Information
-
Patent Grant
-
6817232
-
Patent Number
6,817,232
-
Date Filed
Tuesday, April 8, 200321 years ago
-
Date Issued
Tuesday, November 16, 200420 years ago
-
Inventors
-
Original Assignees
-
Examiners
Agents
-
CPC
-
US Classifications
Field of Search
US
- 073 40
- 073 46
- 073 47
- 073 497
- 073 112
- 073 115
- 073 116
- 073 1172
- 073 1173
- 073 1181
- 073 119 R
-
International Classifications
-
Abstract
An apparatus detects leak in a fuel vapor treatment system which is referred to as an evaporation system. The apparatus measures a required time T2 that is required for decreasing pressure in the evaporation system from P0 to P1 while opening a base leak hole that provides known amount of leak. Then, a required time T1 that is required for decreasing pressure from P0 to P1 is measured while closing the base leak hole. The apparatus compares the required times T1 and T2 in order to detect a leak other than the base leak hole. In this process, a specified coefficient that is defined in accordance with the base leak hole is taken into consideration. It is possible to detect the leak of the evaporation system with high accuracy even when the amount of remaining fuel is extremely large.
Description
CROSS REFERENCE TO RELATED APPLICATIONS
This application is based on Japanese Patent Applications No. 2002-109172 filed on Apr. 11, 2002 and No. 2003-24353 filed on Jan. 31, 2003 the contents of which are incorporated herein by reference.
BACKGROUND OF THE INVENTION
1. Field of the Invention
The present invention relates to a failure diagnosis method and failure diagnosis device for an evaporated fuel treating unit and in particular, to a technology for making a determination on the leak of fuel vapor.
2. Description of Related Art
The evaporated fuel treating unit is a unit for preventing evaporated fuel produced in a fuel tank from being discharged into the atmosphere. A combined body of structural members including the fuel tank, a canister, a purge passage, and a purge control valve forms a closed space when the foregoing purge control valve is closed. This closed space is called an evaporation system. It is desired to mount a failure diagnosis device for determining whether or not evaporated fuel leaks from the evaporation system. Hereinafter, the failure diagnosis device and it's function may be referred to as leak check.
JP-A-5-272417, and U.S. Pat. No. 5,146,902 discloses a method in which pressure in the evaporation system is increased by a pump and then the state of decrease in the pressure in the evaporation system is measured at a specified time set previously to determine the state of leak. However, according to this method, the volume of a space to be pressurized is varied by the amount of remaining fuel and hence the rate of decrease in the pressure is also varied, so that it is possible to detect whether or not leak occurs but impossible to correctly detect the magnitude of the leak. Further, since the state of decrease in the pressure is varied also by differences in the atmospheric temperature and the properties of the fuel, it is impossible to determine the state of the leak sufficiently correctly if no correction is made. For example, the atmospheric temperature and the properties of the fuel affect the amount of evaporated fuel at a certain temperature. In order to grasp the state of the leak correctly, it is thought to correct the state of the leak by parameters affecting the determination such as the amount of remaining fuel but this makes the determination complex and hence increases cost. On the other hand, if stricter conditions for allowing the leak check are become stricter, it is impossible to achieve an essential object of ensuring the frequency of determinations.
On the other hand, JP-A-10-90107 discloses a method in which a pump is driven until operating characteristic values such as current, voltage, the number of revolutions are saturated and the saturated operating characteristic values are compared with the base values to determine the state of leak. However, according to this method, the pump is driven until the operating characteristic values are saturated and hence time to drive a pump is elongated, which degrades fuel consumption. Moreover, it is necessary to use a long-life pump or to increase the frequency of replacements of the pump and hence to increase cost.
Still further, JP-A-11-351078 discloses a method of using a base orifice. Variations in pressure in the evaporation system in this technology are shown in FIG.
19
. The state of decrease in the pressure in the evaporation system from the time when the pressure is increased to a specified pressure P
0
to the time when a previously set time T elapses is measured in a case where leak occurs at an orifice as a base leak point and in a case where leak does not occur. The pressure changing state may be measured as pressure differences P
1
, and P
2
. The amount of change in the pressure P
2
caused by a leak hole as a failure is compared with the amount of change in the pressure P
3
=P
1
−P
2
caused by the orifice as the base leak hole thereby to cancel effects produced by the amount of remaining fuel, atmospheric temperature, fuel properties, and the like.
However, in this method, when the amount of remaining fuel is extremely large, that is, the volume of the space to be pressurized is extremely small, as shown in
FIG. 20
, the rate of decrease in the pressure is increased to make the pressure zero, atmospheric pressure, that is equal to the pressure outside the evaporation system before the foregoing time T elapses. This is not the proper amount of change in pressure. On the other hand, when the amount of remaining fuel is small, the rate of decrease in the pressure is decreased to make it impossible to produce the sufficient amounts of change in pressure P
1
, P
2
and hence to produce a sufficient detection accuracy. For this reason, there is a fear that correct determination can not be made on the state of leak. If the pressure in the evaporation system is sufficiently increased, the state of leak can be correctly determined but there are raised a problem that a fuel tank and the like need to have sufficient resistance to pressure and a problem that the capacity of a pump for increasing pressure needs to be increased. These problems can not be easily solved.
Still further, JP-A-11-351078 discloses a method of measuring time required for the pressure in the evaporation system to decrease by a specified amount of pressure drop. The measurement of time can be easily performed with higher accuracy than the detection of pressure. However, the determination method based on the amount of changes in the pressure P
1
, P
2
can not be used for the determination based on the required time. For this reason, in order to put the method of leak check utilizing the required time into practical use, some improvements need to be made that are not disclosed in JP-A-11-351078.
The present invention has been made in view of the above circumstances. It is the object of the invention to provide a failure diagnosis method and a failure diagnosis device of an evaporated fuel treating unit by which a correct leak check can be performed regardless of the amount of remaining fuel and practically.
SUMMARY OF THE INVENTION
In accordance with the first aspect of the invention, there is provided a failure diagnosis method for diagnosing an evaporated fuel treating unit, which comprises the steps of: producing a pressure difference between inside an evaporation system having a fuel tank, the canister, the purge passage and the purge control valve and outside the evaporation system; measuring the state of change in pressure in the evaporation system; and determining the state of leak in the evaporation system based on the measured state of change in pressure.
In the method: a pressure in the evaporation system is made a first specified pressure, then a base leak hole is opened, and a first required time is measured that is required for the pressure in the evaporation system to change from the first specified pressure to a second specified pressure set at a value closer to a pressure outside the evaporation system in a state where leak occurs at the base leak hole and a leak hole as a failure;
the pressure in the evaporation system is made the first specified pressure, then the base leak hole is closed, and a second required time is measured that is required for the pressure in the evaporation system to change from the first specified pressure to the second specified pressure in a state where leak occurs only at the leak hole as a failure; and
the state of the leak in the evaporation system is determined by comparing the second required time with a determination base time obtained by multiplying the first required time by a coefficient set previously based on the area of the base leak hole.
In the first measurement of the first required time, the leak points of the evaporation system are the leak hole as a failure and the base leak hole and in the second measurement of the second required time, the leak point is only the leak hole as a failure. Thus, the required time that is required for the pressure in the evaporation system to change from the first specified pressure to the second specified pressure is larger at the time of the second measurement in which the area of the leak point is smaller. According to the Bernoulli's theorem, the velocity of flow of gas at the leak point is equal if the pressure in the evaporation system is equal. Thus, the ratio of the foregoing second required time to the foregoing first required time is equal to the ratio of the area of the leak points at the time of the first measurement to the area of the leak point at the time of the second measurement.
Here, the ratio of the area of the leak points at the time of the first measurement to the area of the leak point at the time of the second measurement depends on the ratio of the area of the leak hole as a failure to the area of the base leak hole which causes leak only at the time of the first measurement.
Thus, by setting the foregoing coefficient on the basis of the area of the base leak hole and comparing the foregoing second required time with the foregoing determination base time obtained by multiplying the foregoing first required time by the above coefficient, it is possible to grasp the size of the leak hole as a failure on the basis of the magnitude of the above coefficient and the comparison in magnitude between the first required time and the second required time. In this manner, it is possible to practically determine the state of leak.
At the time of the first measurement and at the time of the second measurement, the amount of remaining fuel is not changed and hence the evaporation system is substantially equivalent, so it is possible to make a correct determination on the state of leak.
