Flicker reduction in electric arc furnaces by means of flicker prediction from the state determination in the initial phase of the smelting process
Field of the Invention:
Scrap metal is predominantly melted in electric arc furnaces for steel production. Above all electric arc furnaces which use 100% scrap metal generate network disturbances, for which the affected power supply company frequently charges with contractual penalties if specific limiting values are exceeded. Therefore, compensation systems (SVC—static VAR compensator) are installed in steel mills, to reduce network disturbances such as flicker and harmonics, in order to maintain predefined limiting values. However, such SVC systems only react afterwards to the already generated network disturbance from the harmonics or flicker generated in the electric arc furnace during the scrap metal melting, and cannot always maintain the prescribed limiting values, in particular if the electric arc furnaces are operated on weak supply networks.
Various conventional remedying measures are known for avoiding excessively high flicker values. For example, a low flicker melting operation is proposed, in which an appropriately selected scrap metal mix having an ultralow KSt value, auxiliary reactants in the furnace loop and a control-technology parameterization are used for the arc stabilization. In this case, the KSt value is the value which describes in particular the type, weight, and density of the scrap metal. According to UIE, this value is between 48 and 85. For example, a furnace transformer restrictor can be used as an auxiliary reactant in the furnace loop. In addition, so-called compensation systems (SVC) have conventionally been used for decades, with which the generated flicker can be reduced by approximately half. Conventional SVC systems having voltage source inverters based on IGBTs (insulated gate bipolar transistor) are also known, which are used if the flicker reduction is to be more than doubled.
However, these conventional measures are linked either to high investment and operating costs or to losses in the production. Not only do the scrap metal composition and quality have influence on network disturbances, the regulation performance of the electrode regulation and the mode of operation in the scrap metal melting phase can also have noticeable effects on the generation of network disturbances. The recognition of scrap metal movements and scrap metal collapse is thus substantially left to the operating personnel. A conventional electrode regulation can only react afterwards to these events here. Only conventional approaches are known, which engage afterwards in the steel production process. Accordingly, a conventional compensation system can only react to the states during the melting and the predefined limiting values are then often exceeded.
It is an object to provide a method and a device for flicker reduction in steel production by means of electric arc furnaces such that network disturbances, in particular flicker, are effectively reduced and limiting values are maintained with a high probability. In addition, the best possible melting performance or the greatest possible introduction of power in the furnaces are to be brought about.
The object is achieved by a method according to the main claim and a device according to the further independent claim.
According to a first aspect, a method is proposed for flicker reduction in steel production by means of an electric arc furnace, wherein a flicker database is provided by means of a storage unit, in which overall time curves of instantaneous flicker are stored in dependence on state variables and operating variables; a time curve of instantaneous flicker is measured by means of a capture device during an initial melting phase of the steel production and associated state variables and operating variables are determined; the measured time curve of instantaneous flicker during the melting phase is compared to the stored time curves of the melting phases of the overall curves of the flicker database with consideration of the state variables and operating variables by means of a computer unit; an overall time curve having maximum correspondence of instantaneous flicker and also state variables and operating variables is selected as a predicted overall curve of the flicker by means of the computer unit, and a preventive dynamic adaptation of the further control of the steel production process upon comparison of the predicted overall curve to predefined limiting values for flicker is executed by means of a control unit.
According to a second aspect, a device is proposed for flicker reduction in steel production by means of an electric arc furnace, wherein a storage unit provides a flicker database, in which overall time curves of instantaneous flicker are stored in dependence on state variables and operating variables; a capture device measures a time curve of instantaneous flicker during an initial melting phase of the steel production and determines associated state variables and operating variables; a computer unit compares the measured time curve of instantaneous flicker during the melting phase to the stored time curves of the melting phases of the overall curves of the flicker database with consideration of the state variables and operating variables; the computer unit selects an overall time curve having maximum correspondence of instantaneous flicker and also state variables and operating variables as a predicted overall curve of the flicker; a control unit preventively dynamically adapts the further control of the steel production process upon comparison of the predicted overall curve to predefined limiting values for flicker.
Fundamentally, the term “control” selected here alternatively or cumulatively includes the term “regulation”.
According to the present invention, an approach for predictive, automated intervention is proposed. Predictive flicker determination is proposed. The term “preventive” means in particular “predictive, problem avoiding” here.
