Exhaust flow modifier, duct intersection incorporating the same, and methods therefor

Information

  • Patent Grant
  • 10975309
  • Patent Number
    10,975,309
  • Date Filed
    Friday, September 30, 2016
    7 years ago
  • Date Issued
    Tuesday, April 13, 2021
    3 years ago
Abstract
A duct intersection comprising a first duct portion and a second duct portion extending laterally from a side of the first duct portion. At least one flow modifier is mounted inside one of the first and second duct portions. The flow modifier is a contoured duct liner and/or the flow modifier includes at least one turning vane. The duct intersection may also include a transition portion extending between the first and second duct portions, wherein the transition portion has a length extending along a side of the first duct portion and a depth extending away from the side of the first duct portion, wherein the length is greater than a diameter of the second duct portion.
Description
TECHNICAL FIELD

The present technology is generally directed to devices and methods for modifying fluid flow within a duct. More specifically, some embodiments are directed to flow modifiers and transition portions for improving the exhaust flow from a coke oven through a duct intersection.


BACKGROUND

Coke is a solid carbonaceous fuel that is derived from coal. Because of its relatively few impurities, coke is a favored energy source in a variety of useful applications. For example, coke is often used to smelt iron ores during the steelmaking process. As a further example, coke may also be used to heat commercial buildings or power industrial boilers.


In a typical coke making process, an amount of coal is baked in a coke oven at temperatures that typically exceed 2000 degrees Fahrenheit. The baking process transforms the relatively impure coal into coke, which contains relatively few impurities. At the end of the baking process, the coke typically emerges from the coke oven as a substantially intact piece. The coke typically is removed from the coke oven, loaded into one or more train cars (e.g., a hot car, a quench car, or a combined hot car/quench car), and transported to a quench tower in order to cool or “quench” the coke before it is made available for distribution for use as a fuel source.


The hot exhaust (i.e. flue gas) is extracted from the coke ovens through a network of ducts, intersections, and transitions. The intersections in the flue gas flow path of a coke plant can lead to significant pressure drop losses, poor flow zones (e.g. dead, stagnant, recirculation, separation, etc.), and poor mixing of air and volatile matter. The high pressure drop losses lead to higher required draft which can lead to leaks and a more difficult to control system. In addition, poor mixing and resulting localized hot spots can lead to earlier structural degradation due to accelerated localized erosion and thermal wear. Erosion includes deterioration due to high velocity flow eating away at material. Hot spots can lead to thermal degradation of material, which can eventually cause thermal/structural failure. This localized erosion and/or hot spots can, in turn, lead to failures at duct intersections. For example, the intersection of a coke plant's vent stack and crossover duct is susceptible to poor mixing/flow distribution that can lead to hot spots resulting in tunnel failures.


Traditional duct intersection designs also result in significant pressure drop losses which may limit the number of coke ovens connected together in a single battery. There are limitations on how much draft a coke plant draft fan can pull. Pressure drops in duct intersections take away from the amount of draft available to exhaust flue gases from the coke oven battery.


These and other related problems with traditional duct intersection design result in additional capital expenses. Therefore, a need exists to provide improved duct intersection/transitions that can improve mixing, flow distribution, minimize poor flow zones (e.g. dead, stagnant, recirculation, separation, etc.), and reduce pressure drop losses at the intersection thereby leading to improved coke plant operation as well as potentially lower costs to design, build, and operate a coke plant.


SUMMARY

Provided herein are contoured duct liners, turning vanes, transition portions, duct intersections, and methods of improving gas flow in an exhaust system. In an exemplary embodiment, a duct intersection comprises a first duct portion and a second duct portion extending laterally from a side of the first duct portion. The second duct portion may tee into the first duct portion. The second duct portion may extend laterally from the side of the first duct portion at an angle of less than 90 degrees.


At least one flow modifier is mounted inside one of the first and second duct portions. In one aspect of the technology described herein, the flow modifier is a contoured duct liner. In another aspect of the present technology, the flow modifier includes at least one turning vane.


In an embodiment, the contoured duct liner comprises a first contoured wall mated to an inside surface of the duct and a second contoured wall mated to the first contoured wall. In one aspect of the present technology, the contoured duct liner may be mounted inside the first duct portion. In another aspect of the present technology, the contoured duct liner is mounted inside the second duct portion. The second contoured wall may comprise a refractory material.


In another embodiment, the contoured duct liner comprises a first wall contoured to mate with an inside surface of a duct intersection and a second wall attached to the first wall. The second wall is contoured to modify the direction of gas flow within the duct intersection. In one aspect of the present technology, the second wall includes at least one convex surface.


In yet another embodiment, the duct intersection comprises a first duct portion and a second duct portion extending laterally from a side of the first duct portion. A transition portion extends between the first and second duct portions, wherein the transition portion has a length extending along a side of the first duct portion and a depth extending away from the side of the first duct portion. In an embodiment, the length is a function of the diameter of the second duct portion. In another embodiment, the length is greater than a diameter of the second duct portion. In a still further embodiment, the length is twice the depth.


Also provided herein is a coking facility exhaust system. In an embodiment the exhaust system comprises an emergency stack and a crossover duct extending laterally from a side of the emergency stack. The system also includes a contoured duct liner including a first wall mated to an inside surface of the emergency stack and a second wall attached to the first wall. The second wall is contoured to modify the direction of gas flow proximate an intersection of the emergency stack and crossover duct. The exhaust system may further comprise a second contoured duct liner mated to an inside surface of the crossover duct.


Also contemplated herein are methods for improving gas flow in an exhaust system. In one embodiment the method may include determining a location of a poor flow zone (e.g. dead, stagnant, recirculation, separation, etc.) within the duct intersection and mounting a flow modifier in the duct intersection at the determined location. In one aspect of the disclosed technology, the location is determined with a computer aided design system, such as a computational fluid dynamics (CFD) system. In other aspects of the disclosed technology, the location is determined by measuring conditions at the duct intersection, such as temperature, pressure, and/or velocity.


In another embodiment, a method of improving gas flow in an exhaust system including at least one duct intersection comprises determining a location of a poor flow zone within the duct intersection and injecting a fluid into the duct intersection at the determined location.


These and other aspects of the disclosed technology will be apparent after consideration of the Detailed Description and Figures herein. It is to be understood, however, that the scope of the invention shall be determined by the claims as issued and not by whether given subject matter addresses any or all issues noted in the background or includes any features or aspects recited in this summary.





BRIEF DESCRIPTION OF THE DRAWINGS

Non-limiting and non-exhaustive embodiments of the devices, systems, and methods, including the preferred embodiment, are described with reference to the following figures, wherein like reference numerals refer to like parts throughout the various view unless otherwise specified.



FIG. 1 is a schematic representation of a coke plant;



FIG. 2 is a schematic representation of a representative coke oven and associated exhaust system;



FIG. 3 is a side view in cross-section of an emergency stack and cross-over duct intersection indicating various flow anomalies near the intersection;



FIG. 4 is a side view in cross-section of a duct intersection according to an exemplary embodiment;



FIG. 5 is a perspective view of a fan manifold that extends between the duct fan and main stack of a coke plant;



FIG. 6 is a side view in cross-section of a traditional fan manifold indicating the velocity of gases traveling through the manifold and main stack;



FIG. 7 is a side view in cross-section of a modified fan manifold indicating the velocity of gases traveling through the manifold and main stack;



FIG. 8 is a side view in cross-section of a turning vane assembly according to an exemplary embodiment;



FIG. 9 is a perspective view of the turning vane assembly shown in FIG. 8;



FIG. 10 is a side view in cross-section of a fan manifold according to an exemplary embodiment indicating the velocity of gases traveling through the manifold and main stack;



FIG. 11A is a front view schematic representation of a duct intersection according to an exemplary embodiment;



FIG. 11B is a side view schematic representation of the duct intersection shown in FIG. 11A;



FIG. 12A is a front view schematic representation of a duct intersection according to an exemplary embodiment;



FIG. 12B is a side view schematic representation of the duct intersection shown in FIG. 12A;



FIG. 13 is a side view of a duct intersection according to another exemplary embodiment;



FIG. 14 is a schematic representation of a fluid injection system for use at a duct intersection;



FIG. 15A is a perspective view of an intermediate HRSG tie in with transition pieces at the tie-in joints;



FIG. 15B is a side view of an intermediate HRSG tie in with transition pieces at the tie-in joints;



FIG. 15C is a perspective view of an intermediate HRSG tie in with transition pieces at the tie-in joints; and



FIG. 15D is a top view of an intermediate HRSG tie in with transition pieces at the tie-in joints.





