The present invention relates, in general, to a tunnel excavation technology based on explosion blasting, and more particularly, to a technology for reducing the propagation of impact or vibration caused by blasting which occurs during the tunnel excavation process. Even more particularly, the present invention relates to an excavation system which forms a free surface, or a series of spaces, around a tunnel using a water jet, so that the blast vibration is not propagated to the ground surface, and an excavation method using the same.
A blasting process using explosives is frequently carried out for construction and engineering operations, in particular, underground tunnel excavation. Although the blasting process has the merit of being capable of efficiently removing a rock base or other obstacles using the explosive power of the explosives, vibration and noise that are unavoidably produced upon blasting are propagated to the ground surface, having an adverse effect on buildings and a variety of other structures. In addition, although impact waves propagated from the source of explosion during the blasting process are significantly reduced depending on the distance, some of the energy generated at that time causes vibration (blast vibration) of the ground while being propagated in the form of elastic waves. When a building or subway facilities are present at a relatively close distance from the source of explosion, there is a possibility that a severe problem can be caused.
Technologies of the related art for reducing the above-described blast vibration are as follows. First, an excavation structure and method for blocking blast vibration using line drill holes disclosed in Korean Patent No. 0531985 proposed a technology of forming at least two rows of line drill holes around an area to be blasted in a rock base to be excavated such that the line drill holes of one row alternate with the line drill holes of the other row. In addition, a tunnel blasting method disclosed in Korean Patent No. 0599982 proposed a technology that uses large uncharged holes which are formed at a distance from the contour of a tunnel, crack guide holes which are disposed between the uncharged holes, and a plurality of expansion holes which are formed inward of the uncharged holes.
These preceding technologies share a commonality in that a plurality of holes which are formed in the direction in which the tunnel extends is used as a vibration reducing means. However, when a plurality of holes is formed, connecting areas are present between the holes. Blast vibration that is propagated through the connecting areas is not blocked. Therefore, the holes used in the preceding technologies are an imperfect vibration reducing means.
In addition, tunnel excavation methods of the related art leave a damage zone in an adjacent rock base portion due to blasting, thereby causing a danger of the tunnel collapsing (see
The tunnel excavation process of the related art involves forming a plurality of charge holes using a jumbo drill, charging the holes with explosives, and exploding the charged explosives. About one hundred charge holes are required for one blasting operation, and the operation of forming the charge holes is manually carried out by jumbo drill workers. Therefore, an improvement in the efficiency of the operation is required.
In general, in the tunnel excavation, a variety of front predictive methods of inspecting the status of a rock bed in the front area that is to be excavated in order to prevent the tunnel from collapsing or the like are being introduced. However, indirect inspection, such as the measurement of a resistance depending on the properties of the rock base, is carried out instead of substantial inspect. Therefore, these methods have low inspection reliability, and still have a danger in that the tunnel may collapse during excavation.
Accordingly, the present invention has been made keeping in mind the above problems occurring in the related art, and is intended to provide a water jet device and an excavation method which effectively reduces the propagation of impact, vibration or noise caused by blasting which occurs during a tunnel excavation process.
The invention is also intended to prevent underbreak or overbreak which would otherwise be produced by the blasting of the tunnel.
The invention is also intended to minimize a damage zone which is formed by the blasting, thereby improving the stability of the tunnel.
The invention is also intended to maximize the efficiency of an operation, so that the operation can be efficiently carried out.
The invention is also intended to enable an excavation point in the tunnel face to be substantially inspected.
In order to overcome the foregoing technical objects, the present invention provides an excavation system using a water jet and an excavation method using the same.
The inventors of the invention considered the connecting areas between the holes, which are known as a problem with the related art, as an adverse faction that must be removed, and defined the formation of a free surface, or a continuous space, along the outer circumference of a tunnel as a best mode. A major technical solution for realizing the best mode is to introduce a water jet technology and an abrasive.
