Not Applicable
Not Applicable.
This disclosure relates to the field of well pressure control apparatus. More particularly, the disclosure relates to methods and devices for quickly disconnecting a lower marine riser package (LMRP) or other device from a well pressure control device coupled to a subsea wellhead.
Marine wellbore drilling techniques known in the art include the use of a pressure control apparatus such as a blowout preventer (“BOP”) disposed proximate the water bottom and coupled to the upper end of a surface conduit or casing disposed in the well (e.g., a “wellhead”). The BOP may comprise one or more sets of reversibly operable “ram=type” pressure control elements, for example, “blind rams” and “shear rams”, and in some embodiments an annular seal. Blind rams fully close an interior bore of the BOP housing to hydraulically isolate the well below the BOP housing. Shear rams may be provided to enable cutting through conduit and/or drilling tools disposed within the interior bore in the BOP housing and subsequently closing to hydraulically isolate the well below the shear rams. Annular seals may be used where it is desired to hydraulically isolate the well while enabling a conduit such as drill pipe, or other drilling tools to pass through the interior bore of the BOP housing.
Each of the foregoing ram-type pressure control elements may be disposed in opposed pairs on the BOP housing and may be operated by respective hydraulic ram actuators, e.g., pistons disposed in respective cylinders. Hydraulic fluid pressure to operate the various ram-type pressure control elements and/or the annular seal may be controlled by an hydraulic fluid line extending from a control valve manifold to a drilling platform on the water surface, and by providing a plurality of accumulators each having hydraulic fluid and gas (e.g., nitrogen) under pressure to supply a relatively large volume of fluid rapidly in the event it becomes necessary to close any one or more of the pressure control elements in the BOP. The accumulators also can supply hydraulic fluid even in the event the hydraulic fluid line to the surface becomes blocked or disconnected. A plurality of the foregoing types of pressure control elements may be connected to each other along the respective interior bores to form a BOP “stack.”
A BOP “stack” (i.e., two or more of the foregoing types of well pressure control devices arranged longitudinally one atop the other) may be coupled, at one longitudinal end opposed to the longitudinal end connected to the wellhead, to a conduit (e.g., a “riser”) that extends to a drilling platform proximate the water surface. Coupling to the riser may be through a set of devices called a “lower marine riser package” (LMRP). In certain situations, for example, adverse weather conditions, that make it desirable to move the riser and the drilling platform away from the well location, it then becomes necessary to disconnect the riser from the BOP stack. Disconnection may be performed, for example, by uncoupling the LMRP from the BOP stack after closing one or more pressure control elements in the BOP stack. Uncoupling may include, for example and without limitation, unthreading threaded connectors, removing coupling bolts from mating flanges and/or releasing a profile connector by rotating components of the LMRP.
Disconnecting the LMRP from the BOP stack in a station keeping emergency is a very important function for a BOP stack. It is known in the art to take one minute or longer to complete an emergency disconnect. Using known methods for LMRP disconnection such as by uncoupling the example devices described above may require that disconnection decisions are made early, e.g., dynamic positioning watch circles need to consider the disconnect time. In addition, permissible LMRP connector release angles can be smaller than flex joint angle ratings. That is, the LMRP release angle can be governing as to the amount of movement of the drilling platform during disconnect operations.
A coupling system according to one aspect of the present disclosure includes a lower marine riser package having a connector at a bottom end and at least one blowout preventer pressure control element coupled to a wellhead and having a connector at an upper end. Explosively frangible fasteners are used to couple the connector on the lower marine riser package to the connector on the at least one blowout preventer pressure control element. A method for separating a lower marine riser package from a blowout preventer coupled to a subsea wellhead includes closing a least one pressure control element in the blowout preventer. At least one explosively frangible fastener coupling the blowout preventer to the lower marine riser package is detonated. The lower marine riser package is then lifted from the blowout preventer.
In some embodiments the connector on the lower marine riser package is coupled to the connector on the at least one blowout preventer pressure control element by the explosively frangible fasteners being disposed through a corresponding bolt flange on each of the connector on the lower marine riser package and the connector on the at least one blowout preventer pressure control element.
In some embodiments the explosively frangible fasteners comprise explosively frangible nuts.
In some embodiments the connector on the at least one blowout preventer pressure control element comprises a profile connection at one longitudinal end.
In some embodiments the connector on the lower marine riser package comprises a profile connection to couple the connector on the lower marine riser package to the lower marine riser package.
In some embodiments a plurality of blowout preventer pressure control elements are coupled to the wellhead.
In some embodiments the lower marine riser package comprises at least one blowout preventer pressure control element.
A method for separating a lower marine riser package from a blowout preventer coupled to a subsea wellhead according to another aspect of the present disclosure includes closing at least one pressure control element in the blowout preventer. At least one explosively frangible fastener coupling the blowout preventer to the lower marine riser package is detonated. The lower marine riser package is then lifted from the blowout preventer.
