Floating stability device for offshore platform

Information

  • Patent Grant
  • 6786679
  • Patent Number
    6,786,679
  • Date Filed
    Thursday, June 6, 2002
    22 years ago
  • Date Issued
    Tuesday, September 7, 2004
    20 years ago
Abstract
An offshore well platform is towed in an upright condition to a well site by the use of a temporary flotation device. The flotation device mounts to a portion of the platform and is partially submerged, increasing the ability and buoyancy of the platform. At the site, the engagement of the flotation device shifts to a deploying position. In the deploying position, the ballast of the platform is increased to cause it to more deeply submerge. The flotation device remains at least partially surrounding the platform and floating while the platform moves downwardly relative to it. This provides lateral support if needed to prevent heeling while being submerged. The flotation device is disengageable from the platform when the platform is fully submerged.
Description




BACKGROUND OF THE INVENTION




1. Field of the Invention




The present invention relates to floating vessels used for offshore drilling and production of petroleum.




2. Description of the Related Art




Petroleum production often requires the placement of rig in an offshore location. In shallower waters, the rigs and production facilities can be placed on freestanding offshore platforms. As the water becomes deeper, however, these become impractical, and it is necessary to have a floating platform, or support vessel, upon which the rigs and production facilities can be placed.




One type of deepwater support vessel is a tension leg platform (TLP). The TLP is a buoyant platform that is secured to the seabed using generally vertically-oriented rigid tethers or rods that restrain the platform against vertical and horizontal motion relative to the well in the seabed below. These platforms have a very short period in response to wave action.




An alternative to the TLP is the deep draft caisson vessel (DDCV). The DDCV is a free floating vessel that is moored to the seabed using flexible tethers so that vertical and horizontal motion of the vessel is restrained, although not eliminated . Examples of DDCVs are found in U.S. Pat. No. 4,702,321.




Methods for restraining the DDCVs attempt to slow, rather than eliminate, the natural response period of the vessel to wave effects. Current DDCV arrangements “decouple” the vessel from the individual wells being supported so that the wells are not subject to the same induced motions as the vessel. Decoupling is typically accomplished by using buoyant means to make the wells separately freestanding and using flexible hoses to interconnect the vertical risers from the well to the production facilities.




A common variety of DDCV is the type shown in U.S. Pat. No. 4,702,321, which utilizes a long cylindrical structure and is commonly known as a spar. The long cylindrical shape of the spar provides a very stable structure when the vessel is in its installed position, exhibiting very slow pitch, surge and heave motions. Heave motion, however, is not totally eliminated, allowing the structure to bob up and down vertically in the sea. Recently, attempts have been made to add a number of horizontally extending plates along the length of the spar in order to help the spar be more resistant to heave.




Regardless of the presence of the plates, the spar must be assembled and transported in a horizontal position and then installed by being upended at or near the final site using a large crane that must also be transported to the installation site. As these caisson structures are often around 650 ft. in length, transport and upending of the structure are risky. Further, it is only after a successful upending of the structure has occurred, and the lower portion of the structure has been successfully moored, that components of the rig can be placed atop the spar.




SUMMARY OF THE INVENTION




In this invention, a platform is provided that has a variable ballast. A flotation device is coupled to the platform to increase the buoyancy of the platform. The flotation device causes the platform to float in a towing position with the platform and the flotation device partially submerged. The flotation device is fixed to the platform while in the towing position, and the platform is towed upright. When at the site, the flotation device is moved to a deploying position. In the deploying position, the flotation device remains in close proximity with a portion of the platform, but is not fixed to it vertically. As ballast is increased in the platform, the platform moves downward relative to the flotation device. The flotation device remains floating closely spaced to a portion of the platform. If the platform heels while lowering, it will contact the flotation device, which provides lateral stability against heeling. Once the platform has been submerged sufficiently so that it is stable, the flotation device is released from the platform.




In the preferred embodiment, the platform has an upper elongated tower section and a lower base section. The base section has a greater cross-sectional dimension than the tower section. The flotation device is preferably annular and fits on top of the base section, surrounding a lower portion of the tower section. Preferably the flotation device is formed in circumferentially extending segments. The segments are separable from each other. The flotation device is disengaged from the platform by uncoupling the segments from each other and pulling them laterally outward from the platform.