Further, in both of the first measurement and the second measurement, an initial pressure and a final pressure are specified pressures set previously, so even when the amount of remaining fuel is large and hence the volume of a space is small to which a pressure difference is applied, it is possible to correctly measure the state of change in pressure. Its effect is only to elongate the required time that is required for the pressure in the evaporation system to change from the first specified pressure to the second specified pressure. Thus, it is possible to substantially relax conditions allowing a proper leak check and to increase the frequency of determinations and to make a correct determination on the state of leak.
It is also recommended that the foregoing coefficient be set at the ratio of the total area of the leak points at the time of the first measurement that include the base leak hole and a leak hole as a failure to the area of the leak point at the time of the second measurement that includes only the leak hole as a failure at the time when the area of the leak hole as a failure is an allowable upper limit value.
The ratio of the foregoing second required time to the foregoing first required time is equal to the ratio of the area of the leak points at the time of the first measurement to the area of the leak point at the time of the second measurement. Here, if the foregoing coefficient is set at the ratio of the area of the leak points at the time of the first measurement to the area of the leak point at the time of the second measurement at the time when the area of the leak hole as a failure is the allowable upper limit value, it is possible to determine whether or not the area of the leak hole as a failure is smaller than its allowable upper limit value by whether or not the second required time is larger than the determination base time.
For example, if the allowable upper limit value of the area of the leak hole as a failure is the area of the base leak hole, in a case where the area of the leak hole as a failure is the allowable upper limit value, the ratio of the area of the leak points at the time of the first measurement to the area of the leak point at the time of the second measurement is two. Assuming that the coefficient is 2 by which the foregoing required time is multiplied when the determination base time is found, it is possible to determine that if the foregoing second required time is longer than the determination base time, the area of the leak hole as a failure is smaller than the allowable upper limit value and if the foregoing second required time is shorter than the determination base time, the area of the leak hole as a failure is larger than the allowable upper limit value.
In accordance with the second aspect of the invention, the pressure in the evaporation system is made the first specified pressure set previously, then the base leak hole is opened, and a required time is measured that is required for the pressure in the evaporation system to change from the first specified pressure to the second specified pressure set previously at a value closer to a pressure outside the evaporation system than the first specified pressure in a state where leak occurs at the base leak hole;
the pressure in the evaporation system is made the first specified pressure, then the foregoing base leak hole is closed, and a pressure reached in the evaporation system is measured when a determination base time obtained by multiplying the required time by a coefficient set previously based on the area of the base leak hole; and
the state of the leak in the evaporation system is determined by comparing the pressure reached with the second specified pressure.
In the first measurement of the first required time, the leak points in the evaporation system are the leak hole as a failure and the base leak hole and in the second measurement of the second required time, the leak point is only the leak hole as a failure. Thus, the rate of change in the pressure in the evaporation system is smaller at the time of the second measurement in which the area of the leak point is smaller. According to the Bernoulli's theorem, the velocity of flow of gas at the leak point is equal if the pressure in the evaporation system is equal. Thus, when a time elapsing during a time period in which the pressure in the evaporation system changes from the same initial pressure to the same pressure is compared between the first measurement and the second measurement, the ratio of the time elapsing at the time of the second measurement to the time elapsing at the time of the first measurement is equal to the area of the leak points at the time of the first measurement to the area of the leak point at the time of the second measurement.
Here, the ratio of the area of the leak points at the time of the first measurement to the area of the leak point at the time of the second measurement depends on the ratio of the area of the leak hole as a failure to the area of the base leak hole which causes leak only at the time of the first measurement.
Thus, by setting the foregoing coefficient on the basis of the area of the base leak hole and comparing the foregoing pressure reached with the second specified pressure when the determination base time obtained by multiplying the foregoing required time by the above coefficient elapses in the second measurement, it is possible to grasp the size of the leak hole as a failure on the basis of the magnitude of the above coefficient and the comparison in magnitude between the foregoing pressure reached and the second specified pressure. In this manner, it is possible to practically determine the state of the leak.
At the time of the first measurement and at the time of the second measurement, the amount of remaining fuel is not changed and hence the evaporation system is substantially equivalent, so it is possible to make a correct determination on the state of the leak. Here, for example, when it is assumed that the coefficient is 2 by which the foregoing required time is multiplied when the determination base time is found, it is possible to determine that as the foregoing pressure reached has larger allowance for the second specified pressure, the leak hole as a failure becomes smaller in size than the base leak hole, and that as the foregoing pressure reached is larger than the second specified pressure, the leak hole as a failure is larger in size than the base leak hole.
Further, the rate of change in pressure in the second measurement is not so large as in the first measurement because only the leak hole as a failure causes the leak. Thus, if the foregoing coefficient is properly selected, even if the amount of remaining fuel is large and hence the volume of the space is small to which the pressure difference is applied, the pressure reached is not changed to the pressure outside the evaporation system. Moreover, as described above, since the rate of change in pressure is smaller in the second measurement than in the first measurement, it is easy to set the determination base time in such as way that the pressure reached does not become the pressure outside the evaporation system. Moreover, since the second measurement is finished regardless of the amount of leak at the time when the determination base time is reached, there is not presented a problem that as the amount of leak is smaller, a time period required to finish the measurement becomes longer, as is the invention claimed in claim
1
. That is, a time period is not much varied that is required to perform the leak check. Thus, this can greatly relax conditions allowing the leak check and increase the frequency of determinations.
Here, in a case where the leak hole as a failure is so large that the quantitative estimation of leak is not required, needless to say, it is not always necessary to have allowance for the pressure outside the evaporation system when the determination base time elapses in the second measurement and it is recommendable to determine that the amount of leak is large when the pressure reaches a specified threshold within the determination base time.
It is recommended that the foregoing coefficient be set at the ratio of the total area of the leak points at the time of the first measurement that includes the base leak hole and the leak hole as a failure to the area of the leak point at the time of the second measurement that includes only the leak hole as a failure at the time when the area of the leak hole as a failure is an allowable upper limit value.
When the pressure in the evaporation system is changed to the second specified pressure in the second measurement and the time that elapses during an interval that the pressure in the evaporation system changes from the first specified pressure to the second specified pressure is compared between the second measurement and the first measurement, the ratio of the elapsed time at the time of the second measurement to the elapsed time at the time of the first measurement is equal to the ratio of the area of the leak points at the time of the first measurement to the area of the leak point at the time of the second measurement. Here, if the foregoing coefficient is set at the ratio of the area of the leak points at the time of the first measurement to the area of the leak point at the time of the second measurement at the time when the area of the leak hole as a failure is the allowable upper limit value, it is possible to determine whether or not the area of the leak hole as a failure is smaller than the allowable upper limit value by whether or not the pressure reached when the elapsed time at the time of the second measurement reaches the determination base time reaches the second specified pressure.
For example, if the allowable upper limit value of the area of the leak hole as a failure is the area of the base leak hole, in a case where the area of the leak hole as a failure is the allowable upper limit value, the ratio of the area of the leak points at the time of the first measurement to the area of the leak point at the time of the second measurement is two. Assuming that the coefficient is 2 by which the foregoing required time is multiplied when the determination base time is found, it is possible to determine that if the pressure reached does not reaches the second specified pressure, the area of the leak hole as a failure is smaller than the foregoing allowable upper limit value and if the foregoing pressure reached is larger than the second specified pressure, the area of the leak hole as a failure is larger than the allowable upper limit value.
It is also recommended that the pressure difference be produced by increasing the pressure in the evaporation system to make the state of change in pressure the state of decrease in pressure.
It is also recommended that the pressure difference be produced by decreasing the pressure in the evaporation system to make the state of change in pressure the state of increase in pressure.
In accordance with the third aspect of the invention, there is provided a failure diagnosis device for diagnosing an evaporated fuel treating unit, which comprises:
a passage for making the evaporation system communicate with an atmosphere;
throttling means mounted in the passage and having a certain passage cross-sectional area;
a valve for closing the passage;
first required time measuring means that controls the pressure difference producing means and the valve to make the pressure in the evaporation system a first specified pressure set previously, then opens the valve, and measures a first required time that is required for the pressure in the evaporation system to change from the first specified pressure to a second specified pressure set at a value closer to a pressure outside the evaporation system than the first specified pressure;
second required time measuring means that controls the pressure difference producing means and the valve to make the pressure in the evaporation system the first specified pressure, then closes the valve, and measures a second required time that is required for the pressure in the evaporation system to change from the first specified pressure to the second specified pressure; and
determination means that determines the state of leak of the evaporation system by comparing the second required time with a determination base time obtained by multiplying the first required time by a coefficient set previously based on the passage cross-sectional area of the throttle means.
