This invention relates to the field of power distribution technologies, and in particular to a method and a system for implementing feeder automation in a power distribution network.
Feeder automation (FA) is an important aspect of power distribution automation. A most common architecture currently employed for FA systems is a so called centralized architecture. In an FA system of the centralized architecture, a master station usually located in a central control room is responsible for managing the overall operation of the system. The master station receives data and signals from slave stations, analyzes the data and signals to determine the operational status of the power network, and makes decision on control and operation schemes to be performed, then generates command signals accordingly, and sends the generated command signals to slave stations to conduct the decided control and operation schemes. A slave station is usually provided for each substation and located in the respective substation. The slave station is responsible for transferring data, signals and command signals between the master station and feeder terminal units (FTU) in communication with the slave station. An FTU is provided on each feeder. The FTU includes Tie-switches, section switches, means for collecting information on the current and voltage of the connected feeder and states of the Tie-switches and section switches, means for generating signals of the current, voltage, load power and states of the Tie-switches and section switches from the collected information, and means for sending the signals to the slave station. Upon receiving a signal of, for example, fault from a slave station, the master station will control FTUs through a slave station to perform a series of actions such as fault detection, fault isolation, and service restoration (FDIR).
In this commonly employed architecture, the master station plays an indispensable role in the system. All local operational signals such as the current, voltage, load power, and switch states must be transferred to the master station, and commands from the master station are transferred to the FTU via slave stations for the FTU to perform corresponding operations. This brings about heavy requirement on the bandwidth of communication channels between the master station and the slave stations as well as between the slave stations and corresponding FTUs. Further, once a communication channel is in fault, said FDIR will become unavailable. Another disadvantage of the strategy is the time delay due to communication that may lead to un-prompt response to faults, which may cause severe damage to electricity consumers.
To address this issue, the Chinese patent publication CN1835334A titled “Non-master station transmission and distribution network control method”, granted to SHANGHAI SUNRISE-POWER AUTOMATION CO. proposes a method for controlling a transmission & distribution network without a master station. As is well known, upon occurrence of a fault on a feeder, a circuit breaker (CB) provided between the feeder and the corresponding substation will trip immediately. To treat the fault situation, the method comprises steps of: (1) fault detection: relevant FTUs detect abnormal powers, and send fault information to all other FTUs on the same feeder; (2) fault locating: based on the fault information, all the FTUs on the feeder determine the fault point; (3) fault isolation: the FTU directly associated with the fault point opens its section switch, and instructs its downstream FTUs to open their section switches; (4) reporting switch opening: the FTU associated with the fault point and its downstream FTUs send section switch state information to other FTUs upon opening their respective section switches; (5) CB closing: switching on the tripped CB; (6) power supply restoration: restoring power supply to nodes isolated from the fault point.
In the solution proposed in CN1835334A, the FTU that detected a fault will send fault information to all other FTUs on the feeder, the FTU associated with the fault will send commands to all its downstream FTUs, and the FTUs that opened their section switches will report their section switch states to all other FTUs on the feeder. Therefore, communication traffic between FTUs is quite heavy, and there is high requirement on the bandwidth of the communication channels between the FTUs. Further, to implement the method, each FTU needs to know the overall configuration of the feeder. Therefore, when a node on the feeder is changed, reconfiguration shall be conducted on each FTU, which is a difficult task especially in case of a feeder with a large number of FTUs.
Chinese patent publication CN1147982C titled “Method for implementing power distribution automation”, granted to QIANJIN ELECTRIC APPLIANCE IND discloses a method for implementing a power distribution system. In this method, an FTU monitors the operational status of section switches and processes fault locally, and sends data regarding the processing to a network communication unit. Communication units of different nodes communicate with each other, so as to cooperate with each other in processing faults in their respective domains.
In the solution proposed in CN1147982C, an FTU can only control a feeder that is only connected to the FTU, that is, a feeder both ends of which are in the domain of the FTU. But in service restoration following a fault, an FTU needs to be able to control feeders in other domains to minimize the influence of the fault on electricity consumers.