DETAILED DESCRIPTION

Provided herein is a contoured duct liner, a duct intersection, and methods of improving gas flow in an exhaust system. The described embodiments may be implemented as original designs or as retrofits to existing facilities. The disclosed designs have been found to improve flow, thermal conditions, and structural integrity at intersections or tie-ins in a coke oven or similar system. By optimizing the external and/or internal shape of intersections, the mixing can be improved, areas of relatively undesirable conditions can be minimized, and pressure drop losses at the intersection can be minimized. Reducing pressure losses at the intersections can help lower draft set point(s), which can lead to improved operation as well as potentially lower cost designs and maintenance. Furthermore, it can be advantageous to minimize the draft set point of the overall system to minimize infiltration of any unwanted outside air into the system.


Specific details of several embodiments of the technology are described below with reference to FIGS. 1-14. Other details describing well-known structures and systems often associated with coke making and/or duct design have not been set forth in the following disclosure to avoid unnecessarily obscuring the description of the various embodiments of the technology. Many of the details, dimensions, angles, and other features shown in the figures are merely illustrative of particular embodiments of the technology. Accordingly, other embodiments can have other details, dimensions, angles, and features without departing from the spirit or scope of the present technology. A person of ordinary skill in the art, therefore, will accordingly understand that the technology may have other embodiments with additional elements, or the technology may have other embodiments without several of the features shown and described below with reference to FIGS. 1-14.



FIG. 1 illustrates a representative coke plant 5 where coal 1 is fed into a battery of coke ovens 10 where the coal is heated to form coke. Exhaust gases (i.e. flue gases) from the coke ovens are collected in a common tunnel 12 which intersects emergency stack 14. Cross-over duct 16 is also connected to common tunnel 12 via the emergency stack 14. Hot flue gases flow through the cross-over duct 16 into a co-generation plant 18 which includes a heat recovery steam generator (HRSG) 20 which in turn feeds steam turbine 22. The flue gases continue on to a sulfur treatment facility 24 and finally the treated exhaust gases are expelled through main stack 28 via duct fans 26, which provide negative pressure on the entire system in addition to the draft created by gases rising through the main stack 28.


With further reference to FIG. 2, it can be appreciated that coke ovens 10 are connected to the common tunnel 12 via uptakes 15. Common tunnel 12 extends horizontally along the top of the coke ovens 10. An emergency stack 14 extends vertically from common tunnel 12 as shown. Cross-over duct 16 intersects emergency stack 14 at a duct intersection 30. In normal operation, the emergency stack 14 is closed whereby exhaust gases travel through the cross-over duct 16 to the co-generation plant 18 (see FIG. 1). In the event of a problem with the co-generation plant 18, or other downstream equipment, the emergency stack 14 may be opened to allow exhaust gases to exit the system directly. While the figures show the common tunnel 12 and cross-over duct 16 intersecting the emergency stack 14 at different elevations, the common tunnel 12 and cross-over duct 16 may intersect the emergency stack 14 at the same elevation. Furthermore, the technology disclosed herein may be applied to the intersections whether they are at the same elevation or different elevations.



FIG. 3 illustrates various flow anomalies present in traditional duct intersections, such as duct intersection 30. Flow anomaly 32 is a point of localized combustion that is due to poor flow/distribution. An additional area of poor flow/mixing distribution 36 is located in the emergency stack 14 across from the cross-over duct 16. A poor flow zone 34 (e.g. dead, stagnant, recirculation, separation, etc.) is located in cross-over duct 16. These poor flow zone areas contain separated flows which can dissipate useful flow energy. These potential poor flow spaces can also contain unwanted, unsteady vortical flow, sometimes enhanced by buoyancy or chemical reactions, which can contribute to unwanted, poor acoustics, forced harmonics, potential flow instabilities, and incorrect instrument readings. Incorrect instrument readings may occur if measurements are made in a poor flow zone that has conditions not representative of flow in the duct. Because of the nature of the poor flow zones, these areas can also cause particle drop out and promote particle accumulation.



FIG. 4 illustrates an improved duct intersection 130 according to an exemplary embodiment. Duct intersection 130 includes a first duct portion in the form of emergency stack 114 and a second duct portion in the form of cross-over duct 116 that extends laterally from a side of the emergency stack 114. In this embodiment, duct intersection 130 includes a plurality of flow modifiers (40, 42, 44) to improve exhaust flow. For example, flow modifier 40 is in the form of a contoured duct liner that is positioned at the intersection 130 of emergency stack 114 and cross-over duct 116. Flow modifier 40 occupies the area where traditional designs have poor flow and mixing such as flow anomaly 32 in FIG. 3. Flow modifier 42 is disposed in cross-over duct 116 to occupy the poor flow zone 34 shown in FIG. 3. Flow modifier 44 is disposed in the emergency stack 114 opposite the cross-over duct 116 and, in this case, occupies the poor mixing distribution region 36 shown in FIG. 3. With the addition of flow modifiers 40, 42, and 44 the flow F within intersection 130 is improved (see FIG. 4).


The duct liners reshape the internal contours of the duct, inherently changing the nature and direction of the flow path among other effects. The duct liners can be used to smooth or improve flow entrance or provide better transition from one path to another especially when there are limitations to do so with the duct shape. The contoured duct liners can be used to alleviate wall shear stress/erosion stemming from high velocities and particle accumulation from settling and/or particle impaction, which could result in slow or poor flow zones. The contoured duct liners also provide better duct transitions, or paths, for better flow transition and movement, mitigation of stress and thermal concentrations, and mitigation of flow separation, etc.


With continued reference to FIG. 4 it can be appreciated that, in this embodiment, the contoured duct liners 40, 42, and 44 are each comprised of a first contoured wall mated to an inside surface of the duct intersection and a second contoured wall mated to the first contoured wall. For example, contoured duct liner 40 includes a first contoured wall 50 which is mated to the inside surface 17 of emergency stack 114 and inside surface 19 of cross-over duct 116. Duct liner 40 also includes a second contoured wall 52 that is mated to the first contoured wall 50. In this case, the second contoured wall 52 is convex and extends into the flow F of the flue gases traveling through the duct intersection 130. Contoured duct liner 42 includes a first contoured wall 54 which is mated to an inside surface 19 of the cross-over duct 116. A second contoured wall 56 is mated to the first contoured wall 54 and is also convex. Similarly, contoured duct liner 44 includes a first contoured wall 58 mated to inside surface 17 of the emergency stack 114 and includes a second contoured wall 60 mated to the first contoured wall 58.


The first contoured walls of the contoured duct liners may be attached to the inside surfaces 17 and 19 by welding, fasteners, or the like. Similarly, the second contoured walls may be attached to their respective first contoured walls by appropriate fasteners or by welding. As one of ordinary skill in the art will recognize, the contoured duct liners may be comprised of various materials which are suitable for corrosive, high heat applications. For example, first contoured walls 50, 54, and 58 may be comprised of steel or other suitable material. The second contoured walls 52, 56, and 60 may comprise a refractory material such as ceramic that is capable of resisting the heat associated with the flue gases and local combustion. The selection of materials can be dependent on the thermal, flow, and chemical properties of the flue gases. Because the flue gases can be of varied temperatures, velocities, chemical composition, in which all can depend on many factors such as the time in the coking cycle, flow control settings, ambient conditions, at the locations in the coking oven system, etc., the material selection can vary as well. The internal lining layers for the hot duct tie-ins could have more significant refractory layers than for cold ducts. Selection of appropriate materials may take into account min/max temperatures, thermal cycling, chemical reactions, flow erosion, acoustics, harmonics, resonance, condensation of corrosive chemicals, and accumulation of particles, for example.