According to this aspect, it is possible to practically and correctly determine the state of leak and further to substantially relax conditions allowing a proper leak check and to increase the frequency of determinations.
It is also recommended that the foregoing coefficient be set at the ratio of the total area of leak points when the first required time is measured which includes the throttling means and a leak hole as a failure to the area of the leak point when the second required time is measured which includes only the leak hole as a failure at the time when the area of the leak hole as a failure is an allowable upper limit value.
In accordance with the fourth aspect of the invention, there is provided a failure diagnosis device for diagnosing the evaporated fuel treating unit, which comprises:
the passage for making the evaporation system communicate with an atmosphere;
the throttling means mounted in the passage and having a certain passage cross-sectional area;
the valve for closing the passage;
required time measuring means that controls the pressure difference producing means and the valve to make the pressure in the evaporation system the first specified pressure set previously, then opens the valve, and measures a required time that is for the pressure in the evaporation system to change from the first specified pressure to the second specified pressure set previously at the value closer to the pressure outside the evaporation system than the first specified pressure;
pressure reached measuring means that controls the pressure difference producing means to make the pressure in the evaporation system the first specified pressure, then closes the valve, and measures pressure reached in the evaporation system when a determination base time elapses that is obtained by multiplying the required time by a coefficient set previously based on the passage cross-sectional area of the throttle means; and
determination means that determines the state of leak of the evaporation system by comparing the pressure reached with the second specified pressure.
According to this aspect, it is possible to practically and correctly determine the state of leak and further to substantially relax conditions allowing the proper leak check and to increase the frequency of determinations.
Here, in a case where the leak hole as a failure is so large that the quantitative estimation of leak is not required, needless to say, it is not always necessary to have allowance for the pressure outside the evaporation system when the determination base time elapses in the measurement of the pressure reached and it is recommendable to determine that the amount of leak is large when the pressure reaches a specified threshold within the determination base time.
It is also recommended that the foregoing coefficient be set at the ratio of the total area of the leak points when the foregoing required time is measured which includes the throttle means and the leak hole as a failure to the area of the leak point when the pressure reached is measured which includes only the leak hole as a failure at the time when the area of the leak hole as a failure is the allowable upper limit value.
It is also recommended that the foregoing pressure difference producing means be so constructed as to be means for increasing the pressure in the evaporation system to make the state of change in pressure the state of decrease in pressure.
It is also recommended that the foregoing pressure difference producing means be so constructed as to be means for decreasing the pressure in the evaporation system to make the state of change in pressure the state of increase in pressure.
It is also recommended that the foregoing pressure difference producing means be constructed by a motor-driven pump. In this case, the pump can be operated without the power of the internal combustion engine, so even when the engine is stopped, it is possible to perform the leak check and hence to increase the frequency of determinations.
It is also recommended that the failure diagnosis device further includes prohibition means that determines whether or not the internal combustion engine is in the state of operation and when it is in the state of operation, prohibits operations of the required time measuring means and the pressure reached measuring means.
During the operation of the internal engine, sometimes, the fuel is shaken by vibration to be abruptly evaporated and a fuel pump arranged in the fuel tank is heated to produce a sudden change in temperature. For this reason, there is a fear that a correct determination on the state of leak could not be preformed. According to the prohibition means, it is possible to eliminate the causes of error of determination and to perform the leak check correctly.
BRIEF DESCRIPTION OF THE DRAWINGS
Features and advantages of embodiments will be appreciated, as well as methods of operation and the function of the related parts, from a study of the following detailed description, the appended claims, and the drawings, all of which form a part of this application. In the drawings:
FIG. 1
is a block diagram showing the construction of an evaporated fuel treating unit in accordance with a first embodiment of the invention.
FIG. 2
is a flowchart in accordance with the first embodiment.
FIG. 3
is the flowchart in accordance with the first embodiment.
FIG. 4
is the flowchart in accordance with the first embodiment.
FIG. 5
is a timing chart in accordance with the first embodiment.
FIG. 6
is a block diagram showing the construction of an evaporated fuel treating unit in accordance with a second embodiment of the invention.
FIG. 7
is a flowchart in accordance with the second embodiment.
FIG. 8
is the flowchart in accordance with the second embodiment.
FIG. 9
is a timing chart in accordance with the second embodiment.
FIG. 10
is a block diagram showing the construction of an evaporated fuel treating unit in accordance with a third embodiment of the invention.
FIG. 11
is a flowchart in accordance with the third embodiment.
FIG. 12
is the flowchart in accordance with the third embodiment.
FIG. 13
is a timing chart in accordance with the second embodiment.
FIG. 14
is a block diagram showing the construction of an evaporated fuel treating unit in accordance with a fourth embodiment of the invention.
FIG. 15
is a flowchart in accordance with the fourth embodiment.
FIG. 16
is the flowchart in accordance with the fourth embodiment.
FIG. 17
is a timing chart in accordance with the fourth embodiment.
FIG. 18
is a flowchart in accordance with another embodiment of the invention.
FIG. 19
is a timing chart showing a failure diagnosis technique according to a related art.
FIG. 20
is a timing chart showing a failure diagnosis technique according to a related art.
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
First Embodiment
The construction of a failure diagnosis device of an evaporated fuel processing unit of a first embodiment of the present invention is shown in FIG.
1
. In this embodiment, the invention is applied to an automobile mounted with an internal combustion engine (engine)
1
. A fuel tank
6
of the engine
1
is connected to a canister
8
through an introduction passage
7
and always communicates with the canister
8
. The canister
8
is filled with an absorbent
9
and fuel evaporated in the fuel tank
6
is temporarily absorbed by the absorbent
9
. The canister
8
is connected to an intake pipe
2
of the engine
1
through a purge passage
10
. The purge passage
10
is provided with a purge valve
11
that is a purge control valve and when the purge valve
11
is opened, the canister
8
is made to communicate with the intake pipe
2
. A solenoid valve is used as the purge valve
11
.
The purge valve
11
is controlled by an electronic control unit (hereinafter referred to as ECU)
18
for controlling parts of the engine
1
. The ECU
18
has a basic construction used for a general engine. The ECU
18
controls such parts as an injector
4
that is mounted in the intake pipe
2
and injects fuel, a throttle
5
that adjusts the amount of intake air, and the like based on the amount of intake air by an air flow sensor
19
mounted in the intake pipe
2
, a fuel-air ratio detected by a fuel-air ratio sensor
20
fixed to an exhaust pipe
3
, an ignition signal, an engine speed, the temperature of engine cooling water, an accelerator position, and the like to provide a suitable amount of fuel injected and a suitable throttle opening. The opening of the purge valve
11
is controlled by a duty control or the like by the ECU
18
when the engine is operated. The purge valve
11
controls a flow rate of evaporated fuel in the purge passage
10
. The evaporated fuel separated from the absorbent
9
is purged into the intake pipe
2
by a negative pressure and is burned with the fuel injected by the injector
4
.
An atmosphere passage
12
opened to the atmosphere at its tip is connected to the canister
8
. The atmosphere passage
12
is provided, in order closer to the tip side, with a closed valve
13
and a pump
14
that is means for increasing pressure. When the pump
14
is operated with the closed valve
13
opened, air from the atmosphere is pressurized and sent to the canister
8
. When the closed valve
13
is closed, the atmosphere passage
12
is closed at the tip. A solenoid type two-way valve is used as the closed valve
13
. Here, there is nothing wrong with reversing the placement of the closed valve
13
and the pump
14
.
A base leak passage
15
that is a passage converging on the atmosphere passage
12
at a point closer to the canister
8
than the pump
14
is connected to the atmosphere passage
12
. The base leak passage
15
is open to the atmosphere at the tip. The base leak passage
15
is provided, in order closer to the tip side, with a base leak valve
16
that is a valve and a base orifice
17
that is means for throttling the flow of air. The base orifice
17
is a fixed orifice having a determined passage area. When the base leak valve
16
is opened, gas can flow within a range throttled by the base orifice
17
. When the base leak valve
16
is closed, the base leak passage
15
is closed at the tip side. A solenoid type two-way valve is used as the base leak valve
16
. Here, there is nothing wrong with reversing the displacement of the base leak valve
16
and the base orifice
17
.
