Historically, conventional, or “hard engineering” structures have been used to defend against erosion from adjacent water courses or water bodies. While effective, these techniques have proven to have considerable undesirable physical impacts of increasing erosion to adjacent land forms or other “down-stream” natural resources. This is primarily due to the hardness of these structures which reflect and/or transmit the energy contained in waves, currents, and scour from moving water onto the nearby landforms which have not been “hardened” through the installation of structural elements. The reflection of waves, currents, and scour results in increased erosion of adjacent resources such as beaches, tidal areas, subsurface features immersed in water, river courses, lakebeds, and important upland land features which often protect other structures such as homes, roadways, and utilities.
To address damage to adjacent resources, many regulatory agencies, environmental advocacy organizations, and environmental contractors have embraced bioengineering and the “Living Shoreline” approach, which is now a nationally-known campaign by the National Oceanic and Atmospheric Administration (NOAA) in the United States of America. In some US states, state wetland regulations prohibit the use of conventional hard engineering structures to protect structures on properties. In these instances, “soft”, bioengineering measures such as those promoted by the NOAA Living Shoreline program are the only alternatives available for coastal property owners. Unfortunately, bioengineering measures promoted by the Living Shorelines program are not robust or structurally sound enough to defend against erosion in portions of the shoreline which are exposed to higher intensity storms such as oceanfront areas, coastal bays, larger estuaries, larger rivers, and lakes.
Conventional, environmentally friendly bioengineering approaches for stabilizing the base of landforms along exposed shorelines can provide structural integrity at the toe of landforms near the shoreline in order to stabilize these landforms. While these approaches are all somewhat effective at stabilizing exposed landforms, they are generally believed to have much lower success when used along ocean fronting land forms, within larger estuaries, larger rivers, and along the shorelines of larger lakes. It is important to note that an effective and reliable strategy for soft bioengineering methodology presently does not exist for most of the oceanfront, larger estuaries, larger rivers, and along the shorelines of larger lakes. Therefore, the owners of real estate must rely on conventional hard engineering structures, which typically exacerbate shoreline erosion in nearby locations or must rely on substandard soft engineering alternatives which are not robust enough for the given site conditions and level of exposure.
The present invention addresses the problems of conventional bioengineering installations by providing an erosion control apparatus and methods of installing same. Fiber rolls and fabric encapsulated soil (FES) lifts are combined in anchored configurations together with synthetic mesh netting, to create bioengineered installations with greater durability, greater resistance to storm, sea and water erosion, and corresponding longer useful life, lengthening repair cycles and facilitating the repair process.
In some embodiments, an erosion control apparatus comprises a plurality of fiber rolls, wherein the rolls are arranged relative to a contour of a shoreline; a plurality of anchors coupled to the fiber rolls, the anchors inserted at a depth through the apparatus; a plurality of soil lifts comprising fiber, the soil lifts are connected to the fiber rolls. A mesh can comprise a layer contacting the soil lifts, wherein the anchors pass through the mesh and the soil lifts and optionally enter the soil underneath the apparatus. This operates to distribute the anchoring force across the system. The fiber rolls are situated directly over a plurality of anchors at different levels of the system so that coupling of the system elements causes compression and loading of the anchor system. Thus, the weight of the entire system serves to aid in the retention of the anchor placements.
The plurality of fiber rolls can comprise a coir fiber and can be either high density or low density. In an embodiment, the plurality of anchors are duckbill anchors. The anchors can be spaced at intervals across each fiber roll to distribute loading across the structure. Each anchor can include a cable or rod connected to an anchor point surface sized to support an overlying cone of material. In an embodiment, the intervals range from twenty-four inches to thirty inches, for example. In an embodiment, the anchors can be inserted at a depth of at least forty-two inches below a slope or grade of the apparatus and can provide at least three thousand pounds of holding force at each insertion point. The anchors preferably extend at an angle that is orthogonal to the plane of the rolls. However, certain embodiments can be configured such that the anchors extend at an angle that is within 45 degrees of the orthogonal direction, or preferably within 30 degrees of the orthogonal direction from the plane of the rolls.
The soil lifts can comprise at least one layer of coir fabric and may be configured to retain sediment. In some embodiments, the sediment is compacted and can have a depth of at least twelve inches. In some embodiment, the mesh contacting the soil lifts comprises polypropylene, polyethylene, or similar synthetic material. In other embodiments, the mesh comprises coir fiber.
In some embodiments, the apparatus further comprises at least a first trench at a highest end of the apparatus. In further embodiments, the apparatus further comprises a second trench located at a lowest end of the apparatus. Each trench can be backfilled with sand or soil. In some embodiments, the first trench and the second trench are at least six inches wide and at least six inches deep. In some embodiments, each trench is covered with sand or soil.
In some embodiments, the apparatus further comprises plant material on or with at least one fiber roll. The mesh may cover at least one of the fiber rolls. Additional lifts may be added over time to the apparatus by constructing more soil lifts on the top or side of the rolls. In some embodiments, the apparatus further comprises at least one erosion control blanket, which can optionally comprise a biodegradable material.
In some embodiments, a plurality of posts are placed along at least a front roll of the apparatus relative to the shoreline. The lifts may be secured with the posts or stakes.
In some embodiments, a method of installing erosion control apparatus comprises placing a mesh within an excavated site; placing a layer of coir fabric over the mesh; arranging a plurality of fiber rolls relative to a shoreline; connecting a plurality of soil lifts to the fiber rolls, the soil lifts comprising fiber; folding the mesh and the fabric over the soil lifts and the rolls; and inserting a plurality of anchors adjacent or coupled to the fiber rolls, the anchors being inserted at a depth, wherein each of the anchors passes through the mesh, the fabric, and at least one soil lift.
