The present invention relates to fluid pipe assemblies, such as for hydrocarbon resource applications, and related methods.
In certain applications where fluids are transported via pipes, the pipes can be subject to stresses from thermal expansion or contraction caused by external temperatures and/or internal fluid temperatures. More particularly, metal pipes will expand or contract as temperatures rise and fall, which may lead to bending of pipes, as well as damage to joints that may compromise the fluid flow.
Various approaches are used in applications where piping is subjected to thermal stress from external or internal sources. One example is set forth in U.S. Pat. No. 7,021,013 to Schilling et al., which discloses a compensator for compensating thermal expansions of ducts or pipelines for carrying flows of hot media, especially ducts that are lined with fire-proof material. The compensator permits inspection of the operability of the expansion gap between adjacent sections of the pipeline and its elastic temperature-resistant jointing material from the outside of the pipeline. The expansion gap in the flame-proof lining is arranged in a cross section plane of the pipeline that is adjacent to but below the cross section plane of the corrugated pipe compensator attached to the steel sheet jackets of adjacent sections of pipeline. The steel sheet jackets are spaced from one another in the area of the expansion gap and the elastic temperature-resistant jointing material is accessible from outside the pipeline upon removal of jacket parts forming a collar around the expansion gap.
Despite the existence of such approaches, further approaches to addressing thermal expansion or compression in pipe assemblies may be desirable.
A fluid pipeline assembly may include a plurality of pipe segments coupled together in end-to-end relation, and a length compensator coupled between an adjacent pair of the plurality of pipe segments to define a fluid passageway therewith. The length compensator may include a tubular body having a plurality of openings spaced apart around a periphery thereof to permit a longitudinal change of the tubular body, and a sealing sleeve extending around the tubular body and covering the plurality of openings.
More particularly, the plurality of openings may include a plurality of slotted openings. Moreover, the plurality of slotted openings may extend orthogonally to a longitudinal axis of the tubular body. In addition, the tubular body may have at least one stop opening extending therethrough, and the length compensator may further include at least one mechanical stop carried by the outer sleeve and extending into the at least one stop opening to limit a longitudinal extension of the tubular body. In particular, the mechanical stop may have a length shorter than a length of a corresponding stop opening.
The length compensator may further include a plurality of seals between the sealing sleeve and the tubular body. Furthermore, at least one of the pipe segments may comprise a radio frequency (RF) dielectric isolator segment. Additionally, at least one of the pipe segments may have a plurality of fluid openings extending radially therethrough and in fluid communication with the fluid passageway. The tubular body may also have opposing threaded ends.
A related method for assembling a fluid pipeline may include coupling a plurality of pipe segments together in end-to-end relation, and coupling a length compensator between an adjacent pair of the plurality of pipe segments to define a fluid passageway therewith. The length compensator may include a tubular body having a plurality of openings spaced apart around a periphery thereof to permit a longitudinal change of the tubular body, and a sealing sleeve extending around the tubular body and covering the plurality of openings.
The present invention will now be described more fully hereinafter with reference to the accompanying drawings, in which embodiments of the invention are shown. This invention may, however, be embodied in many different forms and should not be construed as limited to the embodiments set forth herein. Rather, these embodiments are provided so that this disclosure will be thorough and complete, and will fully convey the scope of the invention to those skilled in the art. Like numbers refer to like elements throughout.
Referring initially to
In the illustrated example, a wellbore 32 extends within the subterranean formation 31, and the system 30 includes a radio frequency (RF) antenna 33 configured to be positioned within the wellbore, an RF source 34 at the wellhead, and a transmission line 35 coupled between the RF antenna and the RF source. More particularly, the transmission line 35 extends within a liner 37 which is made up of a plurality of tubular pipe segments (indicated by dashed lines in
Heating of the subterranean formation 31 advantageously helps in the hydrocarbon extraction process, which may be accomplished through a separate producer well(s) and/or by extraction through the liner 37 in some embodiments. Further details on RF heating of subterranean formations for hydrocarbon resource recovery are set forth in U.S. Pat. No. 8,772,683 to Parsche, which is assigned to the present Applicant Harris Corp., and which is hereby incorporated herein in its entirety by reference.
With respect to systems that utilize RF energy to provide heating, such systems may suffer from a high degree of electrical near field coupling that exists between the radiating antenna element 33 and the transmission line 35 that delivers the RF power to the antenna, resulting in common mode current on the liner 37, for example. Left unchecked, this common mode current heats unwanted areas of the formation, effectively making the liner 37 part of the radiating antenna. As a result, an RF isolator 38, which is made of a dielectric material, is sometimes coupled in line with the segments of the liner 37 to help prevent these common mode currents from traveling back up the liner from the antenna 33.
However, well pipe, even once installed in a reservoir, is subject to expansion and contraction due to heating, cooling or other environmental factors. In the reservoir, expansion/contraction within the borehole 32 may be constricted by the surrounding geological formation. If constrained, the pipe segments of the liner 37 may generate significant internal tensile loads while contracting, or significant internal compressive loads if expanding.
This problem may become particularly acute in the longitudinal dimension where pipe lengths may extend hundreds of meters. More particularly, expansion and contraction over such distances may potentially exceed several meters and/or result in very large (e.g., 106 lbf) internal loads. Internal pipe loads resulting from these conditions may cause field failures such as buckling/twisting of the pipe string, as well as dimensional changes in the case of a slotted pipe, leading to loss of sand control or other structural failures that may result in the loss of the well. Moreover, this problem is especially acute for composite RF isolators 38, as dielectric isolator materials typically do not have the required strength to withstand such forces. Since the composite isolator(s) 38 is in series with the relatively stiff, high strength metal segments of the liner 37, the isolators may accordingly get crushed beyond their capability to sustain integrity.