In an embodiment, the flow modifiers may comprise a multilayer lining that is built up with a relatively inexpensive material and covered with a skin. In yet another embodiment, refractory or similar material can be shaped via gunning (i.e. spraying). Better control of shaping via gunning may be accomplished by gunning in small increments or layers. In addition, a template or mold may be used to aid the shaping via gunning. A template, mold, or advanced cutting techniques may be used to shape the refractory (e.g. even in the absence of gunning for the main shape of an internal insert) for insertion into the duct and then attached via gunning to the inner lining of the duct. In yet another embodiment, the flow modifier may be integrally formed along the duct. In other words, the duct wall may be formed or “dented” to provide a convex surface along the interior surface of the duct. As used herein, the term convex does not require a continuous smooth surface, although a smooth surface may be desirable. For example, the flow modifiers may be in the form of a multi-faceted protrusion extending into the flow path. Such a protrusion may be comprised of multiple discontinuous panels and/or surfaces. Furthermore, the flow modifiers are not limited to convex surfaces. The contours of the flow modifiers may have other complex surfaces that may be determined by CFD analysis and testing, and can be determined by design considerations such as cost, space, operating conditions, etc.



FIG. 5 illustrates a traditional fan manifold 70 that extends between the duct fans 26 and main stack 28 (see FIG. 1). Fan manifold 70 comprises a plurality of branches 72, 74, and 76 which all intersect into plenum 80. As shown in the figure, branches 74 and 76 include flow diverters 78 while plenum 80 includes flow straightener 79. With reference to FIG. 6, which indicates velocity magnitude in the fan manifold 70, traditional fan manifold designs result in a high velocity flow 82 which can damage the duct as a result of high shear stress. In contrast, FIG. 7 illustrates a fan plenum 180 intersection which includes a turning vane assembly 90. In this case, the magnitude of the velocity flowing next to the surface of main stack 128 is much lower than in the conventional duct configuration shown in FIG. 6. The higher flow velocity 184 is displaced inward away from the inside wall of the main stack 128, thereby reducing shear stress on the wall and helping to prevent erosion and corrosion of the stack. Turning vanes inside the duct help direct the flow path for a more efficient process. Turning vanes can be used to better mix flow, better directing of flow, and mitigation of total pressure losses, for example.


With reference to FIGS. 8 and 9, the turning vane assembly 90 includes an inner vane 92 and an outer vane 94. In this embodiment, both the inner and outer vanes are disposed in the main stack 128. FIG. 8 provides exemplary dimensions by which a turning vane assembly could be constructed. However, these dimensions are exemplary and other dimensions and angles may be used. As perhaps best shown in FIG. 9 the inner vane 92 includes a leading portion 902 that connects to an angled portion 904, which, in turn, connects to trailing portion 906. As shown in the figure, the angled portion 904 tapers from a 100 inch width to an 80 inch width. Similarly, the trailing portion 906 tapers from an 80 inch width to a 50 inch width. Here again, the dimensions are only representative and may vary. In this embodiment, the angled portion 904 is angled at approximately 45 degrees; however, other angles may be used depending on the particular application. Outer vane 94 includes a leading portion 908 connected to an angled portion 910 which in turn is connected to a trailing portion 912. Outer turning vane 94 also includes side walls 914 and 916 as shown. Side walls 914 and 916 are canted inward towards the angled and trailing portions 910 and 912 at an angle A. In this embodiment angle A is approximately 10 degrees. Turning vane assembly 90 may be mounted or assembled into the main stack 128 with suitable fasteners or may be welded in place, for example.


In an exemplary embodiment shown in FIG. 10, a fan manifold plenum 280 intersects main stack 228 with a ramped transition. In this case, it can be appreciated that the fan manifold plenum 280 has an upper wall 281 which transitions into the main stack 228 at an angle. As shown by the velocity magnitude 282, this results in a lower flow velocity magnitude than with traditional fan manifold designs shown in FIGS. 5 and 6. It has been found that improving the intersection/transition from the duct fan to the main stack can reduce wear and erosion as well as ash buildup in the main stack. In addition to the ramped transition, contoured duct liners and/or turning vanes may be used together in combination. For example, contoured duct liners may be located in the slower velocity regions 202, 204, and 206 as shown in FIG. 10.



FIGS. 11A and 11B illustrate a duct intersection 230 according to another exemplary embodiment. In this embodiment, the duct intersection 230 includes an emergency stack 214 and a cross-over duct 216 with a transition portion 240 extending therebetween. Changing the size of the duct cross sectional areas near or at intersections can help improve flow performance. In general, increasing the size of the flow cross sectional area as in transition portion 240 can help reduce flow losses. The transition portion can help better transition flow from a duct to a joining duct at tie-ins or intersections. The transitions can be flared, swaged, swept, or the like to provide the desired flow behavior at the intersections. In addition, the transitions may converge or diverge with respect to the direction of flow. Converging and diverging portions may be used in combination, e.g. the duct may first converge and then diverge or vice versa. Furthermore, it should be understood that the embodiments may be implemented in various combinations. For example, a turning vane assembly, such as described above with respect to FIGS. 7-9, may be used in conjunction with the duct liners, whether fabricated or gunned in place, as well as transition portions.


The transition portion 240 has a length L extending along a side of the exhaust duct and a depth D extending away from the side of the exhaust duct. In this embodiment, the length is greater than a diameter d of the cross-over duct 216. The length L may be a function of the duct diameter d or the depth D. For example, the length L may be twice the depth D. FIG. 12A and 12B illustrate a duct intersection 330 including a transition portion 340 that is similar to that shown in FIGS. 11A and 11B, except in this case the exhaust stack 314 includes an enlarged annular region 315 that is adjacent to the intersection 330. FIG. 13 illustrates yet another embodiment of a duct intersection 430 with an asymmetric transition portion 440. Depending on the desired design performance, external fins could be added to help enhance heat transfer with the surrounding ambient air. For example, external fins from the surfaces could be used to help cool localized hot spots.


Duct intersections can be designed, retrofitted, or modified to introduce fluids such as oxidizers (for better combustion or to remove PIC's, products of incomplete combustion), liquids such as water, fuels, inert gases, etc. to help better distribute combustion and mitigate hot spots or allow cooling of the hot stream. For example, fluid could be introduced to provide a boundary layer of cold inert fluid to mitigate hot spots at affected wall surfaces. The fluids, which could include liquids such as water, inert or other gases, could be used for cooling or mitigating certain chemical reactions. The ducts can be modified to accommodate ports or additional pathways for introducing fluids. Fluid introduction, if introduced from a pressurized source, could also create entrainment, thereby improving mixing or flow energy.



FIG. 14 illustrates a duct intersection 530 including a fluid injection system 540. Fluid injection system 540 is operative to inject fluid at particular regions in the intersection 530 to energize or direct flow, as well as insulate the surface of the ducts from exhaust gases. Fluid injection system 540 includes a controller 542 which is connected to a plurality of valves, or fluid injectors 544, via wiring 548. Each injector 544 is connected by tubing 546 to a fluid reservoir 550. It should be understood that the term fluid encompasses liquids as well as gases. Thus, the injection system 540 may inject liquids or gases into the exhaust flow. The injectors may be spaced optimally depending on design conditions. The injectors can inject fluid transversely into the duct, as shown in FIG. 14. Alternatively, the injectors could inject external fluid axially or along the exhaust flow direction at various locations. The injectors could also inject fluid at different injection angles. The direction and method of injection depends on the conditions that exist at the tie-ins and intersections. The injected fluid may come from an external pressurized source. In another embodiment, the fluid may be entrained through a port or valve by the draft of the exhaust flow.


The fluid injection system 540 may also include various sensors, such as temperature sensor 552 connected to controller 542 via cable 554. Various sensors, such as sensor 552, may provide feedback to controller 542 such that fluid may be injected at appropriate times. While the embodiment is illustrated as having a single temperature sensor, other additional sensors of different types of sensors may be employed in providing control feedback to controller 542. For example, other sensor may include pressure, velocity, and emissions sensors, such as an oxygen sensor.


The fluid injection system 540 may be used in conjunction with the contoured duct liners, turning vanes, and transition portions disclosed above. The contoured duct liners in conjunction with the fluid injection system may extend the use of the duct intersection as a true mixing zone and potentially a combustion chamber. Air and other additives (e.g. oxygen) may be injected into the intersection to allow better combustion and use of the tunnels as extended combustion zones. Also, a well-mixed duct intersection may be configured to act as a second combustion chamber. The addition of extra air into the duct intersection mixing zone can burn any excess flue gas and even cool off the intersection with excess air or other gases, such as nitrogen. For example, if the common tunnel is too hot and fully combusted, air may be injected to cool the process. In contrast, if the flue gas is not completely combusted before entering the heat recovery steam generator (HRSG), it could reduce the HRSG tubes, which are typically made of metal, leading to accelerated corrosion and failure. In this case, an oxidizer is added, such as air, to burn all the combustibles before entering the HRSG.


