The present invention generally relates to a flow control tool for use in a wellbore, and particularly a flow control valve adapted for use in a well, alone or with other downhole tools.
The process of making a production well, after drilling it, ready for production and/or injection is called completion of a well. This principally involves: preparing the bottom of the borehole at, or in the proximity of, the production layer(s) to meet the required specifications; running in the production tubing or pipe and its associated downhole tools; as well as perforating and stimulating, as required. The process of running in and cementing the casing can also be included, if necessary due to the strata structure. All these processes will be described in detail below.
A subterranean formation containing hydrocarbons comprises at least one layer of soft or fractured rock(s) or strata containing the hydrocarbons, in the following called a production layer. Each production layer must be covered by a layer of impermeable rock(s) or strata preventing the hydrocarbons from escaping therefrom. The production layer(s) in an oil or gas field are collectively called and/or known as a reservoir.
The drilling can be done vertically through one or more strata/rock layers in order to reach the desired production layer(s), and then possibly horizontally along one or more strata to provide as efficient well(s) as possible. A production well extending through the reservoir is conventionally divided into several production zones, and particularly one or more production zones per one production layer. A production well may extend several thousand meters vertically through the formation, and be connected to substantially horizontal branches extending up to several kilometers through the production layer(s).
The drilling in the geological strata can be done by rotating a drill bit at the end of a drill string and forcing it in the desired direction through geological or rock layers or strata to create or form a wellbore. Once a predetermined length of the wellbore is drilled, the drill string with the drill bit may be pulled out, and the wellbore may be lined with a steel pipe called a casing or liner. Hence, an outer annular space or ring room is formed between the casing and the formation. It is a common, but not obligatory, practice to cement the casing to the formation by filling all or part of the outer annular space with cementing slurry or slurries. Open boreholes or wellbores are also common, when the strata allow having such. A fully or partially cemented casing can stabilize the formation and at the same time can make it possible to isolate certain layers or regions behind the casing for retrieval of hydrocarbons, gas, water or even geothermal heat. It is well-known to anyone skilled in the art that e.g. epoxy/resin-based cementing slurries in some cases are better suited for the task than cement based mixtures.
The terms “cement” and “cementing” are thus to be construed generally as use and/or injection of a viscous slurry, which then hardens for the purpose of retaining the casing in the formation and/or stabilizing the formation and/or creating a barrier between different zones, and not exclusively as use of cement only. Cementing tools or valves may be arranged in the casing at predetermined locations. When a segment of the casing is to be cemented, the cementing valve is opened and cement slurry is pumped down the casing, out through the valve ports, and into the outer annular space between the casing and the formation. The person skilled in the art will be familiar with the use of suitable plugs, staged cementing, in which a first batch of cement or liquid slurry is allowed to set before the next batch of cement or liquid slurry is pumped into the outer annular space above it, thus reducing the hydrostatic pressure from the cement, which might otherwise harm or damage a weak formation, and other cementing techniques and details.
During cementing, injection and production in wells as those described above, the possibility for large differential pressures between different zones increases with increasing depth(s). Production of hydrocarbons from strata deep below the seabed and geothermal applications are both likely to involve large or high pressures. Isolation of zones and injection of liquid or gas to increase the pressure in the production zones or regions can lead to correspondingly large differential pressures.
When a well is drilled and lined with a casing, a return flow path from the formation around the casing to the surface must be established. In some instances, it is possible to penetrate the casing by setting off explosive charges at one or more predetermined depths to enable radial flow of production fluid from the formation into the casing. In other instances, the casing may be provided with prefabricated holes or slits, possibly combined with sand screens. In many applications, the combination of high hydraulic pressure and relatively porous production strata implies a substantial risk for damage of the formation if explosives are used to penetrate the casing. In these cases, it is a common practice to use valve sections with radially extending openings which are opened to allow radial flow of cement or epoxy/resin out of the casing for stabilizing and retaining the casing in the formation, and/or for radial flow of injection fluid from inside the pipe to the surrounding formation to maintain or increase the hydraulic pressure in the formation, and/or for radial flow of production fluid from the formation into the casing. Such valve sections designed for inclusion in a tubular, usually by means of threaded couplings of the same kind as used when connecting the pipe segments to a string, are called “valves” in the following for simplicity.
