1. Field of the Invention
The present invention relates to a flyback energy converter. More particularly, the present invention relates to a flyback energy converter for outputting currents steadily.
2. Description of the Prior Art
In the prior art, a flyback energy converter feedbacks the output voltage by an opto-coupler for isolating the electric. However, the opto-coupler will be affected by the working temperature, so that the opto-coupler is replaced by a method of primary sensing.
The common method of primary sensing has two ways. One is to sense an input voltage and two terminal voltages of the switch when the switch is turned off. Another is to sense the voltage at an auxiliary coil. Wherein the first way has a problem about integrated circuits in high-pressure process, the cost cannot be decreased easily. The second way can sense the output voltage by the auxiliary coil, and the induced voltage generated by the auxiliary coil can be used as a power supply for the integrated circuits.
I=0.5×Is—pk×toff/T formula (1)
However, the peak value of the current Is_pk can be set as a constant by the controller 94. According to the formula (1), if the toff/T is a constant, the average current I will be output steadily.
To sum up, developing a device outputting average current I steadily became an important issue in the field.
Accordingly, a scope of the invention is to provide a flyback energy converter for outputting currents steadily.
According to an embodiment, the flyback energy converter comprises a transformer, a load, a switch and a primary controlling circuit. The transformer comprises a primary winding, a secondary winding and an auxiliary winding. The primary winding is electrically connected to a power supply. The load is electrically connected to the secondary winding. The switch is serially connected to the primary winding for controlling a primary current of the primary winding. The primary controlling circuit comprises a first voltage measurement terminal and a switch controlling terminal. Wherein, the voltage measurement terminal is used to measure an output voltage wave provided from the auxiliary winding for obtaining a part of time period of the output voltage wave. Then, a total working time will be obtained by enlarging the part of time period according to a predetermined multiple and transferred into a predetermined clock. The switch 13 controlled by the switch controlling terminal according to the predetermined clock, for letting the secondary winding steadily output a secondary current to the load.
Additionally, the primary controlling circuit further comprises a timing device, a timing multiplication device and a first flip-flop. The voltage measurement terminal is used to measure the output voltage wave provided from the auxiliary winding for letting the timing device obtain the part of time period of the output voltage wave. The timing multiplication device enlarges the part of time period into the total working time according to the predetermined multiple. The first flip-flop transfers the total working time into the predetermined clock.
The timing device further comprises a first reference voltage, a reversed comparator, a reverser and a second flip-flop. Wherein, a timing signal can be obtained after the first reference voltage and the output voltage wave flow through the reversed comparator. The predetermined clock is transferred into a reversed predetermined clock by the reverser. The timing signal, the reversed predetermined clock and a data signal S4 are transferred into the part of time period by the second flip-flop. The timing multiplication device enlarges the part of time period into the total working time according to the predetermined multiple, the first flip-flop transfers the total working time into the predetermined clock.
Furthermore, in practice that the primary controlling circuit further comprises a second reference voltage and a comparator. A signal can be obtained by the second reference voltage and a voltage wave flowing through the comparator. The total working time and the signal can be transferred in to the predetermined clock by the first flip-flop.
Compared to the prior art, the primary controlling circuit of the flyback energy converter further comprises the timing multiplication device. The timing multiplication device enlarges the part of time period into the total working time according to the predetermined multiple. Take the total working time as the switching cycle of the switch, the steady output current can be obtained.
The advantage and spirit of the invention may be understood by the following recitations together with the appended drawings.
Please refer to
The transformer 11 comprises a primary winding 111, a secondary winding 112 and an auxiliary winding 113. In the embodiment, the primary winding 111 is electrically connected to a power supply 15 through a bridge rectifier circuit 16. The power supply 15 is an alternating current power supply.
The load 12 is electrically connected to the secondary winding 112. In the embodiment, the load 12 is a plurality of light emitting diodes (LED1, LED2).
The switch 13 is serially connected to the primary winding 111 for controlling a primary current of the primary winding 111.
The primary controlling circuit 14 comprises a first voltage measurement terminal 14a and a switch controlling terminal 14b. Wherein, the voltage measurement terminal 14a is used to measure an output voltage wave provided from the auxiliary winding 113 for obtaining a part of time period of the output voltage wave. Then, a total working time will be obtained by enlarging the part of time period according to a predetermined multiple and transferred into a predetermined clock. The switch 13 is controlled by the switch controlling terminal 14b according to the predetermined clock, for letting the secondary winding 112 steadily output a secondary current to the load 12. In the embodiment, the part of output voltage wave is a positive half-wave.
Please refer to
To be noticed, in the embodiment the timing device 141 comprises a first reference voltage Vref_1, a reversed comparator 1411, a reverser 1412 and a second flip-flop 1413. Wherein, the a timing signal S2 can be obtained after the first reference voltage Vref_1 and the output voltage wave S1 flow through the reversed comparator 1411. The predetermined clock Tp is transferred into a reversed predetermined clock S3 by the reverser 1412. The timing signal S2, the reversed predetermined clock S3 and a data signal S4 of a data source 14d are transferred into the part of time period toff by the second flip-flop 1413.
Please refer to
Compared to prior art, the primary controlling circuit of the flyback energy converter comprises the timing multiplication device enlarges the part of time period into the total working time according to the predetermined multiple. Take the total working time as the switching cycle of the switch for outputting currents steadily.
With the example and explanations above, the features and spirits of the invention will be hopefully well described. Those skilled in the art will readily observe that numerous modifications and alterations of the device may be made while retaining the teaching of the invention. Accordingly, the above disclosure should be construed as limited only by the metes and bounds of the appended claims.
Number | Date | Country | Kind |
---|---|---|---|
100105327 | Feb 2011 | TW | national |