In further embodiments, the anchor system can include rocks, concrete, or other formed components that can be installed prior to placement of the soil lifts and/or fiber rolls. Cables or other coupling rods or elements can be attached to these anchor components by a formed loop in the cable, threaded eyelets or other fixtures suitable to connect the anchors to the rolls. Each anchor point can be attached to one or more fiber rolls. The connecting cables can be attached to the anchor points prior to placement of the soil lifts and fiber rolls. The cables can extend around or extend through slots in the soil lifts.
In preferred embodiments, duckbill anchors are used to hold some or all of the fiber rolls of the array in place. Once duckbill anchors are in place, they generally cannot be moved other than pulling them out entirely. This normally entails a complete reconstruction of the array which can be very costly. Further preferred embodiments, helical anchors can be used for some or all of the anchors in the array. Unlike duckbill anchors, helical anchors can be repositioned after placement, thereby making removal and repositioning possible. It is often necessary to make repairs to installed fiber roll arrays which can entail the need to re-tension the cables. Further embodiments in which helical anchors have been used in the initial installation can employ a method of repairing the array in which one or more of the helical anchors can be driven deeper into the slope from the initial placement position at a first depth to a second position at a greater depth. This greater depth is more likely to remain stable during severe storm events that could potentially cause the removal of duckbill anchors at a shallower depth during such events.
Generally, the space between the fiber rolls and the anchor points and related anchor surface area has a fill material. This fill material can include soil, rocks, and/or the soil lifts. The fill material is confined by the overlying fiber rolls which combine to load the anchor system. The system components are coupled to the anchoring system to substantially increase the stability of the system during storms and tidal or flooding events.
Further improvements can be provided for the repair and maintenance of fiber roll arrays with the use of anchors, which after installation, can be driven further into the slope on which the array is positioned. The use of helical anchors, for example, enable the repair of a damaged array by disconnecting the cable from a top end of the helical anchor, coupling the anchor to a rotational drive mechanism, and turning the drive mechanism to turn the previously installed anchor to further penetrate into the soil underlying the array. By driving one or more helical anchors to a deeper location in the slope, this enables the repair of the existing installation without the need for removing all of the anchors.
Reference will now be made in detail to various embodiments of the disclosed devices and methods, examples of which are illustrated in the accompanying drawings. Wherever possible, the same reference numbers will be used throughout the drawings to refer to the same or like parts.
In this application, the use of the singular includes the plural unless specifically stated otherwise. In this application, the use of “or” means “and/or” unless stated otherwise. Furthermore, the use of the term “including”, as well as other forms, such as “includes” and “included”, is not limiting. Any range described herein will be understood to include the endpoints and all values between the endpoints.
Prior to this disclosure, there has not been a reliable and robust bioengineering method of stabilizing an exposed landform in locations of higher erosion risk, such as oceanfront, estuarine, riverfront, lakefront, and other features of land bordering a body of water.
The present disclosure incorporates the benefits of mass and weight of sediment-filled lifts and the benefits of fiber rolls to prevent sediment from liquefying and flowing through the fabric in storm or flooding events. The present disclosure also relies on anchoring the fiber rolls with the use of earth anchors. The earth anchors can include different structures such as helical-style anchors and duckbill-style anchors, provided they can be positioned below grade and provide superior holding power. In some embodiments, the earth anchors are produced by A. B. Chance Company located in Centralia, Mo. In some embodiments, the anchors are rock anchors such as those produced by MilSpec® Anchors located in Alexander City, Ala. In an embodiment, earth anchors provide a minimum of 3,000 pounds of holding force at each anchor point. In an embodiment, each element of the disclosed apparatus provides a minimum of 3,000 pounds of holding force. Anchor points are installed at intervals of approximately twenty-four to thirty inches along an edge of each fiber roll. In some embodiments, anchor points are installed at intervals of approximately twenty-four to ninety-six inches along an edge of each fiber roll. In an embodiment, the anchor points are installed every thirty inches from along the top and bottom edge of each fiber roll.
Prior to this disclosure, property owners were faced with choosing between substandard, soft bioengineering techniques which require frequent repairs or fail during storm conditions. Such conditions increase the forces of moving water on the bioengineering components or conventional engineering approaches which tend to reflect storm energy and exacerbate erosion damage to adjacent or down-stream natural resources. Neither conventional engineering approaches or prior bioengineering techniques were well-matched for sea level rise. Conventional engineering measures for erosion control do not support plants and often cannot be expanded in a modular technique without major foundational reconstruction. While fiber rolls and similar bioengineering methods provide good support for the root systems of plants, the inability to hold the fiber rolls in place during a storm event undermines the ability for plants to become established as the plants are damaged every time the array becomes dislodged. Successful bioengineering relies extensively on the integrity of the plant root systems for long-term performance.
The present disclosure not only provides substantially more structural integrity than any other bioengineering method for shoreline protection, but due to its superior structural integrity and ability to support plant growth, the important role plants play in all bioengineering designs is enhanced and secured on a substantially longer timeframe. The disclosed apparatus are also readily expandable, making it possible to increase the number of lifts over time by simply constructing more lifts on the top or sides of the array without making any other structural changes to the array or damaging the supporting bioengineering materials and plants. In some instances, more than one apparatus can be installed at the same site vertically, horizontally, or a combination thereof. Conversely, conventional engineering methods such as sea walls often require substantial increases in their foundation or embedment below grade before their height can be increased. The expandability of the present disclosure makes it a preferred alternative in marine environments undergoing sea level rise.
The disclosed apparatus, in some embodiments, is installed in a site above ground water in the surrounding soil. In other embodiments, the lowest section of the disclosed apparatus is inserted no more than one foot into ground water.