By means of data-processing analysis of a present operating situation in an initial phase of a melting process in comparison to a flicker knowledge database, the future development of the flicker can advantageously be concluded. In this manner, an optimized melting operating mode may be dynamically set, which enables the greatest possible performance or the greatest possible performance capacity and limiting of the flicker to predefined limiting values at the same time. An implementation can be performed in particular within the scope of a novel, intelligent, predictive, and state-oriented electrode regulation and melting monitoring, so that further advantages can be implemented in the electric arc furnace.
It has been recognized according to the invention that the flicker values to be expected may be determined with relatively high reliability from suitable state variables and operating variables, which are determined during the first minutes in a melting phase. During this time, the electric arcs drill through the scrap metal. This phase is therefore referred to as the drilling phase. The instantaneous flicker arising in this case is symptomatic to a certain degree for the melt and can be used together with other measured state variables for a flicker prediction.
Further advantageous embodiments are claimed in conjunction with the dependent claims.
According to one advantageous embodiment, in each case dimension and slope of instantaneous flicker can be stored and measured.
According to a further advantageous embodiment, state variables and operating variables can be a basket number, a steel quality, electrical parameters, and/or scrap metal parameters.
According to a further advantageous embodiment, a respective initial melting phase can have in each case a drilling phase and a collapse phase for scrap metal introduced in each case by means of a basket, wherein the measurement and the determination can take place in each case during the first 100 to 200 seconds after the melting of the introduced scrap metal.
According to a further advantageous embodiment, the predicted flicker values can be less than the predefined limiting values, so that the control unit can control the steel production process to achieve maximum capacity with optimum energy introduction.
According to a further advantageous embodiment, predicted flicker values can be greater than the predefined limiting values, so that the control unit can control the steel production process in a manner adapted for flicker reduction during the times of the flicker values which are greater than predicted.
According to a further advantageous embodiment, the control unit can take into consideration the auxiliary information that the flicker values which are greater than predicted preferentially occur for each basket at the end of a drilling phase and/or during a collapse phase.
According to a further advantageous embodiment, the control unit can increase the inductance of the electric arc furnace by means of higher throttle steps or switching in a throttle during the times of the flicker values which are greater than predicted.
According to a further advantageous embodiment, the control unit can set an electrode regulation for short arcs having greater currents during the times of the flicker values which are greater than predicted.
According to a further advantageous embodiment, the control unit can apply periodic movements to the electric arcs during the time of the flicker values which are greater than predicted.
According to a further advantageous embodiment, the control unit can re-parameterize an already existing compensation system in a dynamically adapted manner during the time of the flicker values which are greater than predicted.
According to a further advantageous embodiment, the predicted flicker values can lie in a border region to the predefined limiting values, so that the control unit can switch the steel production process in a manner controlled between maximum capacity and flicker reduction.
According to a further advantageous embodiment, the control unit can control the steel production process in a manner adapted for flicker reduction during the times at the end of a drilling phase for each basket and during a collapse phase.
The invention will be described in greater detail on the basis of exemplary embodiments in conjunction with the figures. In the figures:
Scenario 1 shows a steep increase and high flicker values in the drilling phase B. Scenario 2 according to
It is particularly advantageous to use the items of information from the curve of the instantaneous flicker and the associated state variables and operating variables in particular in the starting phase from approximately 100 to 200 seconds during the melting of each basket K, to predict the future flicker.