In the first embodiment, the upper deck structure of the platform is mounted to the platform before the platform is towed to the desired location. In the second embodiment, the upper deck structure is installed at the location. This is handled by mounting the upper deck structure on a buoyant member and towing the buoyant member to the location. The buoyant member has two spaced-apart arms, resulting in a slot. The arms are spaced apart from each other sufficiently to allow the arms of the buoyant member to float on opposite sides of the platform after the platform has been fully deployed and the flotation device removed. The arms support the upper deck structure at a distance above the upper end of the platform. Once in place over the platform, the platform buoyancy is increased, allowing the platform to rise up into contact with the upper deck structure. The deck structure is then secured to the platform, and the buoyant member is then moved laterally away from the structure.











BRIEF DESCRIPTION OF THE DRAWINGS





FIG. 1

is a schematic sectional view of a platform and flotation device constructed in accordance with this invention.





FIG. 2

is a schematic side elevational view of the platform and flotation device of

FIG. 1

, taken along the line


2





2


of FIG.


1


.





FIG. 3

is a schematic side elevational view illustrating the platform and flotation device of

FIG. 1

being towed to a site.





FIG. 4

is a schematic side elevational view of the flotation device and platform of

FIG. 1

, showing the platform being lowered relative to the flotation device.





FIG. 5

is a schematic top view of the platform and flotation device of

FIG. 1

, showing the segments of the flotation device separated from each other and being towed away from the platform.





FIG. 6

is a schematic side elevational view of the platform of

FIG. 1

in its fully installed position.





FIG. 7

illustrates an alternate method, wherein the platform of

FIG. 1

is towed to the site without its upper deck structure.





FIG. 8

is a schematic side elevational view of the platform of

FIG. 7

, showing it being lowered further into the sea relative to the flotation device.





FIG. 9

is a schematic side elevational view of the platform of

FIG. 7

, shown in a submerged position, and showing the upper deck structure being floated over it by means of a buoyant member.





FIG. 10

is a sectional view of the buoyant member of

FIG. 9

, taken along the line


10





10


of FIG.


9


.





FIG. 11

is a schematic side elevational view of the platform of

FIG. 8

, showing the buoyant member around the upper end of the platform, with the platform raised up into contact with the upper deck structure.





FIG. 12

is a schematic side elevational view of the platform of

FIG. 7

, shown fully installed with the upper deck structure.





FIG. 13

is a graph illustrating an example of a righting arm and a heel arm of the platform and flotation device of

FIG. 1

being towed under selective wind conditions.











DETAILED DESCRIPTION OF THE INVENTION




Referring to

FIG. 1

, platform


11


has a base section


13


and a tower section


15


. Base section


13


has a greater horizontal cross-sectional area than the cross-sectional area of tower section


15


. In the preferred embodiment, both base section


13


and tower section


15


are cylindrical. Base section


13


has a vertical height that is much less than the vertical height of tower section


15


.




An upper deck structure


17


is schematically shown mounted on the upper end of tower section


15


. Upper deck structure


17


may in some instances comprise drilling equipment, including a derrick, living quarters and associated machinery. Upper deck structure


17


may also comprise production equipment for separating gas and water from well fluids and processing the oil or gas. Alternately, upper deck structure


17


could be a much simpler structure, such a deck for helicopter landing. In the latter instance, tower section


15


and base section


13


could be employed for storing chemicals and the like, in which case platform


11


serves as a tender to a production or drilling vessel.




Preferably base section


13


has a section of fixed ballast


19


such as heavy metal. Additionally, base section


13


has at least one ballast chamber


21


, which is a watertight chamber that can be flooded selectively with water to increase the ballast or pumped free of water to decrease the ballast. Tower section


15


also has a number of ballast chambers


23


, each of which may be selectively filled with water or pumped free of water. In this embodiment, a central vertical passage


24


extends downward through tower section


15


and base section


13


. Central passage


24


allows drilling tools to be lowered from upper deck structure


17


into the sea. If platform


11


is employed as a tender, the lower end of base section


13


would preferably be closed against sea water, and central passage


24


would be used for transporting materials and personnel from base section


13


to upper deck structure


17


.