The coir fiber rolls 110 are arranged along a shoreline, riverbank, lakefront, or other waterfront. The soil behind the coir fiber rolls 110, relative to the shoreline, riverbank, lakefront, or other waterfront, may be graded. In some embodiments, the soil is graded at a slope angle in a range of 0 to 45 degrees (1:1 slope). In an embodiment, the soil is graded at a slope angle in a range of 20 to 50 degrees. In a further embodiment, the soil is graded at a slope angle no greater than 33 degrees (2:1 slope). The slope angle may be 33, 34, 35, 36, 37, 38, 39, 40, 41, 42, 43, 44, 45, 46, 47, 48, 49, or 50 degrees, or any angle in between. In some embodiments, the soil of the apparatus 100 can include varying slope angles throughout the apparatus 100. The coir fiber rolls are described in greater detail below with respect to
The coir fiber rolls 110 are anchored with the use of anchors 120. The anchors 120 may be referred to as “earth anchors” and may be helical-style anchors, duckbill-style anchors, or any other type of anchor that can be driven below grade. The anchors 120 are inserted at a specified depth into the soil lifts 130 or the soil underneath the apparatus 100. In some embodiments, the anchors 120 are inserted adjacent to the plurality of the coir fiber rolls 110. In an embodiment, each anchor 120 provides a minimum of three thousand pounds of holding force. The distribution of anchors is described with more detail with respect to
In an embodiment, the anchors 120 are installed across a face of the coir fiber rolls 110. In some embodiments, the anchors 120 are inserted adjacent to the coir fiber rolls 110 to secure the coir fiber rolls 110. In some embodiments, the anchors 120 are inserted adjacent to multiple coir fiber rolls 110. The anchoring system of the apparatus 100 further comprises ¼″ galvanized aircraft cable 116 and zinc-coated copper crimps. The crimps are used to form a loop in the cable 116. Cables 116 are attached to each earth anchor 120 by forming a loop with a crimp. One cable 116 may be joined to another cable 116 by securing two loops together. These cables 116 form a network of cables 116 which harness the coir fiber rolls 110 and all tie back to the individual anchors 120 to create a high degree of integrity. The anchors 120 are placed to a depth of at least 42″ below finished slope grade into naturally or artificially compacted soil using a hardened steel driving rod. Deeper anchor placements can be used with greater slope angles or more exposed formations.
The apparatus 100 further comprises a plurality of fiber encased soil lifts 130. The soil lifts 130 can comprise two layers of seven hundred-gram (or heavier) woven coir fabric encased by high tenacity polypropylene or polyethylene synthetic mesh 140 that is resistant to ripping. The soil lifts 130 are configured to retain sediment and allow the sediment to naturally compact within the soil lift 130. All sediment in each soil lift 130 preferably has a consistent depth of approximately 12″, but the depth of each soil lift 130 can vary across the apparatus 100. The sediment in each soil lift 130 can be compacted using a portable plate compactor at 6″ soil depth intervals.
In some embodiments, each soil lift 130 in an apparatus 100 is of uniform length. In some embodiments, the length of each soil lift 130 is four feet. In some embodiments, the length of each soil lift 130 is eight feet. In some embodiments, the top soil lift 130 has a length of eight feet and each other soil lift 130 has a length of four feet. In some embodiments, each soil lift 130 has a length of about three to three and a half feet.
The soil lifts 130 are connected to the coir fiber rolls 110. Additional soil lifts 130 can be added to the apparatus 100 over time by constructing the additional soil lifts 130 onto the top of the coir fiber rolls 110, for example. The completed series of coir fiber rolls and soil lifts may be referred to as a protection array, configured to protect a shoreline. In some embodiments, the coir fiber rolls 110 are incorporated into, or encapsulated within, the soil lifts 130.
In some embodiments, the soil lifts 130 can optionally be coupled to one another by fasteners or coupling elements 108 such as stakes, hog rings, or clips. As an example, hog rings may be inserted through two adjacent soil lifts 130 and subsequently bent with pliers, or other manipulation means, to bend the hog rings into a circular shape to couple the adjacent soil lifts 130. In some embodiments, the fasteners or coupling elements 108 are stainless steel. In some embodiments, rope is weaved through the surface of adjacent soil lifts 130 to couple the soil lifts 130. The fasteners or coupling elements 108 serve to mechanically couple the soil lifts 130 together.
The synthetic mesh 140 is incorporated as an outward layer of fabric used for developing fabric encased soil lifts. In some embodiments, the mesh 140 comprises raschel polypropylene knotless netting, 3 mm high tenacity (rip resistant), 1½″ mesh opening, with enhanced UV stabilization. In other embodiments, the mesh 140 comprises polyethylene. In other embodiments, the mesh 140 comprises 100% biodegradable coir fabric. In some embodiments, the mesh opening can range from ½″ to 7″. In an embodiment, the mesh 140 covers the coir fiber rolls 110 that are not filled with plant material 170. In a preferred embodiment, the netting is not photo-degradable. The earth anchors 120 pass through the mesh 140 and soil lifts 130 into the soil beneath. In some embodiments, the synthetic mesh 140 can be substituted with a layer of coir fabric.
After installation of the mesh 140, the coir fiber rolls 110 covered by the mesh 140 are at least partially covered by sand 150. In an embodiment, the first six coir fiber rolls 110 relative to the shoreline, riverbank, lakefront, or other waterfront are at least partially covered by the mesh 140 and sand 150. The number of coir fiber rolls 110 covered by the mesh 140 and sand 150 may be adjusted based on the conditions of the site of the apparatus 100. The inclusion of sand 150 is described in more detail below with respect to
A plurality of posts 160 may be placed at intervals along at least the front coir fiber roll 110 of the apparatus 100 relative to the shoreline, riverbank, lakefront, or other waterfront. The posts 160 provide additional support for the apparatus 100. In an embodiment, the posts 160 may be 4″ by 4″ or 6″ by 6″, and spaced at 5 foot intervals along the first coir fiber roll 110. In some embodiments, the apparatus 100 does not include posts 160.
