Floorboards provided with a mechanical locking system

Information

  • Patent Grant
  • 11898356
  • Patent Number
    11,898,356
  • Date Filed
    Friday, July 15, 2022
    a year ago
  • Date Issued
    Tuesday, February 13, 2024
    3 months ago
Abstract
Floorboards provided with a mechanical locking system including a locking strip protruding from a first edge of a first floorboard. The locking strip is provided with a locking element configured to cooperate with a locking groove at a lower side of a second edge of a second floorboard for locking the first edge and the second edge in a horizontal direction. The first edge and the second edge are configured to be assembled by a vertical downward motion of the second edge towards the first edge. The second edge is provided with a calibrating groove adjacent the locking groove. Also, a method for producing a mechanical locking system.
Description
TECHNICAL FIELD

The present disclosure relates to floorboards provided with a mechanical locking system, and a method for producing a mechanical locking system at edges of floorboards.


TECHNICAL BACKGROUND

Due to tolerances allowed during manufacturing, the thickness of different floorboards may slightly differ. As a consequence, different portions of a mechanical locking system may be arranged at different heights of the floorboards. For example, the distance from the sub floor on which the floorboards are arranged to a tongue arranged on a first floorboard may be different from the distance from the sub floor to a tongue groove of a second floorboard, into which the tongue is to be inserted for locking in a vertical direction, which is shown in FIG. 1. This may result in difficulties when joining the floorboards, since the floorboards may not enter into a locking position. However, such differences in thickness of the floorboards usually does not results in problems when locking the floorboards together when the floorboards are arranged on a foam provided on the sub-floor. Such a foam is usually compressible. The compressible foam allows a thicker floorboard to be pressed towards the sub-floor such that the tongue groove on the thicker floorboard is positioned at the same height as the tongue of an adjacent floorboard.


Such an underlying foam is conventionally used when installing laminate flooring, engineered wood floorings, etc. When installing floors made of plastics, such as vinyl floorings, for example LVT (Luxury Vinyl Tiles), such a foam is not conventionally used.


As a result, the differences in thickness between different floorboards may result in difficulties when locking the floorboards together, especially when joining the floorboards by a so-called fold down technique. The fold down technique involves assembling the floorboards by a vertical downward movement of one edge of one of the floorboards. As described above, floorboards having different thickness may result in the tongue groove of one floorboard being positioned at a different height than the tongue of the adjacent floorboard, resulting in difficulties when joining the floorboards, because the floorboards may not enter into a locking position.


SUMMARY

It is an object of at least certain embodiments of the present disclosure to provide an improvement over the above-described techniques and known art.


A further object of at least certain embodiments of the present disclosure is to facilitate locking of floorboards by means of a mechanical locking system.


Another object of at least certain embodiment of the present disclosure is to facilitate locking of floorboards by means of a mechanical locking system when the floorboards have different thicknesses.


A further object of at least certain embodiment of the present disclosure is to facilitate locking of floorboards by means of a mechanical locking system when no underlying foam is used.


At least some of these and other objects and advantages that will be apparent from the present disclosure have been achieved by floorboards provided with a mechanical locking system comprising a locking strip protruding from a first edge of a first floorboard, wherein the locking strip is provided with a locking element configured to cooperate with a locking groove at a lower side of a second edge of a second floorboard for locking the first and second edge in the horizontal direction. The first and the second edges are configured to be assembled by a vertical downward motion of the second edge towards the first edge. The second edge is provided with a calibrating groove adjacent the locking groove.


An advantage of embodiments of the present disclosure is that the calibrating groove compensates for floorboards having different thicknesses, especially a difference in thickness at the edges of the floorboards. The calibrating groove allows the second edge to be pushed towards a sub-floor on which the floorboards are arranged. Thereby, the second edge may be displaced such that an upper side of the second floorboard is aligned with an upper side of the first floorboard at the first and second edges, respectively, even if the thickness of the second floorboard exceeds the thickness of the first floorboard.


Another advantage of embodiments of the present disclosure is that locking of the floorboards may be facilitated. Conventionally, due to different floorboards having different thicknesses, locking of portions of the mechanical locking system such as a tongue and a tongue groove, may be hindered. The tongue may have difficulties in entering into engagement with the tongue groove for locking as discussed above. By providing the calibrating groove of the present disclosure, the second edge may be bent downwards until a locking position in which the tongue enters into the tongue groove is reached.


At least the second edge may be flexible.


At least the second floorboard may be flexible. The flexibility or resiliency of the second edge, or of the floorboard, allows the second edge to be bent downwards towards the sub-floor.


At least the second floorboard may comprise a plastic material, preferably a thermoplastic material, or an elastomer.


A core of the second floorboard may comprise a plastic material, preferably a thermoplastic material, or an elastomer.


The calibrating groove may be open towards the locking groove.


The depth of the calibrating groove may substantially equal or exceed a mean variation in thickness between the floorboards.


The depth of the calibrating groove may substantially equal a difference in thickness between the first and the second floorboard at the first and the second edge.


The calibrating groove may be arranged at the lower side of the second floorboard.


The locking element may comprise a curved outer upper part. The locking groove may have a shape complimentary to the shape of the locking element.


The first or the second edge may be provided with a tongue configured to cooperate with a tongue groove at the other of the first or the second edge for locking the first and the second edge in the vertical direction.


The tongue may be formed of the same material as the first or the second edge.


The tongue may be provided at the second edge and extend vertically downward from an upper side of the second floorboard.


The width of the tongue may increase with a distance from the upper side of the second floorboard.


The tongue may be a displaceable tongue arranged in a displacement groove. The displaceable tongue may be configured to enter into engagement with the tongue groove when the floorboards are in a locking position.


According to a second aspect, the present disclosure is realized by a method for producing a mechanical locking system at edges of a first and second floorboard. The method comprises the step of:

    • providing a first and a second floorboard, wherein the first floorboard has a first thickness and the second floorboard has a second thickness different from the first thickness,
    • forming a locking groove at a lower side of a second edge of the first and second floorboard, and
    • forming a calibrating groove at the lower side of the second edge of at least one of the first and second floorboard with a tool, wherein the tool is positioned at a fixed position relative an upper side of the first and second floorboard.


The method according to the second aspect of the present disclosure may incorporate the advantages of the floorboards, which have previously been discussed such that the previous discussion is applicable also to the method for producing a mechanical locking system.


The method may further comprise positioning a bottom surface of the calibrating groove at a fixed distance from the upper side of the first and second floorboard.


The bottom surface of the calibrating groove may positioned such that a depth of the calibrating groove substantially equals or exceeds a mean variation in thickness between the floorboards.


The bottom surface of the calibrating groove may be positioned such that a depth of the calibrating groove substantially equals a difference in thickness between the first and the second floorboard.


The locking groove and the calibrating groove may be formed adjacent each other. The calibrating groove may be formed in the lower side of the first floorboard and the second floorboard.


The calibrating groove may be open towards the locking groove.


The method may further comprise forming a locking strip provided with a locking element at a first edge of the first and the second floorboard, wherein the locking element is configured to cooperate with the locking groove. The locking element may be configured to cooperate with the locking groove for locking in a horizontal direction.


The method may further comprise forming a tongue groove at the first edge or the second edge of the first floorboard and the second floorboard, and providing a tongue at the other of the first edge and the second edge of the first floorboard and the second floorboard, wherein tongue is configured to cooperate with the tongue groove. The tongue may be configured to cooperate with the tongue groove for locking in a vertical direction.


The step of providing a tongue may comprise forming a displacement groove at the other of the first edge and the second edge of the first floorboard and the second floorboard, and inserting the tongue in the displacement groove, the tongue being displaceable in the displacement groove.





BRIEF DESCRIPTION OF THE DRAWINGS

The present disclosure will by way of example be described in more detail with reference to the attached drawings, which show embodiments of the present disclosure.



FIG. 1 shows floorboards arranged on sub-floor according to known art.



FIG. 2 shows floorboards according to an embodiment of the present disclosure.



FIG. 3 shows the floorboards of FIG. 2 in a locked position.



FIG. 4 shows floorboards according to another embodiment of the present disclosure.



FIG. 5 shows the floorboards of FIG. 4 in a locked position.



FIG. 6a shows a cross-section of a first floorboard.



FIG. 6b shows a cross-section of a second floorboard.





DETAILED DESCRIPTION


FIGS. 2, 3, 4 and 5 show a mechanical locking system of a set of floorboards comprising at least a first floorboard 1 and a second floorboard 2. FIGS. 6a and 6b show the first floorboard 1 and the second floorboard 2, respectively. The first and second floorboards 1, 2 are arranged on a sub-floor 10. The first floorboard 1 has an upper side 15 facing away from the sub-floor 10 and a lower side 16 facing toward the sub-floor 10. The second floorboard 2 has an upper side 17 facing away from the sub-floor 10 and a lower side 18 facing toward the sub-floor 10.


