Abstract
A self-actuated cyclical flow interruption valve on a deployment tool is positioned at a proximal end of a well completion assembly. Fluid is pumped though the self-actuated cyclical flow interruption valve and vented immediately distal of the valve, to return to surface of the well. A water hammer pulse is generated each time the self-actuated cyclical flow interruption valve closes, thereby generating an impact force that acts to push the completion equipment distally into the well. The continuous cyclic force of the impact facilitates placement of the completion equipment where desired in the well, including within a horizontal extension of the well. Fluid discharged through the self-actuated cyclical flow interruption valve circulates up to the surface through a vertical and inclined section of the well.
Description
BACKGROUND

1. Field of the Invention


The present invention relates to placement of wellbore completions.


2. Description of the Related Art


Downhole drilling operations have seen use of well casings for some time. After a well is drilled, casings are inserted into the borehole to provide structural integrity to the borehole. Casings are often made up of sections of steel pipe that connect end-to-end as they are inserted into the borehole. Many wells that are drilled require a casing, and typically as the depth of the well increases, the diameter of successive sections of the casing decreases. A final completion, which may incorporate a casing section, screens, liners, valves or other components, is often required in the producing formation.


Often a borehole that begins as a vertical well will be extended in a horizontal direction, for example, to reach a petroleum reservoir that is disposed in a region laterally offset relative to the vertical portion of the well. In such wells, there is a need to ensure placement of completion equipment in the horizontal portion, and the horizontal extension can be relatively long.


In addition, various types of downhole vibratory tools have been used for through-tubing well intervention operations, including cleaning and milling operations inside liners after they are placed. It would be desirable to provide a specialized tool that can assist in the placement of completion equipment such as liners, screens, valves, patches, plugs, packers, velocity strings, diverters, flow control devices, monitoring equipment, whipstocks or any other equipment in the horizontal portion of a borehole.


SUMMARY OF THE INVENTION

The present invention provides a system and method to facilitate the placement of completion equipment or other similar equipment using a fluid actuated valve that helps push the equipment into the well. The exemplary embodiment of the system facilitates placement of completion equipment using a tool that includes a self-actuated cyclical flow interruption valve as the fluid actuated valve of the system. The self-actuated flow interruption valve can be placed on a deployment tool located at the top of the completion equipment. In the preferred embodiment the tool is releasably attached to the completion equipment. The valve and attached completion equipment are placed in position downhole, fluid is then pumped though the self-actuated flow interruption valve and vented to return to surface. The pulse that is generated when the self-actuated flow interruption valve closes creates an impact that acts to push the completion equipment distally into the well.





BRIEF DESCRIPTION OF THE DRAWINGS

Various aspects and attendant advantages of one or more exemplary embodiments and modifications thereto will become more readily appreciated as the same becomes better understood by reference to the following detailed description, when taken in conjunction with the accompanying drawings, wherein:



FIG. 1 is a schematic cross-sectional view of an exemplary system for extended reach completion placement including a self-actuated cyclical flow tool.



FIG. 2A is a schematic cross-sectional view of an exemplary system for extended reach completion placement including a self-actuated cyclical flow tool showing a pulse valve in the open state during completion placement.



FIG. 2B is a schematic cross-sectional view of an exemplary system for extended reach completion placement including a self-actuated cyclical flow tool showing a pulse valve in the closed state during completion placement.



FIG. 3 is a schematic cross-sectional view of an exemplary system for extended reach completion placement including a self-actuated cyclical flow tool showing the completion after landing the liner hanger at the bottom of the casing.



FIG. 4 is a schematic cross-sectional view of an exemplary system for extended reach completion placement including a self-actuated cyclical flow tool showing the retrieval of the deployment tools.



FIG. 5 is an enlarged cross-sectional view of a shear pin release mechanism of an exemplary system for extended reach completion placement.



FIG. 6 is an enlarged cross-sectional view of a reverse thread release mechanism of an alternate system for extended reach completion placement.



FIG. 7 shows an example of a water hammer impulse force time history of a system for extended reach completion placement.





DETAILED DESCRIPTION

Exemplary embodiments are illustrated in referenced Figures of the drawings. It is intended that the embodiments and Figures disclosed herein are to be considered illustrative rather than restrictive. No limitation on the scope of the technology that follows is to be imputed to the examples shown in the drawings and discussed herein.