The closed valve
13
, the pump
14
, the base leak valve
16
that have been described above, the foregoing purge valve
11
, and the like are controlled by the ECU
18
. When the purge valve
11
, the closed valve
13
, the base leak valve
16
are closed, a combined body (which is to be checked for leak and hereinafter referred to as an evaporation system) of the fuel tank
6
, the introduction passage
7
, the canister
8
, the purge passage
10
and the atmosphere passage
12
and a leak passage
15
accompanying them forms a closed space forming body that forms a closed space. When the purge valve
11
is in a closed state, the evaporated fuel can be diffused in the evaporation system. Further, when the pump
14
is operated in a state where only the closed valve
13
is opened, it is possible to increase the pressure in the evaporation system and hence to produce a pressure difference between inside the evaporation system and outside the evaporation system that is in an atmospheric pressure.
Further, the canister
8
is provided with a pressure sensor
21
that is pressure detecting means for detecting the pressure in the canister
8
and the detection signal of the pressure sensor
21
is applied to the ECU
18
as a signal for leak check. The pressure sensor
21
detects the pressure in the evaporation system and a place where the pressure sensor
21
is fixed is not limited in the canister
8
but can be in a member constructing the evaporation system, for example, can be in the introduction passage
7
or the purge passage
10
.
Alarm unit
22
, e.g., an indicator, for giving a driver an alarm when an abnormality is found by a leak check is provided in a vehicle compartment. The alarm unit
22
is operated by the ECU
18
.
Control conducted by the ECU
18
when the leak check is performed is shown in
FIG. 2
,
FIG. 3
, and
FIG. 4. A
failure diagnosis method and the operation of a failure diagnosis device in accordance with the invention will be described. Steps from S
101
to S
105
are procedures for determining whether a leak check is allowed or not and prevent the leak check from being conducted in a state where there might produce an error, in the determination of the leak check. First, it is determined at Step S
101
whether conditions of the leak check are met or not. The conditions of the leak check are met when driving conditions, temperature conditions and the like satisfy predetermined conditions. When it is determined that the conditions of the leak check are met, the procedure proceeds to Step S
102
and when it is determined that the conditions of the leak check are not met, the flow of procedures is finished. In this manner, for example, the leak check under high temperature is prevented.
Step S
102
is a procedure as prohibition means where it is determined whether the engine is in a state of stop or not, that is, a key is turned off or not. When it is determined that the key is turned off, the procedure proceeds to Step S
103
and when it is determined that the key is not turned off, the procedure waits until the key is turned off (Step S
102
). During the operation of the engine, temperature in the fuel tank
6
is increased by heat generated by a fuel pump and the like or fuel in the fuel tank
6
is shaken by the running state of a vehicle or road noises, so that the fuel is remarkably evaporated in some cases. The leak check is eliminated when the fuel is evaporated to vary the pressure in the evaporation system.
Step S
103
to Step S
105
are procedures for waiting for a predetermined time t
0
set previously to elapse after the key is turned off and at Step S
103
, a timer t is reset (t=0) and at Step S
104
, the timer t is advanced by 1. Then, it is determined at Step S
105
whether the timer t reaches t
0
or not. When it is determined that the timer t reaches t
0
, the leak check is conducted at Step S
106
. When it is determined that the timer t does not reach to, the procedure returns to Step S
104
where the procedure waits for a predetermined time t
0
to elapse. Since the state in the fuel tank
6
is not stabilized just after the key is turned off, the leak check is eliminated in a state where the state in the tank
6
is not stabilized.
The leak check (Step S
106
) will be described in detail. Operations of the respective valves
13
,
16
and the pump
14
follow timing charts shown in FIG.
5
.
Steps S
200
to S
212
are first measuring procedures as the first required time measuring means of the ECU
18
. First, at Step S
200
, the purge valve
11
and the base leak valve
16
are closed to close the evaporation system at the purge valve
11
and the base leak valve
16
and the closed valve
13
is opened. Next, at Step S
201
, the pump
14
is turned on to increase the pressure in the evaporation system (t
1
). Here, the capacity (amount of discharge) of the pump
14
is set in such a way that even when a leak as large as a leak regulatory value occurs at any part in the evaporation system, the pressure in the evaporation system is increased. Pressure detected by the pressure sensor
21
is gradually increased.
Incidentally, as shown at Step S
200
and S
201
, by closing the purge valve
11
and the base leak valve
16
before turning on the pump
14
, it is possible to prevent the pressure from being dropped by the pump
14
being operated before the purge valve
11
and the base leak valve
16
are completely closed and hence to conduct the leak check with high efficiency. Needless to say, it is also recommended that the pump
14
be turned on at the same time when the purge
11
and the base leak valve
16
are closed, depending on the responsivity or the required specifications of the solenoid valve used as the purge valve
11
and the base leak valve
16
.
Pressure P is measured at Step S
202
and it is determined at the next Step S
203
whether or not the measured pressure P is larger than a specified pressure P
0
set previously. When it is determined that the measured pressure P is larger than the specified pressure P
0
, the procedure proceeds to Step S
205
and when it is determined that the measured pressure P is not larger than the specified pressure P
0
, the procedure waits for the pressure P to increase (Step S
202
, S
203
). At this time, it is determined at Step S
204
whether or not an elapsed time ta after the operation of the pump
4
is longer than a predetermined time ta
1
. Here, the predetermined time ta
1
is a time to drive the pump
4
that is required for the pump
4
to increase the pressure in the evaporation system to the specified pressure P
0
in a case where a leak corresponding to a base value occurs in the evaporation system. In a case where a very large leak occurs in the evaporation system, even if the pump
4
is operated for a sufficient time, the pressure in the evaporation system does not reach the specified pressure P
0
. For this reason, in a case where the elapsed time ta is longer than the predetermined time ta
1
at Step S
204
, the procedure proceeds to Step S
226
where it is determined that the leak of the evaporation system is abnormal.
When the pressure P is larger than the specified pressure P
0
, the closed valve
13
is closed at Step S
205
and the pump
14
is turned off at Step S
206
. In this manner, the evaporation system is closed at the position of the closed valve
13
in addition to the positions the purge valve
11
and the base leak valve
16
.
By closing the closed valve
13
before turning off the pump
14
as shown at Steps S
205
, S
206
, it is possible to prevent the pressure from being dropped by the pump
14
being turned off before the closed valve
13
is completely closed. Here, for the convenience of description, in
FIG. 5
, the pump
14
is turned off at the same time when the closed valve
13
is closed. Needless to say, it is also recommended that the pump
14
be turned off at the same time when the closed valve
13
is closed, depending on the responsivity and the required specifications of the solenoid valve used for the closed valve
13
.
Next, the base leak valve
16
is opened at Step S
207
(t
2
). In this manner, gas in the evaporation system pressurized to the specified pressure P
0
passes through the base orifice
17
and flows out of the tip of the base leak passage
15
. The base orifice
17
is a base leak hole the passage cross-sectional area of which is known. When the evaporation system has a leak hole as a failure, the gas flows out of the leak hole. This outflow of gas varies the pressure in the evaporation system. This state of change in the pressure is a state of decrease in the pressure where the pressure in the evaporation system decreases toward the pressure outside the evaporation system that is the atmospheric pressure.
When the base leak valve
16
is opened, a timer T
1
is reset (T
1
=0) at Step S
208
.
The pressure P is measured at Step S
209
and it is determined at the following Step S
210
whether or not the measured pressure P is lower than the specified pressure P
1
set previously. When it is determined that the measured pressure P is lower than the specified pressure P
1
, the procedure proceeds to Step S
212
. When it is determined that the measured pressure P is not lower than the specified pressure P
1
, at Step S
211
, the timer T
1
is advanced (T
1
=T
1
+1) and the procedure returns to Step S
209
. That is, a required time is measured that is required for the pressure in the evaporation system to decrease from the first specified pressure P
0
to the second specified pressure P
1
lower than the first specified pressure P
0
.