The first and second floorboards 1, 2 are provided with the mechanical locking system. The mechanical locking system comprises a locking strip 5. The locking strip 5 protrudes from a first edge 3 of the first floorboard 1. The locking strip 5 is provided with a locking element 6. The locking element 6 is configured to cooperate with a locking groove 7 arranged at the lower side 18 of a second edge 4 of the second floorboard 2 for locking the first and second edges 3, 4 in a horizontal direction.


The locking element 6 has an outer upper portion 30. The locking groove 7 has an outer lower portion 31. In the embodiment shown in FIGS. 2 and 3, the locking element 6 has a curved or rounded outer upper portion 30. The curved upper portion 30 may be shaped as a part of a circle or ellipse. The locking groove 7 may have a shape complimentary to the shape of the locking element 6. That is, the outer lower portion 31 of the locking groove 7 may be curved or rounded. In the embodiment shown in FIGS. 4 and 5, the locking element 6 has an inclined outer upper portion 32. The locking groove 7 may have a shape complimentary to the shape of the locking element 6. That is, the outer lower portion 33 of the locking groove 7 may be inclined. Further, a lower part of the locking element 6 facing the sub-floor 10 may be inclined relative to the sub-floor 10 as shown in FIGS. 4 and 5.


The first and second edges 3, 4 are configured to be assembled and locked together by a vertical downward motion of the second edge 4 towards the first edge 3.


The mechanical locking system may further comprise a tongue 8 and a tongue groove 9. The tongue 8 may be arranged at the first edge 3 or the second edge 4. The tongue groove 9 may be arranged at the other of the first edge 3 and the second edge 4. The tongue 8 is configured to cooperate with the tongue groove 9 for locking the first edge 3 and the second edge 4 in a vertical direction. The tongue 8 may protrude from the first edge 3 at an angle relative to the upper side 15 of the first floorboard 1 as shown in FIGS. 2 and 3. Alternatively, the tongue 8 may protrude from the first edge 3 in a horizontal direction with an angle.


As shown in FIGS. 2 and 3, the tongue 8 may be a displaceable tongue arranged in a displacement groove 12 at the first edge 3 or the second edge 4. The displaceable tongue 8 may be formed as a separate part. That is, the displaceable tongue 8 may be formed of a different material than the material of the first and second floorboards 1, 2. Such a displaceable tongue 8 is for example described in WO2007/015669. In the embodiment shown in FIGS. 2 and 3, the tongue 8 is a displaceable tongue arranged in a displacement groove 12 at the first edge 3. The tongue groove 9 is arranged at the second edge 4. The displaceable tongue 8 is displaceable within the displacement groove 12. The displaceable tongue 8 is configured to cooperate with the tongue groove 9 for locking the first edge 3 and the second edge 4 in a vertical direction.


In the embodiment shown in FIGS. 4 and 5, the tongue 13 may be formed of the same material as the first edge 3 or the second edge 4. The tongue 13 may be an integrated part of the first edge 3 or the second edge 4. In FIGS. 4 and 5, the tongue 13 is formed of the same material as the second edge 4. The tongue groove 14 is formed at the first edge 3. The tongue 13 is preferably configured to cooperate with the tongue groove 14 for locking the first edge 3 and the second edge 4 in a vertical direction. In the embodiment shown in FIGS. 4 and 5, the tongue 13 extends vertically downward from the upper side 17 of the second floorboard and protrudes horizontally. The width of the tongue 13 increases with the distance from the upper surface 17 of the second panel 2. The tongue 13 may have a dovetailed shape as seen in cross-section.


The first and second edges 3, 4 may be short edges of the first and second floorboards 1, 2, respectively. The long edges of the first and second floorboards 1, 2 may also be provided with a mechanical locking system. For example, the long edges may be provided with a mechanical locking system configured for locking floorboards together by angling. Alternatively, the long edges may be provided with a mechanical locking system of the type described above. It is also contemplated that the floorboards may be square shaped, rectangular shaped or any other polygonal shape.


In embodiments, at least the second edge 4 is flexible, elastic or resilient, such that the second edge 4 may be pushed in a vertical direction. The second edge 4 is preferably pushed downwards in the vertical direction towards the sub-floor 10. In one embodiment, the first and second floorboards 1, 2 are flexible, elastic, or resilient. The first and second floorboards 1, 2 may in this embodiment comprise a plastic material, preferably a thermoplastic material such as polyvinyl chloride (PVC), polyurethane (PU and/or PUR), polypropylene (PP), or polyethylene (PE), or a combination thereof. The thermoplastic material may be polystyrene (PS), polyethylene terephthalate (PET), polyacrylate, polyvinyl butyral, or a combination thereof. The first and second floorboards 1, 2 may also comprise an elastomer. The first and second floorboards 1, 2 may comprise a WPC (Wood Plastic Composite). The resiliency of the second edge 4 may also be obtained by removing material from the second edge 4.


In embodiments, the first and second floorboards 1, 2 may comprise one or more layers. The first and second floorboards 1, 2 may comprise a core. The mechanical locking system may be formed in the core. The first and second floorboards 1, 2 may further comprise a surface layer, preferably a decorative surface layer or a print layer arranged on an upper side of the core. The surface layer may further comprise a wear resistant layer arranged on the decorative surface layer or the print layer. The first and second floorboards 1, 2 may further comprise a backing layer arranged on a lower side of the core. The core may provide the second edge 4 flexible or resilient properties. The core may comprise a plastic material, preferably a thermoplastic material such as polyvinyl chloride (PVC), polyurethane (PU), polypropylene (PP), or polyethylene (PE)), or a combination thereof. The thermoplastic material may be polystyrene (PS), polyethylene terephthalate (PET), polyacrylate, polyvinyl butyral, or a combination thereof. The core may also comprise a WPC (Wood Plastic Composite). The core may also comprise an elastomer. It is also contemplated that the core may comprise more than one layer. For example, the core may comprise a first layer of a wood fibre based panel such as MDF or HDF and a second layer of a resilient material such as plastic, preferably comprising a thermoplastic material or an elastomer.


The first and second floorboards 1, 2 may be resilient floorboards such as Luxury Vinyl Tiles or Planks, vinyl free floorings, etc. The first and second floorboards 1, 2 may comprise a core, a surface layer arranged on an upper side of the core, and optionally a backing layer arranged on a lower side of the core. The core may comprise a thermoplastic material such as polyvinyl chloride (PVC), polyurethane (PU), polypropylene (PP), or polyethylene (PE). The core may comprise an elastomer. The surface layer may comprise one or more layers, such as a print layer, a wear resistant layer and a protective coating. The print layer and/or the wear resistant layer may comprise a thermoplastic material such as a thermoplastic foil. The thermoplastic material of the print layer and the wear resistant layer may be polyvinyl chloride (PVC), polyester, polypropylene (PP), polyethylene (PE), polystyrene (PS), polyurethane (PUR), polyethylene terephthalate (PET), polyacrylate, polyvinyl butyral, or a combination thereof. The protective coating may be a radiation curable coating such as UV curable coating.


As shown in FIGS. 2 and 3, and in FIGS. 4 and 5, the second edge 4 is provided with a calibrating groove 11. The calibrating groove 11 is arranged adjacent the locking groove 7. The calibrating groove 11 is arranged at a lower side 18 of the second floorboard 2. The calibrating groove 11 extends to the locking groove 7. The calibrating groove 11 is open towards the locking groove 7. The calibrating groove 11 extends from the lower side 18 of the floorboard 2 in a vertical direction. The calibrating groove 11 has a bottom surface 19, which may extend in a horizontal direction, or may be inclined.


In an embodiment in which the second floorboard 2 at the second edge 4 comprises a core, the calibrating groove 11 may be formed in the core. In an embodiment in which the second floorboard 2 at the second edge 4 comprises a core and a backing layer at the lower side of the core, the calibrating groove 11 may formed in the backing layer, or in the backing layer and the core.


The calibrating groove 11 is configured to adjust to differences in thickness between the first and second floorboards 1, 2, and especially configured to adjust to a difference in thickness at the first and second edges 3, 4 of the first and second floorboards 1, 2, respectively. As seen in FIGS. 2 and 4, the thickness of the second floorboard 2 at the second edge 4 exceeds the thickness of the first floorboard 1 at the first edge 3. As a consequence, the tongue groove 9 is arranged above the tongue 8 such that the tongue 8 is hindered from entering into cooperation with the tongue groove 9, as shown in FIG. 2. In the embodiment shown in FIG. 4, the tongue 13 is only partly inserted into the tongue groove 14. The locking surfaces of the tongue 13 and tongue groove 14 are only partly in engagement.