In some embodiments, coir fiber rolls 110 not covered by the mesh 140 are filled with plant material 170. In other embodiments, at least one of the coir fiber rolls 110 covered by the mesh 140 or incorporated into the soil lifts 130 are filled with the plant material 170. The plant material 170 may be any vegetation with suitable roots for securing the apparatus 100 from eroding. In an embodiment, the plant material 170 is American beachgrass. In other embodiments, the plant material 170 may be any native plantings appropriate to the site conditions, which will grow quickly and stabilize the landform.
In some embodiments, the apparatus 100 includes marsh pillows 190. The pillows 190 may be installed between the apparatus 100 and the shoreline. The pillows 190 are described in greater detail below with respect to
In an embodiment, the apparatus 100 further comprises at least one erosion control blanket 180. In an embodiment, the blanket 180 is biodegradable and may degrade over approximately a three year period. In a further embodiment, the blanket 180 comprises coir fiber netting. The blanket 180 may be secured with the posts 160. In some embodiments, the blanket 180 may be secured with the earth anchors 120. If multiple blankets are employed, an interior blanket is typically a straw/coir/jute, short term, composite erosion control blanket and an exterior blanket is typically 700 or 900-gram woven coir fabric. The blanket 180 is further configured to provide UV protection to the coir fiber rolls 110. The blanket 180 is further configured to prevent chafing between the coir fiber rolls 110 and the cables 116 during storm events.
In an embodiment, a composite erosion control blanket 185 is installed within forty-eight hours of grading the soil above (up gradient) the coir fiber rolls 110 relative to the shoreline, riverbank, lakefront, or other waterfront. In an embodiment, the composite erosion control blanket 185 is secured with a first trench located at a first end of the apparatus 100, the first end being positioned substantially parallel to the shoreline and at a highest end of the apparatus 100 furthest from the shoreline. In a further embodiment, the mesh 140 is secured with a second trench at a second end of the apparatus 100, the second end being positioned substantially parallel to the shoreline and at a lowest end of the apparatus 100 closest to the shoreline. In an embodiment, the trenches are 6″×6″ (that is at least six inches wide and six inches deep) lock-in trenches at the top and bottom of the slope with a minimum of 6″ overlaps in the transition from one horizontal width of erosion control blanket to the next. 30″ hardwood stakes 135 can be used at a spacing of 36″ on center with ¼″ biodegradable twine used to secure the composite 185 to the ground surface. The trenches may be backfilled, seeded, and lightly mulched with sterilized, weed-free chopped straw or comparable equivalent mulch product.
The soil behind the coir fiber rolls 110, relative to the shoreline, riverbank, lakefront, or other waterfront, may be graded. In some embodiments, the soil is graded at the same slope angle as the coir fiber rolls 110. In some embodiments, the soil is graded at a different slope angle than the coir fiber rolls 110. The coir fiber rolls 110 and/or the soil may be graded at a slope angle in a range of 0 to 45 degrees (1:1 slope). In an embodiment, coir fiber rolls 110 and/or the soil is graded at a slope angle in a range of 20 to 50 degrees. In a further embodiment, coir fiber rolls 110 and/or the soil is graded at a slope angle no greater than 26.6 degrees (2:1 slope). In a further embodiment, coir fiber rolls 110 and/or the soil is graded at a slope angle no greater than 18 degrees (3:1 slope). The slope angle may be 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32, 33, 34, 35, 36, 37, 38, 39, 40, 41, 42, 43, 44, 45, 46, 47, 48, 49, or 50 degrees, or any angle in between. In some embodiments, the soil of the apparatus 100 can include varying slope angles throughout the apparatus 100.
Each anchor 120 may be inserted at varying angles throughout the apparatus 100.
The anchors 120 may all be inserted at the same angle throughout the apparatus 100 or the insertion angle of the anchors 120 may vary throughout the apparatus 100. In some embodiments, each anchor 120 is inserted at the same angle relative to the orthogonal plane. In some embodiments, each anchor 120 is inserted at varying angles relative to the orthogonal plane. In such embodiments, some of the anchors 120 may be inserted at similar angles relative to the orthogonal plane.
In some embodiments, the anchor 120 inserted closest to the shoreline may be inserted vertically. A vertical anchor 120 is advantageous when the apparatus 100 is installed above a seawall, bulkhead, or other traditional structure used to reduce erosion from adjacent water courses or water bodies to connect the apparatus 100 to the seawall, bulkhead, or other traditional structure.
An anchor 120 may secure one or more coir fiber rolls 110. In some embodiments, an anchor 120 may pass through one or more soil lifts 130. In some embodiments, an anchor 120 may pass through the mesh 140 and sand 150. In some embodiments, each individual anchor 120 may secure the same or different elements of the apparatus 100 as other anchors 120.
Each anchor 120 is inserted at an angle relative to a plane relative to a base layer of earth. The insertion angle of the anchor 120 may be normal (orthogonal) to a plane as depicted in
The anchors 120 utilized in the apparatus 100 may be helical-style anchors, duckbill-style anchors, or any other type of anchor that can be driven below grade. In a preferred embodiment, the apparatus utilizes duckbill-style anchors. In some embodiments, the anchors 120 may be installed approximately every twenty-four to thirty inches along the top and bottom edge of each coir fiber roll 110.