When the pressure P reaches the second specified pressure P
1
(t
3
), the required time T
1
is stored in a memory at Step S
212
.
The following Step S
213
to S
223
are second measurement procedures and procedures as the second required time measuring means of the ECU
18
. Like the procedures at from Steps S
200
to S
212
, a time is determined that is required for the pressure in the evaporation system to decrease from the first specified pressure P
0
to the second specified pressure P
1
with the base leak valve
16
closed. That is, at Step S
213
, the base leak valve
16
is closed to close the evaporation system at the positions of the purge valve
11
and the base leak valve
16
and the closed valve
13
is opened. Then, at Step S
214
, the pump
14
is turned on to increase the pressure in the evaporation system.
In this respect, it is also recommended that also at Steps S
213
, S
214
, the pump
14
be turned on at the same time when the base leak valve
16
is closed.
At Step S
215
, the pressure P is measured and at the following Step S
216
, it is determined whether or not the measured pressure P is higher than the specified pressure P
0
set previously. When it is determined that the measured pressure P is higher than the specified pressure P
0
, the procedure proceeds to Step S
217
and when it is determined that the measured pressure P is not higher than the specified pressure P
0
, the procedure waits for the pressure P to increase (Step S
215
, S
216
).
When the pressure P is higher than the specified pressure P
0
, the closed valve
13
is closed at Step S
217
and the pump
14
is turned off at Step S
218
(t
4
). In this manner, the evaporation system is closed at the position of the closed valve
13
in addition of the positions of the purge valve
11
and the base leak valve
16
.
In this respect, it is also recommended that also at Steps S
217
, S
218
, the pump
14
be turned on at the same time when the closed valve
13
is closed.
In the evaporation system after this t
4
, the base leak valve
16
is closed, which is different from a state during a period from t
2
to t
3
, and hence the gas in the evaporation system pressurized to the specified pressure P
0
flows out of only the leak hole as a failure to reduce the pressure in the evaporation system. Here, in a period after t
4
and in a period from t
2
to t
3
, the amount of remaining fuel is equal to each other and hence the volume of a space to be pressurized in the evaporation system is also equal and an atmospheric temperature is also substantially equal to each other. Needless to say, the property of the fuel is also equal. Thus, the states in both the periods are assumed to be equivalent except that they are different in a portion where a gas leak occurs.
When the pump
14
is turned off, the timer T
2
is reset at Step S
219
(T
2
=0).
At Step S
220
, the pressure P is measured and at the following Step S
221
, it is determined whether or not the measured pressure P is lower than the specified pressure P
1
. When it is determined that the measured pressure P is lower than the specified pressure P
1
, the procedure proceeds to Step S
223
, and when it is determined that the measured pressure P is not lower than the specified pressure P
1
, the timer T
2
is advanced (T
2
=T
2
+1) at Step S
222
and the procedure returns to Step S
220
. That is, a time is measured that is required for the pressure P in the evaporation system to decrease from the first specified pressure P
0
to the second specified pressure P
1
.
When the pressure P reaches the second specified pressure P
1
(t
5
), the required time T
2
is stored in a memory at Step S
223
.
At the following Steps S
224
to S
227
, it is determined whether a leak occurs in the evaporation system. This is a procedure as the determination means of the ECU
18
.
Here, before the description of a determination procedure, a determination principle will be described. In a case where gas leaks from the evaporation system, as is known from the Bernoulli's theorem expressed by an equation (1), if the pressure in the evaporation system is equal, the velocity of flow of leaking gas is equal at any leak point regardless of the area A of the leak point. In the following equation (1), v is the velocity of flow, P is pressure, ρ is density, g is gravity, and z is position in a vertical direction.
V
2
/2+
P/ρ+gz
=constant (1)
Therefore, under the same pressure, the flow rate of the leaking gas Q (=v×A) is proportional to the area A of the leak point. If the area A doubles, the flow rate of the leaking gas Q also doubles and hence the rate of decrease in the pressure caused by the leak also doubles. In other words, in a case where a leak hole is formed in a substantially closed space, if the area A of the leak hole doubles, a time becomes one half that is required for the pressure to decrease from the same initial pressure by the same pressure difference ΔP.
In this embodiment, the area of the leak hole is determined by using the above principle. First, a case is assumed in which a leak hole equal to the base orifice
17
is formed in the evaporation system by a failure. In this case, the total of area of the leak holes when the base leak valve
16
is closed is one half of the total area of the leak holes when the base leak hole
16
is opened. For this reason, the required time T
2
is two times the required time T
1
. That is, T
2
=T
1
×2. The required time T
2
is a time required for the pressure P to decrease to the second specified pressure P
1
when the base leak valve
16
is closed. The required time T
1
is a time required for the pressure P to decrease to the second specified pressure P
1
when the base leak valve
16
is opened.
Next, a case is assumed in which the leak hole larger than the base orifice
17
is formed in the evaporation system by a failure. In this case, the total area of the leak holes when the base leak valve
16
is closed is large than one half of the total area of the leak holes when the base leak hole
16
is opened. For this reason, the required time T
2
is smaller than two times the required time T
1
. That is, T
2
<T
1
×2.
Further, a case is assumed in which the leak hole smaller than the base orifice
17
is formed in the evaporation system by a failure. In this case, the total area of the leak holes when the base leak valve
16
is closed is smaller than one half of the total area of the leak holes when the base leak hole is opened. For this reason, the required time T
2
is larger than two times the required time T
1
. That is, T
2
>T
1
×2.
Therefore, at Step S
224
, the required time T
2
is compared with a determination base time (T
1
×2) obtained by multiplying the required time T
1
by a coefficient 2 and it is determined whether or not T
2
>T
1
×2. That is, by comparing the required time T
2
with the determination time T
1
×2, it is determined whether or not the area of the leak hole as a failure is larger than the passage cross-sectional area of the base orifice
17
. When it is determined that the area of the leak hole as a failure is larger than the passage cross-sectional area of the base orifice
17
, it is determined that the leak is little and the procedure proceeds to Step S
225
where the leak of the evaporation system is diagnosed as being normal to finish the leak check. When it is determined at Step S
224
that the area of the leak hole as a failure is not larger than the passage cross-sectional area of the base orifice
17
, it is determined that the leak is much and the procedure proceeds to Step S
226
where the leak of the evaporation system is diagnosed as being abnormal. Then, at Step S
227
, the alarm unit
22
is operated to finish the leak check.
In a case of the first measurement where the leak occurs at the base orifice
17
and in a case of the second measurement where the leak does not occur at the base orifice
17
, the evaporation system is substantially equal in the mount of remaining fuel and the atmospheric temperature and hence the amount of remaining fuel and the atmospheric temperature do not produce effects. Thus, it is not necessary to make a correction based on these factors. Further, since the pump
14
stops increasing the pressure in the evaporation system at the specified pressure P
0
, it is not necessary to use the pump
14
having a high discharge capacity. Still further, this shortens the operating time of the pump
14
, reduces load applied to the pump
14
, and hence elongates the life of the pump
14
. Thus, this reduces power consumption and hence saves energy.
Further, in both cases of measurements, along with the initial pressure, the final pressure is the specified pressure P
1
set previously, so that even when the amount of remaining fuel is large and the volume to be pressurized is small, the effects produced by these factors are only to shorten the required times T
1
and T
2
that are required for the pressure to decrease from the first specified pressure PO to the second specified pressure P
1
. Therefore, it is possible to always determine the state of the leak correctly. This can greatly relax conditions allowing the proper leak check and hence increase the frequency of determinations.
Here, while the determination base time is obtained by multiplying T
1
by a coefficient of 2, the coefficient is not always limited to 2 but can be 3, for example. In this case, an upper limit value (determination base value) allowed as the area of the leak hole as a failure becomes one half of the passage cross-sectional area of the base orifice
17
, and when the leak hole as a failure equal to the determination base value is formed in the evaporation system, the required time T
2
becomes equal to the determination base time (T
1
×3). This is because the ratio of the area of the leak hole at the time of the first measurement to the area of the leak hole at the time of the second measurement becomes 3.
In general, the following equations hold. Assuming that the passage cross-sectional area of the base orifice
17
is A
0
and the area of the leak hole as a failure AL, the equations (2) and (3) hold.