Hydraulic fracturing, poses particularly demanding requirements to the design, robustness and durability of the valve(s). In hydraulic fracturing, a mixture containing e.g. 4% small ceramic particles can be injected into the formation at a pressure quite above the formation pressure. Fractures in the formation are expanded by the pressure and filled with these particles. When the hydraulic pressure is removed, the particles remain in the fractures and keep them open. The purpose is to improve the inflow of production fluid from the formation and into a so-called production pipe.
It is also a common practice to insert at least one production pipe into the casing. The inner annular space or ring room between the casing and the production pipe is filled with a suitable liquid/fluid or mud, and is generally used to maintain and increase hydraulic pressure. The production pipe is in these cases used as the return path, and conveys the production fluid up to the surface. When using a production pipe within the casing, it is of course also necessary to provide the production pipe with openings or apertures for inflow of production fluid therein, and it may be necessary to isolate production zones from the liquid/fluid or mud in the inner annular space between the production pipe(s) and the casing. Isolating the different zones can be accomplished by using mechanical plugs called “packers”, rather than by using cementing slurry or slurries. Such packers are mainly used in the inner annular space between the production pipe and the casing, because it may be problematic to achieve sufficient sealing against the formation, especially if the formation is porous. Valves corresponding to the valves described above can be arranged in the production pipe(s), and they can be opened once they are localized in the production zone(s).
One or more injection wells may be provided at a distance from the production well(s) in a field. The injection well(s) can be used to pump water, saline and/or gas back into the formation in order to increase the pressure. Additives such as acid, solvents or surfactants may be added to the fluid in order to enhance the production of hydrocarbons in processes known as “stimulating a zone”.
Valves can be used to control the flow of formation fluid from a production zone into the production pipe through the casing, possibly through a horizontal and/or vertical branch. Valves can also be used for controlling an injection fluid from an injection well into a certain zone of the formation to be stimulated. When the formation fluid from a production zone contains too much water to be economically sustainable, the production zone can be shut down, typically by means of one or more valves. The valves are operated between open and closed, and possibly choked, positions using a variety of techniques, including use of wireline tools, strings of pipes, coiled tubing, self-propagating tools known as borehole or well tractors or runners, and drop balls or the like. Some valves may be operated using separate hydraulic control lines. However, the space and cost required for providing separate hydraulic control lines and relatively expensive hydraulic valves quickly make hydraulically operated valves impractical for use in a tubular having many valves.
Managed Pressure Drilling (MPD) and Dual Gradient Drilling (DGD) are oil-field drilling techniques that are becoming more common and thus create a need for equipment and technology in order to make them practical. These drilling techniques often utilize a higher density of drilling mud inside the drill string and a lower density return mud path on the outside of the drill string. In dual gradient drilling (DGD), an undesirable condition called “u-tubing” can result when the mud pumps for a drilling system are stopped. Mud pumps are commonly used to deliver drilling mud into the drill string and to extract return mud from the wellbore and return riser(s). In a typical u-tubing scenario, fluid flow inside a drill string may continue to flow, even after the mud pumps have been powered down, until the pressure inside the drill string is balanced with the pressure outside the drill string, e.g. in the well bore and/or the return riser(s). This problem is exacerbated in those situations, where a heavier density fluid precedes a lighter density fluid in a drill string. In such a scenario, the heavier density fluid can cause, by its own weight, a continued flow in the drill string even after the mud pumps have been shut off. This u-tubing phenomenon can result in undesirable well kicks, which can cause damage to a drilling system. For this reason, it is desirable that when mud pumps in a drilling system are turned off, the forward fluid flow is discontinued quickly. The present invention can be utilized in drilling operations.