The density of the anchors 120 per square foot is dependent on the height of the apparatus 100. In an embodiment with 2.5′ and 3.3′ spacing between the center axes of adjacent coir fiber rolls 110, the apparatus includes three to four cables 116 per coir fiber roll 110. Therefore the range of anchor density for an apparatus 100 from one coir fiber roll 110 high to one hundred coir fiber rolls 110 high is generally in a range of eighteen to forty-eight anchors 120 per one hundred square feet.
In an embodiment including four cables 116 per 10′ coir fiber roll 110, the anchor density can be twenty-four to forty-eight anchors 120 per one hundred square feet. In embodiment including one coir fiber roll 110, the anchor density can be thirty-six to forty-eight anchors 120 per one hundred square feet. In an embodiment including five coir fiber rolls 110, the anchor density can be twenty-two to twenty-nine anchors 120 per one hundred square feet. In an embodiment including ten coir fiber rolls 110, the anchor density can be twenty to twenty-six anchors 120 per one hundred square feet. In an embodiment including one hundred coir fiber rolls 110, the anchor density can be eighteen to twenty-four anchors 120 per one hundred square feet.
In one embodiment, at least twenty to twenty-nine anchors 120 are inserted per one hundred square feet. In an embodiment, the anchors 120 are driven into the soil by a hydraulic hammer. Typically, the anchors 120 have a distal portion comprising an anchor point 127 that can comprise a duckbill or helical segment, or a plate, for example. This anchor point 127 has a surface area 129 that supports a cone shaped load 126 of overlying soil and structure. The anchor point 127 surface area 129 is preferably at least four square inches or larger. The anchors 120 are positioned so that the cone shaped load 126 at least overlaps the cone 128 of an adjoining anchor 120.
In a further embodiment, the anchors 120 are driven into the soil by an impact of eighteen ft/lb of impact energy at a rate of two thousand three hundred (2300) blows/minute, for example. This impact energy can vary depending on soil conditions and the anchor depth requirements at a given installation.
The marsh containers 190 may be secured to the soil by an anchor 120, a stake 135, or combinations thereof. In some embodiments, the marsh containers 190 are fastened to cables 116 with four anchors 120 per marsh container 190 In some embodiments, the marsh containers 190 are filled with plant material 170. In further embodiments, the plant material 170 may be maritime grasses native to the shoreline.
Coir fiber rolls are then arranged in the site relative to the shoreline and connected within the soil lifts (Step 1030). A coir fiber roll may be a 20″ diameter by 10′ long, measured at a nine pound per cubic foot density, comprised of a mattress of inner coir fibers encased in a UV stabilized synthetic polypropylene mesh. Alternatively, the coir fiber roll may be a mattress of inner coir fibers encased in a 100% biodegradable coir rope mesh. The soil lifts are filled with sediment and the sediment is compacted (Step 1040). All sediment in each soil lift has a consistent depth of approximately 12″. The sediment in each soil lift is compacted using a portable plate compactor at 6″ soil depth intervals. Thus, the fill material positioned between the fiber rolls and the anchors can include soil, rocks, or other biodegradable materials either within, or instead of, soil lifts. Optionally, all of the fill material can be contained within a single container that envelopes the volume between the fiber rolls and the anchor system.
Then the mesh and the coir fabric are folded over the coir fiber rolls and soil lifts (Step (1050). In an embodiment, the number of coir fiber rolls in the apparatus and the number of coir fiber rolls covered by the mesh are determined by specific design criteria varying with each installation site. In an embodiment, the mesh is installed as each lift is constructed. The completed series of coir fiber rolls and soil lifts may be referred to as a protection array.
The method continues when a plurality of anchors are inserted and coupled to the rolls to secure the rolls to the soil lifts. (Step 1060). Step 1060 is described in further detail below in regards to
After construction of the soil lifts is completed, at least one coir fiber roll is filled with plant material (Step 1070). The plant material may be any vegetation with suitable roots for securing the apparatus from eroding. In an embodiment, the plant life is American beachgrass. In other embodiments, the plant material may be any native plantings appropriate to the site conditions, which will grow quickly and stabilize the landform. Next at least one biodegradable erosion control blanket is installed and secured with posts inserted along at least a first fiber roll (Step 1080). The blanket may be installed along all disturbed and/or unstable ground located above the protection array. In an embodiment, the blanket is biodegradable. In a further embodiment, the blanket comprises coir fiber netting. If multiple blankets are employed, an interior blanket is typically a straw/coir/jute, short term, composite erosion control blanket and an exterior blanket is typically 700 or 900 gram woven coir fabric. The at least one blanket is secured when a plurality of posts are inserted through the blanket along at least a first roll of the apparatus relative to the shoreline, riverbank, lakefront, or other waterfront. The plurality of posts may be 4″ by 4″ or 6″ by 6″, and spaced at 5 foot intervals along the first coir fiber roll. The blanket may additionally be secured by a biodegradable twine used to secure the blanket firmly to the soil. The twine may extend from the highest elevation of destabilized or disturbed soil down the uppermost soil lift.
A first trench is excavated at a highest end of the apparatus and a second trench is excavated at a lowest end of the apparatus. (Step 1090). In some embodiments, only a first trench is excavated. In an embodiment, the trenches are 6″×6″ (that is at least six inches wide and six inches deep) lock-in trenches at the top and bottom of the slope with a minimum of 6″ overlaps. 30″ hardwood stakes may be used at a density of 36″ on center with 1/4″ biodegradable twine used to secure the mesh to the ground surface. The trenches are be backfilled, seeded, and lightly mulched with sterilized, weed-free chopped straw or comparable equivalent mulch product. (Step 1095).