Although the embodiments have been described with respect to a duct intersection between an emergency stack and cross-over duct, the disclosed technology may be applicable to hot duct tie-ins, cold duct tie-ins, stack junctions, and HRSGs. For example, as shown in FIGS. 15A-15D, an intermediate HRSG tie in may include transition pieces (632, 634, 652) at the tie-in joints. Transitions 632 and 634 connect duct 622 to duct 630. Duct 630 connects to a rectangular tube 650 via transition piece 652.


Also contemplated herein are methods of improving gas flow in an exhaust system that includes at least one duct intersection. The methods may include any procedural step inherent in the structures described herein. In an embodiment, the method comprises determining a location of a low or poor flow zone, an area of poor combustion, or an area of poor mixing (i.e. areas of relatively undesirable conditions) within the duct intersection and providing a flow modifier at the determined location. Providing a flow modifier may include, for example and without limitation, mounting a duct liner within the duct, gunning a refractory material to the inside of the duct, mounting turning vanes within the duct, forming a convex surface along the duct, and combinations of the above. The location may be determined with a computer aided design system, such as a CFD system. The location may also be determined by measuring conditions at the duct intersection, such as temperature, pressure, and velocity. In another embodiment the method comprises determining a location of a poor flow zone within the duct intersection and injecting a fluid into the duct intersection at the determined location.


From the foregoing it will be appreciated that, although specific embodiments of the technology have been described herein for purposes of illustration, various modifications may be made without deviating from the spirit and scope of the technology. Further, certain aspects of the new technology described in the context of particular embodiments may be combined or eliminated in other embodiments. Moreover, while advantages associated with certain embodiments of the technology have been described in the context of those embodiments, other embodiments may also exhibit such advantages, and not all embodiments need necessarily exhibit such advantages to fall within the scope of the technology. Accordingly, the disclosure and associated technology can encompass other embodiments not expressly shown or described herein. Thus, the disclosure is not limited except as by the appended claims.


EXAMPLES

1. A duct intersection, comprising:

    • a first duct portion;
    • a second duct portion extending laterally from a side of the first duct portion; and
    • at least one flow modifier disposed inside one of the first and second duct portions.


2. The duct intersection according to claim 1, wherein the flow modifier is a contoured duct liner.


3. The duct intersection according to claim 2, wherein the contoured duct liner comprises a first contoured wall mated to an inside surface of the duct and a second contoured wall mated to the first contoured wall.


4. The duct intersection according to claim 3, wherein the second contoured wall comprises a refractory material.


5. The duct intersection according to claim 2, wherein the second duct portion tees into the first duct portion.


6. The duct intersection according to claim 5, wherein the contoured duct liner is mounted inside the first duct portion.


7. The duct intersection according to claim 5, wherein the contoured duct liner is mounted inside the second duct portion.


8. The duct intersection according to claim 1, wherein the flow modifier includes at least one turning vane.


9. The duct intersection according to claim 1, wherein the flow modifier comprises molded refractory material.


10. The duct intersection according to claim 1, wherein the second duct portion extends laterally from the side of the first duct portion at an angle of less than 90 degrees.


11. A contoured duct liner for use in a duct intersection, comprising:

    • a first wall contoured to mate with an inside surface of a duct intersection; and
    • a second wall attached to the first wall, wherein the second wall is contoured to modify the direction of gas flow within the duct intersection.


12. The contoured duct liner according to claim 11, wherein the second wall includes at least one convex surface.


13. The contoured duct liner according to claim 11, wherein the second wall comprises a refractory material.


14. A coking facility exhaust system, comprising:

    • an emergency stack;
    • a crossover duct extending laterally from a side of the emergency stack; and
    • a contoured duct liner, including a convex surface operative to modify the direction of gas flow proximate an intersection of the emergency stack and crossover duct.


15. The coking facility exhaust system according to claim 14, further comprising a second contoured duct liner disposed on an inside surface of the crossover duct.


16. An improved coking facility exhaust system including an emergency stack and a crossover duct extending laterally from a side of the emergency stack, the improvement comprising:

    • a contoured duct liner, including a convex surface operative to modify the direction of gas flow proximate an intersection of the emergency stack and crossover duct.


17. A method of improving gas flow in an exhaust system including at least one duct intersection, the method comprising:

    • determining a location having undesirable flow characteristics within the duct intersection; and
    • providing a flow modifier in the duct intersection at the determined location.


18. The method according to claim 17, wherein the location is determined with a computer aided design system.


19. The method according to claim 17, wherein the location is determined by measuring conditions at the duct intersection.


20. The method according to claim 19, wherein the conditions are selected from the group consisting of temperature, pressure, and velocity.


21. The method according to claim 17, wherein the flow modifier is a contoured duct liner.


22. The method according to claim 17, wherein the flow modifier is at least one turning vane.


23. The method according to claim 17, further comprising gunning refractory material on an inside surface of the duct intersection at the determined location, thereby providing the convex surface.


24. A duct intersection, comprising:

    • a first duct portion;
    • a second duct portion extending laterally from a side of the first duct portion; and
    • a transition portion extending between the first and second duct portions, wherein the transition portion has a length extending along a side of the first duct portion and a depth extending away from the side of the first duct portion, wherein the length is greater than a diameter of the second duct portion.


25. The duct intersection according to claim 24, wherein the length is twice the depth.


26. The duct intersection according to claim 24, wherein the transition portion is flared.


27. The duct intersection according to claim 24, wherein the first duct portion includes an enlarged annular region and the transition portion extends between the enlarged annular region and the second duct portion.


28. The duct intersection according to claim 24, wherein the second duct portion extends laterally from the side of the first duct portion at an angle of less than 90 degrees.


29. The duct intersection according to claim 24, wherein the second duct portion tees into the first duct portion.


30. The duct intersection according to claim 24, further comprising at least one flow modifier having a convex surface disposed inside one of the first and second duct portions.


31. The duct intersection according to claim 30, further comprising at least one turning vane.


32. A method of improving gas flow in an exhaust system including at least one duct intersection, the method comprising:

    • determining a location of a poor flow zone within the duct intersection; and
    • injecting a fluid into the duct intersection at the determined location.