In a functioning production well, one of the maintenance operations that is performed is a hole-cleaning. There are several methods for cleaning a wellbore, and in particular for cleaning the inside of a casing or an annulus of e.g. an oil well, using hole-cleaning or washing tools, wherein the wireline or downhole cleaning tool is lowered into the well or casing in the proximity of the area where deposits or debris are to be removed from the inside of the well or casing. A washing or flushing fluid is pumped through the work string and out into the casing or well via the washing or cleaning tool. After the cleaning operation is completed the cleaning tool may be withdrawn from the well or casing. The cleaning tool can comprise an inlet for jetting flushing fluid into the tool from the work string, and a rotatable nozzle head or bit having a plurality of nozzles and being in fluid communication with the inlet. The capacity in liters per minute (l/min.) of the cleaning tool is limited to e.g. about 250-350 l/min. However, it is sometimes desired and/or necessary to pump into the well more liters per minute (l/min.), e.g. about 500-700 l/min. This problem can be solved by use of the present invention.
Furthermore, when necessary or needed to operate (e.g. close and/or open) a valve such as e.g. a sleeve valve, a shifting tool can be used. Before operating said valve with the shifting tool, a jetting tool is usually used to clean the valve, particularly its engagement portions/profiles or recesses. The present invention can simplify these operations, and be used as a jetting tool together with the shifting tool.
The main features of the present invention are given in the independent claims. Additional features of this invention are given in the dependent claims.
The invention relates to a downhole tool comprising a housing and a mandrel. The housing can be annular and/or tubular. The mandrel is axially hollow. The mandrel is glidingly arranged within the housing. The mandrel is arranged between an inflow portion or element arranged within the housing at one or first end and a discharge portion or element arranged within the housing at the other or second end. The mandrel can be formed as a piston comprising an outer flange. The outer flange is dividing the mandrel or piston in two parts, an inflow part and an outflow part, respectively. The outer flange is arranged in the space or ring room between the mandrel or piston (particularly its outer surface) and the inner surrounding wall or surface of the housing. The outer flange can have a sealing ring for sealing the space or ring room between the outer surface of the inflow part of the mandrel or piston and the inner surrounding wall or surface of the housing from the space or ring room between the outer surface of the outflow part of the mandrel or piston and the inner surrounding wall or surface of the housing. The flange can be acting on a first end of a spring being arranged around the mandrel or piston. The spring can be arranged particularly in the space or ring room between the outer surface of the outflow part of the mandrel or piston and the inner surrounding wall or surface of the housing. The other or second end of the spring can be leaning against a ring room sealing element. The ring room sealing element can be arranged at, or in the proximity of, the discharge portion or element that is arranged within the housing and at its other or second end thereof. The mandrel can have several positions in the housing. In an initial or first position of the mandrel or piston, a fluid flow can run 100% through the tool via an inflow nozzle of the inflow portion or element, through the inside of the mandrel or piston and out of a discharge nozzle of the discharge portion or element. On the non-spring or inflow side or part of the mandrel, the housing can be arranged with at least one flow side port and/or nozzle. The mandrel itself (particularly its non-spring or inflow side or part) can be arranged or supplied with at least one side port. At a predetermined flow rate having a first predetermined pressure and with the help of a passage arranged in the housing wall and connecting the inflow side of the tool with the space or ring room on the non-spring or inflow side of the mandrel or piston and at least one side port in the mandrel or piston and being arranged on its spring or outflow side, the mandrel can thus be moved towards the discharge nozzle of the discharge portion or element, due to (predetermined or controlled) pressure drop or loss over the inflow nozzle, thus providing for sufficient force on the mandrel or piston overcoming the spring resistance, so that, in this second position of the mandrel or piston, the fluid flow will be split in two paths: 1) one side flow (or side flow path) through the side port(s) in the mandrel and the flow side port(s) or nozzle(s) in the housing, both being concurrent with each other in this instance, and 2) one through-flow (or through-flow path) through the tool center (that is the inside of the mandrel or piston) and via or out of the discharge nozzle of the discharge portion or element.
