Claims
- 1. A process for installing a floating platform to the ocean floor using a spoolable tether comprising installing the spooled tether onto the floating platform.
- 2. The process of claim 1 wherein the tether is a composite, twisted tether.
- 3. The process of claim 1 further comprising towing the floating platform to a site for installation; unspooling the tether; connecting a bottom end connector of the tether to a foundation on the ocean floor; and connecting a top end connector of the tether to the floating platform.
- 4. The process of claim 3 further comprising removing the empty spool from the floating platform.
- 5. The process of claim 1 wherein the floating platform is a tension leg platform (TLP).
- 6. The process of claim 1 wherein the spooled tether installed on the floating platform further comprises a spool holder, a spool having a tether wound thereon supported by the spool holder, and a means for winding and unwinding the spool connected to and driving the spool.
- 7. The process of claim 1 wherein the foundation is a suction anchor, and the suction anchor is connected to the bottom end connector prior to unspooling the tether and attached to the ocean floor after unspooling the tether.
- 8. The process of claim 1 wherein the tether is divided into a plurality of lengths, each length being spooled onto one of a corresponding plurality of spools, the tether being connected together with connectors as the lengths thereof are unspooled.
- 9. The process of claim 5 wherein the spooled tether is temporarily installed on the TLP hull.
- 10. The process of claim 9 wherein the spooled tether is installed above the waterline.
- 11. The process of claim 9 wherein the spooled tether is installed below the waterline.
- 12. The process of claim 11 wherein the spool has sealed ends such that the spool is buoyant when installed underwater.
- 13. The process of claim 5 wherein the spooled tether is permanently installed on the TLP hull.
- 14. The process of claim 13 wherein the spooled tether is installed above the waterline.
- 15. The process of claim 13 wherein the spooled tether is installed below the waterline.
- 16. The process of claim 15 wherein the spool has sealed ends such that the spool is buoyant when installed underwater.
- 17. The process of claim 5 wherein the spooled tether is temporarily installed on the TLP deck.
- 18. The process of claim 5 wherein the spooled tether is permanently installed on the TLP deck.
- 19. A process for moving a floating platform anchored to the ocean floor by a spoolable tether, comprising: disconnecting a top end connector of the tether from the floating platform and a bottom end connector of the tether from a foundation on the ocean floor; spooling the tether onto a spool installed on the floating platform; towing the floating platform to a different site for re-installation; and unspooling the tether and reconnecting the tether to the ocean floor and the floating platform.
- 20. The process of claim 19 wherein the foundation is a suction anchor, the bottom end connection remains connected to the suction anchor, and the suction anchor is released from the ocean floor and raised to the surface as the tether is spooled onto the spool.
- 21. The process of claim 19 wherein the spool is mounted upon the floating platform prior to disconnecting the tether and removed upon reconnecting the tether.
- 22. A tension leg platform (TLP) comprising a spooled tether installed thereon.
- 23. The TLP of claim 22 wherein the tether is a composite, twisted tether.
- 24. The TLP of claim 22 wherein the spooled tether further comprises a spool holder, a spool having the tether wound thereon supported by the spool holder, and a means for winding and unwinding the spool connected to and driving the spool.
- 25. The TLP of claim 22 wherein the spooled tether is temporarily installed on the TLP hull.
- 26. The TLP of claim 25 wherein the spooled composite tether is installed above the waterline.
- 27. The TLP of claim 25 wherein the spooled composite tether is installed below the waterline.
- 28. The TLP of claim 22 wherein the spooled tether is permanently installed on the TLP hull.
- 29. The TLP of claim 28 wherein the spooled composite tether is installed above the waterline.
- 30. The TLP of claim 28 wherein the spooled composite tether is installed below the waterline.
- 31. The TLP of claim 22 wherein the spooled tether is temporarily installed on the TLP deck.
- 32. The TLP of claim 22 wherein the spooled composite tether is permanently installed on the TLP deck.
- 33. A tether spool having sealed ends such that the spool is buoyant when installed underwater.
CROSS-REFERENCE TO RELATED APPLICATIONS
[0001] This application claims the benefit under 35 U.S.C. §119(e) of U.S. Provisional Patent Application No. 60/286,885, filed Apr. 27, 2001, which is hereby incorporated herein by reference.
Provisional Applications (1)
|
Number |
Date |
Country |
|
60286885 |
Apr 2001 |
US |