1
/T
1
:1
/T
2
=(
A
0
+
AL
):
AL
(2)
T
2
/
T
1
=(
A
0
+
AL
)/
AL
(3)
Thus, when the upper limit (determination base value) allowed as the area AL of the leak hole as a failure is expressed by αA
0
by using the passage cross-sectional area A
0
of the base orifice
17
as a unit and the area of the leak hole as a failure is the determination base value αA
0
, the following equation (4) is obtained from the equation (3). Thus, a coefficient by which the required time T
1
is multiplied when the determination base time is set becomes (
1+α)/α.
T
2
/
T
1
=(1+α)/α (4)
Thus, a case where the required time T
2
is compared with the required time T
1
×2 is an example in which α=1, and a case where the required time T
2
is compared with the required time T
1
×3 is an example in which α=½.
As described above, by setting the coefficient by which the required time T
1
is multiplied when the determination base time is found based on the determination base value obtained by using the passage cross-sectional area of the base orifice
17
as a unit, it is possible to grasp the size of the leak hole as a failure by the magnitude of the coefficient (1+α)/α and a comparison in magnitude between the required time T
2
and the determination base time (T
1
×(1+α)/α).
Then, by setting the coefficient (1+α)/α at the ratio of the area (A
0
+AL) of the leak points at the time of the first measurement to the area AL of the leak point at the time of the second measurement at the time when the area AL of the leak hole as a failure is the allowable upper limit value αA
0
, it is possible to determine whether or not the area AL of the leak hole as a failure is smaller than the allowable upper limit value αA
0
by the comparison in magnitude between the foregoing required time T
2
and the determination base time (T
1
×(1+α)/α). Thus, it is possible to set the determination base value regardless of the size of the base orifice
17
.
Second Embodiment
A second embodiment of the invention will be described based on from
FIG. 6
to FIG.
9
. The second embodiment adopts the construction shown in FIG.
6
. The components described in the foregoing embodiment are denoted by the same reference symbols and descriptions will be focused on differences between the second embodiment and the foregoing embodiment.
The procedures of the leak check performed by the ECU
18
A are shown in FIG.
7
and FIG.
8
.
FIG. 9
shows the waveforms of respective parts at the time of the leak check. Steps from S
300
to S
319
are equal to Steps from S
200
to S
219
.
The following Steps from S
313
to S
319
and from S
322
to S
324
are second measurement procedures and construct means for measuring a pressure reached of the ECU
18
A.
Of the following Steps from S
320
to S
326
, at Steps S
320
, S
321
, S
323
, A
325
, and S
326
, it is determined whether or not leak occurs in the evaporation system. These are procedures as the determination means of the ECU
18
A. At Step S
320
, T
2
is compared with T
1
×2 and it is determined whether or not T
2
is larger than T
1
×2. When it is determined that T
2
is larger than T
1
×2, the procedure proceeds to Step S
321
and when it is determined that T
2
is not larger than T
1
×2, the procedure proceeds to Step S
322
. The procedure proceeds to Step S
322
immediately after t
4
when the timer T
2
is reset. The Step S
321
will be described later.
At Step S
322
, the pressure P is measured and at the following Step S
323
, it is determined whether or not the measured pressure P is lower than the foregoing specified pressure P
1
. When it is determined that the measured pressure P is lower than the foregoing specified pressure P
1
, the procedure proceeds to Step S
325
and when it is determined that the measured pressure P is not lower than the foregoing specified pressure P
1
, the procedure proceeds to Step S
324
. The procedure proceeds to Step S
324
just after t
4
when the time T
2
is reset.
At Step S
324
, the timer T
2
is advanced (T
2
=T
2
+1). Then, the procedure returns to Step S
320
. That is, while it is being monitored after t
4
whether or not the time T
2
that elapses after the pressure P in the evaporation system becomes the specified pressure P
0
and then the pump
14
is turned off is larger than the determination base time T
1
×2 (Step S
320
) and whether or not the pressure P is lower than the foregoing specified pressure P
1
(Step S
322
), the pressure decreases from the first specified pressure P
0
to the second specified pressure P
1
.
In this embodiment, the area of the leak hole is determined by using the above principle. First, a case is assumed in which the leak hole equal to the base orifice
17
is formed in the evaporation system by a failure. In this case, the total of area of the leak holes when the base leak valve
16
is closed is one half of the total area of the leak holes when the base leak hole
16
is opened. For this reason, the required time T
2
is two times the required time T
1
. That is, T
2
=T
1
×2. The required time T
2
is a time required for the pressure P to decrease to the second specified pressure P
1
when the base leak valve
16
is closed. The required time T
1
is a time required for the pressure P to decrease to the second specified pressure P
1
when the base leak valve
16
is opened. The pressure reached P′ when the required time T
2
reaches the determination base time T
1
×2 is the foregoing specified pressure P
1
.
Next, a case is assumed in which the leak hole larger than the base orifice
17
is formed in the evaporation system by a failure. In this case, the total of area of the leak holes when the base leak valve
16
is closed is large than one half of the total area of the leak holes when the base leak hole
16
is opened. For this reason, the required time T
2
is smaller than two times the required time T
1
. That is, T
2
<T
1
×2. Thus, the pressure becomes smaller than the specified pressure P
1
before the time T
2
reaches the determination base time T
1
×2. That the pressure becomes smaller than the specified pressure P
1
before the time T
2
reaches the determination base time T
1
×2 is equivalent to that the pressure reached P
1
when the determination base time T
1
×2 elapses becomes smaller than the specified pressure P
1
.
Further, a case is assumed in which the leak hole smaller than the base orifice
17
is formed in the evaporation system by a failure. In this case, the total of area of the leak holes when the base leak valve
16
is closed is smaller than one half of the total area of the leak holes when the base leak hole is opened. For this reason, the required time T
2
is larger than two times the required time T
1
. That is, T
2
>T
1
×2. Thus, even when the required time T
2
becomes the determination base time T
1
×2, the pressure P does not reach the specified pressure P
1
. The pressure reached P′ when the determination base time T
1
×2 elapses is larger than the specified pressure P
1
.
Thus, when it is determined earlier at Step S
320
that the lapsed time T
2
is larger than the determination base time T
1
×2, it is determined that the leak is little and the procedure proceeds from Step S
320
to Step S
321
where the leak of the evaporation system is diagnosed as being normal and then the leak check is finished. On the other hand, when it is determined earlier at Step S
323
that the pressure P is lower than the specified pressure P
1
, it is determined that the leak is much and the procedure proceeds from Step S
323
to Step S
325
where the leak of the evaporation system is diagnosed as being abnormal. Then, at the following Step S
326
, the alarm unit
22
is operated and then the leak check is finished.
Also in this embodiment, in a case of the first measurement where leak occurs at the base orifice
17
and in a case of the second measurement where the leak does not occur at the base orifice
17
, the evaporation system is substantially equal in the amount of remaining fuel (the volume of the space) and the atmospheric temperature, and hence the amount of remaining fuel and the atmospheric temperature do not produce effects. Thus, it is not necessary to make a correction based on these factors. Further, since the pump
14
stops increasing the pressure at the specified pressure P
0
, it is not necessary to use the pump
14
having a high discharge capacity. Still further, this shortens the operation time of the pump
14
and reduces load applied to the pump
14
and hence elongates the life of the pump
14
. Thus, this reduces power consumption and saves energy.
In contrast to the first embodiment in which it is determined whether the leak is much or little by the length of time required for the pressure P to decrease from the specified pressure P
0
to the specified pressure P
1
, in this embodiment, it is determined whether the leak is much or little by the determination as to which of the time when the lapsed time T
2
becomes larger than the determination base time T
1
×2 and the time when the pressure P becomes lower than the specified pressure P
1
comes earlier, so that after the determination base time T
1
×2 is reached, it is not necessary to measure the state of decrease in the pressure P. Thus, it is possible to perform the leak check within a short time.
Here, while the determination base time is obtained by multiplying T
1
by a coefficient of 2, the coefficient is not always limited to 2 but can be 3, for example. In this case, an upper limit value (determination base value) allowed as the area of the leak hole as a failure is one half of the passage cross-sectional area of the base orifice
17
, and when a leak equal to the determination base value occurs in the evaporation system, a pressure reached P′ at the time when the determination base time T
1
×3 elapses becomes equal to the specified pressure P
1
. This is because the ratio of the area of the leak points at the time of the first measurement to the area of the leak point at the time of the second measurement is 3.