Claims
  • 1. A coking facility exhaust system, comprising: an emergency stack having a length, an upstream portion, and a terminal end that is selectively openable;a crossover duct extending laterally from a side of the emergency stack at an intersection of the emergency stack and crossover duct, such that the length of the emergency stack extends beyond the crossover duct; anda contoured duct liner, including a convex surface operative to modify the direction of gas flow proximate the intersection of the emergency stack and crossover duct; wherein the convex surface of the contoured duct liner is operatively coupled with, and spaced from, a non-convex shaped surface of the exhaust system, such that the contoured duct liner is provided with a non-uniform thickness along a length of the contoured duct liner and a fluid flow passing the contoured duct liner passes over the convex surface of the contoured duct liner and is prevented from passing beneath the convex surface of the contoured duct liner, between the convex surface of the contoured duct liner and the non-convex shaped surface of the exhaust system to which the convex surface of the contoured duct liner is coupled.
  • 2. The coking facility exhaust system according to claim 1, further comprising a second contoured duct liner disposed on an inside surface of the crossover duct.
  • 3. The coking facility exhaust system according to claim 2, wherein: the contoured duct liner is operatively coupled with an inside surface of the emergency stack and extends into the gas flow proximate the intersection of the emergency stack and crossover duct; andthe second contoured duct extends into the gas flow proximate the intersection of the emergency stack and crossover duct.
  • 4. The coking facility exhaust system according to claim 2, wherein the contoured duct liner and second contoured duct liner are each comprised of refractory material gunned onto at least one of an inside surface of the emergency stack and an inside surface of the crossover duct.
  • 5. The coking facility exhaust system according to claim 1, further comprising: a transition portion extending between the emergency stack and crossover duct, wherein the transition portion has: a length extending along a side of the emergency stack; and a depth extending away from the side of the emergency stack; wherein the length of the transition portion is greater than a diameter of the crossover duct; the transition portion being shaped to reduce turbulent fluid flow from the emergency stack into the crossover duct.
  • 6. The coking facility exhaust system according to claim 5, further comprising an enlarged annular region coaxial with the emergency stack; the transition portion extending between the enlarged annular region and the crossover duct.
  • 7. The coking facility exhaust system according to claim 5, wherein the transition portion is asymmetric.
  • 8. The coking facility exhaust system according to claim 5, wherein the transition portion length is twice the transition portion depth.
  • 9. The coking facility exhaust system according to claim 5, wherein the transition portion is flared.
  • 10. The coking facility exhaust system according to claim 5, wherein the crossover duct extends laterally from the side of the emergency stack at an angle of less than 90 degrees.
  • 11. The coking facility exhaust system according to claim 5, wherein the crossover duct tees into the emergency stack.
  • 12. The coking facility exhaust system according to claim 1, wherein the contoured duct liner is operatively coupled with an inside surface of the emergency stack and extends into the gas flow proximate the intersection of the emergency stack and crossover duct.
  • 13. The coking facility exhaust system according to claim 1, wherein the contoured duct liner is operatively coupled with an inside surface of the crossover duct and extends into the gas flow proximate the intersection of the emergency stack and crossover duct.
  • 14. The coking facility exhaust system according to claim 1, wherein the contoured duct liner is operatively coupled with an inside surface of the emergency stack and an inside surface of the crossover duct and extends into the gas flow proximate the intersection of the emergency stack and crossover duct.
  • 15. The coking facility exhaust system according to claim 1, wherein: the contoured duct liner is operatively coupled with an inside surface of the emergency stack and an inside surface of the crossover duct and extends into the gas flow proximate the intersection of the emergency stack and crossover duct; andthe second contoured duct extends into the gas flow proximate the intersection of the emergency stack and crossover duct.
  • 16. The coking facility exhaust system according to claim 1, further comprising at least one turning vane positioned within, and in a fixed relationship to, a fluid pathway that passes through at least one of the emergency stack or the crossover duct.
  • 17. The coking facility exhaust system according to claim 1, wherein the contoured duct liner is comprised of refractory material gunned onto at least one of an inside surface of the emergency stack and an inside surface of the crossover duct, thereby providing the convex surface.
  • 18. An improved coking facility exhaust system including an emergency stack and a crossover duct extending laterally from a side of the emergency stack, the improvement comprising: the emergency stack having a terminal end that is selectively openable and the crossover duct extending laterally from the side of the emergency stack such that a length of the emergency stack extends beyond the crossover duct; anda contoured duct liner, including a convex surface operative to modify the direction of gas flow proximate an intersection of the emergency stack and crossover duct, where a length of the emergency stack extends beyond the intersection in opposite directions; wherein the convex surface of the contoured duct liner is operatively coupled with, and spaced from, a non-convex shaped surface of the exhaust system, such that the contoured duct liner is provided with a non-uniform thickness along a length of the contoured duct liner and a fluid flow passing the contoured duct liner passes over the convex surface of the contoured duct liner and is prevented from passing beneath the convex surface of the contoured duct liner, between the convex surface of the contoured duct liner and the non-convex shaped surface of the exhaust system to which the convex surface of the contoured duct liner is coupled.
CROSS-REFERENCE TO RELATED APPLICATIONS

The present application is a divisional of U.S. patent application Ser. No. 13/730,673, filed Dec. 28, 2012, the disclosure of which is incorporated herein by reference in its entirety.

