The present invention relates to: a building foundation structure including a ground improved body obtained by improving a surface layer ground, and foundation concrete placed on the ground improved body; and a construction method therefor.
There has been known a building foundation structure including a ground improved body obtained by improving a surface layer ground, and foundation concrete placed on the ground improved body (see, for example, Patent Literatures 1 and 2).
Such a building foundation structure has features that: construction cost is reduced with a simple structure; a support force of the entire foundation can be improved while differential settlement can be suppressed; and liquefaction of sediment at the time of an earthquake is effectively inhibited by a ground covering effect, for example.
In such a building foundation structure, generally, the shape of a lower surface of foundation concrete located below a building pillar is a square, and the shape of the foundation concrete is a rectangular parallelepiped (square prism) (see, for example, an engagement projection 7a in FIG. 5 of Patent Literature 1, and FIG. 1 of Patent Literature 2).
[PTL 1] Japanese Patent No. 3608568
[PTL 2] Japanese Patent No. 5494880
The present inventor has conducted thorough studies for further improvement in the building foundation structure having the above features, and has conceived of revising the shape of the lower surface of the foundation concrete located below the building pillar. Then, various studies for the shape have been conducted.
As a result, the shape that achieves both of reduction in stress transferred to a lower ground and reduction in construction cost by reducing the placing amount of the foundation concrete has been figured out, and further, a parameter study has been conducted, thus arriving at completion of the present invention.
An object to be achieved by the present invention is to, in a building foundation structure including a ground improved body obtained by improving a surface layer ground, and foundation concrete placed on the ground improved body, reduce stress transferred to a lower ground, and reduce construction cost by reducing the placing amount of the foundation concrete.
To achieve the above object, a building foundation structure according to the present invention includes a ground improved body obtained by improving a surface layer ground, and foundation concrete placed on the ground improved body. The foundation concrete located below a building pillar has a bottom surface having a four-or-more-sided polygonal shape smaller than a plan shape of the foundation concrete. The foundation concrete has a lower surface including the bottom surface, a part of the lower surface other than the bottom surface being a slope surface connecting the bottom surface and the plan shape. (claim 1).
Here, it is preferable that a slope angle of the slope surface from a horizontal plane is not less than 20° and not greater than 40° (claim 2).
According to the above building foundation structure, the bottom surface of the foundation concrete located below the building pillar is formed in a four-or-more-sided polygonal shape smaller than the plan shape of the foundation concrete, and a part of the lower surface of the foundation concrete other than the bottom surface is formed to be slope surfaces connecting the bottom surface of the foundation concrete and the plan shape of the foundation concrete, whereby the range in which stress is transferred from the foundation to the lower ground is broadened, and thus stress transferred to the lower ground can be reduced.
In addition, since the foundation concrete located below the building pillar has the shape mentioned above, the volume thereof becomes smaller as compared to the shape of conventional foundation concrete. Therefore, the placing amount of foundation concrete can be reduced, and thus construction cost can be reduced.
In particular, when the slope angle of the slope surface from the horizontal surface is set to be not less than 20° and not greater than 40°, the reduction rate of stress transferred to the lower ground and the reduction rate of the placing amount of the foundation concrete are increased.
To achieve the above object, a construction method for a building foundation structure according to the present invention is a construction method for a building foundation structure that includes a ground improved body obtained by improving a surface layer ground, and foundation concrete placed on the ground improved body, The construction method includes: a ground improvement step; a foundation excavation step; and a foundation placing step. The ground improvement step is a step of backfilling soil obtained by digging a surface layer ground down, mixing and stirring the soil while adding and mixing a solidification material, and then performing compaction to form the ground improved body. The foundation excavation step includes a step of excavating an upper part of the ground improved body located below an above-ground part of a building pillar, into a polygonal prism shape with a four-or-more-sided base, to form an upper excavated portion, and a step of excavating a part below the upper excavated portion, so as to form a bottom surface having a four-or-more-sided polygonal shape smaller than a plan shape of the upper excavated portion, and form a slope surface connecting the bottom surface and a lower end of the upper excavated portion, thus forming a lower excavated portion. The foundation placing step is a step of placing leveling concrete into the lower excavated portion, performing foundation reinforcing bar arrangement in the upper excavated portion and the lower excavated portion, and placing the foundation concrete.