A flotation device


25


is shown mounted on platform


11


. Flotation device


25


is a buoyant member, preferably a tank that is filled with air and sealed from water to provide a buoyant chamber. In this embodiment, flotation device


25


is annular and secured to platform


11


by a set of fasteners


27


, shown by dotted lines. Fasteners


27


are illustrated to be located on an inner diameter


29


of flotation device


25


for engaging the top of base section


13


. Fasteners


27


could alternately engage tower section


15


or both tower section


15


and base section


13


. Fasteners


27


may be a variety of types of clamps or locking members either mechanically or hydraulically actuated.




Flotation device


25


in the embodiment of

FIG. 1

has an outer diameter


31


that is greater than the outer diameter of base section


13


. A lower portion of the outer diameter


31


surrounds the outer diameter of base section


13


. This results in an outer lower portion


33


that extends downward flush with the lower end of base section


13


. Fixed ballast such as ballast


19


may optionally be located in the lower end of outer lower portion


33


. Outer lower portion


33


is not essential and in some cases, the lower end of flotation device


25


could be flush with the top of base section


13


. In that case, outer diameter


31


of flotation device


25


could be the same or even less than the outer diameter of base section


13


.




As shown in

FIG. 2

, flotation device


25


is preferably constructed in a plurality of separate circumferentially extending segments


35


. Four segments


35


are shown, although this number could be more or less. Segments


35


are assembled and coupled to each other in the annular configuration shown in

FIG. 2

by fasteners


37


. Fasteners


37


, similar to fasteners


27


, could be of many different types, such as clamps or locks, either hydraulically or mechanically actuated. Each segment


35


is a separate sealed, watertight member so that each is independently buoyant.




Flotation device


25


is employed to provide additional buoyancy to platform


11


to increase the stability of platform


11


while it is being towed upright to a desired location, shown in

FIG. 3

, and also to stabilize platform


11


while it is being submerged to the desired position as illustrated in FIG.


4


. The dimensions of flotation device


25


are developed by known principles. Once installed on base section


13


, base section


13


will be fully submerged and flotation device


25


will be partly submerged. Lower outer portion


33


of flotation device


25


will be fully submerged. The horizontal cross-sectional area of flotation device


25


significantly increases the water plan of platform


11


while being towed, the water plan being the surface area of platform


11


and flotation device


25


measured at the waterline. The increased water plan greatly increases the stability of platform


11


while being towed.




Referring to

FIG. 13

, the graph is representative of a righting arm curve


39


and a heeling arm curve


41


of platform


11


when assembled with flotation device


25


. Righting arm curve


39


represents the ability of the assembled platform


11


and flotation device


25


to right itself if it is being heeled due to strong winds. In the example of

FIG. 13

, the wind is assumed to be 70 knots. As the amount of heel increases to around 25°, righting arm curve


39


increases, and therefore the ability of platform


11


to right itself also increases. The heeling arm


41


decreases slightly as the heel increases because as the platform


11


heels more, it presents less structure normal to the wind. The area A


1


under righting arm curve


39


and above heeling arm curve


41


should be greater than the area A


2


. The area A


2


is the area under heeling arm curve


41


and above righting arm curve


39


to the first point where they cross, which is about 7° in the example shown. For stability, the ratio of A


1


over A


2


in many cases should be at least 1.4. In the example shown, it is 2.53, presenting a stable configuration for towing even in a 70 knot wind.




The graph of

FIG. 13

will change for the same structure at different wind speeds. Also, the graph of

FIG. 13

changes as tower section


15


is more deeply submerged. At the fully installed depth, there will be no point at which the righting arm curve


39


crosses the heeling arm curve


41


because of its extensive depth. That is, once installed, even if heeled to 40°, the righting arm will be greater than the heeling arm, preventing capsizing.




If a graph such as

FIG. 13

is plotted for the platform


11


without flotation device


25


, the area A


1


would still be greater than the area A


2


, but the ratio would be much less than 2.53. Adding flotation device


25


improves the righting ability because it adds buoyancy and also creates a greater water plan. Without flotation device


25


, the water plan would only be the cross-sectional area of tower section


15


, considerably less than if combined with the water plan of flotation device


25


. Flotation device


25


also lowers the vertical center of gravity.