When arranged on the sub-floor 10, the presence of the calibrating groove 11 at the second edge 4 results in a distance being formed between the sub-floor 10 and the floorboard 2 at the second edge 4. The calibrating groove 11 allows that the second edge 4 to be pushed towards the sub-floor 10 to a position wherein the tongue 8, 13 can enter into engagement with the tongue groove 9, 14, which is shown in FIGS. 3 and 5. When the tongue 8, 13 engages with the tongue groove 9, 14, the first edge 3 and the second edge 4 are locked in the vertical direction. As seen in FIGS. 3 and 5, at least a portion of a bottom surface 19 of the calibrating groove 11 is abutting the sub-floor 10. The engagement of the tongue 8, 13 in the tongue groove 9, 14 locks the first edge 3 and the second edge 4 in a position wherein the second edge 4 is bent towards the sub-floor 10. Preferably, the upper side 17 of the second floorboard 2 at the second edge 4 is aligned with the upper side 15 of the first floorboard 1 at the first edge 3 when the tongue 8, 13 has entered into engagement with the tongue groove 9.


Preferably, the flexible or resilient properties of the second floorboard 2, or of the core of the second floorboard 2, help achieve the desired bending at the second edge 4. The width of the calibrating groove 11 in a horizontal direction parallel to the upper surface 17 and perpendicular to a joint plane 34 may be adjusted to material properties of the second floorboard 2. If the second floorboard 2 is more rigid, the width of the calibrating groove 11 should be increased in order to obtain the desired bending at the second edge 4. If the second floorboard 2 is more flexible and/or resilient, the width of the calibrating groove 11 can be reduced compared to the more rigid floorboard. By adjusting the width of the calibrating groove 11, the desired flexibility and resiliency of the second floorboard 2 for allowing bending of the second edge 4 towards the sub-floor 10 can be achieved.


The calibrating groove 11 preferably extends along the extension of the second edge 4 in a horizontal direction parallel to the upper surface 17 and horizontally along the joint plane 34. The calibrating groove 11 is preferably continuous. In an alternative embodiment, the calibrating groove 11 may be non-continuous in the horizontal direction parallel to the upper surface 17 and horizontally along the joint plane 34.


Preferably, the depth of the calibrating groove 11 substantially equals the difference in thickness between the first floorboard 1 and the second floorboard 2. Preferably, the depth of the calibrating groove 11 is less than 0.5 mm, preferably less than 0.3 mm, more preferably less than 0.2 mm.


The calibrating groove 11 can be formed when forming the mechanical locking system. The depth of the calibrating groove 11 can be chosen as a mean difference in thickness between several floorboards, or as a depth exceeding the mean difference in thickness between several floorboards. Floorboards having a thickness exceeding a desired thickness may be provided with a calibrating groove 11. Floorboards having a thickness less than the desired thickness may not be provided with any calibrating groove 11.



FIG. 6a shows the first floorboard 1 in cross-section. The first floorboard 1 comprises the first edge 3 and a second edge 24. FIG. 6b shows the second floorboard 2 in cross-section. The second floorboard 2 comprises the second edge 4 and a first edge 23. The first and second floorboards 1, 2 in FIGS. 6a-6b correspond to the first and second floorboards 1, 2 in FIGS. 2-5 described above. FIGS. 2-5 show joining of the first and second floorboards 1, 2 while FIGS. 6a-6b show the floorboards separately. The description of the first and second floorboards 1, 2 with reference to FIGS. 2-5 above is applicable also for the first and second floorboards 1, 2 described below with reference to FIGS. 6a-6b, and vice versa.


A method of forming a mechanical locking system at edges of the first and second floorboards 1, 2 will now be described with reference to FIGS. 6a-6b. A locking groove 27 is formed at a lower side 16 of the second edge 24 of the first floorboard 1 having a first thickness. A locking groove 7 is also formed at a lower side 18 of the second edge 4 of the second floorboard 2 having a second thickness. The thickness of the first floorboard 1 may differ from the thickness of the second floorboard 2.


If the thickness of any one of the first and second floorboards 1, 2, preferably measured at the second edge 4, 24 where the locking groove 7, 27 is formed, exceeds a predetermined thickness, a calibrating groove 11 is formed in that floorboard. If the thickness is equal to or less than a predetermined thickness, no calibrating groove is formed. In FIGS. 6a-6b, a calibrating groove 11 has been formed in both the first and second floorboards 1, 2.


The calibrating groove 11 is formed by a tool 40. The tool 40 is positioned at a fixed distance from an upper side 15, 17 of the first floorboard 1 and the second floorboard 2. The fixed distance is the same between the upper side 15 of the first floorboard 1 and the tool 40 and between the upper side 17 of the second floorboard 2 and the tool 40. The fixed distance corresponds to a predetermined desired value of the thickness. The predetermined desired value may correspond to a mean thickness of at least the first and second floorboards.


By the tool 40 being arranged at a fixed position, any floorboard having a thickness exceeding said distance will be provided with a calibrating groove 11. The tool 40 may be a knife, a heating device adapted to melt a portion of the floorboard, a scraping tool, a carving tool, etc.


The first floorboard 1 and the second floorboard 2 are preferably conveyed by the same conveyor element when the floorboards 1, 2 pass the tool 40. The distance between the conveyor element and the tool 40 is fixed. Preferably, the upper side 15, 17 of the first floorboard 1 and the second floorboard 2, respectively, abut the conveyor element.


The calibrating groove 11 is formed at the lower side 16, 18 of the second edge 4, 24 of the first and second floorboards 1, 2. The calibrating groove 11 may be formed by cutting, scraping, or melting a portion of the floorboard. The calibrating groove 11 is formed such that the calibrating groove 11 is open towards the locking groove 7, 27. The calibrating groove 11 is arranged adjacent the locking groove 7, 27. Preferably, the first and second floorboards 1, 2 are conveyed in a horizontal direction between a first position wherein the locking groove 7, 27 is formed and a second position wherein the calibrating groove 11 is formed.


The calibrating groove 11 has a bottom surface 19. The calibrating groove 11 is formed such that the bottom surface 19 of the calibrating groove 11 of a first floorboard 1 and the bottom surface 19 of the calibrating groove 11 of a second floorboard 2 are positioned at substantially the same distance from the upper side 15, 17 of the first and second floorboards 1, 2, respectively. A distance between the upper side 15, 17 of a respective floorboard and the bottom surface 19 of each calibrating groove 11 is essentially the same for the first and second floorboards 1, 2. Even if the first and second floorboards 1, 2 have a different thickness, the bottom surface 19 of each calibrating groove 11 is positioned at a substantially equal distance from the upper side 15, 17 of the respective first and second floorboards 1, 2. Consequently, the depth of the calibrating groove 11 may differ from one floorboard to another depending on the original thickness of the floorboard at the second edge 4, 24.


The method may further comprise forming a locking strip 5 provided with a locking element 6 at the first edge 3 of the first floorboard 1 and forming a locking strip 25 provided with a locking element 26 at the first edge 23 of the second floorboard 2. The locking element 6, 26 is configured to cooperate with the locking groove 7, 27 for locking in a horizontal direction.


The method may further comprise forming a tongue groove 9 at the second edge 4 of the second floorboard 2 and forming a tongue groove 29 at the second edge 24 of the first floorboard 1. A displacement groove 12 may be formed at the first edge 3 of the first floorboard 1 and a displacement groove 22 is formed at the first edge 23 of the second floorboard 2. The method may further comprise inserting a displaceable tongue 8 into each displacement groove 12 and 22 as shown in FIGS. 6a-6b. The displaceable tongue 8 is displaceable within the displacement groove 12, 22. The displaceable tongue 8 is adapted to lock the floorboards in the vertical direction. Alternatively, vertical locking may be obtained by the tongue 13 and the tongue groove 14 shown in FIGS. 4 and 5.


It is to be understood that the locking strip 25, the locking element 26 and the displacement groove 22 of the first edge 23 of the second floorboard 2 essentially correspond to the locking strip 5, the locking element 6 and the displacement groove 12 of the first edge 3 of the first floorboard 1, and that the description above with reference to FIGS. 2-5 also is applicable to FIGS. 6a-6b.


It is to be understood that locking groove 27 and the tongue groove 29 of the second edge 24 of the first floorboard 1 essentially correspond to the locking groove 7 and the tongue groove 9 of the second edge 4 of the second floorboard 2, and that the description above with reference to FIGS. 2-5 also is applicable to FIGS. 6a-6b.


The first and second edges 3, 4, 23, 24 may be short edges of the first and second floorboards 1, 2. The long edges of the first and second floorboards 1, 2 may be provided with a mechanical locking system. For example, the long edges may be provided with a mechanical locking system configured for locking floorboards together by angling. Alternatively, the long edges may be provided with a mechanical locking system of the type described above. It is also contemplated that the floorboards may be square shaped, rectangular shaped or any other shape. It is contemplated that there are numerous modifications of the embodiments described herein, which are still within the scope of the present disclosure.


By upper side 15, 17 of the floorboards 1, 2 is meant a side facing away from the sub-floor 10 when the floorboards are installed. However, during production, the upper surface 15, 17 may not necessary facing upwards but may temporarily facing downwards. It is further contemplated that the calibrating groove 11 may have any shape. For example, the calibrating groove may be U-shaped as shown in FIGS. 2-3. Furthermore, the bottom surface 19 of the calibrating groove 11 may be inclined, as shown in FIGS. 4-5.