Here, it is preferable that a slope angle of the slope surface from a horizontal plane is not less than 20° and not greater than 40°.
According to the above construction method for the building foundation structure, in the foundation excavation step, the ground improved body formed in the ground improvement step is excavated to form the upper excavated portion having a polygonal prism shape with a four-or-more-sided base, and form, below the upper excavated portion, the lower excavated portion that has a bottom surface having a four-or-more-sided polygonal shape smaller than the plan shape of the upper excavated portion, and a slope surface connecting the bottom surface and the lower end of the upper excavated portion. Thus, when the polygonal prism shape is a square prism shape, i.e., the plan shape is a square, and the shape of the bottom surface is a square, for example, the shape of the lower surface of the foundation concrete placed in the foundation placing step becomes a reverse quadrangular frustum.
Therefore, in the building foundation structure constructed by the above construction method, the range in which stress is transferred from the foundation concrete to the lower ground is broadened, and thus stress transferred to the lower ground can be reduced.
In addition, since the foundation concrete located below the building pillar has the above shape, the volume thereof becomes smaller as compared to the shape of conventional foundation concrete. Therefore, the placing amount of foundation concrete can be reduced, and thus construction cost can be reduced.
In particular, at the time of forming the lower excavated portion in the foundation excavation step, the slope angle of the slope surface from the horizontal surface is set to be not less than 20° and not greater than 40°. With this configuration, the reduction rate of stress transferred to the lower ground and the reduction rate of the placing amount of the foundation concrete are increased.
As described above, the building foundation structure and the construction method therefor according to the present invention can reduce stress transferred to the lower ground, and reduce construction cost by reducing the placing amount of the foundation concrete.
Hereinafter, embodiments according to the present invention will be described with reference to the drawings.
A building foundation structure 1 according to the present invention includes a ground improved body 2 obtained by improving a surface layer ground G, and foundation concrete 3 placed on the ground improved body 2.
A bottom surface BS1 of the foundation concrete 3 located below a building pillar 4 is formed in a four-or-more-sided polygonal shape smaller than the plan shape of the foundation concrete 3. A part of the lower surface of the foundation concrete 3 other than the bottom surface BS1 is formed to be slope surfaces connecting the bottom surface BS1 and the plan shape of the foundation concrete 3.
A plan view in
The building foundation structure 1 includes a ground improved body 2 obtained by improving a surface layer ground G, and foundation concrete 3 placed on the ground improved body 2.
The plan shape of the foundation concrete 3 is a square, and a bottom surface BS1 of the foundation concrete 3 is a square smaller than the plan shape of the foundation concrete 3.
A part of the lower surface of the foundation concrete 3 other than the bottom surface BS1 is formed to be slope surfaces S1 that connect the bottom surface BS1 and the plan shape of the foundation concrete 3 as shown in
The building foundation structure 1 according to the present embodiment is individual footing. However, continuous footing or mat foundation may be employed.
Next, an example of a construction process for the building foundation 1 will be described.
<Ground Improvement Step>
(Dig-Down Step)
The surface layer ground G below a ground level GL shown in
(Primary Improvement Step)
Next, a primary improvement step is performed as follows. A backhoe, for example, to which a mixing fork is mounted as an attachment, is used to perform excavation on the ground into a square shape which corresponds to the lower-part shape of the ground improved body 2. Then, mixing and stirring are performed while a solidification material such as a cement-based solidification material is added and mixed, and compaction is performed by a heavy machine and a roller, etc., to form the lower part of the ground improved body 2.
(Secondary Improvement Step)
Next, a secondary improvement step is performed as follows. The soil obtained by digging in the dig-down step is backfilled to the upper side of the lower part of the ground improved body 2 by a backhoe or the like. Then, a backhoe, for example, to which a mixing fork is mounted as an attachment, is used for excavating the surface layer ground G from the ground level GL into the upper-part shape of the ground improved body 2. Then, mixing and stirring are performed while a solidification material is added and mixed, and compaction is performed by a heavy machine and a roller, etc., to form the upper part of the ground improved body 2.
