Field of the Invention
This invention relates to structures for resisting seismic loading of structures and, more particularly, to novel systems and methods for retrofitting structures to increase seismic resistance.
Background Art
Seismic retrofitting of “soft, weak, or open front” (SWOF) buildings presents tactical challenges for engineers. Utilities and other obstructions often make moment-resisting frames difficult to install. The most viable retrofit component is often a cantilevered column with an appropriate new foundation.
The SEAOC (Structural Engineers Association of California) Blue Book suggests strategies that rationalize designing cantilevered columns using the R factor for the overall building. Plywood shear walls are typically used as the lateral force resisting system in SWOF buildings. Using the R factor for plywood shear walls instead of R for cantilevered column systems reduces seismic design forces, thus reducing construction costs. However, building officials may not accept the Blue Book rationale; furthermore, designers may wish to increase the ductility of cantilevered columns.
Seismic retrofitting is particularly difficult in established urban areas, such as San Francisco. Many building lots in San Francisco are very narrow, providing limited room for seismic retrofitting structures, requiring cantilevered columns or moment-resisting frames. Likewise, the front of almost all mid-block buildings includes a garage door, main entry door or stairwell, and a door to a service alley. Some buildings have two stairways; some have two garage doors; in some neighborhoods the garage door is recessed inward several feet from the front wall, and the service alley entrance opens from the wall on one side of the recess. Hardly any buildings have more than four feet of unobstructed wall length available for installing shear panels.
Near the front of almost all buildings in San Francisco there are multiple gas and electric meters, either in the garage or service alley. Water service is usually not metered separately, so a single water supply line is typical. In some buildings, the waste plumbing stack from stories passes next to the garage door. Relocation of such structures is extremely expensive. Other obstructions to seismic retrofitting include fire-sprinkler lines, water heater flues and HVAC ducts. Often the garage door hugs the foundation or side wall of the garage and no space is left for vertical members of a moment-resisting frame. Owners of buildings affected by the mandatory soft story retrofit ordinance must often relocate utilities, at substantial added cost, to allow installation of steel frames. For owners who hope to strengthen their buildings voluntarily, the added costs may simply cause them to drop their retrofit desires altogether.
The apparatus and methods disclosed herein provide an improved approach to seismic retrofitting where space is very limited.
In view of the foregoing, in accordance with the invention as embodied and broadly described herein, a method and apparatus are disclosed in one embodiment of the present invention as including a column defining a first column end and a second column end offset from one another along the vertical direction. A structural fuse defines a first attachment point, a second attachment point, and a third attachment point, the second attachment point being positioned between the first and third attachment points.
The structural fuse is pivotally secured to the column at the second and third attachment points having the first attachment point extending beyond the first column end. The structural fuse is configured to yield in response to a load in a horizontal direction perpendicular to the vertical direction and applied at the first attachment point that is insufficient to cause yielding of the column. The third attachment point may a slot having a long dimension oriented in the vertical direction, the structural fuse being pinned to the column through the slot.
The apparatus includes a building defining a superstructure offset from a ground plane, the first attachment point being secured to the superstructure and the column being rigidly anchored to the ground plane. The structural fuse and column are effective to provide a seismic response factor of at least 6.5 for the building.
The apparatus may include a retention plate, a portion of the structural fuse between the second and third attachment points being sandwiched between the retention plate and the column. In some embodiments, the retention plate is pivotally mounted to the column coaxially at the second attachment point. The retention may define an arcuate slot, the third attachment point being secured to the column by a pin positioned within the arcuate slot.
In some embodiments, the column is an I beam defining first and second flanges and a web extending between the first and second flanges, the second and third attachment points being pivotally secured to the web.
In some embodiments, a first separation between the first and second attachment points is greater than a second separation between the second and third attachment points.
In some or all embodiments, the third attachment point is a slot having a long dimension oriented parallel to the vertical direction.
In some embodiments, the structural fuse has an increasing width with distance from the third attachment point toward the second attachment point. The increasing width with distance from the third attachment point toward the second attachment point may be effective to cause the structural fuse to yield substantially simultaneously along a length of the structural fuse between the second and third attachment points. In some embodiments, the width increases with the distance from the third attachment point toward the second attachment point proportionally to a square root of the distance.
A corresponding method of installation is also disclosed and claimed.
The foregoing features of the present invention will become more fully apparent from the following description and appended claims, taken in conjunction with the accompanying drawings. Understanding that these drawings depict only typical embodiments of the invention and are, therefore, not to be considered limiting of its scope, the invention will be described with additional specificity and detail through use of the accompanying drawings in which:
It will be readily understood that the components of the present invention, as generally described and illustrated in the drawings herein, could be arranged and designed in a wide variety of different configurations. Thus, the following more detailed description of the embodiments of the system and method of the present invention, as represented in the drawings, is not intended to limit the scope of the invention, as claimed, but is merely representative of various embodiments of the invention. The illustrated embodiments of the invention will be best understood by reference to the drawings, wherein like parts are designated by like numerals throughout.
Referring to
The retrofitting structure 10 includes a column 14 having a long dimension thereof oriented parallel to the vertical direction 12a. One or more structural fuse 16 define attachment points at the top T and bottom B of an active region and an attachment point C above point T, the portion between points C and T referred to herein as the extension. Points T and B are pivotally fastened to the column 14 and point C is pivotally fastened to the superstructure of the building in which the retrofitting structure 10 is installed. In the embodiments disclosed herein a loading structure 18 is fastened to the superstructure and defines an attachment point for the structural fuse 16. In the illustrated embodiment the loading structure 18 has a T-shaped cross section in the lateral direction 12b, with the structural fuse being pinned to a vertically downward extending flange of the loading structure 18.
A bottom portion of the column 14 is fastened to the ground 20, such as by being placed in concrete, bolted to a frame member that itself is fastened to concrete, or by some other means that fixes the base of the column 14 with respect to directions 12b and 12c. In particular, the fixing of the column 14 to the ground 20 is such that it resists rotation of the column 14 in a plane parallel to directions 12a, 12b.
The top end of the column 14 may be structurally mounted to the loading structure 18 exclusively by the structural fuses 16. However, other structures such as drywall or non-structural framing may be positioned around the column 14 and loading structure 18, but may be insufficient to substantially alter the function of the retrofitting structure 10. The structural fuses 16 may therefore extend vertically above the top end of the column 14 in order to mount to the loading structure 18 without the column 14 interfering with the loading structure 18.