The present invention provides a system and method to facilitate the placement of completion equipment or other similar equipment using a fluid-actuated valve that helps push the equipment into the well. The exemplary embodiment of the system facilitates placement of completion equipment using a tool that includes a self-actuated cyclical flow interruption valve as the fluid-actuated valve of the system. The self-actuated flow interruption valve can be placed on a deployment tool located at the top of the completion equipment. The completion equipment is fed into the well using deployment tubing. Fluid is then pumped though the self-actuated flow interruption valve and vented immediately below the valve to return to surface. The “water hammer pulse” that is generated when the self-actuated flow interruption valve closes creates an impact that acts to push the completion equipment distally into the well. Fluid discharged through the tool circulates up the vertical and inclined sections of the well, which is typically a larger diameter cased hole than the completion that is being placed. A portion of the flow, such as may be required for hole conditioning and lubrication, could be pumped into the liner during this procedure. The flow into the completion would be limited to prevent premature actuation of any pressure actuated completion equipment, such as packers and sleeve valves.


In an exemplary embodiment of this tool, a self-piloted hydraulic valve, such as described in U.S. Pat. Nos. 6,237,701 and 7,139,219, U.S. patent application No. 12/957,049, and in other commonly assigned pending patent applications, can be included on a deployment tool that is disposed on top of the liner. U.S. patent application No. 12/957,049 is herein incorporated by reference. However, it is not intended that the tool be limited to use of the self-piloted hydraulic valve disclosed in these patents, since other types of self-actuated fluid valves can alternatively be used to create water hammer pulses or vibration.


Referring to FIG. 1, the system for extended reach deployment 10 is shown during deployment from a drill rig 20. The completion may incorporate equipment such as screens, perforated tubing, casing and multistage fracture completions containing multiple sliding valves and ball seats any of which may be deployed by such a system. The system is designed to overcome the challenges of inserting the completion into an extended-reach horizontal openhole and into deviated wells with a tortuous wellpath including toe-up or high dogleg severity where sliding friction can hamper full deployment of the completion. The completion must generally be deployed through casing 30 that extends from surface to some depth. FIG. 1 shows a well that is cased 40 in the vertical section 50 with an openhole curve and horizontal section 60, but more complex geometries, including multiple telescopic casing strings, are common and this figure is not meant to be limiting in regard to well geometry.


The completion 70 is supported by a liner hanger 80 that is designed to latch into and seal with a casing profile 150 at the bottom of the casing 40. In the preferred embodiment, the liner hanger 80 is coupled to a release mechanism 90 just below a self-actuated cyclic flow interruption valve or impulse valve 100. Also in a preferred embodiment, this valve is of the pilot and poppet design disclosed in U.S. patent application No. 12/957,049. The valve is in turn supported on a deployment string 110 typically comprising joints of tubing that are deployed into the well by a drill rig 20 as shown or a workover rig or by a continuous string of coiled tubing. The deployment string 110 may include a section of heavy walled tubing to provide additional weight to push the completion though the curve and into the horizontal section of the well 50. These rigs include a rotary table 120 as shown or a top drive that is capable of rotating the deployment string 110. Fluid pumps 130 are provided and are connected to supply fluid to the deployment string 110 through a swivel 140. A coiled tubing rig may also be employed although this equipment does not allow rotation of the deployment string.



FIG. 1 shows the system 10 being lowered into a well with the completion 70 part way through the curved section of the openhole with no fluid flowing. Friction forces increase as the completion 70 enters the curve and horizontal section and the weight of the deployment string 110 may not be sufficient to push the completion 70 to bottom. At this point fluid can be pumped by pump 130 though swivel 140 and through the deployment string 110 as shown by arrows in FIG. 2A. The fluid flows through the pulse valve 100 and is discharged into the well above the release mechanism 90 to return to surface. Although not shown, some flow may also be discharged into the completion for well conditioning. Surface valves and equipment for handling the return flow are well known and are not shown.



FIG. 2A shows the pulse valve 100 in the open position with all fluid being discharged. FIG. 2B shows the impulse valve 100 in the closed position. Closing the valve 100 stops the flow of fluid and results in a water hammer impulse force shown by the large open arrow acting downwards at the valve 100. The water hammer impulse force is proportional to the mass flow rate of the fluid. An example of the cyclic impulse forces generated by the valve 100 as described in U.S. patent application No. 12/957,049, with a 2-78″ outer diameter, and while operating at 3 bbl per minute water flow rate, is shown in FIG. 7. The cyclic impulse forces act on the top of the completion 70 and drive it into the well.