Furthermore, it is contemplated that the mechanical locking system described above with reference to FIGS. 2-6b may be used without the calibrating groove 11. For example, floorboards having a mechanical locking system may be provided, comprising a locking strip 5 protruding from a first edge 3 of a first floorboard 1. The locking strip 5 may be provided with a locking element 6 configured to cooperate with a locking groove 7 at a lower side 18 of a second edge 4 of a second floorboard 2 for locking the first edge 3 and the second edge 4 in the horizontal direction. The locking element 6 comprises a curved outer upper part 30. The locking groove 7 may have a curved outer lower part 31.

Claims
  • 1. Floorboards including a mechanical locking system, the mechanical locking system comprising a locking strip protruding from a first edge of a first floorboard, wherein the locking strip includes a locking element configured to cooperate with a locking groove at a lower side of a second edge of a second floorboard for locking the first edge and the second edge in a horizontal direction,wherein the first edge or the second edge includes a tongue configured to cooperate with a tongue groove at the other of the first edge or the second edge for locking of the first edge and the second edge in a vertical direction,wherein the first edge and the second edge are configured to be assembled by a vertical downward motion of the second edge towards the first edge,wherein a core of the first floorboard comprises a plastic material and a core of the second floorboard comprises a plastic,wherein at least said second edge is flexible, wherein said second edge includes a calibrating groove adjacent said locking groove,wherein the calibrating groove is open towards the locking groove, andwherein the calibrating groove is configured such that the second edge is bendable downwards until a locking position in which the tongue enters into the tongue groove is reached.
  • 2. The floorboards as claimed in claim 1, wherein the calibrating groove is arranged at the lower side of the second edge of the second floorboard.
  • 3. The floorboards as claimed in claim 1, wherein the locking element has a curved outer upper part.
  • 4. The floorboards as claimed in claim 1, wherein the tongue is formed of the same material as the first edge or the second edge.
  • 5. The floorboards as claimed in claim 1, wherein the tongue is provided at the second edge and extends vertically downward from an upper side of the second floorboard.
  • 6. The floorboards as claimed in claim 1, wherein a width of the tongue increases with a distance from the upper side of the second floorboard.
  • 7. The floorboards as claimed in claim 1, wherein the tongue is a displaceable tongue arranged in a displacement groove.
  • 8. The floorboards as claimed in claim 1, wherein the locking groove opens downward.
  • 9. The floorboards as claimed in claim 1, wherein the locking element protrudes upward.
  • 10. The floorboards as claimed in claim 1, wherein the calibrating groove connects with the locking groove at a bottom surface of the second floorboard.
  • 11. Floorboards including a mechanical locking system, the mechanical locking system comprising a locking strip protruding from a first edge of a first floorboard, wherein the locking strip includes a locking element configured to cooperate with a locking groove at a lower side of a second edge of a second floorboard for locking the first edge and the second edge in a horizontal direction,wherein the first edge or the second edge includes a tongue configured to cooperate with a tongue groove at the other of the first edge or the second edge for locking of the first edge and the second edge in a vertical direction,wherein the first edge and the second edge are configured to be assembled by a vertical downward motion of the second edge towards the first edge,wherein a core of the first floorboard comprises a plastic material and a core of the second floorboard comprises a plastic,wherein at least said second edge is flexible, wherein said second edge includes a calibrating groove adjacent said locking groove,wherein the calibrating groove is open towards the locking groove, andwherein the calibrating groove being adapted to allow the second edge to be pushed towards a sub-floor on which the floorboards are adapted to be arranged to a position wherein the tongue can enter into engagement with the tongue groove.
  • 12. The floorboards as claimed in claim 11, wherein the calibrating groove is arranged at the lower side of the second edge of the second floorboard.
  • 13. The floorboards as claimed in claim 11, wherein the locking element has a curved outer upper part.
  • 14. The floorboards as claimed in claim 11, wherein the tongue is formed of the same material as the first edge or the second edge.
  • 15. The floorboards as claimed in claim 11, wherein the tongue is provided at the second edge and extends vertically downward from an upper side of the second floorboard.
  • 16. The floorboards as claimed in claim 11, wherein a width of the tongue increases with a distance from the upper side of the second floorboard.
  • 17. The floorboards as claimed in claim 11, wherein the tongue is a displaceable tongue arranged in a displacement groove.
  • 18. The floorboards as claimed in claim 11, wherein the locking groove opens downward.
  • 19. The floorboards as claimed in claim 11, wherein the locking element protrudes upward.
  • 20. The floorboards as claimed in claim 11, wherein the calibrating groove connects with the locking groove at a bottom surface of the second floorboard.
Priority Claims (1)
Number Date Country Kind
1350377-6 Mar 2013 SE national
CROSS REFERENCE TO RELATED APPLICATIONS

The present application is a continuation of U.S. application Ser. No. 17/067,989, filed on Oct. 12, 2020, which is a continuation of U.S. application Ser. No. 16/528,992, filed on Aug. 1, 2019, now U.S. Pat. No. 10,844,612, which is a continuation of U.S. application Ser. No. 15/333,630, filed on Oct. 25, 2016, now U.S. Pat. No. 10,407,919, which is a continuation of U.S. application Ser. No. 14/224,628, filed on Mar. 25, 2014, now U.S. Pat. No. 10,301,830, which claims the benefit of Swedish Application No. 1350377-6, filed on Mar. 25, 2013. The entire contents of U.S. application Ser. No. 17/067,989, U.S. application Ser. No. 16/528,992, U.S. application Ser. No. 15/333,630, U.S. application Ser. No. 14/224,628 and Swedish Application No. 1350377-6 are hereby incorporated herein by reference in their entirety.