In one example, the overall height from the lower end of base section


13


to upper deck structure


17


is 200 ft. Base section


13


has a diameter of 108 ft. and a height of 30 ft. Tower section


15


is cylindrical with an outer diameter of 50 ft. and an inner diameter of 20 ft. Flotation device


25


has an outer diameter


31


of 136 ft and an inner diameter


29


of 64 feet. In this example, the water plan of flotation device


25


is much greater than the water plan of tower section


15


. The water plan of tower section


15


is pi times the square of the radius, approximately 1962 square feet, and the water plan of flotation device


25


is pi times outer diameter


31


divided by two and squared less inner diameter


29


divided by two and squared, approximately 11,304 square feet. The height of the portion of flotation device


25


extending above base section


13


is 20 ft, resulting in an overall height at outer diameter


31


of 50 feet. This produces a draft while towing of 29.50 ft. and a vertical center of gravity of 45.47 ft. Of course, platform


11


and flotation device


25


may have different dimensions than those listed above.




Referring again to

FIG. 3

, in operation, flotation device


25


will be assembled and secured to platform


11


by fasteners


27


(FIG.


1


). A tow vessel


43


will be secured to base section


13


for towing platform


11


to a desired location. Once at the desired location, as shown in

FIG. 4

, moorings


45


will be attached to the sea floor. Fasteners


27


(

FIG. 1

) will be released to place flotation device


25


in the deploying mode. Platform


11


is now free to move downward relative to flotation device


25


, although flotation device


25


is retained with tower section


15


because it still surrounds it. Because inner diameter


29


of flotation device


25


is greater than the outer diameter of tower section


13


by a clearance on a side of seven feet, flotation device


25


will not initially be in physical contact with tower section


13


. Water is pumped into ballast chambers


21


and


23


(FIG.


1


), causing platform


11


to move downward. As it moves downward, flotation device


25


provides lateral stability by remaining in place surrounding platform tower section


15


. That is, should platform


11


begin to heel, tower section


15


would contact part of inner diameter


29


of flotation device


25


, which would add stability. Prior to reaching a certain depth, platform


11


will still be unstable, therefore flotation device


25


adds stability during this deploying movement.




Once platform


11


has been submerged to a depth in which it is stable, such as about 120 ft. in the above example, there will be no degree of heel in which the righting arm curve


39


(FIG.


13


), drops below the heeling arm curve


41


. At this point, if desired, flotation device


25


could be disengaged from tower section


15


. Alternately, the operator may wish to completely deploy platform


11


to its final depth before detaching flotation device


25


. In the above example of dimensions for platform


11


, the draft while fully deployed is about 160 ft.




Flotation device


25


is disengaged from tower section


15


as illustrated in FIG.


5


. Fasteners


37


(

FIG. 2

) are released to enable segments


35


to separate and segments


35


are pulled radially outward from platform


11


. Flotation device


25


may be reassembled, towed back to land and reused.

FIG. 6

shows platform


11


at its fully deployed depth with flotation device


25


removed.





FIG. 7

illustrates an alternate method for deploying platform


11


. In

FIG. 7

, upper deck structure


17


is left off initially. This reduces the amount of weight at the upper end of platform


11


. Flotation device


25


is assembled on base section


13


and towed to the site by vessel


43


. Then, as illustrated in

FIG. 8

, platform


11


is moored by moorings


45


and fasteners


27


(

FIG. 1

) are moved to the deploying position. The ballast of platform


11


is increased by pumping water into it, causing it to lower as shown in

FIG. 8

while flotation device


25


remains floating. Once platform


11


is stable, flotation device


25


is removed.




Referring to

FIG. 9

, preferably, platform


11


is over-ballasted to a depth somewhat deeper than its desired draft when fully installed. Upper deck structure


17


is towed separately to the site on a buoyant member


47


. Buoyant member


47


has the shape of a horseshoe, as shown in FIG.


10


. It has vertical columns


49


that support upper deck structure


17


above buoyant member


47


. Columns


49


are located on two spaced-apart buoyant arms


51


. Arms


51


are parallel to each other and join each other at a base


53


. The end opposite base


53


is open, defining a slot


55


between the free ends of arms


51


. Slot


55


has a width greater than the width or diameter of tower section


15


. This enables buoyant member


47


to be towed and pushed around the upper portion of tower section


15


, as shown in

FIG. 11

, with arms


51


on opposite sides of tower section


15


.