FIG. 3 shows the completion 70 after it has reached bottom. At this point the liner hanger 80 engages the casing profile 150 and latches in place to prevent reverse motion or rotation. The design of liner hangers 80 and casing profiles 150 are well known and not described in detail here. A variety of liner hangers 80 and casing profiles 150 may be deployed depending on the well requirements. Referring to FIG. 3, fluid pumping has stopped and the deployment string is now released using the release mechanism 90. A shear pin type of release mechanism 90 is shown in FIG. 5. Once the liner hanger 80 is latched, overpull on the deployment string 110 will shear the pins 160 and allow retrieval of the deployment string 110, pulse valve 100 and release mechanism 90 as shown in FIG. 4. The release mechanism 90 may also incorporate reverse, left hand, threads to engage the liner hanger 80 as shown in FIG. 6. For this embodiment, right-handed rotation of the deployment string 110 will disengage the release mechanism 90 from the liner hanger 80 and allow retrieval to surface. More complex latch and release mechanisms are also in common use for tool release of the completion and may be employed to release the deployment string 110. The two options shown here are not meant to be limiting as other release mechanisms may be deployed with the extended reach deployment system 10.


Other exemplary embodiments (not shown) can use a plurality of fluid-actuated valves that are designed to interrupt the flow of fluid though tubing and to then impart an impact or cause a vibration due to the resulting water hammer effect. Multiple tools of this type can also be placed at different levels in the deployment string to increase the action of the tools.


Although the concepts disclosed herein have been described in connection with one or more exemplary form of practicing them and modifications thereto, those of ordinary skill in the art will understand that many other modifications can be made thereto. Accordingly, it is not intended that the scope of these concepts in any way be limited by the above description.

Claims
  • 1. A method for placing a completion into an openhole section of well below a well casing, comprising the steps of: (a) inserting a completion string connected to a liner hanger having a release mechanism section into a well,(b) inserting a flow cycling valve connected to a deployment string into a well,(c) activating a fluid pump on the surface to pump fluids downhole to the flow cycling valve disposed proximally of the completion string to generate one or more pressure pulses,(d) applying the force caused by the one or more pressure pulses to advance the completion distally into the well until the flow cycling valve and the liner hanger encounter a casing profile, and(e) causing the release mechanism to release from the liner hanger, thereby completing the placement of the completion in the well.
  • 2. The method for placing a completion into an openhole section of well below a well casing as described in claim 1, further comprising the step of: (a) latching the liner hanger when it encounters the casing profile, and(b) causing the release mechanism, where the release mechanism is a shear pin release type, to release by creating overpull on the deployment string.
  • 3. The method for placing a completion into an openhole section of well below a well casing as described in claim 1, further comprising the step of: (a) latching the liner hanger when it encounters the casing profile, and(b) causing the release mechanism, where the release mechanism is a reverse, left hand thread release type, to release by rotating the deployment string.
  • 4. The method for placing a completion into an openhole section of well below a well casing as described in claim 1, further comprising the step of: (a) removing the deployment string connected to the flow cycling valve and a released portion of the release mechanism, thereby completing the completion installation in the well.
  • 5. The method for placing a completion into an openhole section of well below a well casing as described in claim 1, wherein the flow cycling valve is a pulse valve.
  • 6. The method for placing a completion into an openhole section of well below a well as described in claim 5, wherein the pulse valve is a pilot and poppet water hammer valve.
  • 7. A system for placing a completion into an openhole section of well below a well casing, comprising: a completion string connected to a liner hanger having a release mechanism section,a flow cycling valve connected to a deployment string and disposed proximally of the completion string, anda fluid pump on the surface to pump fluids downhole to the flow cycling valve to thereby generate one or more pressure pulses, the flow cycling valve positioned so the force of the pulses serves to advance the completion distally into the well.
  • 8. The system of claim 7 wherein the release mechanism section is a shear pin type release mechanism and the release mechanism section is disposed between the completion and the flow cycling valve.
  • 9. The system of claim 8 wherein said release mechanism is coupled to the completion with shear pins and the external features on proximal end of the completion engage features on distal end of the casing thereby preventing axial motion of the completion.
  • 10. The system of claim 7 wherein the release mechanism section incorporates a reverse thread that engages the completion and external features on the proximal end of the completion that engage features at the end of the casing thereby preventing rotation of the completion but allowing for the rotation a releasable portion of the release mechanism section.
  • 11. The system of claim 7 wherein the flow cycling valve is a pilot and poppet water hammer valve.
  • 12. A system for placing a completion into an openhole section of well below a well casing, comprising: a completion string connected to a liner hanger having a release mechanism section,a pulse valve connected to a deployment string and disposed proximally of the completion string, anda fluid pump on the surface to pump fluids downhole to the pulse valve to thereby generate one or more pressure pulses, the pulse valve positioned so the force of the pulses serves to advance the completion distally into the well.
  • 13. The system of claim 12 wherein the release mechanism section is a shear pin type release mechanism and the release mechanism section is disposed between the completion and the pulse valve.
  • 14. The system of claim 13 wherein said release mechanism is coupled to the completion with shear pins and the external features on proximal end of the completion engage features on distal end of the casing thereby preventing axial motion of the completion.
  • 15. The system of claim 13 wherein the pilot and poppet water hammer valve is configured such that the poppet is reciprocally moveable between a closed position, in which it at least partially blocks pressurized fluid flow from the fluid pump on the surface from flowing through a poppet seat of the poppet, and an open position, in which pressurized fluid flows through the throat of the poppet seat, the valve creating a pressure pulse each time the poppet moves to the closed position.
  • 16. The system of claim 12 wherein the release mechanism section incorporates a reverse thread that engages the completion and external features on the proximal end of the completion that engage features at the end of the casing thereby preventing rotation of the completion but allowing for the rotation a releasable portion of the release mechanism section.
  • 17. The system of claim 12 wherein the pulse valve is a pilot and poppet water hammer valve.
  • 18. The system of claim 12 further comprising a swivel allowing for rotation of the deployment string.
  • 19. The system of claim 12 further comprising a casing profile, the liner hanger configured to latch on the casing profile as the completion string reaches an installation position in the well.
RELATED APPLICATIONS