Referring specifically to
In some embodiments, this approximately simultaneous yielding is achieved by having width between edges 22 in the lateral direction 12b increasing with distance from point B moving to point T. The separation of edges 22 may increase according to a function having at least one term equal to Sqrt(y), where y is a distance from point B along the active region.
In the illustrated embodiment, the structural fuses 16 are fastened to the column 14 by means of apertures 24a, 24b, 24c at points C, T, and B, respectively. Bolts 26a, 26b, 26c pass through apertures 24a, 24b, 24c and through the column 14 in order to fasten the structural fuses 16 to the column 14 and constrain rotation about points C, T, and B as the structural fuses bend and deform.
The bending of the structural fuses 16 may result in shortening of the span BT as it becomes the chord length of the arcuate deformed structural fuse 16 between points B and T. Accordingly, the aperture 24c may be embodied as a slot having a long dimension thereof oriented in the vertical direction 12a when the structural fuses 16 are undeformed. Accordingly, when deformed as shown in
In some embodiments, buckling of the structural fuses 16, i.e. any movement out of the plane of directions 12a, 12b is prevented or reduced by retention plates 28 that also fasten to the column 14 having the structural fuses 16 sandwiched between the column 14 and the retention plates 28. The retention plates 28 may be fastened to the column 14 to achieve a certain amount of clamping force in order to prevent buckling of the structural fuses 16 and may exert a significant frictional force on the structural fuse 16 and may therefore operate as a damping force. In some embodiments the frictional force is undesirable.
Experiments conducted by the inventor have shown that localized buckling of the structural fuses 16 leads to rapid fatigue cracking and failure. The retention plate 28 may therefore be selected to have adequate strength and stiffness to keep the structural fuses 16 from buckling along the edge 22 that is currently in compression. However, if buckling is limited to small amplitude, then failure may occur elsewhere.
In some embodiments, the retention plates 28 are secured to the column 14 by the same bolts 26b, 26c that constrain rotation of the structural fuses 16. In some embodiments, the retention plates 28 are additionally or alternatively fastened to the column 14 by fasteners 30 positioned such that they do not interfere with the bending of the structural fuses 16. As shown, this may include positioning the fasteners 30 vertically near points T and B and laterally offset therefrom such that for the entire range of movement of the structural fuses 16, the structural fuses 16 will not contact the fasteners 30.
In the embodiment of
Referring specifically to
The retention plates 28 may likewise include flanges 38 extending in the longitudinal direction 12c and a web 40 extending between the flanges 38 in the lateral direction 12b. The flanges 38 increase the stiffness of the retention plates 28 and enable them to further reduce buckling of the structural fuses 16. In some embodiments, the retention plates 28 may be embodied as a length of HSS (hollow structural section) cut in half lengthwise. A retention plate 28 made of HSS provides for deeper flanges 38 and correspondingly increased stiffness. Another advantage of HSS is the surface finish, which reduces friction. The gentle corner radius and the smoothness of the wall of HSS also causes much less damage to the structural fuses 16 as they slide beneath the retention plates 28.
HSS is available in a variety of sizes and thickness and therefore provides a variety of widths and thickness of the web 40 and height of the flanges 38 in the longitudinal direction 12c. This allows designers to choose a width suitable for the particular structural fuses 16 and column 14 that the retention plates 28 needs to match. Thicker HSS sections can prevent out-of-plane deformation of the web 40 that spans between the flanges 38.
As shown in
As shown in
As Point C moves back and forth it follows an arc of radius CT, with Point T at the center (
In experiments conducted by the inventor, the top of the slot 42 enlarged under repeated cyclic loading. This created a key-hole shape, and prevented free movement of the bolt 26a at Point C as the loading plate traveled back and forth. Accordingly, the loading structure 18 may have an increased strength or thickness to prevent this deformation. Additionally or alternatively, the loading structure 18 may be positioned to bear against the top of the web 34 so that the loading structure 18 will not be pulled down if the bolt 26a snags in the slot 42 as it follows the downward arc during its travel.
Referring to
As is apparent in
In the elastic range, stress in the structural fuse between Points T and B is given by:
σ=Rbot(y)/ S (1)
where y is the distance from Point B as shown, and S is the elastic section modulus of the structural fuse given by:
S=td(y)2/6 (2)
where t is the thickness of the structural fuse 16 (parallel to the longitudinal direction 12c) and d(y) is the width (parallel to the lateral direction 12b) at that distance y from point B along the structural fuse 16 that is under consideration.
For bending stress to be uniform along the active region of the structural fuse 16, S may advantageously increase linearly with distance from Point B. Linear increase in S means that width d(y) must vary with the square root of the distance from Point B, which is reflected in the curving edges 22 of the structural fuse 16. Note that the short arcs near the ends of the active region of the structural fuse 16 merely provide smooth transitions at connection points B and T.
Cyclic loading at Point C causes bending in the structural fuse 16 to alternate between concave to the left and concave to the right. To prevent low-cycle fatigue in the structural fuse 16, the strain should be limited to 20 times the yield strain for the particular material, such as steel, used to form the structural fuse 16 (Uang, 2016). For an expected yield strength Fy of 55 ksi for the structural fuse 16, this gives a limit of about 3.8 percent total strain. Wider structural fuse 16 sections require greater arc radii to limit bending strain, which corresponds to a longer active region. Geometric relations between the structural fuse 16 width and radius influence the length of the active region.
In order to limit torsional movement of the retrofitting system 10, the deflection of the structural fuse 16 should be comparable to the deflection of seismic force resisting system (SFRS) elements along other lines of resistance, e.g. the longitudinal direction 12c.