In an aspect of the invention, provided is a water jet system that includes a moving unit movable over an area that is to be blasted; an articulated robot arm disposed on the moving unit; a water jet nozzle mounted on a leading end of the robot arm; a supply unit which supplies high pressure water to the water jet nozzle; and a control unit which controls the moving unit, the robot arm and the water jet nozzle. It is preferable that the supply unit supply an abrasive along with high-pressure water.
According to an embodiment of the invention, the water jet nozzle may include a depth sensor part which measures a depth of the free surface that is crushed by the high-pressure water, and the control unit may control the robot am and the supply unit based on the depth that is crushed.
In addition, the water jet nozzle may include a width sensor part which measures a width of the free surface that is crushed by the high-pressure water, and the control unit may control the robot arm and the supply unit based on the width that is crushed.
The water jet system having the above-described, configuration forms a free surface having a predetermined depth around an area to be blasted in the direction in which the tunnel is to be excavated. After the free surface is formed, explosives the area to be excavated is charged with explosives and blasted.
According to the invention, it is possible to effectively reduce the propagation of blast vibration using the free surface.
In addition, since blast overbreak is reduced, the cost of an additional reinforcing construction can be reduced.
Furthermore, no underbreak is produced, thereby requiring no additional operation, and the formation of a damage zone due to blasting is minimized, thereby enhancing the stability of the tunnel and improving the operation efficiency.
In addition, it is possible to substantially analyze the geological features of the tunnel face to be excavated, thereby ensuring the safety of tunnel construction.
In order to realize the foregoing object/ the present invention provides an excavation system that includes:
Hereinafter, exemplary embodiments of the invention will be described in detail with reference to the accompanying drawings.
First of all, the terminologies or words used in the description and the claims of the present invention should not be interpreted as being limited merely to common and dictionary meanings. On the contrary, they should be interpreted based on the meanings and concepts of the invention in compliance with the scope of the invention on the basis of the principle that the inventor(s) can appropriately define the terms in order to describe the invention in the best way.
Therefore, it should be understood that, since the following embodiments disclosed in the description and the constructions illustrated in the Drawings are provided by way of example and do not limit the scope of the present invention, a variety of equivalents and changes that can replace the following embodiments are possible at a time point when the present invention was applied.
Referring to
The moving unit 100 is a moving means which can move back and forth in the direction of excavation over an area to be excavated. Specifically, the moving unit 100 is a component which allows the water jet device 600 to freely move back and forth and to the left and to the right. The moving unit 100 can be implemented as including a plurality of wheels or a caterpillar, The moving unit 100 is disposed in front of the surface to be excavated 10, or the area to be blasted, and can move in the direction of tunnel blasting. An object to be moved is the articulated robot arm 200 which is provided with the water jet nozzle 300.
The articulated robot arm 200 has a multi-articulated structure mounted on the moving unit 100. The articulated robot arm 200 is mounted on the upper portion of the moving unit 100, and functions as a support for spatial movement of the water jet nozzle 300 which is mounted on the distal end thereof.
The joints of the articulated robot arm 200 are preferably configured as a hydraulic type since they are required to stand against a repulsive force or reaction of the water jet nozzle 300. For reference, although the water jet device 600 shown in
As described above, the water jet nozzle 300 is mounted on the front end of articulated robot arm 200. A plurality of water jet nozzles 300 may be employed. The water jet nozzle 300 can be configured such that it can be stretched back and forth. Referring to
In addition, the water jet nozzle 300 can have a rotational part such that the rotational part of the water jet nozzle 300 rotates in order to sufficiently transfer the explosive force of water ejected from the water jet device 600 to the ground.