Initially, the lower ends or legs


57


of upper deck structure


17


are spaced above the upper end of tower section


15


. Then, the buoyancy in platform


11


is increased, causing the upper end of tower section


15


to come up into engagement with legs


57


. Tower section


15


will lift upper deck structure


17


from buoyant member


47


, and legs


57


will be secured to the upper end of tower section


15


. Then, as illustrated in

FIG. 12

, buoyant member


47


is removed along with columns


49


. This is done by towing buoyant member


47


laterally outward from tower section


15


.




The invention has significant advantages. The flotation device increases the stability while towing of the platform, enabling the platform to be towed in an upright condition. The platform therefore does not need to be towed horizontally, then upended for deploying. The flotation device also adds stability while the vessel is being deployed at the site, resisting heeling by encircling the tower section. The flotation device is readily removed from the tower once it is submerged to a depth of stability. This allows the flotation device to be reused or recycled.




While the invention has been shown in only two of its forms, it should be apparent to those skilled in the art that it is not so limited but susceptible to various changes without departing from the scope of the invention. For example, the platform may be configured in other shapes other than cylindrical. Although, preferred, the platform need not have larger diameter base section and a smaller diameter tower section. Also, the flotation device could be configured in other shapes rather than annular. Additionally, devices such as rollers could be mounted to the inner diameter of the flotation device to contact the tower section while the platform is being submerged.