Accordingly, there exists a need in the art to improve the existing technologies to facilitate more efficient and reliable fault processing with simplified configuration.
In view of the above situation in the prior art, the present invention has been made to provide a solution with which the requirement on bandwidth of communication channels is reduced, response to a fault is efficient, influence of network modification on the feeder automation system is restricted in limited domains, and re-configuration of the feeder automation system following network modification is simplified.
In one aspect of the present invention, there is provided a method for operating a feeder automation system comprising: a first domain comprising a first slave station; a second domain comprising a second slave station; and a tie-switch provided between the first domain and the second domain; wherein the first slave station is adapted to operate the tie-switch directly, and the second slave station is adapted to operate the tie-switch through the first slave station.
In a preferred embodiment of the present invention, the tie-switch is configured as a real tie-switch in the first slave station, and as a virtual tie-switch in the second slave station.
In a further preferred embodiment of the present invention, the first slave station comprises the configuration of the first domain, and the first slave station comprises means for supervising and operating the first domain. The second slave station comprises the configuration of the second domain, and the second slave station comprises means for supervising and operating the second domain.
The feeder automation system of the present invention may also comprise a master station in communication with the first slave station and the second slave station. The first domain comprises a terminal device in communication with the first slave station, and the second domain comprises a terminal device in communication with the second slave station.
In another aspect of the present invention, there is provided a method for operating a feeder automation system as described above comprising: detecting, by the first slave station, a fault in the first domain; determining, by the first slave station, the location of the fault in the first domain; isolating, by the first slave station, the location of the fault in the first domain; and restoring, by the first slave station, power supply to the first domain.
In a preferred embodiment, restoring power supply to the first domain further comprises: searching, by the first slave station in the first domain, an available route to a connectivity node that is to be restored with power supply comprising the tie-switch; sending, by the first station, a request to the second slave station to inquire if there is an available route to the tie-switch in the second route; receiving, by the first slave station, a response from the second slave station indicating that there is an available route to the tie-switch in the second domain; closing, by the first slave station, the tie-switch.
The response may comprise information of load capacity of the route in the second domain, and prior to closing the tie-switch, the method further comprises determining, by the first slave station, whether the capacity of the route in the second domain matches the requirement of the connectivity node.
In embodiments of the present invention, the first slave station regularly reports the state of the tie-switch and the energization state of the feeder in the first domain connected to the tie-switch to the second slave station, and the second slave station regularly reports the energization state of the feeder in the second domain connected to the tie-switch to the first slave station.
In embodiments of the present invention, the first slave station receives information from a feeder terminal unit in the first domain prior to detecting the fault; and the second slave station receives information from a feeder terminal unit in the second domain.
The information received by the first slave station may comprise the current and voltage of a feeder and the state of a switch supervised by the feeder terminal unit in the first domain, and the information received by the second slave station may comprise the current and voltage of a feeder and the state of a switch supervised by the feeder terminal unit in the second domain.
If a fault occurs in the second domain, the method for operating the feeder automation system comprises: detecting, by the second slave station, a fault in the second domain; determining, by the second slave station, the location of the fault in the second domain; isolating, by the second slave station, the location of the fault in the second domain; and restoring, by the second slave station, power supply to the second domain.
In this case, restoring power supply to the first domain may further comprise: searching, by the second slave station in the second domain, an available route to a connectivity node that is to be restored with power supply comprising the tie-switch; sending, by the second station, an inquiry request to the first slave station to inquire if there is an available route to the tie-switch in the first route; receiving, by the second slave station, a response from the first slave station indicating that there is an available route to the tie-switch in the first domain; sending, by the second slave station, an operation request to the first slave station to close the tie-switch; and receiving, by the second slave station, a report of closing the tie-switch from the first slave station.
The response may comprise information of the load capacity of the route in the first domain, and prior to closing the tie-switch, the method may further comprise determining, by the second slave station, whether the capacity of the route in the first domain matches the requirement of the connectivity node.