US Referenced Citations (623)
Number Name Date Kind
213740 Conner Apr 1879 A
1394120 Rockwell Oct 1921 A
1787027 Wasleff Dec 1930 A
1925070 Livezey Aug 1933 A
2015813 Nielsen Oct 1935 A
2088238 Ray Jul 1937 A
2089075 Siebs Aug 1937 A
2266464 Kraft Dec 1941 A
2303745 Karreman Dec 1942 A
2306295 Casto Dec 1942 A
2497837 Nelson Feb 1950 A
2740167 Rowley Apr 1956 A
2769726 Wetterau et al. Nov 1956 A
2818895 Zuber Jan 1958 A
2872712 Brown et al. Feb 1959 A
2947040 Schultz Aug 1960 A
3051084 Scheibli Aug 1962 A
3055461 De Ridder Sep 1962 A
3087269 Hudson Apr 1963 A
3120083 Dahlberg et al. Feb 1964 A
3247638 Gay, Jr. Apr 1966 A
3259417 Chapman Jul 1966 A
3397496 Sohns Aug 1968 A
3436888 Par Apr 1969 A
3538665 Gohner Nov 1970 A
3554850 Kuhle Jan 1971 A
3578548 Wesp May 1971 A
3694983 Couquet Oct 1972 A
3720027 Christensen Mar 1973 A
3742669 Mansfeld Jul 1973 A
3760547 Brenneman Sep 1973 A
3857749 Yoshida Dec 1974 A
3919820 Green Nov 1975 A
3937861 Zuckerman et al. Feb 1976 A
4037377 Howell et al. Jul 1977 A
4100710 Kowallik Jul 1978 A
4113399 Hansen, Sr. Sep 1978 A
4172169 Mawson et al. Oct 1979 A
4176210 Skinner Nov 1979 A
4180615 Bettoli Dec 1979 A
4187131 Graham et al. Feb 1980 A
4196554 Anderson et al. Apr 1980 A
4242390 Nemeth Dec 1980 A
4299070 Oltmanns et al. Nov 1981 A
4313866 Renshaw Feb 1982 A
4333987 Kwart et al. Jun 1982 A
4393187 Boba et al. Jul 1983 A
4423178 Renshaw Dec 1983 A
4426820 Terbrack et al. Jan 1984 A
4489115 Layman et al. Dec 1984 A
4507188 Chu Mar 1985 A
4512131 Laramore Apr 1985 A
4570353 Evans et al. Feb 1986 A
4574099 Nixon Mar 1986 A
4599841 Haid Jul 1986 A
4614680 Fry et al. Sep 1986 A
4772500 Stroppiana Sep 1988 A
4785065 Uhl et al. Nov 1988 A
4807412 Frederiksen Feb 1989 A
4944514 Suiter Jul 1990 A
5007222 Raymond Apr 1991 A
5050362 Tal et al. Sep 1991 A
5112671 Diamond et al. May 1992 A
5134026 Melcher Jul 1992 A
5148850 Urbanick Sep 1992 A
5162141 Pavey et al. Nov 1992 A
5182892 Chase Feb 1993 A
5185193 Phenicie et al. Feb 1993 A
5229217 Holzer Jul 1993 A
5295341 Kajiwara Mar 1994 A
5333429 Cretti Aug 1994 A
5344700 McGath et al. Sep 1994 A
5349796 Meyerson Sep 1994 A
5380794 Schaefer et al. Jan 1995 A
5433806 Pasquali et al. Jul 1995 A
5441677 Phillips, Sr. Aug 1995 A
5458953 Wang et al. Oct 1995 A
5465546 Buse Nov 1995 A
5502939 Zadok et al. Apr 1996 A
5548937 Shimonohara Aug 1996 A
5618602 Nelson Apr 1997 A
5630304 Austin May 1997 A
5670237 Shultz et al. Sep 1997 A
5671575 Wu Sep 1997 A
5694730 Del et al. Dec 1997 A
5706621 Pervan Jan 1998 A
5755068 Ormiston May 1998 A
5797237 Finkell, Jr. Aug 1998 A
5858160 Piacente et al. Jan 1999 A
5900099 Sweet et al. May 1999 A
5950389 Porter Sep 1999 A
6006486 Moriau et al. Dec 1999 A
6029416 Andersson Feb 2000 A
6052960 Yonemura Apr 2000 A
6065262 Motta May 2000 A
6101778 Goeran Aug 2000 A
6139945 Krejchi et al. Oct 2000 A
6173548 Hamar et al. Jan 2001 B1
6182410 Pervan Feb 2001 B1
6209278 Tychsen Apr 2001 B1
6216409 Roy et al. Apr 2001 B1
6233899 Mellert et al. May 2001 B1
6291078 Chen et al. Sep 2001 B1
6314701 Meyerson Nov 2001 B1
6324809 Nelson Dec 2001 B1
6332733 Hamberger et al. Dec 2001 B1
6345481 Nelson Feb 2002 B1
6363677 Chen et al. Apr 2002 B1
6397547 Martensson Jun 2002 B1
6438919 Knauseder Aug 2002 B1
6455127 Valtanen Sep 2002 B1
6490836 Moriau et al. Dec 2002 B1
6505452 Hannig et al. Jan 2003 B1
6536178 Paalsson et al. Mar 2003 B1
6546691 Leopolder Apr 2003 B2
6553724 Bigler Apr 2003 B1
6558070 Valtanen May 2003 B1
6591568 Paalsson Jul 2003 B1
6617009 Chen et al. Sep 2003 B1
6647690 Martensson Nov 2003 B1
6671968 Shannon Jan 2004 B2
6672030 Schulte Jan 2004 B2
6675545 Chen et al. Jan 2004 B2
6695944 Courtney Feb 2004 B2
6711869 Tychsen Mar 2004 B2
6715253 Pervan Apr 2004 B2
6729091 Martensson May 2004 B1
6761008 Chen et al. Jul 2004 B2
6763643 Maartensson Jul 2004 B1
6766622 Thiers Jul 2004 B1
6769218 Pervan Aug 2004 B2
6769219 Schwitte et al. Aug 2004 B2
6772568 Thiers et al. Aug 2004 B2
6786019 Thiers Sep 2004 B2
6790512 MacQueen et al. Sep 2004 B2
6804926 Eisermann Oct 2004 B1
6851237 Niese et al. Feb 2005 B2
6851241 Pervan Feb 2005 B2
6854235 Martensson Feb 2005 B2
6862857 Tychsen Mar 2005 B2
6865855 Knauseder Mar 2005 B2
6874292 Moriau et al. Apr 2005 B2
6880305 Pervan et al. Apr 2005 B2
6880307 Schwitte et al. Apr 2005 B2
6895881 Whitaker May 2005 B1
6898911 Kornfalt et al. May 2005 B2
6898913 Pervan May 2005 B2
6918220 Pervan Jul 2005 B2
6922964 Pervan Aug 2005 B2
6922965 Rosenthal et al. Aug 2005 B2
6928779 Moriau et al. Aug 2005 B2
6933043 Son et al. Aug 2005 B1
6955020 Moriau et al. Oct 2005 B2
6966963 O'Connor Nov 2005 B2
6986934 Chen et al. Jan 2006 B2
7051486 Pervan May 2006 B2
7086205 Pervan Aug 2006 B2
7090430 Fletcher et al. Aug 2006 B1
D528671 Grafenauer Sep 2006 S
7121058 Palsson et al. Oct 2006 B2
7127860 Pervan et al. Oct 2006 B2
7137229 Pervan Nov 2006 B2
7155871 Stone et al. Jan 2007 B1
7169460 Chen et al. Jan 2007 B1
7171791 Pervan Feb 2007 B2
7211310 Chen et al. May 2007 B2
7251916 Konzelmann et al. Aug 2007 B2
7275350 Pervan et al. Oct 2007 B2
7328536 Moriau et al. Feb 2008 B2
7337588 Moebus Mar 2008 B1
7356971 Pervan Apr 2008 B2
7377081 Ruhdorfer May 2008 B2
7386963 Pervan Jun 2008 B2
7398625 Pervan Jul 2008 B2
7419717 Chen et al. Sep 2008 B2
7451578 Hannig Nov 2008 B2
7454875 Pervan et al. Nov 2008 B2
7484337 Hecht Feb 2009 B2
7516588 Pervan Apr 2009 B2
7543418 Weitzer Jun 2009 B2
7552568 Paalsson et al. Jun 2009 B2
7568322 Pervan Aug 2009 B2
7584583 Bergelin et al. Sep 2009 B2
7603826 Moebus Oct 2009 B1
7607271 Griffin et al. Oct 2009 B2
7614197 Nelson Nov 2009 B2
7617645 Moriau et al. Nov 2009 B2
7621094 Moriau et al. Nov 2009 B2
7634886 Moriau et al. Dec 2009 B2
7634887 Moriau et al. Dec 2009 B2
7637066 Moriau et al. Dec 2009 B2
7640708 Moriau et al. Jan 2010 B2
7644555 Moriau et al. Jan 2010 B2
7644557 Moriau et al. Jan 2010 B2
7647743 Moriau et al. Jan 2010 B2
7650728 Moriau et al. Jan 2010 B2
7654054 Moriau et al. Feb 2010 B2
7658048 Moriau et al. Feb 2010 B2
7677001 Pervan Mar 2010 B2
7678215 Martin et al. Mar 2010 B2
7716896 Pervan May 2010 B2
7739849 Pervan Jun 2010 B2
7763345 Chen et al. Jul 2010 B2
7779597 Thiers et al. Aug 2010 B2
7802415 Pervan et al. Sep 2010 B2
7841144 Pervan Nov 2010 B2
7841150 Pervan Nov 2010 B2
7856784 Martensson Dec 2010 B2
7856789 Eisermann Dec 2010 B2
7861482 Pervan et al. Jan 2011 B2
7866110 Pervan Jan 2011 B2
7866115 Pervan et al. Jan 2011 B2
7886497 Pervan Feb 2011 B2
7896571 Hannig et al. Mar 2011 B1
7926234 Pervan et al. Apr 2011 B2