Claims
  • 1. A method for deploying an offshore well facility, comprising:(a) providing a platform with a variable ballast; (b) fastening a flotation device to the platform in a manner to increase buoyancy of the platform, the flotation device causing the platform to float in a towing position with the platform and the flotation device partially submerged; then (c) towing the platform and the flotation device to a desired location; then (d) increasing the ballast of the platform, and unfastening the flotation device so that the platform moves downward relative to the flotation device to a deeper partially submerged but floating position while retaining the flotation device floating adjacent a portion of the platform to provide stability against heeling; then (e) removing the flotation device from a vicinity of the platform while the platform remains floating.
  • 2. The method according to claim 1, wherein step (b) comprises securing the flotation device adjacent a lower base section of the platform: and step (c) comprisestowing the platform to the desired location while the flotation device remains adjacent the lower base section.
  • 3. The method according to claim 1, wherein step (b) comprises rigidly securing the flotation device to the platform; and step (c) comprises towing the platform to the desired location while the flotation device remains rigidly secured to the platform.
  • 4. The method according to claim 1, wherein:step (a) comprises providing the platform with an upper vertically elongated tower section and a lower base section having a horizontal cross-sectional area greater than the tower section; step (b) comprises mounting the flotation device to the lower base section; and step (c) comprises towing the platform to the desired location while the flotation device remains mounted to the lower base section; and step (d) comprises releasing the flotation device from the lower base section but retaining the flotation device adjacent the tower section as the platform moves downward.
  • 5. The method according to claim 1, wherein:step (a) comprises providing the platform with an upper vertically elongated tower section and a lower base section having a horizontal cross-sectional area greater than the tower section, and providing the flotation device with a water plan that is greater than a water plan of the tower section; step (b) comprises rigidly mounting at least a portion of the flotation device directly on top of the base section around the tower section; step (c) comprises towing the platform to the desired location while the flotation device remains directly on top of the base section: and step (d) comprises releasing the flotation device from its position directly on top of the base section but retaining the flotation device around the tower section as the platform moves downward.
  • 6. The method according to claim 1, wherein while in the towing position, the flotation device has a greater water plan than the platform.
  • 7. A method for deploying an offshore well facility, comprising:(a) providing a platform with a variable ballast: (b) fastening a flotation device to the platform in a manner to increase buoyancy of the platform, the flotation device causing the platform to float in a towing position with the platform and the flotation device partially submerged; then (c) towing the platform and the flotation device to a desired location; then (d) increasing the ballast of the platform, and unfastening the flotation device so that the platform moves downward relative to the flotation device to a deeper partially submerged position while retaining the flotation device floating adjacent a portion of the platform to provide stability against heeling; then (e) removing the flotation device from a vicinity of the platform; and wherein step (a) comprises providing the platform with an upper vertically elongated tower section and a lower base section having a horizontal cross-sectional area greater than the tower section; step (b) comprises forming the flotation device into an annular configuration with separable segments, and mounting at least a portion of the flotation device on top of the base section and around a lower portion of the tower section; step (d) comprises leaving the flotation device around the tower section as the platform moves downward; and step (e) comprises separating at least some of the segments from each other and pulling them laterally outward from the tower section.
  • 8. A method for deploying an offshore well facility, comprising:(a) providing a platform with a variable ballast: (b) fastening a flotation device to the platform in a manner to increase buoyancy of the platform, the flotation device causing the platform to float in a towing position with the platform and the flotation device partially submerged; then (c) towing the platform and the flotation device to a desired location; then (d) increasing the ballast of the platform, and unfastening the flotation device so that the platform moves downward relative to the flotation device to a deeper partially submerged position while retaining the flotation device floating adjacent a portion of the platform to provide stability against heeling; then (e) removing the flotation device from a vicinity of the platform; and after the flotation device is disengaged: mounting an upper deck structure on a buoyant member that has two laterally spaced apart arms; floating the arms on opposite sides of an upper portion of the platform, with the deck structure spaced above an upper end of the platform; then allowing the platform to become less submerged, causing the upper end of the platform to contact and support the deck structure; then attaching the deck structure to the upper end of the platform and removing the buoyant member.
  • 9. A method for deploying an offshore well facility, comprising:(a) providing a platform with an elongated upper tower section and a lower base section, the base section having a greater horizontal cross-sectional than the tower section; (b) securing a flotation device to the base section at least partially surrounding the tower section, the flotation device causing the platform to float in a towing position with the base fully submerged and the flotation device partially submerged; then (c) towing the platform and the flotation device to a desired location while the flotation device remains secured to the base section; then (d) releasing the flotation device from the base section to allow downward vertical movement of the platform relative to the flotation device while the flotation device remains floating and at least partially surrounding the tower section, and pumping water into a chamber of the platform to cause the platform to move downward relative to the flotation device to a deeper partially submerged but still floating position; then (e) disengaging the flotation device from the tower section while the platform remains floating.
  • 10. A method for deploying an offshore well facility, comprising:(a) providing a platform with an elongated upper tower section and a lower base section, the base section having a greater horizontal cross-sectional than the tower section; (b) securing a flotation device to the base section at least partially surrounding the tower section, the flotation device causing the platform to float in a towing position with the base fully submerged and the flotation device partially submerged; then (c) towing the platform and the flotation device to a desired location; then (d) releasing the flotation device from the base section to allow downward vertical movement of the platform relative to the flotation device while the flotation device remains floating and at least partially surrounding the tower section, and pumping water into a chamber of the platform to cause the platform to move downward relative to the flotation device to a deeper partially submerged position; then (e) disengaging the flotation device from the tower section; and wherein the step of securing the flotation device in step (b) comprises completely surrounding the tower section with the flotation device.
  • 11. A method for deploying an offshore well facility, comprising:(a) providing a platform with an elongated upper tower section and a lower base section, the base section having a greater horizontal cross-sectional than the tower section; (b) securing a flotation device to the base section at least partially surrounding the tower section, the flotation device causing the platform to float in a towing position with the base fully submerged and the flotation device partially submerged; then (c) towing the platform and the flotation device to a desired location; then (d) releasing the flotation device from the base section to allow downward vertical movement of the platform relative to the flotation device while the flotation device remains floating and at least partially surrounding the tower section, and pumping water into a chamber of the platform to cause the platform to move downward relative to the flotation device to a deeper partially submerged position; then (e) disengaging the flotation device from the tower section; and wherein the step of securing the flotation device in step (b) comprises completely surrounding a lower portion of the tower section with the flotation device and also surrounding at least an upper portion of the base with the flotation device.