The water jet nozzle 300 includes a depth sensor part 310 and a width sensor part 320 at predetermined portions thereof which can measure the depth and width of cutting. Specifically, the depth sensor part 310 of the water jet nozzle 300 measures the depth of crushing from the free surface 20 which is crushed by high-pressure water. The control unit 500 controls the articulated robot arm 200 and the supply unit 400 based on the depth of crushing. In addition, the width sensor part 320 of the water jet nozzle 300 measures the width of crushing from the free surface 20 which is crushed by the high-pressure water. The control unit 500 controls the articulated robot arm 200 and the supply unit 400 based on the width of crushing. The depth sensor part 310 and the width sensor part 320 can be configured based on a laser.
The robot arm 200 has a plurality of posture control sensors in order to adjust the angle of inclination and the length or the nozzle, and controls the nozzle in real time depending on sensed values. In addition, a sensor is provided which senses when the rock base collapses in the state in which the nozzle is introduced into the free surface during operation.
The water jet nozzle 300 is required to operate so as to stretch back and forth while maintaining a predetermined distance from the rock base. The optimum distance between the rock base and the nozzle 300 is maintained by measuring the crushing of the rock, base using the distance sensor 310 and the width sensor part 320. In general, the distance between the rock base and the nozzle is measured to be about 10 cm so that optimum performance is obtained.
The tables below represent times spent for the formation of the free surface depending on the state of nozzles, distances and the like, which were measured by tests. The tests were carried out using two nozzles as one pair and by setting coupling angles jangles between the nozzles when the nozzles are coupled at sides) to 7.1° and 3.8°, depending on the distances from the rock base and the moving speeds of the nozzles (when the nozzles were linearly moved to the left and right without being stretched back and forth).
In the tables above, the cutting shapes represent cutting shapes that were produced depending on the distances between the rock base and the nozzles when the nozzles were a pair of nozzles in the tests.
Conditions in the tests are presented in the following table.
Water Jet Pump
A water jet device having a high flow rate was used.
Orifice
No. 24 orifice was used (dia. 0.061 cm, 8.8 liters/min@2500 bar).
Focusing Nozzle
Inner diameter of a nozzle tip: 0.09 inch=2.29 mm.
Test Pressure and Amount or Abrasive Input
Test pressure: 2500 bar
Amount of an abrasive required: 57 g/s (per each)
In addition, the supply unit 400 creates the high-pressure water and supplies it to the water jet nozzle 300. The supply unit 400 can supply an abrasive along with the high-pressure water to the water jet nozzle 300. The abrasive can be interpreted as particles of sand or the like. The abrasive supplied to the water jet nozzle 300 is accelerated by the high-pressure water, and serves to increase the efficiency of the crushing and cutting of the surface to be excavated 10 together with the water. Of course, the control unit 500 can adjust the pressure of the water ejected through the water jet nozzle 300 and the amount of the abrasive required.
As described above, the control unit 500 of the invention controls the moving unit 100, the articulated robot arm 200 and the wafer jet nozzle 300. The control unit 500 controls the movement of the moving unit 100 on which the water jet nozzle 300 and the articulated robot arm 200 provided, and controls the speed of rotation of the rotational part of the water jet nozzle 300 and the pressure and direction of the water that is ejected from the water jet nozzle 300.
In addition, the invention using the water jet device 600 also includes a line recognizing means 210 which recognizes a predetermined color line L which is painted on the surface to be excavated 10 in order to perform crushing so that the free surface 20 is formed on the surface to be excavated 10. Such recognition can be carried out as follows: A worker paints the line in advance according to a targeted surface of the tunnel, and the device automatically recognizes the line via image recognition and controls the operation of the device 600 so as to form the free surface.
In addition to the above-described image recognition method, the method of automatically recognizing the position in which the free surface is to be formed can be carried out as follows.