US Referenced Citations (321)
Number Name Date Kind
425797 Hunt Apr 1890 A
469868 Osbourn Mar 1892 A
845719 Schniewind Feb 1907 A
976580 Krause Jul 1909 A
1140798 Carpenter May 1915 A
1424777 Schondeling Aug 1922 A
1430027 Plantinga Sep 1922 A
1486401 Van Ackeren Mar 1924 A
1530995 Geiger Mar 1925 A
1572391 Kiaiber Feb 1926 A
1677973 Marquard Jul 1928 A
1705039 Thornhill Mar 1929 A
1721813 Geipert Jul 1929 A
1757682 Palm May 1930 A
1818370 Wine Aug 1931 A
1818994 Kreisinger Aug 1931 A
1830951 Lovett Nov 1931 A
1848818 Becker Mar 1932 A
1947499 Schrader et al. Feb 1934 A
1955962 Jones Apr 1934 A
2075337 Burnaugh Mar 1937 A
2141035 Daniels Dec 1938 A
2195466 Otto Apr 1940 A
2394173 Harris et al. Feb 1946 A
2424012 Bangham et al. Jul 1947 A
2649978 Such Aug 1953 A
2667185 Beavers Jan 1954 A
2723725 Keifer Nov 1955 A
2756842 Chamberlin et al. Jul 1956 A
2813708 Frey Nov 1957 A
2827424 Homan Mar 1958 A
2873816 Umbricht et al. Feb 1959 A
2902991 Whitman Sep 1959 A
2907698 Schulz Oct 1959 A
3015893 McCreary Jan 1962 A
3224805 Clyatt Dec 1965 A
3462345 Kernan Aug 1969 A
3511030 Hall et al. May 1970 A
3542650 Kulakov Nov 1970 A
3545470 Paton Dec 1970 A
3592742 Thompson Jul 1971 A
3616408 Hickam Oct 1971 A
3623511 Levin Nov 1971 A
3630852 Nashan et al. Dec 1971 A
3652403 Knappstein et al. Mar 1972 A
3676305 Cremer Jul 1972 A
3709794 Kinzler et al. Jan 1973 A
3710551 Sved Jan 1973 A
3746626 Morrison, Jr. Jul 1973 A
3748235 Pries Jul 1973 A
3784034 Thompson Jan 1974 A
3806032 Pries Apr 1974 A
3811572 Tatterson May 1974 A
3836161 Buhl Sep 1974 A
3839156 Jakobi et al. Oct 1974 A
3844900 Schulte Oct 1974 A
3857758 Mole Dec 1974 A
3875016 Schmidt-Balve et al. Apr 1975 A
3876143 Rossow et al. Apr 1975 A
3876506 Dix et al. Apr 1975 A
3878053 Hyde Apr 1975 A
3894302 Lasater Jul 1975 A
3897312 Armour et al. Jul 1975 A
3906992 Leach Sep 1975 A
3912091 Thompson Oct 1975 A
3917458 Polak Nov 1975 A
3928144 Jakimowicz Dec 1975 A
3930961 Sustarsic et al. Jan 1976 A
3933443 Lohrmann Jan 1976 A
3957591 Riecker May 1976 A
3959084 Price May 1976 A
3963582 Helm et al. Jun 1976 A
3969191 Bollenbach Jul 1976 A
3975148 Fukuda Aug 1976 A
3984289 Sustarsic et al. Oct 1976 A
4004702 Szendroi Jan 1977 A
4004983 Pries Jan 1977 A
4025395 Ekholm et al. May 1977 A
4040910 Knappstein et al. Aug 1977 A
4045299 McDonald Aug 1977 A
4059885 Oldengott Nov 1977 A
4067462 Thompson Jan 1978 A
4083753 Rogers et al. Apr 1978 A
4086231 Ikio Apr 1978 A
4093245 Connor Jun 1978 A
4100033 Holter Jul 1978 A
4111757 Ciarimboli Sep 1978 A
4124450 MacDonald Nov 1978 A
4135948 Mertens et al. Jan 1979 A
4141796 Clark et al. Feb 1979 A
4145195 Knappstein et al. Mar 1979 A
4147230 Ormond et al. Apr 1979 A
4162546 Shortell Jul 1979 A
4181459 Price Jan 1980 A
4189272 Gregor et al. Feb 1980 A
4194951 Pries Mar 1980 A
4196053 Grohmann Apr 1980 A
4211608 Kwasnoski et al. Jul 1980 A
4213489 Cain Jul 1980 A
4213828 Calderon Jul 1980 A
4222748 Argo et al. Sep 1980 A
4225393 Gregor et al. Sep 1980 A
4235830 Bennett et al. Nov 1980 A
4239602 La Bate Dec 1980 A
4248671 Belding Feb 1981 A
4249997 Schmitz Feb 1981 A
4263099 Porter Apr 1981 A
4268360 Tsuzuki et al. May 1981 A
4271814 Lister Jun 1981 A
4284478 Brommel Aug 1981 A
4285772 Kress Aug 1981 A
4287024 Thompson Sep 1981 A
4289584 Chuss et al. Sep 1981 A
4289585 Wagener et al. Sep 1981 A
4296938 Offermann et al. Oct 1981 A
4299666 Ostmann Nov 1981 A
4302935 Cousimano Dec 1981 A
4303615 Jarmell et al. Dec 1981 A
4307673 Caughey Dec 1981 A
4314787 Kwasnik et al. Feb 1982 A
4330372 Cairns et al. May 1982 A
4334963 Stog Jun 1982 A
4336843 Petty Jun 1982 A
4340445 Kucher et al. Jul 1982 A
4342195 Lo Aug 1982 A
4344820 Thompson Aug 1982 A
4344822 Schwartz et al. Aug 1982 A
4353189 Thiersch et al. Oct 1982 A
4366029 Bixby et al. Dec 1982 A
4373244 Mertens et al. Feb 1983 A
4375388 Hara et al. Mar 1983 A
4392824 Struck et al. Jul 1983 A
4394217 Holz et al. Jul 1983 A
4395269 Schuler Jul 1983 A
4396394 Li et al. Aug 1983 A
4396461 Neubaum et al. Aug 1983 A
4431484 Weber et al. Feb 1984 A
4439277 Dix Mar 1984 A
4440098 Adams Apr 1984 A
4445977 Husher May 1984 A
4446018 Cerwick May 1984 A
4448541 Wirtschafter May 1984 A
4452749 Kolvek et al. Jun 1984 A
4459103 Gieskieng Jul 1984 A
4469446 Goodboy Sep 1984 A
4474344 Bennett Oct 1984 A
4487137 Horvat et al. Dec 1984 A
4498786 Ruscheweyh Feb 1985 A
4506025 Kleeb et al. Mar 1985 A
4508539 Nakai Apr 1985 A
4527488 Lindgren Jul 1985 A
4564420 Spindeler et al. Jan 1986 A
4568426 Orlando Feb 1986 A
4570670 Johnson Feb 1986 A
4614567 Stahlherm et al. Sep 1986 A
4643327 Campbell Feb 1987 A
4645513 Kubota et al. Feb 1987 A
4655193 Blacket Apr 1987 A
4655804 Kercheval et al. Apr 1987 A
4666675 Parker et al. May 1987 A
4680167 Orlando Jul 1987 A
4704195 Janicka et al. Nov 1987 A
4720262 Durr et al. Jan 1988 A
4724976 Lee Feb 1988 A
4726465 Kwasnik et al. Feb 1988 A
4793981 Doyle et al. Dec 1988 A
4824614 Jones Apr 1989 A
4889698 Moller et al. Dec 1989 A
4919170 Kallinich et al. Apr 1990 A
4929179 Breidenbach et al. May 1990 A
4941824 Holter et al. Jul 1990 A
5052922 Stokman et al. Oct 1991 A
5062925 Durselen et al. Nov 1991 A
5078822 Hodges et al. Jan 1992 A
5087328 Wegerer et al. Feb 1992 A
5114542 Childress et al. May 1992 A
5213138 Presz, Jr. May 1993 A
5227106 Kolvek Jul 1993 A
5228955 Westbrook, III Jul 1993 A
5234601 Janke et al. Aug 1993 A
5318671 Pruitt Jun 1994 A
5370218 Johnson et al. Dec 1994 A
5423152 Kolvek Jun 1995 A
5542650 Abel et al. Aug 1996 A
5622280 Mays et al. Apr 1997 A
5659110 Herden et al. Aug 1997 A
5670025 Baird Sep 1997 A
5687768 Mull, Jr. et al. Nov 1997 A
5715962 McDonnell Feb 1998 A
5752548 Matsumoto May 1998 A
5787821 Bhat et al. Aug 1998 A
5810032 Hong et al. Sep 1998 A
5816210 Yamaguchi Oct 1998 A
5857308 Dismore et al. Jan 1999 A
5913448 Mann et al. Jun 1999 A
5928476 Daniels Jul 1999 A
5968320 Sprague Oct 1999 A
6017214 Sturgulewski Jan 2000 A
6059932 Sturgulewski May 2000 A
6139692 Tamura et al. Oct 2000 A
6152668 Knoch Nov 2000 A
6187148 Sturgulewski Feb 2001 B1
6189819 Racine Feb 2001 B1
6290494 Barkdoll Sep 2001 B1
6412221 Emsbo Jul 2002 B1
6596128 Westbrook Jul 2003 B2
6626984 Taylor Sep 2003 B1
6699035 Brooker Mar 2004 B2
6758875 Reid et al. Jul 2004 B2
6907895 Johnson et al. Jun 2005 B2
6946011 Snyder Sep 2005 B2
6964236 Schucker et al. Nov 2005 B2
7056390 Fratello et al. Jun 2006 B2
7077892 Lee Jul 2006 B2
7314060 Chen et al. Jan 2008 B2
7331298 Barkdoll et al. Feb 2008 B2
7433743 Pistikopoulos et al. Oct 2008 B2
7497930 Barkdoll et al. Mar 2009 B2
7611609 Valia et al. Nov 2009 B1
7644711 Creel Jan 2010 B2
7722843 Srinivasachar May 2010 B1
7727307 Winkler Jun 2010 B2
7785447 Eatough et al. Aug 2010 B2
7803627 Hodges Sep 2010 B2
7823401 Takeuchi Nov 2010 B2
7827689 Crane et al. Nov 2010 B2
7998316 Barkdoll Aug 2011 B2
8071060 Ukai et al. Dec 2011 B2
8079751 Kapila et al. Dec 2011 B2
8080088 Srinivasachar Dec 2011 B1
8152970 Barkdoll et al. Apr 2012 B2