<Foundation Excavation Step>
(Upper excavated portion forming step)
Next, with respect to the ground improved body 2 formed in the ground improvement step, as shown in a plan view in
(Lower Excavated Portion Forming Step)
Next, a part below the upper excavated portion 2A is excavated into a reverse quadrangular frustum so that a bottom surface BS2 has a square shape, and thus a lower excavated portion 2B is formed.
For example, the lower excavated portion 2B is formed by performing excavation to a predetermined depth into a rectangular parallelepiped shape in a range of a transverse width B2 and a longitudinal width W2 shown in
<Foundation Placing Step>
Then, leveling concrete 6 shown in
Next, a pedestal anchor bolt for fixing the steel pillar 4 is fixed to the leveling concrete 6, foundation reinforcing bar arrangement is performed in the upper excavated portion 2A and the lower excavated portion 2B, and foundation concrete 3 is placed.
An upper part 3A (range of height H1 in
Next, the steel pillar 4 is installed and floor concrete 5 is placed.
Through the above process, construction of the building foundation (understructure) 1 shown in
<Confirmation of Effects Through Numerical Analysis>
Next, numerical analysis performed for confirming effects will be described.
(Analysis Method)
Numerical analysis is performed on an analysis model shown in the plan view in
Setting is made as follows: improvement width L=2.5 m, foundation height H=0.8 m, and foundation transverse width B1=foundation longitudinal width W1=3.0 m.
A load applied to the foundation 3 is set to 900 kN, and a distributed load w of 2,500 kN/m2 is applied to an area with a transverse-direction range a and a longitudinal-direction range b (a=b=0.6 m).
Evaluation items are principal stresses (kN/m2) at points A to C underneath the foundation concrete 3, a ground contact pressure (kN/m2) at a point D underneath the ground improved body 2, and a concrete amount (m3) which is the volume of the foundation concrete 3, as shown in
(Examples and Comparative Example)
Analysis is performed while a slope angle α of the slope surfaces S1, S2 (side surface of reverse truncated cone) from a horizontal plane is changed as α=0°, 10°, 20°, 30°, 40°, 45°. The case of α=0° is defined as Comparative example, and the cases of α=10°, 20°, 30°, 40°, 45° are defined as Examples 1 to 5, respectively.
An analysis model in the case of α=0° in Comparative example has a shape shown in a plan view in
(Parameters)
With respect to α=10°, 20°, 30°, 40°, 45°, the transverse width B2 of the foundation bottom surface, the longitudinal width W2 of the foundation bottom surface, the height H1 of the rectangular parallelepiped part, and the height H2 of the reverse quadrangular frustum part are set as shown in Table 1.
(Analysis Result)
Table 1 shows a result of analysis for the evaluation items.
From the graph in
The reason is considered as follows. In Examples, the shape of the lower surface of the foundation concrete 3 located below the building pillar 4 is a reverse quadrangular frustum. Therefore, the range in which stress is transferred from the foundation concrete 3 to the lower ground is broadened, and thus stress transferred to the lower ground can be reduced.
Then, it is found that the ground contact pressure underneath the improved body decreases as the slope angle α is increased, and the ground contact pressure underneath the improved body becomes further smaller in a range of 20°≤α≤40° and is minimized in the vicinity of α=30°.
For example, the ground contact pressure underneath the improved body in Example 3 (α=30°) is smaller by about 8% than the ground contact pressure underneath the improved body in Comparative example (α=0°).
In addition, from the graph in
The reason is as follows. In Examples, the shape of the lower surface of the foundation concrete 3 located below the building pillar 4 is a reverse quadrangular frustum. Therefore, the volume of the foundation concrete is smaller in Examples (
Then, it is found that the concrete amount decreases as the slope angle α is increased, and the concrete amount becomes further smaller in a range of 20°≤α≤40° and is minimized in the vicinity of α=30°.
For example, the concrete amount in Example 3 (α=30°) is smaller by about 42% than the concrete amount in Comparative example (α=0°).
From the above analysis result, it is found that setting the slope angle α of the slope surfaces S1, S2 (side surface of reverse truncated cone) from the horizontal plane in a range not less than 20° and not greater than 40° is preferable because the reduction rate of the stress transferred to the lower ground and the reduction rate of the placing amount of the foundation concrete are increased, and in particular, setting the slope angle α to about 30° is more preferable because the reduction rate of the stress transferred to the lower ground and the reduction rate of the placing amount of the foundation concrete are maximized.