Deflection at Point C for a given angle of rotation θ can be adjusted by varying the distance between points C and T within a reasonable range. However, changing this parameter affects many other parts of the assembly. Calculated elastic deflection for the structural fuse 16 itself may range from 0.1 inch to 0.22 inch for several different configurations. Elastic deflection of the column 14 may be calculated using the classic formula for a cantilevered beam with concentrated load at the free end, where deflection is given as PL3/3EI, where P is the lateral load, L is the length of the column 14 above the ground 20, E is the elastic modulus of the column 14, and I is the moment of inertia of the column 14. The design example given below illustrates the relationship between the lengths
The need for clamping to prevent buckling of the structural fuse 16 may be balanced with respect to friction that results from increased clamping force. Friction against a lower portion (closer to point B) of the structural fuse 16 will increase the moment closer to the top of the active region. This will focus the yielding in the upper region (closer to point T), where the width-to-thickness ratio is greatest. When initial yielding occurs predominantly (or only) in the upper region, it may result in early local buckling and failure.
In order to reduce friction, the surfaces of the web 40 of the retention plate 28 and/or the web 34 of the column 14 in contact with the structural fuse 16 may be smooth. In some embodiments, these surfaces may be polished or treated with lubricants to reduce friction. The lubricant used is preferably very viscous and chemically stable inasmuch as the retrofitting structure may not be needed for decades after the assembly is installed but would need to still function. Other methods to reduce friction include sandwiching a thin layer (or layers) of plastic between the structural fuses 16, column 14 and retention plate 18 or coating components with slippery material, or a combination of any of these approaches. Coatings or sheets may preferably have high compressive strength comparable to the steel components.
The edges of the retention plate 28 may be rounded, as shown in
In order to account for friction, the contours of the edges 22 may be adjusted from the Sqrt(y) profile mentioned above. For example, the width of the active region of the structural fuse 16 that will theoretically lead to simultaneous yielding along the length of the active region may be multiplied by a “capacity increase factor” (CIF) to provide an increased section modulus at any particular location along the structural fuse. Examples of CIF values include:
Testing indicates that cases 1 and 2 provide particularly good distribution of yielding, especially as compared to structural fuses 16 in the absence of use of the CIF. When yielding first occurs at the ‘weakest’ point along structural fuses 16 with an augmented width according to the CIF, the extreme fiber bending stress at a particular point along the active region is equal to Fy divided by the CIF at the point under consideration. Contemporary steel can provide impressive ductility when treated properly. For the CIF of type 2, structural fuses 16 survived 10 cycles of 2.5 inches to 3 inches before failure. Note that friction is independent of the thickness of the structural fuse 16. Accordingly, as the thickness of the structural fuse 16 is increased, it may be found that the CIF could be reduced.
Referring to
In the plot of
General Design Approach
The manner in which the dimensions of the structural fuse 16 and column 14 are selected for a given application will now be described. The retrofitting structure 10 would typically be paired with more conventional structural elements and systems. This section discusses some of the interactions between existing building code sections and design considerations for the retrofitting structure 10.
Comparison to Conventional Structural Systems
The combination of cantilevered column 14 and structural fuse 16 does not match any conventional structural system. Choosing seismic design parameters (overstrength, deflection amplification, and response factors) leaves an enormous range of possibilities: for example, R is 1.25 for ordinary cantilevered columns, and 8 for special moment frames. The retrofitting structure 10 has traits of both. Guidance may be found in the document FEMA (Federal Emergency Management Agency) recently developed: “Quantification of Building Seismic Performance Factors: Component Equivalency Methodology” FEMA P-795 (FEMA, 2011), which is hereby incorporated herein by reference.
FEMA P-795 details the analysis, testing, and conceptual comparisons considered acceptable to determine whether a particular component can be substituted into a particular conventional structural system. Four factors are considered in determining equivalency:
The retrofitting structure 10 is particularly suited for bracing wood-framed buildings. For substitution into wood-framed buildings braced with WSP shear walls, the structural fuse 16 needs to have similar initial stiffness, ductility, peak strength, post-yield strength, and ultimate deformation capacity.
Experiments conducted by the inventor indicate that performance matching that of WSP shear walls can be achieved through design choices for the retrofitting structure 10. Accordingly, the retrofitting structure 10 could be substituted into wood structural panel (“WSP”) shear wall systems using seismic response factor R=6.5, overstrength factor Ω0=3, and deflection amplification factor Cd=4.
Linear Static Design Approach
The retrofitting structure 10 is particularly suited for wood-framed buildings of four stories or less, which would typically be analyzed using the linear static design approach in ASCE-7 Section 12.8, Equivalent Lateral Force Procedure (ELF Procedure).
Seismic Force Calculations
R=6.5
ρ=1.0 or 1.3, as appropriate under ASCE-7 requirements (redundancy factor; penalty for lack of redundant elements)
A detailed design example will be presented in following sections.
Strength of Column 14
The column 14 may advantageously remain in the elastic range (with an appropriate safety factor) when the structural fuse 16 reaches full plastic moment. American Institute of Steel Construction (“AISC”) Seismic Provisions require using the “expected material strength,” Ry and Fy (where Fy is the specified steel yield strength, and Ry is the expected strength ratio given in AISC 341 Table A3.1) for designing adjoining members. Ry varies from 1.1 to 1.5 for plate or bar stock, depending on the type of steel used. The preceding reflects the exception given in ASCE 7 that caps forces increased by the overstrength factor:
The structural fuses 14 may be designed such that the applied load P induces yielding. Since the plastic modulus of a rectangular section is 1.5 times the elastic section modulus, a load of 1.5 P is required to bring the structural fuses 16 into fully plastic bending. Applying Ry on top of this we get a factored value of P(col) for designing the column 14 as:
P(col)=1.5(P) Ry, (3)
where P(col) is the force for which the column 14 should remain elastic, P is the force determined through the ELF Procedure, and Ry is an expected strength ratio. Note that for calculating the maximum moment in the column 14 we need to calculate the moment M in the column as if P(col) is applied at point C, which is above the top of the column 14.
Load Calculations Related to Story Drift
Drift limits are given in ASCE-7 Table 12.12.1 and depend on risk category and design of non-structural elements to accommodate drift. For a typical unfinished lower level garage, a drift limit of 0.025h is appropriate, where h is the height from garage floor to first floor sheathing. Two important provisions in ASCE-7 apply to determining story drift, as follows:
Drift includes contributions from deformation of both the column and the structural fuses. Typically the combined elastic deformation at design load would be determined and increased by the deflection amplification factor, Cd. The amplified deflection must be less than the allowable story drift.