In all the drawings, a solid circle indicates a closed tie-switch or section switch, a hollow circle indicates an opened tie-switch or section switch. A solid rectangle indicates a closed CB, and a hollow rectangle indicates an opened CB.
Each domain includes a slave station (not shown). In the following description, the slave station of Domain 1 is indicated as slave station 1, the slave station of Domain 2 is indicated as slave station 2, and the slave station of Domain 3 is indicated as slave station 3. Each domain also includes Intelligent Electronic Devices (IED) like FTU, DTU (Distribution Terminal Unit), and TTU (Transformer Terminal Unit), and primary equipment controlled by the IEDs, like Tie-switches or section switches. In Domain 1, power supply is introduced into the FA system from a bus bar BB1 through circuit breaker CBR1 provided on the inlet line. L1, L2 and L3 are three connectivity nodes to which electricity consumers are connected. The electricity consumers can be end users or lower level substations. Between two adjacent connectivity nodes, a section switch is provided. For example, a section switch Dis 1 is provided between connectivity nodes L1 and L2, Dis 2 is provided between connectivity nodes L2 and L3.
Similarly, in Domain 2, power supply is introduced into the network from a bus bar BB2 through a circuit breaker CBR2. And connectivity nodes L4 and L5 and section switches Dis 3, Dis 4 belong to this domain. In domain 3, power supply is introduced into the network from a bus bar BB3 through a circuit breaker CBR3. And connectivity nodes L6, L7, L8 and L9 and section switches Dis 6, Dis 8 and Dis 9 belong to this domain.
According to relevant specifications, in a network supplied by more than one power sources, each power source supplies a part of the sub-network in normal operation, and each part supplied by a power source is isolated from other parts via a Tie-switch. In
As indicated in
To avoid misoperation on the boundary Tie-switches, slave stations that control a same Tie-switch shall cooperate with each other. In one embodiment of the present invention, a boundary Tie-switch is configured as a real Tie-switch in one domain, and in another domain, the boundary Tie-switch is configured as a virtual Tie-switch. For example, Dis 3 can be configured as a real Tie-switch in Domain 1, and as a virtual Tie-switch in Domain 2. Dis 5 can be configured as a real Tie-switch in Domain 3, and as a virtual Tie-switch in Domain 1. Dis 7 can be configured as a real Tie-switch in Domain 2, and as a virtual Tie-switch in Domain 3.
Refer to
A slave station can directly operate a real Tie-switch. But to operate a virtual Tie-switch, it needs to send a request to the slave station of which the Tie-switch is a real one. For example, slave station 1 can operate Dis 3 directly, because Dis 3 is a real Tie-switch of this slave station. If slave station 1 is to operate Dis 5, it needs to send an operating request to slave station 3, and the slave station 3 operates Dis 5 according to the request and other operational conditions, because Dis 5 is a virtual Tie-switch of slave station 1, and a real Tie-switch of slave station 3.
A slave station reports the status of the boundary Tie-switch that is a real Tie-switch of it to the slave station of which the Tie-switch is a virtual one. In the embodiment shown in
With the above architecture, a slave station will perform certain controls and operations independently without intervention from other slave stations or a master station. For example, in case of a fault, the slave station can detect the fault, determine the location of the fault and isolate the fault independently. To restore power supply stopped by a fault, the slave station needs to exchange limited information with other slave stations, which will be described in detail later.
As discussed above, in the present invention, various controls and operations are performed by slave stations without intervention from a master station. Therefore, slave stations play important roles in the system. Conceptually, each slave station acts as an agent of the master to execute various functions of the master station.
To cooperate with each other, the slave stations communicate with each other to exchange data and signals. Data and signals exchanged between the slave stations include those necessary for fault restoration, mainly status of a boundary Tie-switch and energization conditions of associated connectivity nodes.
As mentioned above, Dis 3 is a real Tie-switch of Domain 1 and a virtual Tie-switch of Domain 2. In this case, slave station 1 regularly gets the status of Dis 3, and reports the status of Dis 3 to slave station 2. Slave station 1 also reports the energization condition of the connectivity node L3 to slave station 2 regularly. Similarly, slave station 2 reports the energization condition of the connectivity node L4 to slave station 1 regularly.
