times of being stopped per going-round is calculated; the total value of getting-on/off time periods of passengers is calculated; the total value of door-opening/closing time periods and the total value of running time periods are likewise calculated; a going-round time period of an elevator is calculated from these calculation results; and a practical transportation capacity per on triple-deck elevator is calculated. As a result, an advantage exists in that it is possible to make the calculation of a transportation capacity regarding the triple-deck elevator system, and to carry out the equipment planning based thereon that cannot be conventionally achieved.
Hereinafter, a preferred embodiment according to the present invention is described.
First, expressions of the traffic calculation of TD according to the invention are hereinafter described referring to
a) is a diagram showing TD formed of three cages of P1, P2, and P3.
For example, alphabet a in
Herein, since a building of 3(N+1) stories is supposed, the service floor for each cage of P1, P2, and P3 itself to be capable of being stopped except for the reference floor is N numbers of floors respectively.
Thus, the probability of, for example, P1 of being stopped at a certain floor will be S/N with Expression 1. This probability is the same as in the cases of P2 and P3. Therefore, in the same manner as in the case of a, the probability of being stopped in order for any passenger of P1, P2, and P3 to get out is (S/N)3.
Accordingly, the predicted number of times Sa of being stopped in the case of a is Sa=N(S/N)3.
Likewise, the predicted number of times Sb of being stopped in the case of b is Sb=N{(S/N)2−(S/N) 3}.
Further, the predicted number of times Se of being stopped in the case of e is Se=N{(S/N)−2(S/N)2+(S/N)3}.
The predicted number of times St of being stopped including all the cases is St=sa+3Sb+3Se, so that will be obtained with the following expression.
Further, the average number of passengers getting out every time any of P1, P2, and P3 are stopped is P/S, so that
Furthermore, the total value of getting-on time periods and others will be expressed as follows:
total value of getting-on time periods=P×ton total value of door-opening/closing time periods=(St+1)(to+tc) (11)
total value of running time periods=(St+1)(tf(3)−tv(3))+2H×tv(3)
Where: tf(3) is a running time period per 3 floors, and tv(3) is a passing time period per 3 floors.
When each value is calculated as described above, one going-round time period of TD RTTTD will be calculated with the following expression as the total sum of these values.
[Expression 12]
RTT
TD
=P×t
on
+t
off-all+(S(3−3S/N+(S/N)2)+1)(to+tc+tf(3)−tv(3))+H×tv(3) (12)
Furthermore, with this value, the transportation capacity per unit time of one TD (the number of persons capable of being transported per unit time) HCTD will be obtained with the following expression.
HC
TD=300×3P/RTT (13)
Heretofore, the expressions of traffic calculation of TD to which the invention is applied are described.
Now, the arrangement and operation according to the first embodiment of the invention is described.
With reference to
In addition, the triple-deck elevator equipment planning support system 1 is formed of: a standard database 1A in which data regarding the standard triple-deck elevator specification is stored; a cage data setting means 1B for setting a specific cage specification from the standard database 1A; transportation capacity calculation means 1C for calculating the practical transportation capacity per elevator on the basis of the building and cage specification data 1E having been set; and optimum draft plan deriving means 1D that compares the required transportation capacity having been inputted from the human I/F 2 and the transportation capacity per elevator having been calculated by transportation capacity calculation means 1C, and that derives the optimum number of elevators. These respective means are configured of software on the above-mentioned MPU or on the computer.
Furthermore, the above-mentioned transportation capacity calculation means 1C further consists of: average stop number calculation means 1C1 for calculating the average number of times of being stopped per going-round on the basis of set data of the building specification and cage specification data; getting-on/off time calculation means 1C2 for calculating the total value of getting-on/off time periods of passengers; door-opening/closing time calculation means 1C3 for calculating the total value of door-opening/closing time periods; running time calculation means 1C4 for calculating the total value of running time periods; going-round time calculation means 1C5 for calculating a going-round time period of an elevator from the calculation results of each of these means; and practical transportation capacity calculation means 1C6 for calculating the practical transportation capacity per triple-deck elevator based on the calculation result of mentioned going-round time calculation means 1C5.
Now, the operation according to the first embodiment of the invention is described referring to
First, in Step S101, building specification data are inputted through the human I/F 2 of
Subsequently, in Step S102, cage data setting means 1B sets cage data in accordance with the building specification having been inputted. For this setting, a method of preliminarily storing data regarding the standard cage specification in the standard database 1A is employed.
On the supposition of establishing as a rule such that the uppermost floor of a building to be serviced is, for example, not less than the 11th floor and not more than the 15th floor, the velocity will be 150 m/min; and that it is not less than the 16th floor and not more than the 20th floor, the velocity will be 180 m/min, it is possible to set easily the velocity specification of cages.
Furthermore, when the velocity is determined, it is possible to determine the standard acceleration, rate of acceleration, capacity, door width, and the like on the basis of the foregoing velocity. Moreover, in the case of incapable of being determined as having no alternative or in the case where a user intends to originally set the cage specification, the method of determining the specification data in the interactive mode through the human I/F 2 may be adopted.
When the cage and building specifications are determined in the procedure until Step S102, in Step S103, average stop number calculation means 1C1 makes the calculation of the predicted number of times of being stopped, being the average number of times of being stopped in one going-round in accordance with the mentioned Expression (9).
Subsequently, in Step S104, getting-on/off time calculation means 1C2 makes the calculation of a total value of getting-off time periods of passengers in accordance with the mentioned Expression (10). In Step S105, getting-on/off time calculation means 1C2, door-opening/closing time calculation means 1C3, and running time calculation means 1C4 make the calculations of each of the total values of a getting-on/off time period, a door-opening/closing time period, and a running time period in accordance with Expressions (11) respectively. Next, in Steps S106 and S107, going-round time calculation means 1C5 and transportation capacity calculation means 1C6 make the calculations of a going-round time period of the elevator, and a transportation capacity per elevator in accordance with the mentioned Expressions (12) and (13) respectively.
When the transportation capacity is calculated as described above, in Step S107, optimum draft plan deriving means 1D compares the traffic demand that will be generated in the building and the mentioned transportation capacity per elevator having been calculated to calculate the required number of elevators (Step S108), and outputs it as the optimum draft in Step S110.
Herein, the computation of the required number in Step S108 will be calculated with the following expression:
Required number=5 minute traffic demand/5 minute transportation capacity per elevator.
Further, the 5-minute traffic demand in the above expression will be calculated, for example, with the following table from the type of building and the resident population having been inputted in Step S101.
Whereas, it is preferable to directly set this 5-minute traffic demand in the interactive mode through the human I/F 2.
As described above, according to the invention, on the basis of a given building specification and cage specification data, the average number of times of being stopped per going-round is calculated; the total value of getting-on/off time periods of passengers is calculated based on the mentioned average number of times of being stopped having been calculated, the total value of door-opening/closing time periods and the total value of running time periods are likewise calculated; a going-round time period of an elevator is calculated from these calculation results; and a practical transportation capacity per on triple-deck elevator is calculated based on these calculation results. As a result, it comes to be possible to make the calculation of a transportation capacity regarding the triple-deck elevator system, and to carry out the equipment planning based thereon that cannot be conventionally achieved.
Filing Document | Filing Date | Country | Kind | 371c Date |
---|---|---|---|---|
PCT/JP05/03623 | 3/3/2005 | WO | 00 | 8/7/2007 |