The Cd factor is intended to give a realistic estimate of actual deflections when yielding occurs at design level forces. Cd is described as an “uncertainty factor.” The design approach described in this application ensures that the structural fuses 16 are the only elements that yield in the retrofitting structure 10. To maintain efficiency of design one could argue that Cd should only apply to the structural fuses' 16 contribution to total deflection. Cantilevered column deflection of PL3/3EI has been accepted for over a century with no uncertainty.
Applying Cd to the entire retrofitting structure 10 can increase the required stiffness of the column 14 substantially, resulting in structural sections two or three incremental sizes heavier than would be required to meet only the strength requirements. Analyses of structural fuses 16 conducted by the inventor indicate that a peak elastic deformation in the range of 0.10 to 0.22 inches is likely achievable.
Peak load capacity may be determined by obtaining load-deformation curves well beyond peak elastic load, into the yielding range, and beyond peak load capacity. This understanding of peak load capacity enables determination of how to apply Cd.
Design Example (ASD)
The retrofitting structure 10 fills the need for bracing soft-story buildings in cities such as San Francisco. The City of San Francisco has mandated retrofitting a few thousand soft-story buildings that have a typical maximum size of 25 feet wide by 65 to 80 feet deep. Very few of these have more than three levels above the soft story.
Light wells, inner stairs and decks, etc. usually change the building perimeter from a simple rectangle to a “dumb-bell” or “hourglass” shape. Sometimes the center portion is so narrow that the floor diaphragm will not span from front to back of the building if seismic force resisting elements are located only at the ends.
The following design example presents a structural fuse 16 and column 14 combination meant to brace a three-story wood-framed building with a tributary depth of 35 feet (one-half of an assumed 70-foot deep building). Building material weights used are typical. This example assumes a garage ceiling height of 8 feet.
Seismic Weight
Building weight is determined as 165 pounds per square foot of ground level footprint area. Assuming light wells of 5 feet by 20 feet on both sides of the building we subtract 200 square feet from the gross building area. This gives a total seismic weight, W, of:
W=[(25′×70′)−2(5′)(20′)](0.165 ksf)=256k
Seismic Force Tributary to Structural Fuses & Column
Using the Equivalent Lateral Force Procedure given in ASCE-7, Section 12.8, we find the tributary force at the open front of the building as follows:
V=CSW. (4)
The seismic coefficient, CS, is determined as follows:
CS=SDS/(R/Ie). (5)
Equation (5) is evaluated using the following values: SDS=1.1 (hypothetical site in central San Francisco), R=6.5 (assuming properties of WSP shear walls), and Ie=1.0. The resulting value is CS=1.1/6.5, or CS=0.169
Our tributary V according to (4) is then: V=0.169 (256k/2)=21.7.
There are three more adjustments to make. First, we need to multiply by the redundancy factor ρ of 1.3 since we are designing an element intended to resist 50% of the story shear. Next, the California Existing Building Code allows multiplying V by 0.75 for seismic retrofits. Finally we multiply by 0.7 since we are using allowable stress design. Using the notation from
P=21.7(1.3)(0.75)(0.7)=14.8k.
Mounting Column Initial Design
As discussed earlier, the column 14 is preferably designed to resist a moment developed by a force causing full yielding of the structural fuses 16, multiplied by Ry. For the structural fuses 16 we use ASTM A572 Grade 50 steel. The corresponding Ry per AISC 341 is 1.1. In the absence of complete testing, it is appropriate to increase Ry to 1.25 or more. In this example we will use 1.3 for Ry.
Thus our column 14 is designed based on a magnified load, P(col) of:
P(col)=1.5P (1.3)=1.95 P=28.9k.
One of the major cost savings in using the structural fuses 16 as presented here is that no welding is needed. To avoid a welded base plate, we embed the column 14 in a reinforced concrete footing designed to resist the forces described herein as known in the art of concrete construction.
Design of the column 14 is based on the following: the workpoint for the bottom of the column is the midpoint of a 30 inch deep grade beam, the grade beam is set under a 3 inch thick floor slab, and the ceiling height is 8 feet. Assuming we connect to the underside of the first floor framing at ceiling level, the design column height is 1.25+0.25+8 feet, or H=9.5 feet.
The design moment is:
M=28.9k (9.5 ft)=274 ft.−k
The required section modulus, S, and allowable stress increase of 1.2 for transient loading provides:
Smin=274(12)/0.6(50 ksi)(1.2)=92.0 in3.
If we limit ourselves to seismically compact sections, we can choose a W10×88, W12×96, or W14×68 steel beams for the column 14. Depending on space available for the column 14 and drift considerations, one of the above may be preferred over the others.
Structural Fuse Geometry
material thickness (in longitudinal direction 12c), link width (in lateral direction 12b), active length (separation between points B and T), extension length (distance between points C and T), and yield strength of the steel used to make the structural fuse. These all interact and affect initial stiffness, ultimate deflection before the arced structural fuse 16 contacts the column flanges 32, ductility, etc.
As an initial trial we start with ½ inch thick structural fuses. If we use ½ inch thick plate or bar stock we can determine the required width based on desired stress levels. To reduce the chance of connection holes affecting behavior of the yielding steel we will increase the section modulus within approximately 1.5 inches above the aperture 24c and below the aperture 24b. The increased width portion above aperture 24c and below aperture 24b may have smaller or larger length. Accordingly, references to the 1.5 inch distance below may be replaced with this smaller or larger length.
For the tributary load of 14.8k, given the structural fuse 16 having an active region length of 30 inches and an extension length of 10 inches, we determine Rtop and Rbot as 19.7k, and 4.93k, respectively. These reactions are divided between two structural fuses 16 on either side of the column 14 (see
We want the structural fuse 16 to reach the yield stress at the point 1.5 inch above Point B initially, and for yielding to progress up the link toward Point T.
Using Equation 1 and solving for S we find:
S =(Rbot)(y)/(2 Fy). (6)
Substituting the right-hand expression above into Equation 2 and solving for d we get:
d=√{square root over (3Rbot(y)/t(Fy))}. (7)
Using earlier values we calculate d at the bottom of the active region of the structural fuse (y=1.5 inches) as:
dbot=√{square root over (3(4.93k)(1.5 in)/(0.5 in)(50k/in2))}=0.94 inch.