The present application claims the benefit of U.S. Provisional Patent Application, Ser. No. 61/672,160 filed on Jul. 16, 2012 and U.S. Non-Provisional Patent Application, Ser. No. 12/957,049 filed on Nov. 30, 2010, each incorporated herein by reference in its entirety.

US Referenced Citations (126)
Number Name Date Kind
699273 Wolski May 1902 A
1963090 Jakosky Jun 1934 A
2342732 Gudmundsen Feb 1944 A
2359629 Dexter et al. Oct 1944 A
2388741 Hays Nov 1945 A
2421769 Wolfe Jun 1947 A
2445803 Rogers Jul 1948 A
2492605 Varney et al. Dec 1949 A
2535079 Lebert Dec 1950 A
2543063 Rodgers Feb 1951 A
2562721 Jakosky Jul 1951 A
2562724 Lebert Jul 1951 A
2743083 Zublin Apr 1956 A
2855671 Lundgren et al. Oct 1958 A
2902258 Hildebrant Sep 1959 A
2963099 Gianelloni, Jr. Dec 1960 A
3054595 Kaufmann Sep 1962 A
3058510 Tiraspolsky et al. Oct 1962 A
3065805 Martini Nov 1962 A
3433489 Wiese Mar 1969 A
3441094 Gallo et al. Apr 1969 A
3520225 Baugh Jul 1970 A
3568783 Chenoweth et al. Mar 1971 A
3603410 Angona Sep 1971 A
3606410 Inserra Sep 1971 A
3648786 Chenoweth Mar 1972 A
3648789 Eriksson Mar 1972 A
3655424 Orowan Apr 1972 A
3728040 Loanesian et al. Apr 1973 A
3741302 Brown Jun 1973 A
3802515 Flamand et al. Apr 1974 A
3810637 Bonvin May 1974 A
4033429 Farr Jul 1977 A
4114703 Matson, Jr. et al. Sep 1978 A
4190202 Yie Feb 1980 A
4196911 Matsushita Apr 1980 A
4213332 Bonomo et al. Jul 1980 A
4225000 Mauer Sep 1980 A
4246976 McDonald, Jr. Jan 1981 A
4324299 Nagel Apr 1982 A
4418721 Holmes Dec 1983 A
4437525 O'Hanlon et al. Mar 1984 A
4440242 Schmidt et al. Apr 1984 A
4454935 Pryor Jun 1984 A
4493381 Kajikawa et al. Jan 1985 A
4521167 Cavalleri et al. Jun 1985 A
4529046 Schmidt et al. Jul 1985 A
4573637 Pater et al. Mar 1986 A
4665997 Maurer et al. May 1987 A
4715538 Lingnau Dec 1987 A
4747544 Kranzle et al. May 1988 A
4762277 Pater et al. Aug 1988 A
4790393 Larronde et al. Dec 1988 A
4793435 Smith et al. Dec 1988 A
4817739 Jeter Apr 1989 A
4819745 Walter Apr 1989 A
4821961 Shook Apr 1989 A
4830122 Walter May 1989 A
4862043 Zieve Aug 1989 A
4863101 Pater et al. Sep 1989 A
4890682 Worrall et al. Jan 1990 A
4905775 Warren et al. Mar 1990 A
4923120 Hammelmann May 1990 A
4925510 Hojo et al. May 1990 A
4928509 Nakamura May 1990 A
4934254 Clark et al. Jun 1990 A
4979577 Walter Dec 1990 A
4997159 Yoshino et al. Mar 1991 A
5000516 Kolle et al. Mar 1991 A
5009272 Walter Apr 1991 A
5028004 Hammelmann Jul 1991 A
5051020 Schleicher Sep 1991 A
5121537 Matsui et al. Jun 1992 A
5190114 Walter Mar 1993 A
5191557 Rector et al. Mar 1993 A
5222425 Davies Jun 1993 A
5279262 Muehleck Jan 1994 A
5319610 Airhart Jun 1994 A
5382760 Staron et al. Jan 1995 A