8236142 Westbrook Aug 2012 B2
8266853 Bloom et al. Sep 2012 B2
8398935 Howell, Jr. et al. Mar 2013 B2
8409405 Kim et al. Apr 2013 B2
8647476 Kim et al. Feb 2014 B2
8800795 Hwang Aug 2014 B2
8956995 Masatsugu et al. Feb 2015 B2
8980063 Kim et al. Mar 2015 B2
9039869 Kim et al. May 2015 B2
9057023 Reichelt et al. Jun 2015 B2
9193915 West et al. Nov 2015 B2
9243186 Quanci et al. Jan 2016 B2
9249357 Quanci et al. Feb 2016 B2
10323192 Quanci et al. Jun 2019 B2
20020170605 Shiraishi et al. Nov 2002 A1
20030014954 Ronning et al. Jan 2003 A1
20030015809 Carson Jan 2003 A1
20030057083 Eatough et al. Mar 2003 A1
20050087767 Fitzgerald Apr 2005 A1
20060102420 Huber et al. May 2006 A1
20060149407 Markham et al. Jul 2006 A1
20070116619 Taylor et al. May 2007 A1
20070251198 Witter Nov 2007 A1
20080028935 Andersson Feb 2008 A1
20080169578 Crane et al. Jul 2008 A1
20080179165 Chen et al. Jul 2008 A1
20080257236 Green Oct 2008 A1
20080271985 Yamasaki Nov 2008 A1
20080289305 Girondi Nov 2008 A1
20090007785 Kimura et al. Jan 2009 A1
20090162269 Barger et al. Jun 2009 A1
20090217576 Kim et al. Sep 2009 A1
20090283395 Hippe Nov 2009 A1
20100095521 Bertini et al. Apr 2010 A1
20100106310 Grohman Apr 2010 A1
20100113266 Abe et al. May 2010 A1
20100115912 Worley May 2010 A1
20100181297 Whysail Jul 2010 A1
20100196597 Di Loreto Aug 2010 A1
20100276269 Schuecker et al. Nov 2010 A1
20100287871 Bloom et al. Nov 2010 A1
20100314234 Knoch et al. Dec 2010 A1
20110048917 Kim et al. Mar 2011 A1
20110088600 McRae Apr 2011 A1
20110144406 Masatsugu et al. Jun 2011 A1
20110168482 Merchant et al. Jul 2011 A1
20110174301 Haydock et al. Jul 2011 A1
20110198206 Kim et al. Aug 2011 A1
20110223088 Chang et al. Sep 2011 A1
20110253521 Kim Oct 2011 A1
20110291827 Baldocchi et al. Dec 2011 A1
20110313218 Dana Dec 2011 A1
20120024688 Barkdoll Feb 2012 A1
20120030998 Barkdoll et al. Feb 2012 A1
20120152720 Reichelt et al. Jun 2012 A1
20120180133 Al-Harbi et al. Jul 2012 A1
20120228115 Westbrook Sep 2012 A1
20120247939 Kim et al. Oct 2012 A1
20130020781 Kishikawa Jan 2013 A1
20130045149 Miller Feb 2013 A1
20130216717 Rago et al. Aug 2013 A1
20130220373 Kim Aug 2013 A1
20140033917 Rodgers et al. Feb 2014 A1
20140039833 Sharpe, Jr. et al. Feb 2014 A1
20140048402 Quanci et al. Feb 2014 A1
20140061018 Sarpen et al. Mar 2014 A1
20140083836 Quanci et al. Mar 2014 A1
20140182195 Quanci et al. Jul 2014 A1
20140182683 Quanci et al. Jul 2014 A1
20140183023 Quanci et al. Jul 2014 A1
20140183024 Chun et al. Jul 2014 A1
20140183026 Quanci et al. Jul 2014 A1
20140208997 Alferyev et al. Jul 2014 A1
20140224123 Walters Aug 2014 A1
20140262139 Choi et al. Sep 2014 A1
20140262726 West et al. Sep 2014 A1
20150219530 Li et al. Aug 2015 A1
20150247092 Quanci et al. Sep 2015 A1
20150287026 Yang et al. Oct 2015 A1
20150328576 Quanci et al. Nov 2015 A1
20160026193 Rhodes et al. Jan 2016 A1
20160032193 Sarpen et al. Feb 2016 A1
20160048139 Samples et al. Feb 2016 A1
20160149944 Obermeier et al. May 2016 A1
20160152897 Quanci et al. Jun 2016 A1
20160160123 Quanci et al. Jun 2016 A1
20160186063 Quanci et al. Jun 2016 A1
20160186064 Quanci et al. Jun 2016 A1
20160186065 Quanci et al. Jun 2016 A1
20160222297 Choi et al. Aug 2016 A1
Foreign Referenced Citations (150)
Number Date Country
1172895 Aug 1984 CA
2775992 May 2011 CA
2822841 Jul 2012 CA
87212113 Jun 1988 CN
87107195 Jul 1988 CN
2064363 Oct 1990 CN
2139121 Jul 1993 CN
1092457 Sep 1994 CN
1255528 Jun 2000 CN
1270983 Oct 2000 CN
1358822 Jul 2002 CN
2509188 Sep 2002 CN
25214373 Nov 2002 CN
2528771 Jan 2003 CN
1468364 Jan 2004 CN
1527872 Sep 2004 CN
2668641 Jan 2005 CN
1957204 May 2007 CN
101037603 Sep 2007 CN
101058731 Oct 2007 CN
101157874 Apr 2008 CN
201121178 Sep 2008 CN
101395248 Mar 2009 CN
100510004 Jul 2009 CN
101486017 Jul 2009 CN
201264981 Jul 2009 CN
101497835 Aug 2009 CN
101509427 Aug 2009 CN
102155300 Aug 2011 CN
202226816 May 2012 CN
102584294 Jul 2012 CN
202415446 Sep 2012 CN
103468289 Dec 2013 CN
105189704 Dec 2015 CN
106661456 May 2017 CN
201729 Sep 1908 DE
212176 Jul 1909 DE
1212037 Mar 1966 DE
3231697 Jan 1984 DE
3328702 Feb 1984 DE
3329367 Nov 1984 DE
3407487 Jun 1985 DE
19545736 Jun 1997 DE
19803455 Aug 1999 DE
10122531 Nov 2002 DE
10154785 May 2003 DE
102005015301 Oct 2006 DE
102006004669 Aug 2007 DE
102006026521 Dec 2007 DE
102009031436 Jan 2011 DE
0126399 Nov 1984 EP
0208490 Jan 1987 EP
0903393 Mar 1999 EP
1538503 Jun 2005 EP
2295129 Mar 2011 EP
2339664 Aug 1977 FR
364236 Jan 1932 GB
368649 Mar 1932 GB
441784 Jan 1936 GB
606340 Aug 1948 GB
611524 Nov 1948 GB
725865 Mar 1955 GB
923205 May 1963 GB
S5319301 Feb 1978 JP
54054101 Apr 1979 JP
S5453103 Apr 1979 JP
57051786 Mar 1982 JP
57051787 Mar 1982 JP
57083585 May 1982 JP
57090092 Jun 1982 JP
58091788 May 1983 JP
59051978 Mar 1984 JP
59053589 Mar 1984 JP
59071388 Apr 1984 JP
59108083 Jun 1984 JP
59145281 Aug 1984 JP
60004588 Jan 1985 JP
61106690 May 1986 JP
62011794 Jan 1987 JP
62285980 Dec 1987 JP
01103694 Apr 1989 JP
01249886 Oct 1989 JP
H0319127 Mar 1991 JP
04178494 Jun 1992 JP
H0649450 Feb 1994 JP
H0654753 Jul 1994 JP
H06264062 Sep 1994 JP
07188668 Jul 1995 JP
07216357 Aug 1995 JP
H07204432 Aug 1995 JP
H08104875 Apr 1996 JP
08127778 May 1996 JP
H10273672 Oct 1998 JP
H11-131074 May 1999 JP
2000-204373 Jul 2000 JP
2001200258 Jul 2001 JP
03197588 Aug 2001 JP
2002106941 Apr 2002 JP
2003041258 Feb 2003 JP
2003071313 Mar 2003 JP
2003292968 Oct 2003 JP
2003342581 Dec 2003 JP
2005503448 Feb 2005 JP
2005263983 Sep 2005 JP
2006188608 Jul 2006 JP
2007063420 Mar 2007 JP
4101226 Jun 2008 JP
04159392 Oct 2008 JP
2008231278 Oct 2008 JP
2009073864 Apr 2009 JP
2009073865 Apr 2009 JP
2009144121 Jul 2009 JP
2010229239 Oct 2010 JP
2010248389 Nov 2010 JP
2012102302 May 2012 JP
2013006957 Jan 2013 JP
2013510910 Mar 2013 JP
2013189322 Sep 2013 JP
2014040502 Mar 2014 JP
1019960008754 Oct 1996 KR
1019990054426 Jul 1999 KR
20000042375 Jul 2000 KR
100737393 Jul 2007 KR
10-0797852 Jan 2008 KR
10-2011-0010452 Feb 2011 KR
101314288 Apr 2011 KR
10-0296700 Oct 2011 KR
20130050807 May 2013 KR
101318388 Oct 2013 KR
2083532 Jul 1997 RU
2441898 Feb 2012 RU
1535880 Jan 1990 SU
201241166 Oct 2012 TW
201245431 Nov 2012 TW
50580 Oct 2002 UA
WO-9012074 Oct 1990 WO
WO-9945083 Sep 1999 WO
WO-2005023649 Mar 2005 WO
WO-2005115583 Dec 2005 WO
WO-2007103649 Sep 2007 WO
WO-2008034424 Mar 2008 WO
WO-2010107513 Sep 2010 WO
WO-2011000447 Jan 2011 WO
WO-2012029979 Mar 2012 WO
WO2012031726 Mar 2012 WO
WO-2014021909 Feb 2014 WO
WO2014043667 Mar 2014 WO
WO2014105064 Jul 2014 WO
WO2014153050 Sep 2014 WO
WO2016004106 Jan 2016 WO
Non-Patent Literature Citations (59)
Entry
Chinese Office Action in Chinese Application No. 201280078042.6; dated Oct. 10, 2017; 24 pages.
U.S. Appl. No. 15/322,176, filed Dec. 27, 2016, West et al.
U.S. Appl. No. 15/443,246, filed Feb. 27, 2017, Quanci et al.
U.S. Appl. No. 15/511,036, filed Mar. 14, 2017, West et al.