For the remainder of the active length we want the stress to diminish as we move from Point B to Point T at any particular load. The stress variation is based on the capacity increase factor (CIF) of the link, where CIF may be a function of y as outlined above:
d=√{square root over (3Rbot(y)(CIF)/t(Fy))} (8)
For the point 1.5 inch below Point T (where y=28.5″), and using a CIF of 1.5 at that point, we substitute the following into Equation 8:
dtop=√{square root over (3(4.93 k)(28.5 in)(1.5)/(0.5 in)(50 k/in2))}=5.03 inches.
Widths along the active length can be determined with a spreadsheet at desired increments.
Checking Curvature of the Structural Fuse under Load
To assure that the structural fuse 16 does not suffer low-cycle fatigue it may be preferable to limit the strain in the active region to a maximum strain between 5 and 6 percent.
Using similar triangles and assuming “small” deformation, the radius of curvature, RC, of the center line of the structural fuse 16 extending between points B and T has the following relationship to strain, ε, and depth of section, d: RC=(d/2)/(ε/2). Note that we use only half of the strain to determine the radius; the strain will double when cyclic bending reverses the curvature. Thus the radius of curvature reduces to:
RC =d/ε. (9)
Ultimate Story Drift versus Extension Length of Structural Fuse
Choosing a “target deflection” for the structural fuse 16 connection point C at peak load requires careful consideration. For buildings braced with WSP shear walls, 4% story drift is widely accepted as the dividing line between a building that can be repaired or one that must be demolished. WSP shear walls reach their peak strength at around 2.5% story drift. Accordingly, a deflection between 3 and 4 percent drift may reasonably be assumed to assure that the structural fuse 16 and column 14 will be the last structural elements to fail in a building braced with WSP shear walls. (Note: the “target deflection” has nothing to do with allowable story drift.)
If we aim for a 3.5 inches deflection of Point C from its neutral position (a story drift of about 3.5% for an 8-foot ceiling height), a 10 inch extension of the structural fuse 16 must rotate 20 degrees about Point T to give this drift (i.e, (10 inches)sin(20°=3.4 inches). For a 20-degree arc, the vertical travel of Point C is 0.63 inch. The vertical slot 42 in the loading structure 18 preferably accommodate at least this much vertical travel. Allowing vertical travel for an even greater distance, e.g. 1.5 inches, should have no ill effect on the system. Note that deflection of the column 14 will contribute to the desired 3.5 inches total deflection.
Initial Geometry Check
We want the structural fuse 16 to have initial stiffness similar to a WSP shear wall, while maintaining strength up to at least the story drift where WSP shear walls reach peak strength. The previous sections gave the relationship between strain and curvature, and a target story drift to match WSP shear walls. We need to confirm that the geometry of the structural fuse 16 will provide the target drift level, while at the same time staying below the level of strain that would lead to low-cycle fatigue.
Bending strain depends on the width of the structural fuse 16 and its curvature. Because the width varies along the structural fuse the curvature will also vary, with the smallest radius near the bottom (Point B). Assuming an average curvature gives an approximation. However, in reality the deformed shape varies significantly. The variations caused by friction or other factors outweigh any perceived accuracy that a careful effort at predicting the actual deformed shape would give. In particular, the unpredictable performance due to friction motivates use of the capacity increase factor (CIF) in order to compensate for this uncertainty.
Assuming that we have a CIF of 1.25 at the midpoint of B and T, we calculate the width of the structural fuse as 3.33 inches. Substituting this width into Equation 9, along with our allowable strain of 5%, we can find the radius of curvature RC:
RC=3.33/0.05=67 inch.
Again using simple geometry, we can find relationships between the radius of curvature RC, distance between the pins at Points B and T, and the distance that the centerline of the structural fuse 16 deflects from its neutral position. As shown in
For chord length L between pins at Points B and T, Radius RC, x+Δ=RC, and with
Δ=RC−√{square root over (RC2−L2/4)} (10)
L=2√{square root over (2(RCΔ)−Δ2)} (11)
RC=(Δ2+L2/4)/2Δ□□□ (12)
The deformed link must fit between the flanges 32 of the column 14. for improved performance, the structural fuse 16 should not encroach within the width of any fillet at the transition between the flange 32 and web 34. To meet this restriction, d/2 at the midpoint of the active region plus the quantity Δ as calculated using Equation 10 above, preferably does not exceed half the width between any fillet transition between the flange 32 and web 34 of the column 14. Conversely, giving too much room between the structural fuse 16 at its tightest recommended curvature and the inside face of the column flange 32 could allow significantly greater strain at high story drift. Restricting travel of the structural fuses 16 provides a “safety net” for the system.
We can calculate Δ using (10) with the structural fuse length L of 30 inches and the radius we just determined. Thus:
Δ=67−√{square root over (672−302/4)}=1.70 inches
Now we check clearance between the deformed link and the fillet area of the column 14:
Δ+d/2=1.70+(3.33/2)=3.37 inches
Using a W14×68 as the column 14, AISC tables show 10.875 inches as the distance between tangent points at the innermost edges of fillets between web 34 and flanges 32 (distance “T” in the AISC tables, hereinafter denoted as Tk). Half of Tk is 5.44 inches, which exceeds the 3.37 inches determined above.
Checking Maximum Deflection of Point C
Seismic force is delivered to the system through a pinned connection at Point C, which will move in a circular arc about Point T as shown in
The next step is checking to see if the deformed structural fuses' rotation at Point B will give the 3.5 inch deflection sought in the previous section. If the deflected active region of the structural fuse 16 formed a circular arc between points B and T, and a line tangent to said arc at point T extended to point C′, then the angle θ in
ΔC=
Deflection at C=(10)[30/(2(67))]=2.24 inches
To achieve our desired 3.5 inches deflection of Point C, we need to adjust the geometry of the system. For the same rotation at point T, we could increase the link extension
To avoid the cascading effect just described, we can try lengthening the distance between points T and B; this will encompass a greater arc length, quickly increasing the link rotation at Point T.
Our earlier calculation of Δ+d/2 gave 3.37 inches, compared to an available distance Tk of 5.44 inches. We can therefore increase Δ to be equal 5.44−d/2, or 5.44−1.67=3.77 inches.
Substituting Δ of 3.37 inches into (11), along with RC as previously determined, we solve for L:
L=2√{square root over (2(67)(3.77)−(3.77)2)}=44 inches.