In some embodiments, prior to detonating the at least one explosively frangible fastener, at least one auxiliary line extending between the lower marine riser package and the blowout preventer is uncoupled.
In some embodiments a connector on the lower marine riser package is coupled to a corresponding connector on the blowout preventer by a plurality of explosively frangible fasteners being disposed through a corresponding bolt flange on each of the connector on the lower marine riser package and the connector on the blowout preventer.
In some embodiments the explosively frangible fasteners comprise explosively frangible nuts.
In some embodiments the connector on the blowout preventer comprises a profile connection at one longitudinal end.
In some embodiments the connector on the lower marine riser package comprises a profile connection to couple the connector on the lower marine riser package to the lower marine riser package.
3.
The double mandrel 10 may comprise a lower mandrel 10A coupled to an upper end of the BOP stack 14 and an upper mandrel 10B coupled to a lower and of the LMRP 14. The lower mandrel 10A may be connected to the BOP stack 14, e.g., by a profile coupling, bolted flange, or any other connection known in the art. The upper mandrel 10B may be connected to the LMRP 12, for example, in any similar manner as the connection between the lower mandrel 10A and the BOP stack 14. A riser (not shown) may extend from the top of the LMRP 12 to a drilling platform (not shown) on the water surface. Although the BOP stack 14 shown in the various drawing figures and described herein may include a plurality of wellbore pressure control elements, for purposes of the present disclosure only one such pressure control element is needed.
In the present example embodiment, and referring to
A system according to the present disclosure may comprise a BOP stack which is connected to the wellhead by a connector. A first mandrel with explosively frangible fasteners is located on top of the BOP stack. A lower marine riser package (LMRP) is connected to the mandrel by means of a connector. In some embodiments, the connector may be a second mandrel having a bolt flange corresponding to a bolt flange on the first mandrel. In some embodiments, the second mandrel may have a profile connector at one end for coupling to the LMRP. In some embodiments, the first mandrel may comprise a profile connector similar in configuration to the profile connector on the second mandrel, whereby after separation of the two mandrels, a connection may be provided on the first mandrel to reconnect the LMRP or to connect a capping stack or other device to the BOP stack.
Auxiliary connections between the LMRP and the BOP stack may comprise choke and kill lines, boost lines, hydraulic and/or electric power lines and sensors.
In some embodiments, a double mandrel arrangement with explosive nuts may be used between the BOP stack and the LMRP. This would allow the first mandrel to be released from the lower stack but would still maintain an intact mandrel connection to reconnect either the LMRP or capping stack to the lower stack.
In some embodiments the explosively frangible fasteners could be attached to any other flanged connection on the BOP stack or LMRP. In some embodiments, explosively frangible studs, bolts, or another type of explosively frangible fastener could be used instead of explosively frangible nuts.
A method for separating a LMRP from a BOP stack according to some embodiments may comprise closing a pressure control element, e.g., a shearing element (either a static force operated shear ram or a kinetic energy operated shear ram) in a BOP stack coupled at its upper end to a lower marine riser package (LMRP). All auxiliary connections between the BOP stack and LMRP (if any are present) are disconnected. Explosively frangible fasteners that couple the LMRP to the BOP stack are detonated to separate the LMRP from the BOP stack. In some embodiments, reconnection of the LMRP to the BOP stack or coupling of another device such as a capping stack may be performed by latching dogs onto a connecting profile at one end of the mandrel or connector on an upper longitudinal end of a mandrel on the BOP stack.
Although only a few examples have been described in detail above, those skilled in the art will readily appreciate that many modifications are possible in the examples. Accordingly, all such modifications are intended to be included within the scope of this disclosure as defined in the following claims. In the claims, means-plus-function clauses are intended to cover the structures described herein as performing the recited function and not only structural equivalents, but also equivalent structures. Thus, although a nail and a screw may not be structural equivalents in that a nail employs a cylindrical surface to secure wooden parts together, whereas a screw employs a helical surface, in the environment of fastening wooden parts, a nail and a screw may be equivalent structures. It is the express intention of the applicant not to invoke 35 U.S.C. § 112(f), for any limitations of any of the claims herein, except for those in which the claim expressly uses the words “means for” together with an associated function.
Continuation of International Application No. PCT/US2017/057826. Filed Oct. 23, 2017. Priority is claimed from U.S. Provisional Application No 62/431,455 filed on Dec. 8, 2016. Both the foregoing applications are incorporated herein by reference in their entirety.
Number | Date | Country | |
---|---|---|---|
62431455 | Dec 2016 | US |
Number | Date | Country | |
---|---|---|---|
Parent | PCT/US2017/057826 | Oct 2017 | US |
Child | 16434215 | US |