Further, by setting the coefficient by which the required time T
1
is multiplied when the determination base time is found based on the determination base value obtained by using the passage cross-sectional area of the base orifice
17
as a unit, it is possible to grasp the size of the leak hole as a failure by the magnitude of the coefficient and the comparison in magnitude between the pressure reached P′ and the second specified pressure P
1
.
Then, by setting the coefficient by which the required time T
1
is multiplied at the ratio of the area of the leak points at the time of the first measurement to the area of the leak point at the time of the second measurement at the time when the area of the leak hole as a failure is the allowable upper limit value, it is possible to determine whether or not the area of the leak hole as a failure is smaller than the allowable upper limit value by the comparison in magnitude between the pressure reached P
1
and the second specified pressure P
1
. Thus, it is possible to set the determination base value regardless of the size of the base orifice
17
.
Third Embodiment
In a third embodiment of the invention, a pressure difference is produced between inside the evaporation system and outside the evaporation system by reducing the pressure in the evaporation system. The evaporated fuel treating unit of the third embodiment is shown in FIG.
10
. The components described in the foregoing embodiments are denoted by the same reference symbols and descriptions will be focused on differences between the third embodiment and the foregoing embodiments.
The atmosphere passage
12
is provided with a pump
14
A in place of the pump
14
in the first embodiment. The pump
14
A is a motor-driven pump operated by the control of the ECU
18
B. When the pump
14
A is operated with the closed valve
13
opened, in contrast to the pump
14
, it presses and discharges air from the canister
8
to the atmosphere. This reduces the pressure in the evaporation system and produces a pressure difference between inside the evaporation system and outside the evaporation system that is in the atmospheric pressure.
The procedures of the leak check performed by the ECU
18
B are shown in FIG.
11
and FIG.
12
.
FIG. 13
shows the waveforms of parts in the leak check.
Steps from S
200
to S
212
are first measurement procedures. This is the first required time measuring means of the ECU
18
B. These steps are nearly equal to those in the first embodiment. When the pump
14
A is turned on (Step S
201
A), the pressure in the evaporation system starts to decrease. When the pressure reaches the first specified pressure P
0
(Step S
203
A), the pump
14
A is turned off (Step S
206
A). Here, the first specified pressure P
0
is a pressure value set on a negative side. The second specified pressure P
1
that will be described later is the same.
At Steps from S
207
to S
212
, the state of change in pressure in a state where the base leak valve
16
is opened (Step S
207
) is measured. As to the state of change in pressure in this state, the pressure P in the evaporation system is negative and hence air flows into the evaporation system through the leak hole of the evaporation system and increases the pressure P toward the atmospheric pressure.
When the pressure P increases toward the second specified pressure P
1
set previously closer to the atmospheric pressure and it is determined that P>P
1
(Step S
210
A), a time required for the pressure P to increase from the first specified pressure P to the second specified pressure P
1
is stored as a first required time T
1
(Step S
212
).
Steps from S
213
to S
223
are second measurement procedures. This is the second required time measuring means of the ECU
18
B. These steps are nearly equal to those in the first embodiment. When the pump
14
A is turned on (Step S
214
A), the pressure in the evaporation system starts to decrease. When the pressure reaches the first specified pressure P
0
(Step S
216
A), the pump
14
A is turned off (Step S
218
A).
Then, at Steps from S
217
to S
223
, the state of change in pressure in a state where the base leak valve
16
is closed (Step S
217
) is measured.
When the pressure P increases toward the second specified pressure P
1
and it is determined that P>P
1
(Step S
221
A), a time required for the pressure P to increase from the first specified pressure P
0
to the second specified pressure P
1
is stored as a second required time T
2
(Step S
212
).
Steps from S
224
to S
227
are also performed in the same way as in the first embodiment and a determination as to whether a leak is caused or not is made.
Also in the third embodiment, as in the first embodiment, the Bernoulli's theorem holds true and hence the same determination principle is viable. Thus, by setting the coefficient by which the first required time T
1
is multiplied when the determination base time is found based on the determination base value obtained by using the passage cross-sectional area of the base orifice
17
as a unit, it is possible to grasp the size of the leak hole as a failure by the magnitude of the coefficient and the comparison in magnitude between the second required time T
2
and the determination base time. In this embodiment, air flows from outside the evaporation system into the evaporation system, so that even if a leak might occur in the evaporation system, the evaporated fuel is not discharged from the leak hole to the outside of the evaporation system when the leak check is performed.
Then, by setting the coefficient by which the required time T
1
is multiplied at the ratio of the area of the leak hole at the time of the first measurement to the area of the leak hole at the time of the second measurement at the time when the area of the leak hole as a failure is the allowable upper limit value, it is possible to determine whether or not the area of the leak hole as a failure is smaller than the allowable upper limit value by the comparison in magnitude between the required time T
2
and the determination base time. Thus, it is possible to set the determination base value regardless of the size of the base orifice
17
.
Fourth Embodiment
The evaporated fuel treating unit of a fourth embodiment is shown in FIG.
14
. The fourth embodiment is a combination of the second embodiment and the third embodiment. The components described in the foregoing embodiments are denoted by the same reference symbols and descriptions will be focused on the difference between the fourth embodiment and the foregoing embodiments.
The procedures of the leak check performed by the ECU
18
C are shown in FIG.
15
and FIG.
16
.
FIG. 17
shows the waveforms of parts in the leak check.
Steps from S
300
to S
312
are first measurement procedures. This is the required time measuring means of the ECU
18
C. When the pump
14
A is turned on (Step S
301
A), the pressure P in the evaporation system starts to decrease. When the pressure P reaches the first specified pressure P
0
(Step S
303
A), the pump
14
A is turned off (Step S
306
A).
At Steps from S
307
to S
312
, the state of change in the pressure in a state where the base leak valve
16
is opened (Step S
307
) is measured.
When the pressure P increases toward the second specified pressure P
1
set previously closer to the atmospheric pressure and it is determined that P>P
1
(Step S
310
A), a time required for the pressure P to increase from the first specified pressure P
0
to the second specified pressure P
1
is stored as a required time T
1
(Step S
312
).
Steps from S
313
to S
323
are second measurement procedures. This is means for measuring pressure reached of the ECU
18
C. First, when the pump
14
A is turned on (Step S
314
A), the pressure P in the evaporation system starts to decrease. When the pressure P reaches the first specified pressure P
0
(Step S
316
A), the pump
14
A is turned off (Step S
318
A).
Then, at Steps from S
317
to S
323
, the state of change in the pressure in a state where the base leak valve
16
is closed (Step S
317
) is measured.
Then, at Step S
323
A, it is determined whether or not the pressure P in the evaporation system is larger than the second specified pressure P
1
, that is, P>P
1
until the elapsed time T
2
reaches the determination base time T
1
×2, and when it is determined that the pressure P in the evaporation system is larger than the second specified pressure P
1
, at Step S
325
, the leak of the evaporation system is diagnosed as being abnormal. When the elapsed time T
2
reaches the determination base time T
1
×
2
before the pressure P becomes larger than the second specified pressure P
1
(Step S
320
), at Step S
321
, the leak of the evaporation system is diagnosed as being normal.
Also in the fourth embodiment, as in the second embodiment, the Bernoulli's theorem holds true and hence the same determination principle is viable. Thus, by setting the coefficient by which the required time T
1
is multiplied when the determination base time is found based on the determination base value obtained by using the passage cross-sectional area of the base orifice
17
as a unit, it is possible to grasp the size of the leak hole as a failure by the magnitude of the coefficient and the comparison in magnitude between the pressure reached P′ and the second specified pressure P
1
. In this embodiment, air flows from outside the evaporation system into the evaporation system, so that even if a leak might occur in the evaporation system, the evaporated fuel is not discharged from the leak hole to the outside of the evaporation system when the leak check is performed.
Then, by setting the coefficient by which the required time T
1
is multiplied at the ratio of the area of the leak hole at the time of the first measurement to the area of the leak hole at the time of the second measurement at the time when the area of the leak hole as a failure is the allowable upper limit value, it is possible to determine whether or not the area of the leak hole as a failure is smaller than the allowable upper limit value by the comparison in magnitude between the pressure reached P
1
and the second specified pressure P
1
. Thus, it is possible to set the determination base value regardless of the size of the base orifice
17
.