Using our new L to find the new deflection at point C: for a ½ inch thick, 44 inches long structural fuse 16, ΔC=10[44/2(67)]=3.28 inches.
Even though the structural fuse 16 is almost 50% longer than before, the width at the midpoint has not changed in this example. This is because the “input moment” in the link at Point T has not changed: it is still 148 in−k.
We could also use thicker stock for the structural fuse 16, which allows a shorter structural fuse 16 (and more importantly, shorter and stiffer retention plate 28 and smaller width-to-thickness ratio for the flanges 38). Working through the process for 1 inch thick structural fuses gives the following:
dtop=√{square root over (3(4.93k)(28.5 in)(1.5)/(1 in)(50k/in2))}=3.56 inches
dmid=√{square root over (3(4.93k)(15 in)(1.25)/(1 in)(50k/in2))}=2.36 inches
dbot=√{square root over (3(4.93k)(1.5 in)(1.0)/(1 in)(50k/in2))}=0.66 inches
Based on the above we can calculate revised minimum bending radius, etc., and find:
RC=2.36/0.05=47 inches
Δ=47−√{square root over (472−302/4)}=2.45 inches
Clearance to within the fillet area of the column 14 is Δ+d/2=2.45+(2.36/2)=3.63 inches, which is less than Tk/2 and is therefore acceptable.
For 1 inch thickness and a length of 30 inches, ΔC=10[30/2(47)]=3.20 inches.
Adding the elastic deflection of the mounting column (approximately 0.25 inch) to this estimated deflection due to plastic deformation of the structural fuse puts us in the desired range of 3 to 4 percent total story drift.
Changing the thickness of the structural fuses to 1 inch leads to a reduction in link width. The reduced width allows a tighter radius without exceeding 5% strain, and also without the link remaining outside of the fillet area of the column 14.
Estimating Elastic Deflection of Point C
In the preceding process we estimated an optimum geometry of components considering the smallest allowable radius at the midpoint of the structural fuse 16 in its assumed fully deformed shape. We also need to compare the initial stiffness of the assembly to WSP shear walls to establish “equivalency” under FEMA P-795. This section explains the method used to determine the elastic deflection of the link.
We know that curvature is not uniform along the structural fuse 16. For strains in the elastic range we know that the radius of curvature, RC, is related to section and steel properties as:
R=M/EI (15)
Since both M and I vary between Points T and B, the moment-area method is used to determine the rotation angle at Point T and the deflection at Point C. This is easily accomplished using a spreadsheet. Solving for the rotation at Point B is helpful to illustrate theoretical deformation of the link, even though it is not needed otherwise.
By the moment area method (see
The value of E θ about Point T=summation of [(yi)(Area of cross-hatched strip for each i)/(Ii)]/(30 inches)
Determining the width of the structural fuse 16 along its length, and adding functions to calculate the value of I and the term within the summation may be performed using a spreadsheet. Using 1 inch as our increment i, the term within the summation becomes (yi)(yi)(Rbot)(1 inch)/(Ii).
Deflection at Point C is (θ)(10 inches). Bending of the structural fuse between points C and T makes a negligible addition to this deflection. Spreadsheet calculations give deflection at Point C as 0.15 inch. Roughly calculating the elastic deflection of the column 14 assuming the column height equals the 8-foot ceiling height, for a W14×68 gives 0.23 inch. Thus, total deflection of Point C is 0.38 inch.
The structural fuse 16 contribution is only 40% of the total deflection, so using a stiffer column 14 would have significant effect on the overall deflection. Adjusting the geometry of the structural fuse 16 may be performed to further reduce the total deflection, but may risk introducing low-cycle fatigue and thus reduce ductility.
Sizing Pin Connections at Points C, T, and B
The retrofitting system 10 described up to this point uses bolts 26a-26c to serve to connect both the retention plates 28 and the structural fuses 16 (acting as pins in the latter connection). In the following section, “pin” and “bolt” are used interchangeably.
Reliable connections improve success of the retrofitting system 10. We need to check two connection parameters: strength of the pins in double shear, and bearing of the pin against the web 34 of the column 14. Bearing in the structural fuses 16 will not govern in any reasonable situation.
The pin connections are preferably designed to deliver the force that develops the full plastic moment capacity of the structural fuses, (P(col)) which we calculated earlier to design the column 14.
Deflections depend partly on bolt slip, and in the case of the pin 24b at Point T, deflection is magnified by the ratio of
Recall that we used a factor of 1.95 to multiply the seismic force tributary to the structural fuse to determine the design force for the column 14. Now we increase that by 1.5 and round up to a “Connection Adjustment Factor” of 2.93 (rounded up to 3).
For bolt bearing capacity we use the limit of Fallowable=Fu, (bolt diameter) (tw). To avoid egging we do not factor Fu up by 1.2. We can solve for the bolt diameter as:
dbolt=3F/(Fu)tw (16)
Using Fu of 65 ksi for Grade 50 material, the required bolt diameter at Point C is:
dbolt=3(14.8k)/(65 ksi)0.415 inch=1.65 inches at Point C
We find the other bolt sizes to be 2.2 inches at Point T and 0.55 inches at Point B. Translating to incremental bolt sizes, moving from top to bottom of the assembly we would choose 1¾ inch, 2¼ inch, and ⅝ inch bolts.
The above calculations were intended to limit increased slip due to crushing of steel adjacent to bolts. Such a failure would lead to somewhat increased deflections, but not to catastrophic failure. Since failure of the bolt itself could lead to collapse, using a higher safety factor to calculate required bolt capacity is prudent. We choose 5 for this safety factor.
Again moving from top to bottom of the assembly, and using 5 instead of 3 in (16), our factored forces are: 74 k, 99 k, and 25 k. Factored load at the bottom exceeds the capacity of a ⅝ inch diameter A325-X bolt, so we increase to ¾ inch or ⅞ inch bolt diameter.
Balancing Variables in Link Geometry
Using the retrofitting structure 10 as a bracing method is particularly useful where the available width in a structure to be braced is restricted. The retrofitting structure 10 may be used where the clearance to obstructions is less than an inch. Some of the trade-offs between variables are outlined below:
One of the requirements in FEMA P-795 to establish “component equivalency” is that the initial stiffness of the proposed component compares well with the reference component (in this case a WSP shear wall). The other factors needed to establish equivalency require more sophisticated testing than has been done to date.