In another embodiment, data and signals exchanged between the slave stations further include load capacity of their respective domains.
In the following, the principle of the present invention will be illustrated in more details through an example of fault processing by reference to
Upon occurrence of the fault, slave station 3 will determine according to information from Dis 6, Dis 8, and Dis 9 that the fault is in connectivity node L8. This process is called fault detection.
After fault detection, slave station 3 will open section switches Dis 6, Dis 8, and Dis 9 to isolate the fault connectivity node L8. After fault isolation, the circuit breaker CBR 3 can be closed to restore power supply to connectivity node L9. This is referred to as inner restoration. Apparently connectivity nodes L6 and L7 can not get power through inner restoration.
Since no fault occurs for connectivity nodes L6 and L7, the system will try to restore power supply service to these two nodes to minimize the influence of the fault to the whole system.
To restore power supply to the suffered nodes, slave station 3 will firstly find available routes including Tie-switches to these nodes in its own domain. Taking L6 as an example, since Dis 5→L6 is an available route to L6 that includes a Tie-switch Dis 5, slave station 3 will try to turn on the route, so that power from BB1 can be supplied to L6. In the present specification, an available route means a rout through which power can be transmitted.
The specific communication between two slave stations in a process of service restoration is illustrated in
As shown in
HasAvailableRoute Request
For example, slave station 3 will firstly find a route comprising a Tie-switch in Domain 3 to the suffered connectivity node (L6, in this example). As shown in
HasAvailableRoute Response
Upon receiving the HasAvailableRoute Request, slave station 1 will search for an available route to the Tie-switch Dis 5 and respond with HasAvailableRoute Response. The message HasAvailableRoute Response is a binary variable. If the value of this variable is TRUE, it means that there is an available route in Domain 1. If the value of this variable is FALSE, it means that there is no available route in Domain 1.
As a result of the search, the route BB1→BBR1→L1→Dis 1→L2→Dis 5 will be determined by slave station 1 as an available route to Dis 5. Then slave station 1 will respond to slave station 3 with TRUE.
In an embodiment, if slave station 1 finds an available route to Dis 5, it will also calculate the capacity of this route and send capacity data together with a TRUE response to slave station 3.
Operate Request
If slave station 3 receives a TRUE response and the capacity data from slave station 1, it will determine whether the capacity of domain 1 matches the load requirement of L6. If yes, slave station 3 will operate to close Dis 5, since Dis 5 is a real Tie-switch of Domain 3 and under direct control of slave station 3. In case Dis 5 is a virtual Tie-switch of Domain 3, slave station 3 will send an Operate Request to slave station 1 to request slave station 1 to close Dis 5. If the capacity of domain 1 does not match the load requirement of L6, slave station 3 will try to request other slave station, for example, slave station 2, to provide power supply to L6, or just leave L6 not supplied with power and wait for trouble shooting.
Operate Response
Upon receiving the Operate Request to close a real Tie-switch Dis 5, slave station 1 will operate to close Dis 5 and report the operation result to slave station 3.
The process of restoring service to the connectivity node L7 is similar to the process of restoring service to L6 as discussed above, and the details of which will not be described again.
It is appreciated from the above description that the slave stations independently act as agents of the master station, and cooperate with each other to fulfill the FDIR functions without communication with the master station. Accordingly, communication channel failure from the master station to slave stations will not influence performance of FDIR functions. Further, since each slave station only comprises configurations of its own domain, once a change occurs in a domain, only the slave station of the specific domain needs to be reconfigured.
The principle of the present invention has been illustrated by way of specific embodiments with reference to the drawings, though the skilled in the art should appreciate that the embodiments are just illustrative but can not be considered as limiting the scope of the invention that is defined by the accompanying claims.
Filing Document | Filing Date | Country | Kind | 371c Date |
---|---|---|---|---|
PCT/CN08/71697 | 7/21/2008 | WO | 00 | 1/7/2011 |