  • 12. A method for deploying an offshore well facility, comprising:(a) providing a platform with an elongated upper tower section and a lower base section, the base section having a greater horizontal cross-sectional than the tower section; (b) securing a flotation device to the base section at least partially surrounding the tower section, the flotation device causing the platform to float in a towing position with the base fully submerged and the flotation device partially submerged; then (c) towing the platform and the flotation device to a desired location; then (d) releasing the flotation device from the base section to allow downward vertical movement of the platform relative to the flotation device while the flotation device remains floating and at least partially surrounding the tower section, and pumping water into a chamber of the platform to cause the platform to move downward relative to the flotation device to a deeper partially submerged position; then (e) disengaging the flotation device from the tower section; and after the flotation device is disengaged: mounting an upper deck structure on a buoyant member that has two laterally spaced apart arms; floating the arms on opposite sides of the tower section, with the deck structure spaced above an upper end of the tower section; then allowing the platform to become less submerged, causing the upper end of the tower section to move upward and lift the deck structure from the buoyant member; and attaching the deck structure to the upper end of the tower section and removing the buoyant member.
  • 13. An offshore well facility, comprising:a platform having a variable ballast; a flotation device secured and extending around part of the platform while in a towing position, the flotation device and a lower portion of the platform being partially submerged with an upper portion of the platform extending above the flotation device while in the towing position; the flotation device having a deploying position, wherein the ballast of the platform is increased, causing the platform to move downward relative to the flotation device from the towing position to a deeper partially submerged position while the flotation device remains floating and extending around the upper portion of the platform to provide stability against heeling; the flotation device being releasable from the platform once the platform is submerged sufficiently to become stabile; and the platform having sufficient buoyancy to remain floating after the flotation device is released from the platform.
  • 14. The facility according to claim 13, wherein the flotation device is secured to the platform adjacent a bottom of the platform.
  • 15. An offshore well facility, comprising:a platform having a variable ballast; a flotation device secured and extending around part of the platform while in a towing position, the flotation device and a lower portion of the platform being partially submerged with an upper portion of the platform extending above the flotation device while in the towing position; the flotation device having a deploying position, wherein the ballast of the platform is increased, causing the platform to move downward relative to the flotation device from the towing position to a deeper partially submerged position while the flotation device remains floating and extending around the upper portion of the platform to provide stability against heeling; the flotation device being releasable from the platform once the platform is submerged sufficiently to become stabile; and wherein the flotation device is annular and formed of circumferentially extending segments that are separable from each other to release the flotation device from the platform.
  • 16. An offshore well facility, comprising:a platform having a variable ballast; a flotation device secured and extending around part of the platform while in a towing position, the flotation device and a lower portion of the platform being partially submerged with an upper portion of the platform extending above the flotation device while in the towing position; the flotation device having a deploying position, wherein the ballast of the platform is increased, causing the platform to move downward relative to the flotation device from the towing position to a deeper partially submerged position while the flotation device remains floating and extending around the upper portion of the platform to provide stability against heeling; the flotation device being releasable from the platform once the platform is submerged sufficiently to become stabile; an upper deck structure; a buoyant member that has two laterally spaced apart arms, the upper deck structure being carried on the buoyant member while in a towing position; the arms being positionable on opposite sides of the platform, with the deck structure spaced above an upper end of the platform, enabling the ballast of the platform to be decreased to cause the upper end of the platform to move upward to support the deck structure; and the buoyant member being disengagable from the upper deck structure and the platform.
  • 17. An offshore well facility, comprising:a platform having an upper elongated tower section and a lower base section that has a greater horizontal cross-section than the tower section; a plurality of circumferentially extending segments that secure to each other to define an annular flotation device, the flotation device extending around a lower portion of the tower section on top of the base section while in a towing position, the flotation device being fastened to the platform by a set of fasteners while in the towing position and having sufficient buoyancy to cause the platform to float with base section submerged, the flotation device partially submerged, and an upper portion of the platform extending above the flotation device; the flotation device having a deploying position wherein the fasteners are released, enabling ballast of the platform to be increased, causing the platform to move downward relative to the flotation device from the towing position to a deeper partially submerged position while the flotation device remains floating and extending around the tower section to provide stability against heeling; and at least some of the segments of the flotation device being releasable from each other to enable them to be pulled away from the platform once the platform is submerged sufficiently to stabilize the platform.
  • 18. The facility of claim 17, wherein the each of the segments is separately sealed so as to be independently buoyant.
  • 19. A stabilizing apparatus for use in towing an offshore well platform, comprising:a flotation device having a configuration for extending around a portion of the platform; a set of fasteners for rigidly fastening the flotation device to the platform around a bottom portion of the platform while in a towing position with both the platform and the flotation device being partially submerged; the fasteners being releasable to enable the platform to move downward relative to the flotation device at a designated site while the flotation device remains floating and extending around the upper portion of the platform; and the flotation device being removable from the platform once the platform is submerged sufficiently to stabilize the platform.
  • 20. A stabilizing apparatus for use in towing an offshore well platform, comprising:a flotation device having a configuration for extending around a portion of the platform; a set of fasteners for fastening the flotation device to the platform while in a towing position with both the platform and the flotation device being partially submerged; the fasteners being releasable to enable the platform to move downward relative to the flotation device at a designated site while the flotation device remains floating and extending around the upper portion of the platform; the flotation device being removable from the platform once the platform is submerged sufficiently to stabilize the platform; and wherein the flotation device comprises an annular member.
  • 21. A stabilizing apparatus for use in towing an offshore well platform, comprising:a plurality of segments that secure to each other to define an annular flotation device for extending around a portion of the platform; a set of fasteners for fastening the flotation device to the platform while in a towing position with both the flotation device and the platform being partially submerged and an upper portion of the platform protruding above the flotation device; the fasteners being releasable to enable the platform to move downward relative to the flotation device at a designated site while the flotation device remains floating and extending around the upper portion of the platform; and at least some of the segments of the flotation device being separable from each other to enable them to be pulled away from the upper portion of the platform once the platform is submerged sufficiently to become stabile.
  • 22. The stabilizing apparatus according to claim 21 wherein the flotation device has circular inner and outer diameters.
  • 23. The stabilizing apparatus according to claim 21 wherein the segments comprise watertight chambers that are independently sealed from each other so that each segment is independently buoyant.
Parent Case Info