The required length of WSP shear wall needed to resist 14.8 k would be 14.8 k/0.870 k/ft using ASD for ½ inch thick shear panels nailed with 10-penny nails at 2 inch edge nail spacing), or 17 feet of shear panels.
Equations and factors for calculating the deflection of WSP shear walls are given in the SDPWS published by the American Wood Council (AWC, 2008), which is hereby incorporated herein by reference in its entirety. For a WSP shear wall:
δSW=(8vh3/EAb)+(vh/1000Ga)+(hΔa/b) (17)
Where:
δSW=deflection of shear wall (inches)
v=870 (unit shear in shear wall, pounds/foot)
h=8 (shear wall height, feet)
E=1,600,000 (modulus of elasticity for end posts, psi)
A=12.25 (cross-sectional area of shear wall end posts, in2)
b=17 (width of shear wall, feet)
Ga=28*1.2 (tabulated value from SDPWS, increased by 1.2 as allowed for 5-ply Structural I plywood)
Δa=0.1 (slip & elongation in anchorage for end posts, in2)
Substituting into the above equation we get: δSW=0.29 inch
Initially, the WSP shear wall deflection does not appear to compare well with the 0.38 inch total deflection for the retrofitting structure 10 calculated earlier. However, the majority of the link/column deflection is attributed to the column, and could be compensated for. The WSP shear wall deflection also depends on aspect ratio. If a double-sided shear wall 8.5 feet long was used, predicted WSP deflection increases to 0.32 inch.
When used at opposite ends of a flexible diaphragm, one might question whether a difference in deflection of 0.15 inch between the retrofitting system 10 versus a WSP shear wall would have noticeable or detrimental effect.
Installation and Connections to Wood Framing Above
Connections to framing above will vary depending on the existing construction. In some embodiments, steel angles may be secured to joists on either side of a joist bay using structural screws. This distributes the force along two joists, thus lessening concerns about the capacity of the existing floor diaphragm. A steel channel may be bolted to the outstanding legs of the angles and span across the joist bay. The loading structure 18 can bolt to the channel. Other connection methods could include securing the loading structure 18 to the underside of existing framing directly, using structural screws or other appropriate fasteners. Depending on capacity of the existing floor diaphragm above the retrofitting structure 10 it may be necessary to install plywood to the underside of the framing members to distribute load further.
The column 14 may be installed by excavating for the foundation, suspending the column 14 from the floor framing as described above, assembling a rebar cage around the column 14, and then place the concrete for the new foundation beam.
Alternative Embodiments
Referring to
One possible method to reduce initial deflection in the structural fuse 16 is to add one or more sacrificial shear pins somewhere along the active length of the structural fuse 16. The shear pin would be sized to shear through when the lateral load applied to the structural fuses 16 through the loading structure 18 approaches a peak design force.
In one approach, one or more shear pins 60a extend through all of the web 40 of the retention plate, structural fuses 16, and column web 34, which gives four shear planes, allowing for drilling smaller holes and thus a smaller reduction in the structural fuses' section properties. The structural fuse 16 may be widened where the shear pin 60a passes through it in order to retain the same section properties as without the hole for the shear pin 60a. The material of the shear pin 60a is preferably softer than steel so as not to score the structural fuses 16 as they pass back and forth against the rough end of the failed pin 60a. Brass, aluminum, or even plastic could be used.
In another embodiment, one or more shear pins 60b are placed against either side of the structural fuses 16 and extending through the webs 40 of the retention plate 28 and the web 34 of the column 14.
In another embodiment, one or more shear pins 60c pass through the webs 40 of the retention plates 28 and through the web 34 of the column 14, but not through the structural fuses 16. In this approach, the shear pin 60c operates as an indicator. The head of the shear pin 60c may be come loose or fall out of the hole in the web 40 when the structural fuse 16 moves far enough to shear it off.
In yet another embodiment, one or more shear pins 60d pass through only the web 34 of the column 14. This permits the sheared ends of the shear pins 60d to fall off once sheared through. An observation hole 62 may be formed in the web 40 enabling the state of the shear pin 60d to be observed.
The shear pins 60c and/or 60d may be used to indicate that the structural fuse 16 experienced a particular amount of movement, and could serve as an indication that the structural fuses 16 should be replaced. Shear pins 60c, 60d could be located at various places to show maximum movement of the structural fuse 16.
Referring to
Referring to
For the structural fuse 16 of
In addition, the structural fuse 16 may include flanges 56 on the edges of the structural fuse 16 extending above point T in order to stiffen this region and ensure that yielding only occurs in the active region. Flanges 56 may be incorporated into the extensions of any of the structural fuses 16 described herein. A retention plate 28 may secure to the column 14 over the structural fuse of
Referring to
As shown in
The pivoting of the portion of the retention plate below point T is in the same direction as the bowing of the structural fuse 16 between points B and T. In particular, moving closer to point T from point B, the movement of the retention plate 28 becomes closer to the movement of the structural fuse 16, thereby reducing friction between the structural fuse 16 and the retention plate 28. Accordingly, widening of the structural fuse 16 with distance from point B to point T according to the CIF may be reduced or eliminated in the embodiment of
In some embodiments, a damper 72 may couple the retention plate 28 to the column 14. The damper 72 may be any damping element known in the art, such as a piston and cylinder combination incorporating a viscous fluid in the piston for resisting movement of the piston within the cylinder. Alternatively, the damper 72 may be omitted and damping may be provided by friction between the structural fuse 16 and the retention plate 28 and column 14.
Referring to
In another embodiment, the retention plate 28 may be T-shaped. A T-shaped retention plate 28 may also be substituted for the retention plate 28 of any of the embodiments disclosed herein. As for the embodiment described above, structural fuses 16 may be positioned on either side of the web 34 of the column 14 and a pair of retention plates 28 may be positioned on outward facing surfaces of the structural fuses 16 as shown.
Referring to
Referring to
The following references are hereby incorporated herein by reference in their entirety:
The present invention may be embodied in other specific forms without departing from its purposes, functions, structures, or operational characteristics. The described embodiments are to be considered in all respects only as illustrative, and not restrictive. The scope of the invention is, therefore, indicated by the appended claims, rather than by the foregoing description. All changes which come within the meaning and range of equivalency of the claims are to be embraced within their scope.