Beckman et al., “Possibilities and limits of cutting back coking plant output,” Stahl Und Eisen, Verlag Stahleisen, Dusseldorf, DE, vol. 130, No. 8, Aug. 16, 2010, pp. 57-67.
Kochanski et al., “Overview of Uhde Heat Recovery Cokemaking Technology,” AISTech Iron and Steel Technology Conference Proceedings, Association for Iron and Steel Technology, U.S., vol. 1, Jan. 1, 2005, pp. 25-32.
U.S. Appl. No. 15/164,525, filed Jun. 5, 2017, Quanci et al.
“Conveyor Chain Designer Guild”, Mar. 27, 2014 (date obtained from wayback machine), Renold.com, Section 4, available online at: http://www.renold/com/upload/renoldswitzerland/conveyor_chain_-_designer_guide.pdf.
Practical Technical Manual of Refractories, Baoyu Hu, etc., Beijing: Metallurgical Industry Press, Chapter 6; 2004, 6-30.
Refractories for Ironmaking and Steelmaking: A History of Battles over High Temperatures; Kyoshi Sugita (Japan, Shaolin Zhang), 1995, p. 160, 2004, 2-29.
“Middletown Coke Company HRSG Maintenance BACT Analysis Option 1—Individual Spray Quenches Sun Heat Recovery Coke Facility Process Flow Diagram Middletown Coke Company 100 Oven Case #1—24.5 VM”, (Sep. 1, 2009), URL: http://web.archive.org/web/20090901042738/http://epa.ohio.gov/portals/27/transfer/ptiApplication/mcc/new/262504.pdf, (Feb. 12, 2016), XP055249803 [X] 1-13 * p. 7 * * pp. 8-11 *.
Walker D N et al, “Sun Coke Company's heat recovery cokemaking technology high coke quality and low environmental impact”, Revue de Metallurgie—Cahiers D'Informations Techniques, Revue de Metallurgie. Paris, FR, (Mar. 1, 2003), vol. 100, No. 3, ISSN 0035-1563, p. 23.
Examination Report in European Application No. 12890654.2, dated Mar. 23, 2017.
U.S. Appl. 15/392,942, filed Dec. 28, 2016, Quanci et al.
U.S. Appl. No. 15/987,860, filed May 23, 2018, Crum et al.
U.S. Appl. No. 16/000,516, filed Jun. 5, 2018, Quanci.
Boyes, Walt. (2003), Instrumentation Reference Book (3rd Edition)—34.7.4.6 Infrared and Thermal Cameras, Elsevier. Online version available at: https://app.knovel.com/hotlink/pdf/id:kt004QMGV6/instrumentation-reference-2/ditigal-video.
Kerlin, Thomas (1999), Practical Thermocouple Thermometry—1.1 The Thermocouple. ISA. Online version available at https:app.knovel.com/pdf/id:kt007XPTM3/practical-thermocouple/the-thermocouple.
Madias, et al., “A review on stamped charging of coals” (2013). Available at https://www.researchgate.net/publicatoin/263887759_A_review_on_stamped_charging_of_coals.
Metallurgical Coke MSDS, ArcelorMittal, May 30, 2011, available online at http://dofasco.arcelormittal.com/-/media/Files/A/Arcelormittal-Canada/material-safety/metallurgical-coke.pdf.
U.S. Appl. No. 16/026,363, filed Jul. 3, 2018, Chun et al.
U.S. Appl. No. 16/047,198, filed Jul. 27, 2018, Quanci et al.
Bloom, et al., “Modular cast block—The future of coke oven repairs,” Iron & Steel Technol, AIST, Warrendale, PA, vol. 4, No. 3, Mar. 1, 2007, pp. 61-64.
Astrom, et al., “Feedback Systems: An Introduction for Scientists and Engineers,” Sep. 16, 2006, available on line at http://people/duke.edu/-hpgavin/SystemID/References/Astrom-Feedback-2006.pdf ; 404 pages.
“What is dead-band control,” forum post by user “wireaddict” on AllAboutCircuits.com message board, Feb. 8, 2007, accessed Oct. 24, 2018 at https:/forum.allaboutcircuits.com/threads/what-is-dead-band-contro1.4728/; 8 pages.
India First Examination Report in Application No. 1150/KOLNP/2015; dated Oct. 29, 2018; 8 pages.
U.S. Appl. No. 16/704,689, filed Dec. 5, 2019, West et al.
U.S. Appl. No. 16/729,036, filed Dec. 27, 2019, Quanci et at.
U.S. Appl. No. 16/729,053, filed Dec. 27, 2019, Quanci et at.
U.S. Appl. No. 16/729,057, filed Dec. 27, 2019, Quanci et at.
U.S. Appl. No. 16/729,068, filed Dec. 27, 2019, Quanci et at.
U.S. Appl. No. 16/729,122, filed Dec. 27, 2019, Quanci et at.
U.S. Appl. No. 16/729,129, filed Dec. 27, 2019, Quanci et at.
U.S. Appl. No. 16/729,157, filed Dec. 27, 2019, Quanci et at.
U.S. Appl. No. 16/729,170, filed Dec. 27, 2019, Quanci et at.
U.S. Appl. No. 16/729,201, filed Dec. 27, 2019, Quanci et at.
U.S. Appl. No. 16/729,212, filed Dec. 27, 2019, Quanci et at.
U.S. Appl. No. 16/729 219, filed Dec. 27, 2019, Quanci et at.
U.S. Appl. No. 16/735,103, filed Jan. 6, 2020, Quanci et al.
Joseph, B., “A tutorial on inferential control and its applications,” Proceedings of the 1999 American Control Conference (Cat. No. 99CH36251), San Diego, CA, 1999, pp. 3106-3118 vol. 5.
Knoerzer et al. “Jewell-Thompson Non-Recovery Cokemaking”, Steel Times, Fuel & Metallurgical Journals Ltd. London, GB, vol. 221, No. 4, Apr. 1, 1993, pp. 172-173,184.
U.S. Appl. No. 16/251,352, filed Jan. 18, 2019, Quanci et al.
U.S. Appl. No. 16/428,014, filed May 31, 2019, Quanci et al.
Industrial Furnace Design Handbook, Editor-in-Chief: First Design Institute of First Ministry of Machinery Industry, Beijing: Mechanical Industry Press, pp. 180-183, Oct. 1981.
U.S. Appl. No. 14/987,625, filed Jan. 4, 2016, Quanci et al.
U.S. Appl. No. 15/139,568, filed Apr. 27, 2016, Quanci et al.
ASTM D5341-99(2010)e1, Standard Test Method for Measuring Coke Reactivity Index (CRI) and Coke Strength After Reaction (CSR), ASTM International, West Conshohocken, PA, 2010.
Basset, et al., “Calculation of steady flow pressure loss coefficients for pipe junctions,” Proc Instn Mech Engrs., vol. 215, Part C. IMechIE 2001.
Clean coke process: process development studies by USS Engineers and Consultants, Inc., Wisconsin Tech Search, request date Oct. 5, 2011, 17 pages.
Costa, et al., “Edge Effects on the Flow Characteristics in a 90 deg Tee Junction,” Transactions of the ASME, Nov. 2006, vol. 128, pp. 1204-1217.
Crelling, et al., “Effects of Weathered Coal on Coking Properties and Coke Quality”, Fuel, 1979, vol. 58, Issue 7, pp. 542-546.
Database WPI, Week 199115, Thomson Scientific, Lond, GB; AN 1991-107552.
Diez, et al., “Coal for Metallurgical Coke Production: Predictions of Coke Quality and Future Requirements for Cokemaking”, International Journal of Coal Geology, 2002, vol. 50, Issue 1-4, pp. 389-412.
International Search Report and Written Opinion of International Application No. PCT/US2012/072181; dated Sep. 24, 2013; 13 pages.
Rose, Harold J., “The Selection of Coals for the Manufacture of Coke,” American Institute of Mining and Metallurgical Engineers, Feb. 1926, 8 pages.
Waddell, et al., “Heat-Recovery Cokemaking Presentation,” Jan. 1999, pp. 1-25.
Westbrook, “Heat-Recovery Cokemaking at Sun Coke,” AISE Steel Technology, Pittsburg, PA, vol. 76, No. 1, Jan. 1999, pp. 25-28.
Yu et al., “Coke Oven Production Technology,” Lianoning Science and Technology Press, first edition, Apr. 2014, pp. 356-358.
“Resources and Utilization of Coking Coal in China,” Mingxin Shen ed., Chemical Industry Press, first edition, Jan. 2007, pp. 242-243, 247.
Related Publications (1)
Number Date Country
20170015908 A1 Jan 2017 US
Divisions (1)
Number Date Country
Parent 13730673 Dec 2012 US
Child 15281891 US