The present invention relates to a foundation construction device and its construction method, which belongs to the field of civil engineering foundation construction.
By adopting the integral excavation construction method, the existing large-scale pile foundation technology is of long construction period, high labor intensity, and poor working environment safety.
The present invention provides a foundation construction device and its construction method. Its objective is to overcome the shortcomings of the existing technology. Its main advantages are as follows: The top of the foundation is equipped with a foundation construction device for excavating the rock and soil at the bottom of the foundation, and the factory-prefabricated foundation. It will make the construction work simpler and with a shorter construction period and a lower cost.
The Technical Scheme of the Invention: The foundation construction device includes fixed guide 1 and combined device 2, which is used for the construction of foundation 4 with chain blade 3 at the bottom. Device 1 consists of fixed frame 1-1 and guide 1-2. Device 2 includes chain blade power transmission device 2-1, spoil treatment device 2-2, and rack 2-3. Device 2-1 and device 2-2 are installed on rack 2-3. Device 2-1, foundation 4, and chain blade 3 constitute chain excavating device 5. Foundation 4 is the rack of chain excavating device 5, while chain blade 3 only excavates the rock and soil at the bottom of foundation 4. Chain blade 3 is composed of chain 3-1 and cutter 3-2 fixed on chain 3-1 for rock and soil excavation. Device 1 guides foundation 4 and/or device 2 to make foundation 4 in a straight state. During construction, device 2 is connected with the top of foundation 4, and device 2-1 drives chain blade 3 to run along the track of foundation 4. Chain blade 3 excavates the rock and soil at the bottom of foundation 4, and transports the excavated rock and soil to the top. Device 2-2 separates the rock and soil transported from the bottom of foundation 4 by chain blade 3 from chain blade 3, and device 2 and foundation 4 descend synchronously.
Device 2-1 is composed of chain blade drive device 2-1-1, chain blade tension device 2-1-2, and chain wheel 2-1-3. Frame 2-3 moves within guide 1-2, and foundation 4 also moves within guide 1-2.
The main advantages of the invention are as follows: The top of the foundation is equipped with a foundation construction device for excavating the rock and soil at the bottom of the foundation, and the factory-prefabricated foundation. It will make the construction work simpler and with a shorter construction period and a lower cost.
The foundation construction device includes fixed guide 1 and combined device 2, which is used for the construction of foundation 4 with chain blade 3 at the bottom. Device 1 consists of fixed frame 1-1 and guide 1-2. Device 2 includes chain blade power transmission device 2-1, spoil treatment device 2-2, and rack 2-3. Device 2-1 and device 2-2 are installed on rack 2-3. Device 2-1, foundation 4 and chain blade 3 constitute chain excavating device 5. Foundation 4 is the rack of chain excavating device 5, while chain blade 3 only excavates the rock and soil at the bottom of foundation 4. Chain blade 3 is composed of chain 3-1 and cutter 3-2 fixed on chain 3-1 for rock and soil excavation. Device 1 guides foundation 4 and/or device 2 to make foundation 4 in a straight state. During construction, device 2 is connected with the top of device 2 and foundation 4, and device 2-1 drives chain blade 3 to run along the track of foundation 4. Chain blade 3 excavates the rock and soil at the bottom of foundation 4, and transports the excavated rock and soil to the top. Device 2-2 separates the rock and soil transported from the bottom of foundation 4 by chain blade 3 from chain blade 3, and device 2 and foundation 4 descend synchronously.
Device 2-1 is composed of chain blade drive device 2-1-1, chain blade tension device 2-1-2, and chain wheel 2-1-3.
Frame 2-3 moves within guide 1-2.
Foundation 4 moves within guide 1-2.
Fixed frame 1-1 is a machinery/construction vehicle or machinery/construction ship.
Foundation 4 is slot-type foundation 4A. During construction, slot-type foundation 4A is equipped with chain excavating device 5A for excavating the rock and soil at the bottom of foundation 4A, that is, frame 2A-3 of device 2A is equipped with a device 2A-1.
The foundation is combined foundation 4B composed of several slot-type foundations 4A. Each slot-type foundation 4A is equipped with chain excavating device 5A that excavates the rock and soil at the bottom of respective foundation 4A only, that is, the frame of device 2B is equipped with several devices 2A-1.
Frame 2-3 in device 2 includes slurry pipeline device 6, and slurry pipeline 6-1 is connected with slurry nozzle 6-2 at the bottom of the foundation.
Fixed frame 1-1 is the construction platform of foundation 4, with a lifting device installed at the top.