A plurality of (preferably, at least three) locating terminals is disposed at the side of the entrance of a tunnel. The locating terminals acquire their positions by detecting signals from satellites, and each terminal sends position information including information about its position to the inside of the tunnel. The device 600 acquires distance information pertaining to the terminals and the position information of the terminals by analyzing the position information received from the locating terminals, and recognizes its three-dimensional (3D) position by operation. Afterwards, the free surface according to the tunnel excavation is formed by matching the recognized 3D position with 3D position information according to the tunneling plan which was input in advance. When the device cannot receive the signals because the tunnel is long, a repeater terminal is added in the middle of the tunnel so that the device can recognize its position. When the repeater terminal recognizes its position, the repeater terminal stores its position and sends position information based on its position. In this case, the terminal disposed at the side of the tunnel entrance may be removed. The terminal disposed at the side of the tunnel entrance can also be used as a repeater.
As an alternative, a laser or the like is used to emit information pertaining to the guideline in the direction of excavation from a specific rear point, and the device 600 detects the information and recognizes the 3D position of the device 600. The emitted laser beam is linear in the 3D space, and the 3D position of the device can be acquired when only the information about the distance between the terminal and the device is operated. For this, the device 600 also includes a locating part (not shown) and a posture detecting part (not shown, which recognizes the position of the nozzle from information pertaining to the inclination thereof and the stretching of the nozzle). The device 600 can automatically form the free surface.
Referring to
The line L is the pattern to be crushed having the shape of an arch, and is a predetermined color line L that is drawn on the surface to be excavated 10.
In addition, the pattern to be crushed is basically the arch-shaped pattern, but can be a pattern to which a zigzag pattern is combined.
Here, the water jet nozzle 300 crushes the rock base along the zigzag pattern, and the free surface 20 has a predetermined width in the surface to be excavated 10.
Here, when the line L is formed as the pattern to be crushed, the control unit 500 controls the articulated robot arm 200 so that the water jet nozzle 300 follows the line L that is recognized by the line recognizing means 210.
The line recognizing means 210 which recognizes the line L can be implemented as a photographing means.
When the location of the device is completed in the above-described fashion according to one of the methods of locating the device, the line recognizing means 210 determines the present state of the free surface to be excavated 10, e.g. whether the free surface protrudes toward the device 600 or is caved in the direction of excavation.
When the determination is completed, prior to the main operation, a preliminary operation is carried out by moving the nozzle 300 to protruding portions which must be crushed first. The preliminary operation is carried out by dividing the entire area into sections and operating the robot arm.
That is, the control unit 500 controls the articulated robot arm 200 to move along the line L that is drawn on. the surface to be excavated 20, so that the water jet nozzle 300 mounted on the articulated robot arm 200 crushes the free surface 20 into the shape of the line L.
In this fashion, the articulated robot arm 200 moves along the line L, the water jet nozzle 300 forms an arch-shaped or zigzag trace while moving along with the articulated robot arm 200.
Consequently, the free surface 20, which is excavated into the arch or zigzag shape having a predetermined depth, is formed around the surface to be excavated 10. This free surface 20 is configured such that it is interposed between the surface to be excavated 10 and the surface of the earth and surrounds the surface to be excavated 10.
In addition, the water jet device 600 can also include the line recognizing means 210 which recognizes the predetermined color line L painted on the surface to be excavated 10. Referring to
Specifically, the control unit 500 controls the articulated robot arm 200 so that the water jet nozzle 300 follows the line L that is recognized using the line recognizing means 210. The line recognizing means 210 can be implemented as a photographing means. Thus, the free surface 20 is formed along the line L. For reference, as illustrated in
When the free surface is formed, the space inside the free surface is photographed using a camera mounted on the nozzle, and the status of the rock base is inspected. A possibility of collapse during the subsequent process of blasting a charge or constructing the tunnel is predicted in order to increase the safety of the subsequent construction.
The water jet device 600 will be described as follows. Components of the water jet device include the articulated robot arm 200, a distance measuring sensor, a temperature monitoring sensor, a suction system, a depression detection system.
More specifically, the articulated robot arm 200 is designed such that the free surface 20 can be formed without the problem of device malfunction caused by errors in the free surface 20 and the speed of movement of the articulated robot arm 200 can be controlled.