This invention is a continuation-in-part application of Ser. No. 09/303,078, filed Apr. 30, 1999, now U.S. Pat. No. 6,371,697, entitled Floating Vessel for Deep Water Drilling and Production.

US Referenced Citations (44)
Number Name Date Kind
3360810 Busking Jan 1968 A
3408821 Redshaw Nov 1968 A
3472032 Howard Oct 1969 A
3572041 Graaf Mar 1971 A
3693361 Koehler Sep 1972 A
3760875 Busking Sep 1973 A
3778854 Chow Dec 1973 A
3889476 Gerin Jun 1975 A
4060995 Lacroix et al. Dec 1977 A
4098333 Wells et al. Jul 1978 A
4118942 Liautaud Oct 1978 A
4126011 Lamy et al. Nov 1978 A
4181453 Vache Jan 1980 A
4470723 Michel et al. Sep 1984 A
4473323 Gregory Sep 1984 A
4626137 Willemsz Dec 1986 A
4702321 Horton Oct 1987 A
4913238 Danazcko et al. Apr 1990 A
4934871 Kazokas, Jr. Jun 1990 A
4966495 Goldman Oct 1990 A
4983073 Petty et al. Jan 1991 A
5088858 Massoudi Feb 1992 A
5330293 White et al. Jul 1994 A
5381865 Blandford Jan 1995 A
5403124 Kocaman et al. Apr 1995 A
5421676 Wybro et al. Jun 1995 A
5439060 Huete et al. Aug 1995 A
5439321 Hunter Aug 1995 A
5447392 Marshall Sep 1995 A
5480265 Marshall et al. Jan 1996 A
5480266 Marshall et al. Jan 1996 A
5551802 Wybro Sep 1996 A
5567086 Huete Oct 1996 A
5584607 Baan Dec 1996 A
5588781 Smolinski et al. Dec 1996 A
5609442 Horton Mar 1997 A
5642966 Morrison et al. Jul 1997 A
5706897 Horton, III Jan 1998 A
5775845 Wybro Jul 1998 A
5791819 Christiansen Aug 1998 A
5833397 Horton, III Nov 1998 A
5997218 Børseth Dec 1999 A
6244785 Richter et al. Jun 2001 B1
6503023 Huang et al. Jan 2003 B2
Continuation in Parts (1)
Number Date Country
Parent 09/303078 Apr 1999 US
Child 10/163315 US