Hereinafter, regarding modifications of the plan shape of the foundation concrete 3 and the shape of the bottom surface BS1 of the foundation concrete 3, these shapes and ground FEM analysis results will be described.
Foundation concrete 3 in a building foundation structure according to embodiment 2 of the present invention is shown in a perspective view in
The plan shape of the foundation concrete 3 and the shape of the bottom surface BS1 are regular octagons.
The shape of the upper part 3A of the foundation concrete 3 is a regular octagonal prism, and the shape of the lower surface of the foundation concrete 3 corresponding to the lower part 3B of the foundation concrete 3 is a reverse octagonal frustum.
Foundation concrete 3 in a building foundation structure according to embodiment 3 of the present invention is shown in a perspective view in
The plan shape of the foundation concrete 3 is a regular octagon, and the shape of the bottom surface BS1 is a square.
The shape of the upper part 3A of the foundation concrete 3 is a regular octagonal prism, and a part of the lower surface of the foundation concrete 3 other than the square-shaped bottom surface BS1 is formed to be slope surfaces connecting the lower end (regular-octagonal plan shape) of the upper part 3A of the foundation concrete 3 and the square-shaped bottom surface BS1.
Foundation concrete 3 in a building foundation structure according to embodiment 4 of the present invention is shown in a perspective view in
The plan shape of the foundation concrete 3 is a regular hexadecagon, and the shape of the bottom surface BS1 is a square.
The shape of the upper part 3A of the foundation concrete 3 is a regular hexadecagonal prism, and a part of the lower surface of the foundation concrete 3 other than the square-shaped bottom surface BS1 is formed to be slope surfaces connecting the lower end (regular-hexadecagonal plan shape) of the upper part 3A of the foundation concrete 3 and the square-shaped bottom surface BS1.
<Result of Ground FEM Analysis>
In embodiments 2 to 4, numerical analysis was performed using ground FEM analysis software, regarding analysis models similar to the analysis model shown in the plan view in
Embodiments 2 to 4 are defined as Examples 6 to 8, and these Examples, in which the slope angle α of the slope surfaces S1, S2 from the horizontal surface is set as α=30°, are shown in Table 2, together with Comparative example and Example 3.
As in Table 1, evaluation items are principal stresses (kN/m2) at the points A to C underneath the foundation concrete 3, a ground contact pressure (kN/m2) at the point D underneath the ground improved body 2, and a concrete amount (m3) which is the volume of the foundation concrete 3, as shown in
From Table 2, it is found that the ground contact pressures underneath the improved bodies in embodiments 2 to 4 (Examples 6 to 8) are smaller by about 6 to 7% than the ground contact pressure underneath the improved body in Comparative example (α=0°).
In addition, it is found that the concrete amounts in embodiments 2 to 4 (Examples 6 to 8) are smaller by about 36 to 39% than the concrete amount in Comparative example (α=) 0°.
As described above, the bottom surface BS1 of the foundation concrete 3 located below the building pillar 4 is formed in a four-or-more-sided polygonal shape smaller than the plan shape of the foundation concrete 3, and a part of the lower surface of the foundation concrete 3 other than the bottom surface BS1 is formed to be slope surfaces connecting the bottom surface BS1 of the foundation concrete 3 and the plan shape of the foundation concrete 3, whereby the stress from the foundation is transferred to the lower ground in its broader range, and thus stress transferred to the lower ground can be reduced.
In addition, since the foundation concrete 3 located below the building pillar 4 has the above shape, the volume thereof becomes smaller as compared to the shape of conventional foundation concrete 3 as shown in
The description of the above embodiments is in all aspects illustrative and not restrictive. Various improvements and modifications can be made without departing from the scope of the present invention.