The anchors are passed through the mesh, coir fabric, and soil lift (Step 1040). In a preferred embodiment, the anchors pass through the mesh and soil lifts, which operates to distribute the anchoring force across the entire embedded structure. The coir fiber rolls are anchored with the use of earth anchors and the earth anchors can be inserted through the rolls. Next, the anchors are inserted adjacent to a coir fiber roll and through a soil lift adjacent to another coir fiber roll or through an adjacent soil lift, mechanically coupling the coir fiber rolls and soil lifts (Step 1150). The anchors pass through the mesh and soil lifts to distribute the anchoring force across the system.
In an embodiment, the anchors are inserted at a fixed depth into soil underneath the apparatus; the depth being at least forty-two inches (Step 1060). In the above methods, the anchors may be earth anchors. The earth anchors may be helical-style anchors, duckbill-style anchors, or any other type of anchor that can be driven below grade.
In one embodiment, after a soil lift is compacted, a roll is placed along the “water” side of the lift and the blanket and mesh are folded back toward the landform. In one embodiment, the anchors are driven into the soil after each grouping of the lift, roll, blanket, and mesh are constructed. In another embodiment the anchors may be driven into the soil after each individual lift is constructed, after 2-3 lifts have been constructed or after all the lifts are constructed. In an embodiment utilizing duckbill anchors, anchors should be installed after a lift is constructed. In an embodiment utilizing helical anchors, the anchors may be installed prior to construction of the lifts and steel cables would need to be pulled up through the lifts.
In some embodiments, the anchor 1220b can be secured to the coir fiber roll 1220b with a clamp 1221. The clamp 1221 is attached to a surface of the coir fiber roll 1210b. In some embodiments, the clamp 1221 is attached to the surface of the coir fiber roll 1210b adjacent to the slope surface of the apparatus 100. A plurality of clamps 1221 are secured to the surfaces of the plurality of coir fiber rolls 1210b, each clamp 1221 securing a cable of an anchor 1220b to the plurality of coir fiber rolls 1210b. In some embodiments, each coir fiber roll 1210b is attached to one clamp 1221. In other embodiments, multiple clamps 1221 and anchors 1220b are attached to one or more coir fiber rolls 1210b.
The anchor 1320 may be inserted with the cable 1316 oriented at an angular range θ1 relative to the slope angle of the soil at the insertion point of the anchor 1320a or, if different, the slope angle θ2 of the coir fiber rolls 110. In some embodiments, an anchor 1320 may be inserted as described previously herein in a direction orthogonal to the soil grade or coir fiber rolls 110 if the soil surrounding the anchor point surface is unsaturated or will remain unsaturated during a weather event. In some embodiments, an anchor 1320 may be inserted at an angle up to 45 degrees relative to the orthogonal direction (normal) to the plane if the soil surrounding the anchor point surface is fully saturated or will be fully saturated during a weather event. In some embodiments, an anchor 1320 may be inserted up to 10 degrees relative to the orthogonal direction or plane. In some embodiments, an anchor 1320 may be inserted up to 20 degrees relative to the orthogonal direction. In some embodiments, an anchor 1320 may be inserted up to 30 degrees relative to the orthogonal direction. In some embodiments, an anchor 1320 may be inserted up to 40 degrees relative to the orthogonal direction.
The reinforcement elements 1420a can be inserted at a depth of at least 42 inches below the slope surface of the apparatus. In some embodiments, the reinforcement elements 1420a may be native to the soil and the apparatus can be constructed over the native reinforcement elements 1420a. In some embodiments, the reinforcement elements 1420a may be coupled to anchors prior to inserting the reinforcement elements 1420a into the soil. The anchors are extended from the reinforcement elements 1420a after insertion of other elements of the apparatus such as the mesh 140, blanket 180, soil lifts 130, and coir fiber rolls 110. In some embodiments, the anchors are inserted through mesh 140 and at least one soil lift 130 then coupled to the reinforcement elements 1420a.
According to some embodiments, installation of an erosion control apparatus begins with preparation of the soil at an excavation site. The soil is compacted and graded at a specified slope angle. In some embodiments, the soil is graded at a slope angle in a range of 0 to 45 degrees (1:1 slope). In an embodiment, the soil is graded at a slope angle in a range of 20 to 50 degrees. In a further embodiment, the soil is graded at a slope angle no greater than 33 degrees (2:1 slope). The slope angle may be 33, 34, 35, 36, 37, 38, 39, 40, 41, 42, 43, 44, 45, 46, 47, 48, 49, or 50 degrees, or any angle in between. In some embodiments, the soil of the apparatus can include varying slope angles throughout the apparatus.
Next a plurality of anchors are selected. The anchors may be helical anchors including a cable connected to an anchor point surface sized to support an overlying cone of material. The anchors provide at least 3,000 pounds of holding force at each insertion point. After the anchors are selected, the anchors are spaced approximately every twenty-four to thirty inches. In one embodiment, at least twenty to twenty-nine anchors are inserted per one hundred square feet.
Then, a layer of mesh is placed within an excavated site. The mesh may comprise raschel polypropylene knotless netting (or comparable equivalent), 3 mm high tenacity (rip resistant), 1½″ mesh opening, with UV stabilization, or may comprise polyethylene or coir fiber. The netting can be biodegradable or in a preferred embodiment is non-photodegradable. In some embodiments, the mesh opening can range from ½″ to 7″. Next, at least one layer of coir fabric is placed over the mesh. In some embodiments, two layers of seven hundred gram (or heavier) coir fabric is layered over the mesh. In some embodiments, one or two layers of 700-gram woven coir fabric encased by high tenacity (rip resistant) polypropylene synthetic mesh comprise a soil lift.
Coir fiber rolls are then arranged in the site relative to the shoreline and connected within the soil lifts. A coir fiber roll may be a 20″ diameter by 10′ long, measured at a nine pound per cubic foot density, comprised of a mattress of inner coir fibers encased in a UV stabilized synthetic polypropylene mesh. Alternatively, the coir fiber roll may be a mattress of inner coir fibers encased in a 100% biodegradable coir rope mesh.