In the illustrated system, one or more length compensators 39 may be incorporated within the liner 37. Referring additionally to
In the example of
More particularly, the nature of the dimensions of the slots 41 may be calculated to satisfy mutually dependent limits on material stress and stiffness. To a first order, the length, width and thickness of the slots 41 may be derived such that the stress in the material, once the length compensator 39 is compressed as shown on the right hand side of
The stress in the compressed length compensator 39 is related to the stiffness of a beam of length L and height H deflected by an amount W/2. The width of the cut through the pipe which defines the slot 41 is defined by the total amount of displacement required of the length compensator 39 (which essentially functions as a compressed spring in this example) and the number of columns of cuts included in the spring. Each column of width W+height H contributes an amount W to the total deflection of the spring. For example, if a total deflection of 1 inch is required and the allowable width of the slot 41 is 0.1 inches, then the number of columns of slots is 1÷0.1+1, or 11. The extra slot (+1) is provided since each slot column at the beginning and end of the spring only deflects W/2.
When installing well piping, there may be a significant tensile load on the assembled pipe as it is suspended in the vertical portion of the wellbore 32 during the insertion process, as the weight of the pipe continues to increase as more segments are added. In this regard, the tubular body 40 may optionally include one or more stop opening 51 extending therethrough, and the length compensator 39 may further include a respective mechanical stop 52 carried by the outer sleeve 42 and extending into the stop opening to limit a longitudinal extension of the tubular body. In particular, the mechanical stop 52 may have a length shorter than a length of a corresponding stop opening 51. That is, the stop openings 51 and stops 52 are configured so that the slots 41 are able to compress in response to a compressive force when installed in the lateral or horizontal portion of the borehole 32, but the stops prevent the slots from expanding or being pulled open as a result of a tensile force when the piping is suspended in the vertical portion of the borehole. As perhaps best seen in FIG. 5, the sleeve 42 may have openings 54 therein which during assembly overlap the stop openings 51 in the tubular body 40. The stops 52 may then be inserted through the openings 54 so that they extend into the stop openings 52, and the stops may then be welded to the sleeve 42 to hold them in place, for example. However, other arrangements of stops 52 may be used in different embodiments.
While the stops 52 and stop openings 51 are configured to limit expansion of the slots 41 in the illustrated embodiment, it should be noted that in other implementations the stops 52 may be configured to instead limit compression of the slots 41 and allow them to be expanded with tensile forces, if desired. In accordance with another configuration, the stops 52 may be used to allow both compression and expansion of the slots, but with outer limits on the amount of compression or expansion.
In some embodiments, a respective seal 55 may be provided between the sealing sleeve 42 and the tubular body 40, if desired. In the illustrated example, the seal 55 is an O-ring seal. As seen in
The length compensator 39 advantageously provides “springs” at desired intervals along the length of the liner 37, and in particular may conveniently be located at desired liner section or segment joints. The length compensators 39 are sized to allow each segment of the liner 37 to expand (or contract) without generating significant force which may other damage components such as the RF isolator 38 or compromise segment joints. This results in RF isolator 38 (and liner 37) loads that are significantly reduced and within the capability of typical dielectric isolator materials. Furthermore, significantly reduced liner 37 loads may advantageously reduce or eliminate buckle potential or over stress conditions. It should be noted that while the length compensator 39 has been demonstrated herein with respect to a hydrocarbon RF heating pipeline, the length compensators described herein are applicable to other types of well pipelines, as well as above-ground piping configurations which are subject to compression or expansion from either internal or external thermal conditions, or other compressive or tensile loads.
The length compensator 39 provides a unique spring design which may be machined from standard pipe. Moreover, since it has no moving parts, and it may therefore be compatible with typical sand control requirements without the need for critical seals. The number and configuration of the length compensators 39 may be varied for use with a relatively wide range of expansion (length change). Again, the length compensator 39 may not only be used to replace a standard coupler (pipe joint) in a pipeline, it may also be compatible with RF current transmission line requirements.
Many modifications and other embodiments of the invention will come to the mind of one skilled in the art having the benefit of the teachings presented in the foregoing descriptions and the associated drawings. Therefore, it is understood that the invention is not to be limited to the specific embodiments disclosed, and that modifications and embodiments are intended to be included within the scope of the appended claims.
Number | Name | Date | Kind |
---|---|---|---|
4313627 | de Lange | Feb 1982 | A |
5047201 | Schmidt et al. | Sep 1991 | A |
6409175 | Evans | Jun 2002 | B1 |
7021013 | Schilling et al. | Apr 2006 | B1 |
7918006 | Brayman et al. | Apr 2011 | B2 |
8770280 | Buytaert et al. | Jul 2014 | B2 |
8772683 | Parsche | Jul 2014 | B2 |
20020092649 | Bixenman | Jul 2002 | A1 |
20060027370 | Weinrich | Feb 2006 | A1 |
20110042096 | Nutley | Feb 2011 | A1 |
20140262223 | Wright | Sep 2014 | A1 |
Entry |
---|
US 6,407,175 B1, 06/2002, Evans et al. (withdrawn) |
Number | Date | Country | |
---|---|---|---|
20170045172 A1 | Feb 2017 | US |