Number | Date | Country | Kind |
---|---|---|---|
JP2017-130847 | Jul 2017 | JP | national |
JP2018-034971 | Feb 2018 | JP | national |
Filing Document | Filing Date | Country | Kind |
---|---|---|---|
PCT/JP2018/015895 | 4/17/2018 | WO | 00 |
Publishing Document | Publishing Date | Country | Kind |
---|---|---|---|
WO2019/008866 | 1/10/2019 | WO | A |
Number | Name | Date | Kind |
---|---|---|---|
783901 | Sheldon | Feb 1905 | A |
1006309 | Spickerman | Oct 1911 | A |
1690259 | Strauss | Nov 1928 | A |
1805311 | Hill | May 1931 | A |
2446949 | Neutra | Aug 1948 | A |
2682750 | Lorenz | Jul 1954 | A |
3099911 | Turzillo | Aug 1963 | A |
RE25614 | Turzillo | Jul 1964 | E |
3269126 | Freeman, Jr. | Aug 1966 | A |
3921354 | Connelly | Nov 1975 | A |
4000622 | Chiaves | Jan 1977 | A |
4037384 | Molyneux | Jul 1977 | A |
4043909 | Endo | Aug 1977 | A |
4079930 | Schiron | Mar 1978 | A |
4134707 | Ewers | Jan 1979 | A |
4241543 | Foscarini | Dec 1980 | A |
4275538 | Bounds | Jun 1981 | A |
4591466 | Murray | May 1986 | A |
4714226 | Tracy | Dec 1987 | A |
4767241 | Wells | Aug 1988 | A |
4832533 | Ringesten | May 1989 | A |
4832535 | Crambes | May 1989 | A |
4843785 | Sero | Jul 1989 | A |
4911585 | Vidal | Mar 1990 | A |
5085276 | Rivas | Feb 1992 | A |
5689927 | Knight, Sr. | Nov 1997 | A |
6032421 | Yamada | Mar 2000 | A |
6702522 | Silber | Mar 2004 | B2 |
6910832 | Gagliano | Jun 2005 | B2 |
7497053 | Nicolet | Mar 2009 | B2 |
7556453 | Collina | Jul 2009 | B2 |
7661907 | Armstrong | Feb 2010 | B2 |
7841143 | Jensen | Nov 2010 | B2 |
8291668 | Iske | Oct 2012 | B2 |
8549799 | Tate | Oct 2013 | B2 |
8596924 | Shimada | Dec 2013 | B2 |
8677700 | Fairbairn | Mar 2014 | B2 |
8966837 | Knudsen | Mar 2015 | B2 |
9096985 | Phuly | Aug 2015 | B1 |
9133637 | O'Brien | Sep 2015 | B1 |
9228313 | Magi | Jan 2016 | B2 |
9267258 | Knapp | Feb 2016 | B2 |
9340991 | Yandell | May 2016 | B2 |
9347197 | Phuly | May 2016 | B2 |
9428926 | Kramer | Aug 2016 | B2 |
9546465 | Song | Jan 2017 | B2 |
9567723 | White | Feb 2017 | B2 |
9611615 | Davis | Apr 2017 | B2 |
9777456 | Spiro | Oct 2017 | B1 |
10344440 | Surjaatmadja | Jul 2019 | B2 |
10358838 | Dominguez | Jul 2019 | B2 |
10407859 | Elfass | Sep 2019 | B2 |
10633818 | Spiro | Apr 2020 | B2 |
10655353 | Carless | May 2020 | B2 |
10822765 | Serna Garcia-Conde | Nov 2020 | B2 |
20070181767 | Wobben | Aug 2007 | A1 |
20090013625 | Tourneur | Jan 2009 | A1 |
20130000236 | Gallardo Hernandez | Jan 2013 | A1 |
20150121784 | Abad Huber | May 2015 | A1 |
20170002535 | Surjaatmadja | Jan 2017 | A1 |
20180209113 | Birtele | Jul 2018 | A1 |
Number | Date | Country |
---|---|---|
4005032 | Aug 1991 | DE |
0115553 | May 1987 | EP |
217541 | Aug 1924 | GB |
796959 | Jun 1958 | GB |
60203729 | Oct 1985 | JP |
2003278173 | Oct 2003 | JP |
3608568 | Jan 2005 | JP |
5494880 | May 2014 | JP |
2014145176 | Aug 2014 | JP |
WO-2013058596 | Apr 2013 | WO |
Entry |
---|
International Search Report dated May 22, 2018 from corresponding PCT Application No. PCT/JP2018/015895. |
Number | Date | Country | |
---|---|---|---|
20200141082 A1 | May 2020 | US |