7930862 Bergelin et al. Apr 2011 B2
7958689 Lei Jun 2011 B2
7980043 Moebus Jul 2011 B2
7984600 Alford et al. Jul 2011 B2
8006460 Chen et al. Aug 2011 B2
8021741 Chen et al. Sep 2011 B2
8028486 Pervan et al. Oct 2011 B2
8037656 Liu et al. Oct 2011 B2
8038363 Hannig et al. Oct 2011 B2
8042311 Pervan et al. Oct 2011 B2
8071193 Windmoeller Dec 2011 B2
8091238 Hannig Jan 2012 B2
8099924 Braun Jan 2012 B2
8112891 Pervan Feb 2012 B2
8132384 Hannig Mar 2012 B2
8166718 Liu May 2012 B2
8191333 Braun Jun 2012 B2
8196366 Thiers et al. Jun 2012 B2
8215078 Pervan Jul 2012 B2
8234829 Thiers et al. Aug 2012 B2
8245478 Bergelin et al. Aug 2012 B2
8281549 Du Oct 2012 B2
8293058 Pervan et al. Oct 2012 B2
8353140 Pervan et al. Jan 2013 B2
8356452 Thiers et al. Jan 2013 B2
8365499 Nilsson et al. Feb 2013 B2
8375672 Hannig Feb 2013 B2
8375674 Braun et al. Feb 2013 B2
8480841 Pervan et al. Jul 2013 B2
8484924 Braun Jul 2013 B2
8490361 Curry et al. Jul 2013 B2
8499521 Pervan et al. Aug 2013 B2
8511031 Bergelin et al. Aug 2013 B2
8544231 Hannig Oct 2013 B2
8544232 Wybo et al. Oct 2013 B2
8544234 Pervan et al. Oct 2013 B2
8584423 Pervan et al. Nov 2013 B2
8613826 Pervan et al. Dec 2013 B2
8658274 Chen et al. Feb 2014 B2
8683698 Pervan et al. Apr 2014 B2
8707651 Stockl Apr 2014 B2
8720149 Bossuyt May 2014 B2
8726604 Hannig May 2014 B2
8745952 Perra et al. Jun 2014 B2
8756899 Nilsson et al. Jun 2014 B2
8763340 Pervan et al. Jul 2014 B2
8800150 Pervan Aug 2014 B2
8806832 Kell Aug 2014 B2
8833028 Whispell et al. Sep 2014 B2
8834992 Chen et al. Sep 2014 B2
8952078 Gould Feb 2015 B2
8966853 Hannig Mar 2015 B2
8978336 Perra et al. Mar 2015 B2
9103126 Kell Aug 2015 B2
9212492 Pervan et al. Dec 2015 B2
9217250 Perra et al. Dec 2015 B2
9222267 Bergelin et al. Dec 2015 B2
9228360 Schneider Jan 2016 B2
9260870 Vermeulen et al. Feb 2016 B2
9296191 Pervan et al. Mar 2016 B2
9314936 Pervan Apr 2016 B2
9371653 Liu Jun 2016 B2
9528278 Cappelle Dec 2016 B2
9650792 Ramachandra May 2017 B2
9695600 Vandevoorde et al. Jul 2017 B2
9695601 Whispell et al. Jul 2017 B2
9695851 Hannig Jul 2017 B2
9745758 Baert et al. Aug 2017 B2
9765530 Bergelin et al. Sep 2017 B2
9777487 Pervan et al. Oct 2017 B2
9803374 Pervan Oct 2017 B2
9816270 Pervan et al. Nov 2017 B2
9874035 Wagner Jan 2018 B2
9885186 Liu Feb 2018 B2
9885187 Kell Feb 2018 B2
10000935 Kell Jun 2018 B2
10059084 Lundblad et al. Aug 2018 B2
10113318 Cappelle et al. Oct 2018 B2
10137659 Pervan Nov 2018 B2
10214917 Pervan et al. Feb 2019 B2
10301830 Boo May 2019 B2
10344379 Pervan et al. Jul 2019 B2
10450760 Bergelin et al. Oct 2019 B2
10486399 Chen et al. Nov 2019 B2
10493731 Lundblad et al. Dec 2019 B2
10780676 Lundblad et al. Sep 2020 B2
10844612 Boo Nov 2020 B2
10975580 Pervan et al. Apr 2021 B2
11066836 Bergelin et al. Jul 2021 B2
20010021431 Chen et al. Sep 2001 A1
20020007606 Kettler Jan 2002 A1
20020007608 Pervan Jan 2002 A1
20020007609 Pervan Jan 2002 A1
20020023702 Kettler Feb 2002 A1
20020031646 Chen et al. Mar 2002 A1
20020046433 Sellman et al. Apr 2002 A1
20020056245 Thiers May 2002 A1
20020069611 Leopolder Jun 2002 A1
20020083673 Kettler et al. Jul 2002 A1
20020092263 Schulte Jul 2002 A1
20020095894 Pervan Jul 2002 A1
20020100231 Miller et al. Aug 2002 A1
20020112429 Niese et al. Aug 2002 A1
20020112433 Pervan Aug 2002 A1
20020142135 Chen et al. Oct 2002 A1
20020152707 Martensson Oct 2002 A1
20020170257 McLain et al. Nov 2002 A1
20020170258 Schwitte Nov 2002 A1
20020178674 Pervan Dec 2002 A1
20020178681 Zancai et al. Dec 2002 A1
20020189183 Ricciardelli Dec 2002 A1
20030009971 Palmberg Jan 2003 A1
20030024199 Pervan Feb 2003 A1
20030024200 Moriau et al. Feb 2003 A1
20030033777 Thiers et al. Feb 2003 A1
20030037504 Schwitte et al. Feb 2003 A1
20030041545 Stanchfield Mar 2003 A1
20030101674 Pervan Jun 2003 A1
20030101681 Tychsen Jun 2003 A1
20030110720 Berard et al. Jun 2003 A1
20030140478 Olofsson Jul 2003 A1
20030154676 Schwartz Aug 2003 A1
20030180091 Stridsman Sep 2003 A1
20030188504 Ralf Oct 2003 A1
20030196397 Niese et al. Oct 2003 A1
20030196405 Pervan Oct 2003 A1
20030224147 Maine et al. Dec 2003 A1
20040031225 Fowler Feb 2004 A1
20040031227 Knauseder Feb 2004 A1
20040035078 Pervan Feb 2004 A1
20040060255 Knauseder Apr 2004 A1
20040068954 Martensson Apr 2004 A1
20040107659 Glockl Jun 2004 A1
20040128934 Hecht Jul 2004 A1
20040137180 Sjoberg Jul 2004 A1
20040139678 Pervan Jul 2004 A1
20040168392 Konzelmann et al. Sep 2004 A1
20040177584 Pervan Sep 2004 A1
20040182036 Sjoberg Sep 2004 A1
20040206036 Pervan Oct 2004 A1
20040211143 Hanning Oct 2004 A1
20040211144 Stanchfield Oct 2004 A1
20040219339 Dempsey et al. Nov 2004 A1
20040241374 Thiers et al. Dec 2004 A1
20040255538 Ruhdorfer Dec 2004 A1
20040255541 Thiers Dec 2004 A1
20040261348 Vulin Dec 2004 A1
20050003160 Chen et al. Jan 2005 A1
20050028474 Kim Feb 2005 A1
20050055943 Pervan Mar 2005 A1
20050112320 Wright May 2005 A1
20050138881 Pervan Jun 2005 A1
20050144881 Tate Jul 2005 A1
20050166502 Pervan et al. Aug 2005 A1
20050166514 Pervan Aug 2005 A1
20050166516 Pervan Aug 2005 A1
20050176321 Crette et al. Aug 2005 A1
20050193677 Vogel Sep 2005 A1
20050208255 Pervan Sep 2005 A1
20050210810 Pervan Sep 2005 A1
20050221073 Liou Oct 2005 A1
20050235593 Hecht Oct 2005 A1
20050247000 Zhu Nov 2005 A1
20050250921 Qiu et al. Nov 2005 A1
20050252130 Martensson Nov 2005 A1
20050268570 Pervan Dec 2005 A2
20060010820 Schwitte et al. Jan 2006 A1
20060032168 Thiers et al. Feb 2006 A1
20060032175 Chen et al. Feb 2006 A1
20060048474 Pervan et al. Mar 2006 A1
20060053724 Braun Mar 2006 A1
20060070333 Pervan Apr 2006 A1
20060075713 Pervan et al. Apr 2006 A1
20060099386 Smith May 2006 A1
20060101769 Pervan et al. May 2006 A1
20060144004 Nollet et al. Jul 2006 A1
20060154015 Miller et al. Jul 2006 A1
20060156666 Caufield Jul 2006 A1
20060174974 Brannstrom et al. Aug 2006 A1
20060196139 Pervan et al. Sep 2006 A1
20060225377 Moriau et al. Oct 2006 A1
20060236642 Pervan Oct 2006 A1
20060248830 Gustaaf et al. Nov 2006 A1
20060248831 Moriau et al. Nov 2006 A1
20060260252 Brice Nov 2006 A1
20060260254 Pervan Nov 2006 A1
20060283127 Pervan Dec 2006 A1
20070006543 Engstrom Jan 2007 A1
20070011981 Eisermann Jan 2007 A1
20070022694 Chen et al. Feb 2007 A1
20070028547 Grafenauer et al. Feb 2007 A1
20070094986 Moriau et al. May 2007 A1
20070094987 Moriau et al. May 2007 A1
20070130872 Goodwin Jun 2007 A1
20070151189 Yang Jul 2007 A1
20070151191 August Jul 2007 A1
20070154840 Thies et al. Jul 2007 A1
20070166516 Kim et al. Jul 2007 A1
20070175143 Pervan et al. Aug 2007 A1