Next the anchor cables are passed through the mesh, the layer of coir fabric, the plurality of coir fiber rolls, and the soil lifts. Passing the anchors through the mesh, coir fabric, fiber rolls, and soil lifts of the apparatus overlaps the frustum cone of each anchor with the mesh, coir fabric, fiber rolls, and soil lifts, sharing the loads of each anchor with the mesh, coir fabric, fiber rolls, and soil lifts of the apparatus. Such an overlap provides for stronger reinforcement of the area within the frustum cone of each anchor.
Then the mesh and the coir fabric are folded over the coir fiber rolls and soil lifts. In an embodiment, the number of coir fiber rolls in the apparatus and the number of coir fiber rolls covered by the mesh are determined by specific design criteria varying with each installation site. In an embodiment, the mesh is installed as each lift is constructed. The completed series of coir fiber rolls and soil lifts may be referred to as a protection array.
The cables are then tightened and fastened to the coir fiber rolls. In some embodiments, each cable is tightened and fastened with a crimp. In further embodiments, the crimps are zinc plated copper crimps. The crimps may be attached an end of the cable opposite the end of the anchor comprising the anchor surface area.
In some embodiments, after the cables are fastened at least one coir fiber roll is filled with plant material as described above. Next at least one biodegradable erosion control blanket is installed and secured with posts inserted along at least a first fiber roll as described above. A first trench is excavated at a highest end of the apparatus and a second trench is excavated at a lowest end of the apparatus as described above. The trenches are backfilled, seeded, and lightly mulched with sterilized, weed-free chopped straw or comparable equivalent mulch product.
In some embodiments, the apparatus may include both helical and duckbill anchors 1720. The helical and duckbill anchors 1720 may alternate or be arranged in any suitable combination. In some embodiments, the toe anchor 1720′ is a helical anchor and the apparatus includes alternating helical and duckbill anchors 1720 starting from the helical toe anchor 1720′.
Helical anchors can be used in locations where the soil lifts cannot be used due to limited space or in which the soil lifts may have a limited size or where a single lift is used behind a plurality of coir fabric containers. The soil lift cross-sectional shape and the coir fabric container cross-sectional shape (e.g. circular, oval, square, rectangular) can be selected to match the site requirements.
Helical anchors may be advantageous as toe anchors because, as explained below with regards to
The apparatus may include elements discussed above in regards to other depicted embodiments such as plant material 170. The apparatus may also include additional elements such as matrix 1750, including about 50% cobblestone, about 25% coir fiber and compost, and about 25% sediment encased in layers of coir fiber and jute-burlap. The apparatus may also include a marsh installation 1790 including cobblestones encased in layers of coir fiber and jute-burlap. Voids between the cobblestones may be filled with sediment. In some embodiments, the matrix 1750, the marsh installation 1790, or both, include cobblestones encased in two layers of coir fiber. In some embodiments, the matrix 1750, the marsh installation 1790, or both, include cobblestones encased in a single layer of jute-burlap. In some embodiments, the matrix 1750, the marsh installation 1790, or both, include cobblestones encased in two layers of coir fiber and a single layer of jute-burlap. In some embodiments, a single layer of jute-burlap weighs 20 ounces. In some embodiments, the cobblestones range between 8″ to 12″ in length.
In some embodiments, the anchoring system of the apparatus further comprises zinc-coated copper crimps 1817. The crimps are used to form a loop 1818 in each anchor 1720. Loops 1818 may be welded near the top of each helical anchor 1720. In some embodiments, the loops 1818 are welded between 12″ to 16″ from the lower surface of the fiber roll 110 connected to the helical anchor 1720. The loop structure of the helical anchor 1720 is easier to repair and tighten than the loop of a duckbill anchor 1720 due to the placement of the loop 1818.
The coir fiber roll 1910 is anchored with the use of anchors 1920. In some embodiments, the anchors 1920 are duckbill anchors or can be helical anchors as described herein. The anchors 1920 are inserted at a specified depth into the soil. In some embodiments, the specified depth may be in a range of thirty to fifty inches. In some embodiments, the specified depth may be in a range of thirty to ninety inches. In other embodiments, the anchors 1920 are embedded into the soil at, or just above, the soil surface.
The anchors 1920 are inserted around the coir fiber roll 1910 such that a cable 1916 connecting a set of at least two anchors 120 is situated across a face of the coir fiber roll 1910. In some embodiments, multiple cables 1916 extend from a top point of the coir fiber roll 1910. Each cable 1916 is coupled to the coir fiber roll 1910 with a crimp 1917. The crimp 1917 tightens and fastens the cable 1916. In some embodiments, the crimp 1917 is a zinc plated copper crimp. In some embodiments, ends of the cables 1916 connected to a crimp 1917 are looped.
Each coir fiber roll 1910 is connected to a soil lift 1930. Each soil lift 1930 comprises at least three layers of coir fabric containing sediment 1950. In some embodiments, the sediment 1950 is sand. The sediment 1950 is arranged within the soil lift 1930 at a grade.
The apparatus further includes an erosion control blanket 1980. In some embodiments, the blanket 1980 is a single layer of coir fabric. In further embodiments, the blanket 1980 is a 700-gram or a 900-gram woven coir fabric. The blanket 1980 is biodegradable and may degrade over approximately a three year period. The blanket 1980 may be secured with at least one stake 1935. The at least one stake 1935 may be driven through the blanket 1980 and the soil lift 1930 into the soil, driven through the blanket 1980 and partially driven into the soil lift 1930 from a top surface of the soil lift 1930, or a combination thereof. In some embodiments, the at least one stake 1935 is a wooden stake. In some embodiments, the blanket 1980 is further secured by the anchors 1920.
