Blythe, "Limiting Fault Currents between Private and Public Networks," Electrical Review, Great Britian, Oct. 5, 1973. |
"Fault Levels Too High?," Calor-Emag Corp. leaflet, No. 1197/6E. |
Bottger," The Application of I.sub.s -Limiters in Three Phase Systems," Calor-Emag Pub., circa Aug. 1967. |
Perry et al., "Ultra-High Speed Ground Switch Application and Development," AIEE Paper No. 62-1109, Jun. 1962. |
Heilmann, "The Economic Benefits of Using I.sub.s -Limiters," Calor-Emag Co. Pub., circa Feb. 1963. |
Keders et al., "A Current-Limiting Device for Service Voltages up to 34.5 kV," Paper A76 436-6, IEEE PES Summer Meeting, Portland, Oregon, Jul. 18-23, 1976. |
(S2729-0150) Miyoshi et al., "Ultra-High Speed Protection Device, Fuji Ultrup Fuse," Fuji Electric Review, vol. 18, No. 1 pp. 49-51 (1972). |