20070175144 Hakansson Aug 2007 A1
20070175148 Bergelin Aug 2007 A1
20070175156 Pervan et al. Aug 2007 A1
20070184230 Verrue Aug 2007 A1
20070193178 Groeke Aug 2007 A1
20070196624 Chen et al. Aug 2007 A1
20070218252 Donald Sep 2007 A1
20070275207 Higgins et al. Nov 2007 A1
20080000179 Pervan et al. Jan 2008 A1
20080000180 Pervan Jan 2008 A1
20080000182 Pervan Jan 2008 A1
20080000183 Bergelin et al. Jan 2008 A1
20080000186 Pervan et al. Jan 2008 A1
20080000187 Pervan Jan 2008 A1
20080000188 Pervan Jan 2008 A1
20080000189 Pervan et al. Jan 2008 A1
20080000194 Pervan et al. Jan 2008 A1
20080000417 Pervan et al. Jan 2008 A1
20080005989 Pervan et al. Jan 2008 A1
20080005992 Pervan Jan 2008 A1
20080005997 Pervan Jan 2008 A1
20080005998 Pervan Jan 2008 A1
20080005999 Pervan Jan 2008 A1
20080008871 Pervan Jan 2008 A1
20080010931 Pervan et al. Jan 2008 A1
20080010937 Pervan et al. Jan 2008 A1
20080028707 Pervan Feb 2008 A1
20080028713 Pervan Feb 2008 A1
20080029490 Martin et al. Feb 2008 A1
20080034701 Pervan Feb 2008 A1
20080034708 Pervan Feb 2008 A1
20080041007 Pervan Feb 2008 A1
20080041008 Pervan Feb 2008 A1
20080053028 Moriau et al. Mar 2008 A1
20080060308 Pervan Mar 2008 A1
20080060309 Moriau et al. Mar 2008 A1
20080060310 Moriau et al. Mar 2008 A1
20080066415 Pervan et al. Mar 2008 A1
20080092473 Heyns Apr 2008 A1
20080104921 Pervan May 2008 A1
20080110125 Pervan May 2008 A1
20080134607 Pervan et al. Jun 2008 A1
20080134613 Pervan Jun 2008 A1
20080134614 Pervan Jun 2008 A1
20080138560 Windmoller Jun 2008 A1
20080141610 Thiers et al. Jun 2008 A1
20080148674 Thiers et al. Jun 2008 A1
20080153609 Kotler Jun 2008 A1
20080172971 Pervan Jul 2008 A1
20080184646 Alford et al. Aug 2008 A1
20080241440 Bauer Oct 2008 A1
20080256890 Pervan et al. Oct 2008 A1
20080263975 Mead Oct 2008 A1
20080311355 Chen et al. Dec 2008 A1
20090031662 Chen et al. Feb 2009 A1
20090038253 Martensson Feb 2009 A1
20090049787 Hannig Feb 2009 A1
20090110888 Wuest et al. Apr 2009 A1
20090133353 Pervan May 2009 A1
20090151290 Liu Jun 2009 A1
20090155612 Pervan et al. Jun 2009 A1
20090159156 Walker Jun 2009 A1
20090186710 Joseph Jul 2009 A1
20090193748 Boo et al. Aug 2009 A1
20090217611 Schrader Sep 2009 A1
20090223162 Chen et al. Sep 2009 A1
20090226662 Dyczko-Riglin et al. Sep 2009 A1
20090235604 Cheng et al. Sep 2009 A1
20090249733 Moebus Oct 2009 A1
20090260313 Segaert Oct 2009 A1
20090272058 Duselis et al. Nov 2009 A1
20090320402 Schacht Dec 2009 A1
20100011695 Cheng Jan 2010 A1
20100018147 Du Jan 2010 A1
20100018149 Thiers Jan 2010 A1
20100031594 Liu et al. Feb 2010 A1
20100043333 Hannig Feb 2010 A1
20100058702 Lei Mar 2010 A1
20100242398 Cullen Sep 2010 A1
20100260962 Chen et al. Oct 2010 A1
20100293879 Pervan Nov 2010 A1
20100300029 Braun Dec 2010 A1
20100300030 Pervan et al. Dec 2010 A1
20100319293 Dammers Dec 2010 A1
20110001420 Tchakarov et al. Jan 2011 A1
20110008567 Weeks et al. Jan 2011 A1
20110030303 Pervan et al. Feb 2011 A1
20110041996 Pervan Feb 2011 A1
20110056167 Nilsson Mar 2011 A1
20110094178 Braun Apr 2011 A1
20110131901 Pervan et al. Jun 2011 A1
20110131909 Hannig Jun 2011 A1
20110138722 Hannig Jun 2011 A1
20110146177 Hannig Jun 2011 A1
20110154665 Pervan et al. Jun 2011 A1
20110154763 Bergelin et al. Jun 2011 A1
20110167744 Whispell et al. Jul 2011 A1
20110173914 Engstrom Jul 2011 A1
20110247285 Wybo et al. Oct 2011 A1
20110247748 Pervan et al. Oct 2011 A1
20110258959 Braun Oct 2011 A1
20110296780 Ulrich Dec 2011 A1
20120003439 Chen et al. Jan 2012 A1
20120017534 Oh Jan 2012 A1
20120040149 Chen et al. Feb 2012 A1
20120066996 Konstanczak Mar 2012 A1
20120067461 Braun Mar 2012 A1
20120124932 Schulte et al. May 2012 A1
20120137617 Pervan Jun 2012 A1
20120174519 Schulte Jul 2012 A1
20120174521 Schulte Jul 2012 A1
20120180416 Perra et al. Jul 2012 A1
20120192521 Schulte Aug 2012 A1
20120216472 Martensson et al. Aug 2012 A1
20120266555 Cappelle Oct 2012 A1
20120276369 Jing et al. Nov 2012 A1
20120279154 Bergelin et al. Nov 2012 A1
20120304581 Kim Dec 2012 A1
20130008118 Baert et al. Jan 2013 A1
20130014890 Pervan et al. Jan 2013 A1
20130025964 Ramachandra et al. Jan 2013 A1
20130042563 Pervan Feb 2013 A1
20130042565 Pervan et al. Feb 2013 A1
20130047536 Pervan Feb 2013 A1
20130097959 Michel Apr 2013 A1
20130111758 Nilsson et al. May 2013 A1
20130152492 Whitaker Jun 2013 A1
20130160391 Pervan et al. Jun 2013 A1
20130174507 Oehrlein Jul 2013 A1
20130180193 Bossuyt Jul 2013 A1
20130212971 Cordeiro Aug 2013 A1
20130243996 Hannig Sep 2013 A1
20130269863 Pervan et al. Oct 2013 A1
20130283719 Doehring et al. Oct 2013 A1
20130298487 Bergelin et al. Nov 2013 A1
20130305649 Thiers Nov 2013 A1
20130305650 Liu Nov 2013 A1
20130309441 Hannig Nov 2013 A1
20130333182 Pervan Dec 2013 A1
20140007539 Pervan et al. Jan 2014 A1
20140033633 Kell Feb 2014 A1
20140033635 Pervan et al. Feb 2014 A1
20140069043 Pervan Mar 2014 A1
20140069044 Wallin Mar 2014 A1
20140115994 Pervan et al. May 2014 A1
20140186104 Hamberger Jul 2014 A1
20140215946 Roy et al. Aug 2014 A1
20140237924 Nilsson et al. Aug 2014 A1
20140283466 Boo Sep 2014 A1
20140283477 Hannig Sep 2014 A1
20140290173 Hamberger Oct 2014 A1
20140318061 Pervan Oct 2014 A1
20140325930 Schneider Nov 2014 A1
20140352248 Whispell et al. Dec 2014 A1
20140356594 Chen et al. Dec 2014 A1
20140366476 Pervan et al. Dec 2014 A1
20140366477 Kell Dec 2014 A1
20150114552 Cernohous et al. Apr 2015 A1
20150225964 Chen et al. Aug 2015 A1
20150252573 Devos Sep 2015 A1
20150330088 Derelov Nov 2015 A1
20150368910 Kell Dec 2015 A1
20160016390 Lundblad et al. Jan 2016 A1
20160016391 Lundblad et al. Jan 2016 A1
20160047129 Bowers Feb 2016 A1
20160052245 Chen et al. Feb 2016 A1
20160069089 Bergelin et al. Mar 2016 A1
20160076260 Pervan et al. Mar 2016 A1
20160108624 Nilsson et al. Apr 2016 A1
20160115695 Devos Apr 2016 A1
20160138274 Anspach May 2016 A1
20160186318 Pervan et al. Jun 2016 A1
20160194883 Pervan Jul 2016 A1
20160194885 Whispell et al. Jul 2016 A1
20160201324 Hkansson et al. Jul 2016 A1
20160265234 Pervan Sep 2016 A1
20160333595 Cappelle et al. Nov 2016 A1
20160375674 Schulte Dec 2016 A1
20170030088 Simoens Feb 2017 A1
20170037642 Boo Feb 2017 A1
20170037645 Pervan Feb 2017 A1
20170175400 Josefsson Jun 2017 A1
20170241136 Kell Aug 2017 A1
20170350140 Bergelin et al. Dec 2017 A1
20170362834 Pervan et al. Dec 2017 A1
20170370109 Devos Dec 2017 A1
20180010342 Van Hooydonck Jan 2018 A1
20180094441 Boo Apr 2018 A1
20180313093 Nilsson et al. Nov 2018 A1
20190017278 De et al. Jan 2019 A1