The distance measuring sensor is attached to the water jet nozzle 300, and is configured so as to stop operating when no targets are present within a predetermined distance.
In addition, the temperature monitoring sensor is configured such that it can measure a temperature range recognizable as a human at an excavating point in order to prevent an accident.
The suction system is configured such that the suction system takes in water and discharges it to another area when the water flows as the rock base is crushed. This can consequently prevent deposition and thus increase the speed at which the free surface 20 is formed. The depression detection system is configured such that it can detect the position or portion of the free surface 20 that is depressed and whether or not water jet nozzle 300 is damaged by the depressed ground. If the water jet nozzle 300 is damaged, a design or configuration that facilitates replacement and reassembly is provided.
In addition, it is configured such that, when the water jet nozzle 300 does not properly move when forming the free surface 20, the reasons can be identified.
Hereinafter, with reference to
First, the water jet device 600 is moved to an excavation position using the moving unit 100.
When the device 600 is seated in position, the device determines the present status by scanning its own position and the portion that is to form the free surface, and starts the preliminary operation using the nozzle 300. It is preferable that the nozzle move along the line L while being reciprocated and rotated, thereby effectively forming the free surface. It is preferable that the free surface be formed by operating the robot arm after the depth of the free surface is formed uniform by first treating the convex portions determined by scanning.
Afterwards, the pattern to be crushed that is defined by the line L is formed in the surface to be excavated 10.
The pattern to be crushed is formed by selecting the arch-shaped or zigzag pattern and painting the line L having a predetermined color on the surface to be excavated 10.
The control unit 500 recognizes the line L formed on the surface to be excavated 10 via the line recognizing means 210, and controls the water jet nozzle 300 so as to follow the line L.
When a plurality of robot arms 200 is provided, the operation can be carried out by dividing the area into sections, and the sequence and time of operation is respectively controlled according to the robot arms such that the robot arms 200 do not interfere with each other.
The control unit 500 controls the articulated robot arm 200 so as to move along the line L, so that the free surface 20 is formed in the planned shape of the line L.
The free surface 20 is formed to a predetermined depth in the surface to be excavated 10 using the water jet nozzle 300.
The step of measuring the free surface 20 measures the crushed depth and width of the free surface 20, which is crushed by the water jet nozzle 300, in real time using the sensors. When the measured width or depth does not exceed a reference value, the nozzle 300 is operated again in the corresponding portion in order to achieve the intended width and depth.
When the depth and space of the free surface 20 is not achieved, an initial execution command is fulfilled, and when the depth and space of the free surface 20 is achieved, a blasting preparation step is carried out.
When the process of forming the free surface 20 is completed in this fashion, a plurality of charge holes 30 is subsequently formed in the inner area of the free surface 20 using the water jet nozzle 300. After that, the charge holes 30 are charged with explosives, which in turn cause blasting.
In addition, the pattern to be crushed according to the invention can form the free surface 20 so as to be continuous along the line L, or the designed excavation line of the portion to be excavated. The continuous free surface 20 can reduce the transfer of vibration and noise, thereby reducing blast vibration. Unlike the related art in which blasting is carried out in the state in which only the front side with respect to the direction in which the tunnel is excavated is opened and the upside, downside, left side, right side and the rear side are closed by the adjacent rock base, the invention carries out blasting in the state in which only the downside and rear side are closed by the adjacent root base but the front side, the upside, the left side and the right side are opened. Accordingly, since the free surface 20 is increased, the amount of a charge that is required is minimized. This consequently reduces impact, vibration and noise that are transferred, thereby enabling a more safe and environmental-friendly blasting process.
In addition, when the explosives charged in the charge hole 30 are blasted, vibration, noise and destructive force that occur spread in all directions through the rock base 10 to be excavated, which acts as a medium. However, the vibration, noise and destructive force are deflected or reflected toward the rock base 10 from around the free surface 20 because of the difference between media (i.e. the rock base and air). This is the same as the principle in which sound generated inside water is efficiently transferred inside the water but is not heard in the air outside the water.