This application claims the benefit of U.S. Provisional Patent Application Ser. No. 62/287,985, filed Jan. 28, 2016 and claims the benefit of U.S. Provisional Patent Application Ser. No. 62/397,412 , filed Sep. 21, 2016. This application is a continuation in part application of U.S. patent application Ser. No. 15/226,058, filed Aug. 2, 2016, which is a divisional application of U.S. patent application Ser. No. 14/607,680, filed Jan. 28, 2015, issued Sep. 13, 2016 as U.S. Pat. No. 9,441,360, which claims the benefit of U.S. Provisional Patent Application Ser. No. 61/965,339 filed Jan. 28, 2014. All the foregoing references are hereby incorporated herein by reference.
Number | Name | Date | Kind |
---|---|---|---|
3050831 | Diamond | Aug 1962 | A |
3283464 | Litzka | Nov 1966 | A |
3927499 | Papayoti et al. | Dec 1975 | A |
3963099 | Skinner | Jun 1976 | A |
4038799 | Shanks | Aug 1977 | A |
4047541 | Mercier et al. | Sep 1977 | A |
4263762 | Reed et al. | Apr 1981 | A |
4516874 | Yang et al. | May 1985 | A |
4793113 | Bodnar | Dec 1988 | A |
4922667 | Kobori | May 1990 | A |
5271197 | Uno | Dec 1993 | A |
5519977 | Callahan et al. | May 1996 | A |
5527625 | Bodnar | Jun 1996 | A |
5533307 | Tsai | Jul 1996 | A |
5595040 | Chen | Jan 1997 | A |
5630298 | Tsai | May 1997 | A |
5664380 | Hsueh et al. | Sep 1997 | A |
5749256 | Bodnar | May 1998 | A |
6012256 | Aschheim | Jan 2000 | A |
6042094 | Lee | Mar 2000 | A |
6138427 | Houghton | Oct 2000 | A |
6199336 | Poliquin et al. | Mar 2001 | B1 |
6301854 | Daudet et al. | Oct 2001 | B1 |
6412237 | Sahai | Jul 2002 | B1 |
6681538 | Sarkisian | Jan 2004 | B1 |
6708459 | Bodnar | Mar 2004 | B2 |
6719481 | Hoffman et al. | Apr 2004 | B2 |
6739562 | Rice et al. | May 2004 | B2 |
7293939 | Abbott | Nov 2007 | B2 |
7299593 | diGirolamo et al. | Nov 2007 | B1 |
7712266 | Sarkisian | May 2010 | B2 |
7739850 | Daudet et al. | Jun 2010 | B2 |
7788878 | diGirolamo et al. | Sep 2010 | B1 |
7797886 | Su | Sep 2010 | B2 |
7856765 | Su | Dec 2010 | B1 |
7874120 | Ohata | Jan 2011 | B2 |
8863477 | Stal et al. | Oct 2014 | B2 |
20030221379 | Oliver | Dec 2003 | A1 |
20040045253 | Russell | Mar 2004 | A1 |
20040107654 | Powell | Jun 2004 | A1 |
20050126105 | Leek | Jun 2005 | A1 |
20110308190 | Pryor | Dec 2011 | A1 |
20150101269 | Moreno | Apr 2015 | A1 |
20160298352 | Agha Beigi | Oct 2016 | A1 |
20160319499 | Annan | Nov 2016 | A1 |
Entry |
---|
University of Hawaii College of Engineering, Department of Civil and Environment Engineering, Hybrid Masonry Connector Plate and Headed Stud Small-Scale Wall Testing Research Report UHM/CEE/12-06 by James Aoki and Ian N. Robertson, Dec. 2012. |
The Open Civil Engineering Journal, Development of a Seismic Design Apprach for Infill Walls Equipped with Structural Fuse, Mohammad Aliaari and Ali M. Memari, Oct. 28, 2012, 6, pp. 249-263. |
University of Hawaii College of Engineering, Department of Civil and Environment Engineering, Connector Development for Hybrid Masonry Seismic Structural Systems Research Report UHM/CEE/11-03 by Seth R. Goodnight, Gaur P. Johnson, and Ian N. Robertson, May 2011. |
University of Hawaii College of Engineering, Department of Civil and Environment Engineering, Verification of Fuse Connector Performance for Hybrid Masonry Seismic Structural Systems Research report UHM/CEE/12-05 by Steven Mitsuyuki and Ian N. Robertson, May 2012. |
University of Hawaii College of Engineering, Department of Civil and Environment Engineering, Hybrid Masonry Connector Development Phase II Research Report UHM/CEE/11-04 by Reef Ozaki-Train, Gaur Johnson, and Ian N. Robertson, Dec. 2011. |
China/USA Symposium for the Advancement of Earthquake Sciences and Hazard Mitigation Practices, Current Technologies and Future Research Trends for Seismic Hazard Mitigation of Critical and Important Building Construction by Ian N. Robertson, Ph.D., S.E.1, Feb. 6, 2017, pp. 1-8. |
2016 SEAOC Conventin Proceedings, “Structural Fuse” Connection Providing Ductility and Hysteric Energy Dissipation with Easily Replaceable Elements to Reduce Earthquake Damage and Recovery Time by Thor Matteson, SE, Thor Matteson Engineering, Berkeley, CA, pp. 1-20. |
Matteson, Thor; “Soft Story Retrofits for the Real World: Contilevered Column Modifications for Increased Ductility and Redundancy;” SEAOC 2014 83rd Annual Convention Proceedings, Sep. 2014; pp. 285-299; Structural Engineers Association of California; Sacremento, California. |
Number | Date | Country | |
---|---|---|---|
20170067249 A1 | Mar 2017 | US |
Number | Date | Country | |
---|---|---|---|
61965339 | Jan 2014 | US | |
62287985 | Jan 2016 | US | |
62397412 | Sep 2016 | US |
Number | Date | Country | |
---|---|---|---|
Parent | 14607680 | Jan 2015 | US |
Child | 15226058 | US |
Number | Date | Country | |
---|---|---|---|
Parent | 15226058 | Aug 2016 | US |
Child | 15354787 | US |