20190091977 Lundblad et al. Mar 2019 A1
20190136545 De et al. May 2019 A1
20190211569 Boo et al. Jul 2019 A1
20190249444 Kell Aug 2019 A1
20190277041 Pervan et al. Sep 2019 A1
20190394314 Pervan et al. Dec 2019 A1
20200056379 Boo Feb 2020 A1
20200063441 Boo Feb 2020 A1
20200180282 Lundblad et al. Jun 2020 A1
20200208409 Kell Jul 2020 A1
20200248462 Bergelin et al. Aug 2020 A1
20200362567 Nilsson et al. Nov 2020 A1
20200407981 Boo et al. Dec 2020 A1
20210115680 Whispell et al. Apr 2021 A1
20210207385 Boo Jul 2021 A1
20210214953 Kell Jul 2021 A1
20220112726 Bergelin et al. Apr 2022 A1
20220341186 Nilsson et al. Oct 2022 A1
20220341189 Whispell et al. Oct 2022 A1
Foreign Referenced Citations (208)
Number Date Country
2252791 May 1999 CA
2076142 May 1991 CN
2106197 Jun 1992 CN
2124276 Dec 1992 CN
1270263 Oct 2000 CN
101492950 Jul 2009 CN
1081653 May 1960 DE
1198475 Aug 1965 DE
2251762 May 1974 DE
2832817 Feb 1980 DE
3538538 May 1987 DE
3904686 Aug 1989 DE
4020682 Jan 1992 DE
4242530 Jun 1994 DE
29517995 Feb 1996 DE
19854475 Jul 1999 DE
20002744 Aug 2000 DE
20018817 Jan 2001 DE
10001248 Jul 2001 DE
10032204 Jul 2001 DE
10006748 Aug 2001 DE
20206460 Jul 2002 DE
20207844 Aug 2002 DE
10316695 Oct 2004 DE
202005004537 Jun 2005 DE
102005061099 Mar 2007 DE
102006024184 Nov 2007 DE
102006058655 Jun 2008 DE
202008011589 Nov 2008 DE
202008012001 Nov 2008 DE
202004021867 Dec 2011 DE
202016102034 May 2016 DE
0665347 Aug 1955 EP
0903451 Mar 1999 EP
1045083 Oct 2000 EP
1061201 Dec 2000 EP
1165900 Jan 2002 EP
1165906 Jan 2002 EP
1262609 Dec 2002 EP
1308577 May 2003 EP
1350904 Oct 2003 EP
1357239 Oct 2003 EP
1362947 Nov 2003 EP
1420125 May 2004 EP
1570143 Sep 2005 EP
1585875 Oct 2005 EP
1938963 Jul 2008 EP
2009197 Dec 2008 EP
2339092 Jun 2011 EP
2189591 Mar 2012 EP
2516768 Oct 2012 EP
2615221 Jul 2013 EP
1293043 May 1962 FR
2810060 Dec 2001 FR
1308011 Feb 1973 GB
1430423 Mar 1976 GB
1520964 Aug 1978 GB
2020998 Nov 1979 GB
2117813 Oct 1983 GB
2243381 Oct 1991 GB
2256023 Nov 1992 GB
56-104936 Aug 1981 JP
56-131752 Oct 1981 JP
57-157636 Oct 1982 JP
59-185346 Dec 1984 JP
60-255843 Dec 1985 JP
01-178659 Jul 1989 JP
01-202403 Aug 1989 JP
01-033702 Oct 1989 JP
05-096282 Dec 1993 JP
05-318674 Dec 1993 JP
06-039840 May 1994 JP
07-026467 May 1995 JP
07-180333 Jul 1995 JP
07-300979 Nov 1995 JP
08-074405 Mar 1996 JP
08-086080 Apr 1996 JP
08-109734 Apr 1996 JP
09-053319 Feb 1997 JP
10-002096 Jan 1998 JP
10-219975 Aug 1998 JP
11-131771 May 1999 JP
11-268010 Oct 1999 JP
2002-011708 Jan 2002 JP
3363976 Jan 2003 JP
10-1996-0005785 Feb 1996 KR
10-2007-0000322 Jan 2007 KR
10-2008-0096189 Oct 2008 KR
10-0870496 Nov 2008 KR
2013151493 Oct 2013 NO
506254 Nov 1997 SE
0000785 Sep 2001 SE
0103130 Mar 2003 SE
8903753 May 1989 WO
9006232 Jun 1990 WO
9401628 Jan 1994 WO
9426999 Nov 1994 WO
9627721 Sep 1996 WO
9747834 Dec 1997 WO
9838401 Sep 1998 WO
9858142 Dec 1998 WO
9917930 Apr 1999 WO
9958254 Nov 1999 WO
9966151 Dec 1999 WO
9966152 Dec 1999 WO
0007841 Feb 2000 WO
0017467 Mar 2000 WO
0022225 Apr 2000 WO
0047841 Aug 2000 WO
0052278 Sep 2000 WO
0066856 Nov 2000 WO
0102669 Jan 2001 WO
0102670 Jan 2001 WO
0102671 Jan 2001 WO
0144669 Jun 2001 WO
0147726 Jul 2001 WO
0148331 Jul 2001 WO
0148332 Jul 2001 WO
0148333 Jul 2001 WO
0151732 Jul 2001 WO
0151733 Jul 2001 WO
0153628 Jul 2001 WO
0166877 Sep 2001 WO
0175247 Oct 2001 WO
0177461 Oct 2001 WO
0188306 Nov 2001 WO
0198604 Dec 2001 WO
0255809 Jul 2002 WO
0255810 Jul 2002 WO
0260691 Aug 2002 WO
0292342 Nov 2002 WO
2002103135 Dec 2002 WO
0312224 Feb 2003 WO
0316654 Feb 2003 WO
0325307 Mar 2003 WO
0335396 May 2003 WO
0344303 May 2003 WO
0378761 Sep 2003 WO
0383234 Oct 2003 WO
0385222 Oct 2003 WO
0389736 Oct 2003 WO
2004005648 Jan 2004 WO
2004011740 Feb 2004 WO
2004016877 Feb 2004 WO
2004044348 May 2004 WO
2004050780 Jun 2004 WO
2004052357 Jun 2004 WO
2004053256 Jun 2004 WO
2004053257 Jun 2004 WO
2004085765 Oct 2004 WO
2005068747 Jul 2005 WO
2005088029 Sep 2005 WO
2005098163 Oct 2005 WO
2006032378 Mar 2006 WO
2006043893 Apr 2006 WO
2006104436 Oct 2006 WO
2006123988 Nov 2006 WO
2006133690 Dec 2006 WO
2007015669 Feb 2007 WO
2007016978 Feb 2007 WO
2007020088 Feb 2007 WO
2007053257 May 2007 WO
2007079845 Jul 2007 WO
2007081267 Jul 2007 WO
2007118352 Oct 2007 WO
2008008016 Jan 2008 WO
2008008824 Jan 2008 WO
2008068245 Jun 2008 WO
2008116623 Oct 2008 WO
2008133377 Nov 2008 WO
2008142538 Nov 2008 WO
2009061279 May 2009 WO
2009071822 Jun 2009 WO
2010012104 Feb 2010 WO
2010015516 Feb 2010 WO
2010023042 Mar 2010 WO
2010028901 Mar 2010 WO
2010072357 Jul 2010 WO
2010081532 Jul 2010 WO
2010086084 Aug 2010 WO
2010114236 Oct 2010 WO
2010128043 Nov 2010 WO
2011012104 Feb 2011 WO
2011028171 Mar 2011 WO
2011032540 Mar 2011 WO
2011038709 Apr 2011 WO
2011077311 Jun 2011 WO
2011138722 Nov 2011 WO
2012069485 May 2012 WO
2012084604 Jun 2012 WO
2012101171 Aug 2012 WO
2012126046 Sep 2012 WO
2012136021 Oct 2012 WO
2013017575 Feb 2013 WO
2013026559 Feb 2013 WO
2013044758 Apr 2013 WO
2013092270 Jun 2013 WO
2014007738 Jan 2014 WO
2014043756 Mar 2014 WO
2014182215 Nov 2014 WO
2014209213 Dec 2014 WO
2015078443 Jun 2015 WO
2015104680 Jul 2015 WO
2015174914 Nov 2015 WO
2016029255 Mar 2016 WO
2017101910 Jun 2017 WO
2017115202 Jul 2017 WO
2017187298 Nov 2017 WO
Non-Patent Literature Citations (7)
Entry
Communication Pursuant to Article 94(3) EPC dated Oct. 13, 2017 in EP Patent Application No. 14 794 996.0, EPO, Munich, DE, 9 pages.
Extended European Search Report dated Nov. 10, 2016 in EP 14 79 4996.0, European Patent Office, Munich, DE, 10 pages.
Extended European Search Report mailed in EP 18162875.1, dated Apr. 26, 2018, European Patent Office, Munich, DE, 13 pages.
Extended European Search Report mailed in EP 192062230, dated Feb. 10, 2020, European Patent Office, Munich, DE, 11 Pages.
International Search Report and accompanying Written Opinion issued in PCT/SE2014/050360, dated Jun. 3, 2014, ISA/SE Patent-och registreringsverket, Stockholm, SE, 12 pages.
Lowe's, How to Install a Laminate Floor, YouTube video available for viewing at https:/youtu.be/zhIXVHAejlk?t=3m52s, Oct. 2008 (last accessed Feb. 15, 2018).
Pervan, Darko (Author), Technical Disclosure entitled “VA073a Zip Loc,” IP com No. IPCOM000210869D, Sep. 13, 2011, IP.com Prior Art Database, 36 pages.
Related Publications (1)
Number Date Country
20230115427 A1 Apr 2023 US
Continuations (4)
Number Date Country
Parent 17067989 Oct 2020 US
Child 17865772 US
Parent 16528992 Aug 2019 US
Child 17067989 US
Parent 15333630 Oct 2016 US
Child 16528992 US
Parent 14224628 Mar 2014 US
Child 15333630 US