Consequently, the free surface 20 effectively blocks and reduces the vibration and noise that are generated by the explosion.
In the related art, the destructive force generated by the explosion is propagated in all directions along the rock base, thereby causing a great amount of loss. In contrast, according to the invention, the destructive force is deflected by the free surface 20 and is directed inward again (see
As shown in
The charge holes 30 can be formed using the water jet according to the invention, or be formed using an existing jumbo drill. In addition, when a plurality of robot arms 600 is mounted, the robot arms 600 can be operated so that some of the robot arms 600 form the free surface and the other robot arms 600 form the charge holes.
Afterwards, the tunnel excavation is carried out by blasting the surface to be excavated 10.
The sequence of the blasting is as follows: Some of the explosives which are adjacent to the free surface 20 are blasted first, and the blasting is sequentially directed toward the center and the bottom of the tunnel. Specifically, the blasting is started at the portions that are adjacent to the front side, the left and right free surfaces and the upper free surface, and then the charges in the rock base which are inside and in the bottom of the tunnel sequentially explode. In addition, since the charge holes are generally formed to a depth ranging from 2 m to 3 m, it is possible to carry out sequential blasting instead of simultaneously exploding all of the charge in a corresponding charge hole. For example, part of the explosives that are positioned outermost (adjacent to the front, left, right and upper free surface portions) are exploded first, and explosion is sequentially carried out in the inward direction. When the blasting is carried out in this fashion, the part of the rock base that has more areas corresponding to the free surface is exploded first, thereby reducing the amount of charges.
Hereinafter, a detailed description will be given below of an excavation system using a water jet according to another embodiment of the invention.
Referring to
More specifically, the frame 710 is disposed in front of the surface to be excavated 10. As shown in the figure, the frame 710 has the shape of an arch similar to the cross-sectional shape of the tunnel, and can move in the direction in which the tunnel is excavated. A rail 750 is provided in the frame 710, The moving means 720 is movably meshed, to the rail 750. The moving means 720 reciprocates along the rail 750 under the control of the control device 740. The moving means 720 may move the frame 710 using wheels or a caterpillar without using the rail.
The object that the moving means 720 is to move is the water jet nozzle 730. The water jet nozzle 730 ejects high-pressure water to the front side of the surface to be excavated 10. The high-pressure water is supplied by a water supply unit (not shown). According to the invention, surface to be excavated 10 is broken (or crushed) by the water elected from the water jet nozzle 730. An abrasive may be used together in order to increase the performance. The abrasive is particles of sand or the like, and is supplied to the wafer jet nozzle 730 by an abrasive supply unit (not shown). Consequently, the water jet nozzle 730 ejects the water and the abrasive, which is accelerated by the water, in the direction toward the surface to be excavated 10. The control device 740 can adjust the pressure of the water ejected through the wafer jet nozzle 730 and the amount of the abrasive required. Since the water jet nozzle 730 is fixed to and supported on the moving means 720, it reciprocates along the rail 750.
Here, the moving means 720 includes the rail 750, which includes a first rail 752 which enables the frame 710 to move back and forth and a second rail 754 which enables the water jet nozzle 730 to move.
The first rail 752 is provided to enable forward and backward movement of the frame 710, and the second rail is positioned on the frame 710 such that the water jet nozzle 730 can move along the second rail. The water jet nozzle 730 is mounted on the moving means 720 such that if can reciprocate on the second nozzle 754. In addition, it can also be configured such that the water jet nozzle 730 is mounted on the robot arm, which was described above, and the robot arm is mounted on the frame 710, such that the robot arm can move along the frame.