According to a first step S1, a knowledge database about the curve of the flicker is prepared for each furnace in dependence on the melting process and steel qualities, in which a sufficient number of typical cases is stored. The following data are stored in this so-called flicker database:
Dimension and slope of the instantaneous flicker in the starting phase in the time range of approximately 100 to 200 seconds and in the further curve, as well as basket number, steel quality, electrical parameters, which can be, for example, voltage, current, transformer step, throttle step, effective power and apparent power, etc., and scrap metal parameters, which can be, for example, the scrap metal quality, the scrap metal volume, the scrap metal weight, etc. With a second step S2, this flicker database is transferred into a classifier, using which a similarity search can be carried out over a suitable feature space, for example, with a so-called “closest neighbor” classifier. For this purpose, the flicker curve most similar to the measured instantaneous flicker values, which can be the dimension and slope of the instantaneous flicker, for example, and the associated state variables and operating variables, is found. This classifier can also operate on a dynamically growing knowledge database and can be implemented as a learning system. The knowledge database can also be stored in a decentralized manner in a so-called “enterprise cloud”. Since the data of many different melting furnaces are stored here, the initial learning effort would be reduced. After the most probable flicker curve has been found from the starting phase, the further mode of operation can be dynamically optimized in a third step S3. For this purpose, three cases F1, F2, and F3 can be roughly differentiated. Case F1: the predicted flicker values are significantly less than predefined limiting values. In this case, the mode of operation is trimmed to optimum energy introduction and highest performance. This means, for example, for the electrode regulation, a setting for longer electric arcs and lower currents. Case F2: the predicted flicker values are greater than predefined limiting values. In this case, the mode of operation is adapted for the periods in which high flicker values are expected, as outlined hereafter. As was apparent from
The methods proposed here ensure optimum melting performance and can generally keep the flicker values below predefined limiting values. However, there is not absolute certainty in this regard, since the method is based on a prediction and flicker values occurring in future may deviate therefrom. For example, scrap metal collapses are subject to a certain level of randomness.
The present invention uses the finding that the flicker values to be expected may be determined with high probability from suitable state variables and operating variables, which are captured during the first minutes in the melting phase. In this manner, flicker can be effectively reduced and kept under predefined limiting values. The invention is suitable in particular in the case of steel production using electric arc furnaces.
Number | Date | Country | Kind |
---|---|---|---|
10 2012 217 232 | Sep 2012 | DE | national |
Filing Document | Filing Date | Country | Kind |
---|---|---|---|
PCT/EP2013/063207 | 6/25/2013 | WO | 00 |
Publishing Document | Publishing Date | Country | Kind |
---|---|---|---|
WO2014/048595 | 4/3/2014 | WO | A |
Number | Name | Date | Kind |
---|---|---|---|
5155740 | Ao | Oct 1992 | A |
5438588 | Wanner | Aug 1995 | A |
5818208 | Othman | Oct 1998 | A |
5991327 | Kojori | Nov 1999 | A |
6573691 | Ma et al. | Jun 2003 | B2 |
20030076075 | Ma | Apr 2003 | A1 |
20060050758 | Sedighy | Mar 2006 | A1 |
20080208496 | Habath | Aug 2008 | A1 |
20100219567 | Imanari | Sep 2010 | A1 |
20120134384 | Miani | May 2012 | A1 |
Number | Date | Country |
---|---|---|
1605143 | Apr 2005 | CN |
2742221 | Mar 1979 | DE |
69937873 | Nov 2008 | DE |
0896067 | Feb 1999 | EP |
H09229560 | Sep 1997 | JP |
2008202867 | Sep 2008 | JP |
26187 | Sep 2012 | KZ |
2268556 | Jan 2006 | RU |
Entry |
---|
Development of a Model for Predicting Flicker From Electric Arc Furnaces—by Manchur and Erven, 1992, listed in IDS of Mar. 25, 2015. |
Employing stochastic models for prediction of arc furnace reactive power to improve compensator performance—by Samet and Golshan, 2008, listed in IDS of Mar. 25, 2015. |
Samet, H. et al., “Employing stochastic models for prediction of arc furnace reactive power to improve compensator performance”, IET Generation, Transmission & Distribution, Jan. 21, 2008, pp. 505-515, vol. 2. No. 4. |
Manchur, G., et al., “Development of a Model for Predicting Flicker from Electric Arc Furnaces”, IEEE Transactions on Power Delivery, 1992, pp. 416-426, vol. 7, No. 1. |
Farina, J., et al., “A Methodology for Determining the Frequency Response of Electrodes in Arc Furnaces for Silicon Metal Production”, Conference Record of the 2003 IEEE Industry Applications Conference, 38th IAS Annual Meeting, Salt Lake City, Utah, US, Oct. 12-16, 2003, pp. 105-110. |
Weng Li-Min et al: “Suppression Research of Voltage Fluctuation & Operation Characteristics of Electric Arc Furnace”, China Academic Journal Electric Publishing House, 33, 2004—English abstract. |
Number | Date | Country | |
---|---|---|---|
20150226484 A1 | Aug 2015 | US |