5396965 Hall et al. Mar 1995 A
5603385 Colebrook Feb 1997 A
5646379 Hsu et al. Jul 1997 A
5685487 Ellis Nov 1997 A
5703421 Durkin Dec 1997 A
5740127 Van Steenwyk et al. Apr 1998 A
5743335 Bussear Apr 1998 A
5803188 McInnes Sep 1998 A
5909848 Zink Jun 1999 A
5909879 Simpson Jun 1999 A
5938206 Klosterman et al. Aug 1999 A
5950736 Goldstein Sep 1999 A
5953809 Kowalski Sep 1999 A
6027040 Frye-Hammelmann Feb 2000 A
6053261 Walter Apr 2000 A
6062311 Johnson et al. May 2000 A
6094401 Masak et al. Jul 2000 A
6191511 Zysset Feb 2001 B1
6237701 Kolle et al. May 2001 B1
6263969 Stoesz et al. Jul 2001 B1
6301766 Kolle Oct 2001 B1
6347675 Kolle Feb 2002 B1
6394221 Cosma May 2002 B2
6453996 Carmichael et al. Sep 2002 B1
6557856 Azibert et al. May 2003 B1
6774519 Pullen et al. Aug 2004 B2
6951262 West Oct 2005 B2
6952068 Gieras et al. Oct 2005 B2
6964270 Janssen et al. Nov 2005 B2
7139219 Kolle Nov 2006 B2
7198456 Kolle et al. Apr 2007 B2
7201238 Marvin et al. Apr 2007 B2
7310580 Zhou et al. Dec 2007 B2
7316274 Xu Jan 2008 B2
7524160 Kolle et al. Apr 2009 B2
7686090 Reimert Mar 2010 B2
20010030486 Pijanowski Oct 2001 A1
20040069530 Prain et al. Apr 2004 A1
20050028797 Janssen et al. Feb 2005 A1
20050178558 Kolle et al. Aug 2005 A1
20080210422 Clark Sep 2008 A1
20090154290 Radtke et al. Jun 2009 A1
20110024653 Huber Feb 2011 A1
20120132289 Kolle et al. May 2012 A1
20130000917 Slack et al. Jan 2013 A1
20130299196 Kolle Nov 2013 A1
20150101824 Kolle Apr 2015 A1
Foreign Referenced Citations (1)
Number Date Country
1568680 Jun 1980 DE
Non-Patent Literature Citations (5)
Entry
Borland et al., “Drill Bit Seismic, Vertical Seismic Profiling, and Seismic Depth Imaging to Aid Drilling Decisions in the Tho Tinh Structure Nam Con Son Basin—Vietnam.” Butsuri-Tansa vol. 51, No. 1: 27-44, 1998.
Kolle, Jack K., “A Comparison of Water Jet, Abrasive Jet and Rotary Diamond Drilling in Hard Rock.” Presentation for Energy Sources Technology Conference & Exhibition (ETCE '98), Houston, TX: 6pp., Feb. 2-4, 1998.
Kolle, Jack K., “Moving an Ice Mountain.” Mechanical Engineering: 49-53, Feb. 1990.
Park, Choon Byong; Miller, Richard D.; Steples, Don W.; and Black, Ross A., “Swept impact seismic techniques (SIST).” Geophysics. vol. 61, No. 6 (Nov.-Dec. 1996): p. 1789-1803. 13 FIGs.
Rector et al., “The use of drill-bit energy as a downhole seismic source.” Geophysics vol. 56. No. 5:628-634, May 1991.
Related Publications (1)
Number Date Country
20130299196 A1 Nov 2013 US
Provisional Applications (1)
Number Date Country
61672160 Jul 2012 US
Continuation in Parts (1)
Number Date Country
Parent 12957049 Nov 2010 US
Child 13943584 US