Since the water jet nozzle 730 moves along the frame 710, its movement draws an arch-shaped trace which resembles the shape of the frame. Consequently, an arch-shaped free surface 20 having a predetermined depth is formed around the surface to be excavated 10. The free surface 20 is interposed between the surface to be excavated 10 and the ground surface, and has the shape that surrounds the surface to be excavated 10.
Here, the water jet nozzle 730 can move using the moving means 720, and a plurality of the water jet nozzle can be employed. The water jet nozzle 730 can include a measurement sensor 732 at one side thereof, which measures the cut depth.
In addition, the control device 740 controls the moving speed of the moving means 720 and the pressure and direction of the water ejected from the water jet nozzle 730. Here, an auxiliary material, such as the abrasive, can be mixed with the water ejected from the water jet nozzle 730 in order to increase the efficiency of excavation.
A description will be given of the process of forming the free surface 20 using the water jet system. First, the frame 710 is moved to an excavation position along the first rail 752. Afterwards, the control device 740 determines the pressure of the water jet nozzle 730, the moving speed of the moving means 720 and the amount of the abrasive required.
Since the water jet nozzle 730 moves along the frame 710, its movement draws an arch-shaped trace which resembles the shape of the frame. Consequently, the arch-shaped free surface 20 having a predetermined depth is formed around the surface to be excavated 10. The free surface 20 is interposed between the surface to be excavated 10 and the ground surface, and has the shape that surrounds the surface to be excavated 10.
When the process of forming the free surface 20 is completed, the moving means is moved back along the first rail 752 from the surface to be excavated 10. Afterwards, a plurality of charge holes is formed in the surface to be excavated 10, followed by charging and blasting. During the blasting, blasting vibration (vibration energy) is generated from the source of explosion. The free surface 20 deflects the blasting vibration, thereby effectively preventing or reducing the propagation of the blasting vibration to the surroundings including the ground surface.
In addition, the majority of the blasting vibration deflected from the free surface 20 acts again as energy required for the blasting. Therefore, the amount of explosives required for the blasting can be reduced than the case without the free surface 20. In addition, the possibility of overbreak after the blasting can be significantly reduced. This means that subsequent processing after the blasting is unnecessary, leading to the reduced construction cost and shortened construction period.
In the case where the free surface 20 is absent, the maximum vertical displacement of the ground surface (the ground surface distanced 20 m from the blast point) is about 0.07 (see
“a” is the case where the holes are formed in the free surface, at a width of 10 cm and a depth of 1 m, “b” is the case where blasting was carried out by forming 1 row of line drill holes without the free surface, and “c” is the case where blasting was carried out by forming two rows of line drill holes without the free surface.
Therefore, it can be appreciated that blast vibration can be effectively reduced when the free surface is formed according to the invention.
Although some exemplary embodiments of the present invention have been described with reference to the drawings for illustrative purposes, those skilled in the art to which the present invention relates will appreciate that various modifications and variations are possible, without departing from the scope and spirit of the invention as disclosed in the accompanying claims.
The present invention is applicable to tunnel excavation based on explosive blasting. In particular, it is expected that the invention is highly applicable to construction of urban subways and underground facilities for which high level reduction in the blast vibration is required.
100: moving unit
200: articulated robot arm
300: water jet nozzle
310: depth sensor part
320: width sensor part
400: supply unit
500: control unit
600: water jet device
L: line
710: frame
720: moving means
730: water jet nozzle
732: measuring sensor
740: control device
750: rail
752: first rail
754: second rail
Number | Date | Country | Kind |
---|---|---|---|
10-2010-0095879 | Oct 2010 | KR | national |
10-2010-0102134 | Oct 2010 | KR | national |
10-2010-0102135 | Oct 2010 | KR | national |
10-2011-0029250 | Mar 2011 | KR | national |
Filing Document | Filing Date | Country | Kind | 371c Date |
---|---|---|---|---|
PCT/KR2011/007322 | 10/4/2011 | WO | 00 | 3/28/2013 |