As mentioned above, the side flow through the side ports can be used as a flushing or jetting flow in e.g. hole-cleaning or valve-operating operations, while the through-flow can be used to further operate other downhole tools. Furthermore, the two flows (i.e. the side and through flows) can be regulated in a controllable manner with respect to what is desired to be achieved or to the respective or intended downhole operation. For example, in a cleaning operation, the side flow running into the casing can mainly be regulated to be approximately equal as the through-flow supplied to the cleaning tool, e.g. around 300 l/min, thus allowing about 600 l/min. to be pumped through the work string. While, for example, in a valve-operating operation, the side flow for jetting the engagement profile or recess of the valve can be regulated to be about 200 l/min., and the through-flow supplied to the shifting tool can then be regulated to be about 150 l/min.
Furthermore, the discharge nozzle of the discharge portion or element can be arranged to be plugged, so that the entire fluid flow of the tool will run 100% sideways in a third instance (i.e. a third status of said tool).
The flow control tool can be a flow controlled valve/flow control valve.
The invention will be described in greater detail in the following with reference to the accompanying drawings in which similar numerals refer to similar parts, and where:
The first or top or inflow portion or element 4 can be a first nozzle adapter 4. The second or bottom or discharge portion or element 10 can be a second nozzle adapter 10. Both nozzle adapters 4, 10 can be different or the same depending on the nozzles 31, 41 used.
The discharge or bottom nozzle 41 of the bottom or discharge portion or element 10 can be adapted and/or arranged to be plugged, so that the entire fluid flow of the tool 100 will run 100% sideways, through ports and/or nozzles 24, 7, in a third instance (i.e. a third status of said tool 100).
Said coil tubing tool or downhole tool 100 can be a flow control valve/flow controlled valve 100.
Furthermore, the housing 1 of the tool 100 can be connected to a tubular top connector or sub 6 at its first or top end, and/or to a tubular bottom connector or sub 3 at its second or bottom end.
The ring room sealing element 11 can be, but is not limited only to, a seal plate or a seal ring or a seal flange. The ring room sealing element 11 can be leaning on and/or arranged adjacent to the tubular bottom connector or sub 3. Furthermore, the bottom or discharge portion or element 10 can be arranged within the tubular bottom connector or sub 3 connected to the housing 1.
The tool 100 can further comprise various and/or necessary sealing and/or wear elements, such as, but not limited only to, wear bands 8, 9; sealing rings, O-rings 12, 13 and/or other types of rings 14, 15; wherein all these elements are shown on
The relation or proportion between the side flow and the through-flow can be determined/chosen and/or varied by changing and/or depending on the side port(s)/nozzle(s) 7 and/or the (second or bottom) nozzle 41. The (first or top) nozzle 31 can also have same role, as just mentioned, together with any one of or both of said port(s) and/or nozzle(s) 41, 7.
Additional modifications, alterations and adaptations of the present invention will suggest themselves to those skilled in the art without departing from the scope of the invention as expressed and stated in the following patent claims.
Number | Date | Country | Kind |
---|---|---|---|
20140691 | Jun 2014 | NO | national |
Number | Name | Date | Kind |
---|---|---|---|
3025919 | Angel | Mar 1962 | A |
4298077 | Emery | Nov 1981 | A |
4298078 | Lawrence | Nov 1981 | A |
4749044 | Skipper et al. | Jun 1988 | A |
6109354 | Ringgenberg et al. | Aug 2000 | A |
6378612 | Churchill | Apr 2002 | B1 |
6491098 | Dallas | Dec 2002 | B1 |
9677376 | Swietlik | Jun 2017 | B2 |
9708872 | O'Neal | Jul 2017 | B2 |
20060225885 | Mcgarian | Oct 2006 | A1 |
20100044054 | de Boer | Feb 2010 | A1 |
20100276927 | Simonian | Nov 2010 | A1 |
20110042100 | O'Neal | Feb 2011 | A1 |
20110168410 | deBoer | Jul 2011 | A1 |
20110278017 | Themig | Nov 2011 | A1 |
20130043045 | George | Feb 2013 | A1 |
Number | Date | Country |
---|---|---|
03004828 | Jan 2003 | WO |
2013034577 | Mar 2013 | WO |
Entry |
---|
Norwegian Search Report dated Dec. 18, 2014 in corresponding Norwegian Application No. 20140691. |
Number | Date | Country | |
---|---|---|---|
20150345253 A1 | Dec 2015 | US |