The construction method can be divided into the following steps:
1) Pre-fabricate foundation 4 by sections or integrally at the factory;
2) Install and fix frame 1-1 on the spot;
3) Transport the first section (i.e. bottom section) of foundation 4-1 to the site, load it into fixed frame 1-1, and install chain blade 3;
4) Connect the bottom of frame 2-3 in device 2 with the top of the first section of foundation 4-1, connect chain blade 3 at the bottom of device 2 with the chain blade 3 at the top of the first section of foundation 4-1 to constitute chain excavating device 5, and connect slurry pipeline 6-1 at the bottom of device 2 with slurry pipeline 6-1 at the top of the first section of foundation 4-1;
5) Start device 2-1-1, so that device 2-1-1 drives chain blade 3 to move along the track of foundation 4-1, chain blade 3 excavates the rock and soil at the bottom of the first section of foundation 4-1 and transports the excavated rock and soil to the top, and device 2-2 separates the rock and soil transported by chain blade 3 from the bottom of foundation 4-1 from chain blade 3;
6) Device 2 and the first section of foundation 4-1 descend synchronously to the set position;
7) Separate and remove device 2 from the first section of foundation 4-1;
8) Load the second section of foundation 4-2 into frame 1-1;
9) Connect the bottom of the second section of foundation 4-2 with the top of the first section of foundation 4-1, connect chain blade 3 at the bottom of the second section of foundation 4-2 with chain blade 3 at the top of the first section of foundation 4-1, and connect slurry pipeline 6-1 at the bottom of the second section of foundation 4-2 with slurry pipeline 6-1 at the top of the first section of foundation 4-1;
10) Connect the bottom of frame 2-3 in device 2 with the top of the second section of foundation 4-2, connect chain blade 3 at the bottom of device 2 with chain blade 3 at the top of the second section of foundation 4-2 to constitute chain excavating device 4, and connect slurry pipeline 6-1 at the bottom of device 2 with slurry pipeline 6-1 at the top of the second section of foundation 4-2;
11) Start device 2-1-1, so that device 2-1-1 drives chain blade 3 to move along the track of foundation 4-1, chain blade 3 excavates the rock and soil at the bottom of the first section of foundation 4-1 and transports the excavated rock and soil to the top, and device 2-2 separates the rock and soil transported by chain blade 3 from the bottom of foundation 4-1 from chain blade 3;
12) Device 2, first section of foundation 4-1 and second section of foundation 4-2 descend synchronously to the set position;
13) Separate and remove device 2 from the second section of foundation 4-2;
Repeat the above steps 7), 8), 9), 10), 11), and 12) to complete the connection of each section of the foundation and descend to the set position, and then pull out chain blade 3 for concrete pouring.
The present invention is further described below in conjunction with the drawings attached:
As shown in
As shown in
As shown in
As shown in
As shown in
1) Pre-fabricate foundation 4B by blocks at the factory;
2) Install and fix frame 1-1 on the spot;
3) Transport the first section (i.e. bottom section) of foundation 4B-1 to the site, load it into fixed frame 1-1, and install chain blade 3;
4) Connect the bottom of frame 2B-3 in device 2B with the top of the first section of foundation 4B-1, connect chain blade 3 at the bottom of device 2B with the chain blade 3 at the top of the first section of foundation 4B-1 to constitute chain excavating device 5B, and connect slurry pipeline 6-1 at the bottom of device 2B with slurry pipeline 6-1 at the top of the first section of foundation 4B-1;
5) Start device 2-1-1, so that device 2-1-1 drives chain blade 3 to move along the track of foundation 4B-1, chain blade 3 excavates the rock and soil at the bottom of the first section of foundation 4B-1 and transports the excavated rock and soil to the top, and device 2B-2 separates the rock and soil transported by chain blade 3 from the bottom of foundation 4B-1 from chain blade 3;
6) Device 2B and the first section of foundation 4B-1 descend synchronously to the set position;
7) Separate and remove device 2B from the first section of foundation 4B-1;
8) Load the second section of foundation 4B-2 into frame 1-1;
9) Connect the bottom of the second section of foundation 4B-2 with the top of the first section of foundation 4B-1, connect chain blade 3 at the bottom of the second section of foundation 4B-2 with chain blade 3 at the top of the first section of foundation 4B-1, and connect slurry pipeline 6-1 at the bottom of the second section of foundation 4B-2 with slurry pipeline 6-1 at the top of the first section of foundation 4B-1;
10) Connect the bottom of frame 2-3 in device 2B with the top of the second section of foundation 4B-2, connect chain blade 3 at the bottom of device 2 with chain blade 3 at the top of the second section of foundation 4B-2 to constitute chain excavating device 5B, and connect slurry pipeline 6-1 at the bottom of device 2B with slurry pipeline 6-1 at the top of the second section of foundation 4B-2;
11) Start device 2-1-1, so that device 2-1-1 drives chain blade 3 to move along the track of foundation 4B, chain blade 3 excavates the rock and soil at the bottom of the first section of foundation 4B-1 and transports the excavated rock and soil to the top, and device 2B-2 separates the rock and soil transported by chain blade 3 from the bottom of foundation 4B from chain blade 3;
12) Device 2B, first section of foundation 4B-1, and second section of foundation 4B-2 descend synchronously to the set position;
13) Separate and remove device 2B from the second section of foundation 4B-2;
Repeat the above steps 7), 8), 9), 10), 11), and 12) to complete the connection of each section of the foundation and descend to the set position, and then pull out chain blade 3 for concrete pouring.