Here, in the foregoing respective embodiments, the leak check is performed only when the engine is stopped, but it is also recommended that the leak check be performed during the operation of the engine. In this case, it is recommendable to perform the control shown in
FIG. 18
in place of the control shown in FIG.
2
. That is, when the leak check conditions are met at Step S
401
, the leak check is immediately performed at Step S
402
in the same way as in the foregoing respective embodiments.
Further, in the foregoing respective embodiments, it is determined whether the state of leak of the evaporation system is normal or abnormal, that is, the state of leak of the evaporation system is determined by two steps. However, it is also recommendable to determine the state of leak of the evaporation system by a plurality of steps based on the ratio of the required time T
2
in the first and third embodiments to the determination base time T
1
×2 or the ratio of the pressure reached P
1
in the second and fourth embodiments to the specified pressure P
1
. Further, it is also recommended that in the first and third embodiments, a plurality of times obtained by multiplying the first required time T
1
by a plurality of coefficients be set as a plurality of determination base times and a determination on the comparison between the second required time and the determination base time be performed for the respective determination base times (Step S
224
) and the degree of the leak be determined with higher accuracy by the value of the foregoing determination base time when the result of determination is reversed. Still further, it is also recommended that in the second and fourth embodiments, a plurality of times obtained by multiplying the required time T
1
by a plurality of coefficients be set as a plurality of determination base times and a determination on the comparison between the pressure reached and the second specified pressure for the respective determination base times (Step S
323
) and the degree of the leak be determined with higher accuracy by the value of the foregoing determination base time when the result of determination is reversed.
Further, according to the specifications required, in place of the motor-driven pumps
14
,
14
A, it is possible to use a pump driven by the power of an engine.
Moreover, the specific specifications of the invention can be modified within the spirit and scope of the invention in addition to those described specifically.
Although the present invention has been described in connection with the preferred embodiments thereof with reference to the accompanying drawings, it is to be noted that various changes and modifications will be apparent to those skilled in the art. Such changes and modifications are to be understood as being included within the scope of the present invention as defined in the appended claims.
Claims
- 1. A failure diagnosis method for diagnosing an evaporated fuel treating unit provided with a canister receiving an absorbent for absorbing evaporated fuel, a purge passage for introducing the evaporated fuel separated from the absorbent into an intake pipe of an internal combustion engine, and a purge control valve for controlling a flow rate of the evaporated fuel in the purge passage, the method comprising the steps of:producing a pressure difference between inside an evaporation system including a fuel tank, the canister, the purge passage and the purge control valve and outside the evaporation system; measuring a state of change in pressure in the evaporation system; and determining a state of leak in the evaporation system based on the measured state of change in pressure, wherein the step of measuring the state of change in pressure comprises: a first measuring step comprising the steps of: making a pressure in the evaporation system a first specified pressure; opening a base leak hole; and measuring a first required time that is required for the pressure in the evaporation system to change from the first specified pressure to a second specified pressure set at a value closer to a pressure outside the evaporation system, and a second measuring step comprising the steps of: making the pressure in the evaporation system the first specified pressure; closing the base leak hole; and measuring a second required time that is required for the pressure in the evaporation system to change from the first specified pressure to the second specified pressure, and wherein the step of determining the state of leak in the evaporation system is performed by comparing the second required time with a determination base time obtained by multiplying the first required time by a coefficient set previously based on an area of the base leak hole.
- 2. The failure diagnosis method for diagnosing an evaporated fuel treating unit as claimed in claim 1, the coefficient is set at a ratio of a total area of a leak point at the first measuring step that includes the base leak hole and a leak hole as a failure to an area of the leak point at the second measuring step that includes only the leak hole as a failure at the time when the area of the leak hole as a failure is an allowable upper limit value.
- 3. The failure diagnosis method for diagnosing an evaporated fuel treating unit as claimed in claim 1, wherein the pressure difference is produced by increasing the pressure in the evaporation system and the state of change in pressure is a state of decrease in pressure.
- 4. The failure diagnosis method for diagnosing an evaporated fuel treating unit as claimed in claim 1, wherein the pressure difference is produced by decreasing the pressure in the evaporation system and the state of change in pressure is a state of increase in pressure.
- 5. A failure diagnosis method for diagnosing an evaporated fuel treating unit provided with a canister receiving an absorbent for absorbing evaporated fuel, a purge passage for introducing the evaporated fuel separated from the absorbent into an intake pipe of an internal combustion engine, and a purge control valve for controlling a flow rate of the evaporated fuel in the purge passage, the method comprising the steps of:producing a pressure difference between inside an evaporation system including a fuel tank, the canister, the purge passage and the purge control valve and outside the evaporation system; measuring a state of change in pressure in the evaporation system; and determining a state of leak in the evaporation system based on the measured state of change in pressure, wherein the step of measuring the state of change in pressure comprises: a first measuring step comprising the steps of: making a pressure in the evaporation system a first specified pressure; opening a base leak hole; and measuring a required time that is required for the pressure in the evaporation system to change from the first specified pressure to a second specified pressure set at a value closer to a pressure outside the evaporation system than the first specified pressure, and a second measuring step comprising the steps of: making the pressure in the evaporation system the first specified pressure; closing the base leak hole; and measuring a pressure reached in the evaporation system when a determination base time obtained by multiplying the required time by a coefficient set previously based on an area of the base leak hole, and wherein the step of determining the state of leak in the evaporation system is performed by comparing the pressure reached with the second specified pressure.
- 6. The failure diagnosis method for diagnosing an evaporated fuel treating unit as claimed in claim 5, the coefficient is set at a ratio of a total area of a leak point at the first measuring step that includes the base leak hole and a leak hole as a failure to an area of a leak point at the second measuring step that includes only the leak hole as a failure at the time when an area of the leak hole as a failure is an allowable limit value.
- 7. The failure diagnosis method for diagnosing an evaporated fuel treating unit as claimed in claim 5, wherein the pressure difference is produced by increasing the pressure in the evaporation system and the state of change in pressure is a state of decrease in pressure.
- 8. The failure diagnosis method for diagnosing an evaporated fuel treating unit as claimed in claim 5, wherein the pressure difference is produced by decreasing the pressure in the evaporation system and the state of change in pressure is a state of increase in pressure.
- 9. A failure diagnosis device for diagnosing an evaporated fuel treating unit provided with a canister receiving an absorbent for absorbing evaporated fuel, a purge passage for introducing the evaporated fuel separated from the absorbent into an intake pipe of an internal combustion engine, and a purge control valve for controlling a flow rate of the evaporated fuel in the purge passage, the device comprising:pressure difference producing means for producing a pressure difference between inside an evaporation system including a fuel tank, the canister, the purge passage and the purge control valve and outside the evaporation system; pressure detecting means for detecting a pressure in the evaporation system; a passage for making the evaporation system communicate with an atmosphere; throttling means mounted in the passage and having a certain passage cross-sectional area; a valve-for closing the passage; first required time measuring means that controls the pressure difference producing means and the valve to make the pressure in the evaporation system a first specified pressure set previously, then opens the valve, and measures a first required time that is required for the pressure in the evaporation system to change from the first specified pressure to a second specified pressure set at a value closer to a pressure outside the evaporation system than the first specified pressure; second required time measuring means that controls the pressure difference producing means and the valve to make the pressure in the evaporation system the first specified pressure, then closes the valve, and measures a second required time that is required for the pressure in the evaporation system to change from the first specified pressure to the second specified pressure; and determination means that determines a state of leak of the evaporation system by comparing the second required time with a determination base time obtained by multiplying the first required time by a coefficient set previously based on a passage cross-sectional area of the throttle means.
- 10. The failure diagnosis method for diagnosing an evaporated fuel treating unit as claimed in claim 9, the coefficient is set at a ratio of a total area of a leak point when the first required time is measured that includes the throttling means and a leak hole as a failure to an area of a leak point when the second required time is measured that includes only the leak hole as a failure at the time when an area of the leak hole as a failure is an allowable limit value.
Priority Claims (2)
Number |
Date |
Country |
Kind |
2002-109172 |
Apr 2002 |
JP |
|
2003-024353 |
Jan 2003 |
JP |
|
US Referenced Citations (20)
Foreign Referenced Citations (1)
Number |
Date |
Country |
11-351078 |
Dec 1999 |
JP |