In some embodiments, at least one stone 1990 is disposed between the coir fiber roll 1930 and the shoreline. The at least one stone 1990 may be one or more stones excavated from an installation site and deposited in or on the soil after installation of the coir fiber roll 1910 and the soil lift 1930.
The combination of the coir fiber roll 1910 and the soil lift 1930 may be replicated and installed in series along a shoreline. The total combination of coir fiber rolls 1910 and soil lifts 1930 may be referred to as a protection array, configured to protect the shoreline. The protection array may be combined with the planting of vegetation.
Further embodiments employ systems and methods for installing and/or repairing fiber roll arrays as previously described herein. These embodiments pertain to the installation, reinstallation and repair of damaged fiber rolls. As the purpose of such fiber roll arrays is to reduce the erosion of shorelines that can occur during storms, tidal surges and flooding events, such arrays are frequently exposed to immersion in flood waters with high flow rates and/or the high impact of wave action. This can occur for extended periods of time of many days during significant coastal storms including hurricanes, tropical storms, tsunamis or winter storms that can result in storm surges, swells, tidal motion and wind driven waves from a few feet to many dozens of feet in height. The oscillatory nature of such wave action can push and pull obstacles in their path. Moreover, when fiber rolls are immersed in such wave action for extended periods, water can penetrate into and liquefy the contents of the fiber rolls and any soil or fill material behind or underneath the fiber rolls including any soil lifts that are included in the array. Such liquification can result in both vertical and lateral motion of the fiber rolls relative to the shoreline and also relative to each other. Soil or fill material in or underneath such structures can be transported away for the fiber roll array causing it to be damaged, or potentially partially or fully dislodged from the shoreline. Even with anchoring systems as described herein, such large storm events can require repairs to be made to fiber roll systems that have been severely damaged. Such repairs can be relatively simple, such as re-tensioning of cables and/or harnesses that couple the anchors to the fiber rolls. For duckbill anchors that remain in place after a severe storm event it can be possible to simply tighten the cables connecting anchors to the fiber rolls. Even if a fiber roll at the top of an array becomes dislodged, it can be possible to attach a new fiber roll to the top of the array with the existing anchoring and soil lift system in place. If any of the duckbill anchors are pulled out by one or more storm events, however, this can require dismantling of the entire array and a complete reconstruction may be necessary to restore the integrity of the system.
As described herein, another option for anchoring fiber rolls is to employ helical anchors to anchor fiber rolls to a shoreline. Preferred embodiments further include soil lifts that are coupled to the fiber rolls and thereby anchor fiber rolls to the soil lifts that are positioned behind the fiber rolls so that the fiber rolls face the water on the shoreline to reflect wave energy. Shown in
In the embodiment of
Shown in
A detailed view 2170 of the coupling of the anchors to the fiber rolls is seen in
An important advantage of helical anchors is that they can be used to repair damaged arrays using the procedure 2200 described in connection with
Other embodiments will be apparent to those skilled in the art from consideration of the specification and practice of this disclosure. It is intended that the specification and examples be considered as exemplary only, with the true scope and spirit of the disclosed devices and methods being indicated by the following claims.
This application claims benefit to U.S. Provisional Application No. 63/222,631, filed on Jul. 16, 2021 and also is a continuation-in-part of U.S. patent application Ser. No. 16/548,422 filed on Aug. 22, 2019 which claims the benefit of U.S. Provisional Application No. 62/721,765, filed Aug. 23, 2018, and is also a continuation-in-part of U.S. patent application Ser. No. 15/908,497, filed Feb. 28, 2018, which is a continuation-in-part of International Application No. PCT/US2017/049717, filed on Aug. 31, 2017, and this application is also a continuation-in-part of U.S. patent application Ser. No. 16/329,728, filed on Feb. 28, 2019, which is a 35 U.S.C. § 371 national stage filing of International Application No. PCT/US2017/049717 that is a continuation-in-part of U.S. patent application Ser. No. 15/253,464, filed on Aug. 31, 2016, now U.S. Pat. No. 10,125,462. This application is also a continuation-in-part of U.S. patent application Ser. No. 17/723,051, filed Apr. 18, 2022, which is a continuation of U.S. patent application Ser. No. 15/908,497, filed Feb. 28, 2018, now U.S. Pat. No. 11,306,454, which is a continuation-in-part of International Application No. PCT/US2017/049717, filed on Aug. 31, 2017, which is a continuation-in-part of U.S. patent application Ser. No. 15/253,464, filed Aug. 31, 2016, now U.S. Pat. No. 10,125,462. This application is also a continuation-in-part of U.S. patent application Ser. No. 17/723,052 filed Apr. 18, 2022, which is a continuation of U.S. patent application Ser. No. 16/329,728, filed on Feb. 28, 2019, now U.S. Pat. No. 11,306,455, which is a 35 U.S.C. § 371 national stage filing of International Application No. PCT/US2017/049717 that is a continuation-in-part of U.S. patent application Ser. No. 15/253,464, filed on Aug. 31, 2016, now U.S. Pat. No. 10,125,462. The entire contents of each of these applications being incorporated herein by reference.
Number | Date | Country | |
---|---|---|---|
20220349139 A1 | Nov 2022 | US |
Number | Date | Country | |
---|---|---|---|
63222631 | Jul 2021 | US | |
62721765 | Aug 2018 | US |
Number | Date | Country | |
---|---|---|---|
Parent | 16548422 | Aug 2019 | US |
Child | 17866143 | US | |
Parent | 15908497 | Feb 2018 | US |
Child | 16548422 | US | |
Parent | PCT/US17/49717 | Aug 2017 | US |
Child | 15908497 | US |