The present invention relates to a method and associated system for monitoring a frequency signal and performing a charging management method based on a value of the frequency signal.
Monitoring and managing various power consumption devices typically comprises an inaccurate process with little flexibility. Power systems providing power for power consumption devices typically provide the power without the ability to enable any changes. Providing power without the ability to enable any changes limits any flexibility to account for changes within the power systems.
The present invention provides a charging method comprising: detecting, by a computer processor of a computing apparatus, a frequency signal associated with an input voltage signal used for powering power consumption devices at a first specified location; monitoring, by said computer processor, said frequency signal; generating, by said computer processor, frequency level data associated with said monitoring; receiving, by said computer processor from a first user, a request to enable a charging process for charging a rechargeable power source; receiving, by said computer processor, first power source data associated with said rechargeable power source and said first user; and enabling, by said computer processor based on said frequency level data and/or said first power source data, a first customized charging process associated with said charging said rechargeable power source.
The present invention provides a computing system comprising a computer processor coupled to a computer-readable memory unit, said memory unit comprising instructions that when enabled by the computer processor implements a charging method comprising: detecting, by said computer processor, a frequency signal associated with an input voltage signal used for powering power consumption devices at a first specified location; monitoring, by said computer processor, said frequency signal; generating, by said computer processor, frequency level data associated with said monitoring; receiving, by said computer processor from a first user, a request to enable a charging process for charging a rechargeable power source; receiving, by said computer processor, first power source data associated with said rechargeable power source and said first user; and enabling, by said computer processor based on said frequency level data and/or said first power source data, a first customized charging process associated with said charging said rechargeable power source.
The present invention advantageously provides a simple method and associated system capable of monitoring and managing various power consumption devices.
A power provider (a utility company) must provide power generation to match a combined electric load demand of all users on the power grid (e.g., users charging automotive batteries for electric vehicles) such that a power frequency signal maintains a level that is as close as possible to a target frequency (e.g., 60 hz). The power provider will use a combination of short-term and long-term bulk power generation systems to match the power demand. Devices such as plug-in hybrid electric vehicles (PHEVs) and electric vehicles (EVs) are required to be recharged and require very high amounts of energy to recharge over relatively short periods. An electrical vehicle plugged into a standard US electrical outlet (i.e., through a charging device) may consume an average of 1.5 kilowatts. Therefore, a 14-20 kilowatt-hour battery pack (40-90 mi) may take over 10 hours to charge. Larger capacity and higher rate chargers plugged into higher capacity receptacles place a greater load on the grid for a shorter period of time, thereby further increasing electric grid load instability. Many electric vehicles may have 150-200 mi battery packs and require even more energy. As these types of rechargeable devices are connected to the grid, a fluctuation of electric demand increases significantly and causes the power provider to compensate with more expensive short-term demand based generation which in turn increases energy costs. Therefore, system 2 is enabled to monitor the frequency signal and perform customized charging process associated with charging rechargeable power sources based on a monitored value of the frequency signal and/or additional data.
System 2 comprises a computing system 8a and a computing system 8b connected to a utility(s) 5 through a power transmission grid 7. Computing system 8a is additionally connected to charging devices 11a . . . 11n and charging devices 11a . . . 11n are connected to rechargeable power sources 14a . . . 14n. Computing system 8b is additionally connected to charging devices 12a . . . 12n and charging devices 12a . . . 12n are connected to rechargeable power sources 15a . . . 15n. Charging devices 11a . . . 11n and 12a . . . 12n may comprise any type of charging device used to charge rechargeable power sources (e.g., batteries), including, inter alia, a battery charger. Rechargeable power sources 14a . . . 14n and 15a . . . 15n may comprise a single rechargeable power source or a plurality of rechargeable power sources (located within and/or associated with powering a single device or located within and/or associated with powering a plurality of different devices). Rechargeable power sources 14a . . . 14n and 15a . . . 15n may comprise any type of rechargeable battery including, inter alia, lead acid, nickel cadmium, nickel metal hydride, lithium ion, lithium ion polymer, nanowire, etc. Computing system 8a, charging devices 11a . . . 11n, and rechargeable power sources 14a . . . 14n are located within a specified location 18a. Computing system 8b, charging devices 12a . . . 12n, and rechargeable power sources 15a . . . 15n are located within a specified location 18b. Specified location 18a and/or 18b may comprise a house and surrounding property, a building (associated with a business) and surrounding property, etc. Alternatively, specified location 18a and/or 18b may each comprise a vehicle such as, inter alia, an automobile, a boat, an aircraft, etc. Electrical power (i.e., for powering computing system 8a and 8b and charging devices 11a . . . 11n and 12a . . . 12n) may be retrieved via a power grid (e.g., power transmission grid 7). Utility(s) 5 may comprise any type of electrical power supplier(s) that produces and/or distributes electrical power (i.e., across power transmission grid 7). Utility(s) 5 may produce and/or distribute any type of electrical power including, inter alia, fossil fuel generated power, steam generated power, hydro generated power, solar generated power, wind generated power, fuel cell generated power, etc. Computing systems 8a and 8b may each comprise a memory system. The memory system may comprise a single memory system. Alternatively, the memory system may comprise a plurality of memory systems. The memory system may be internal to computing systems 8a and 8b or external to computing systems 8a and 8b. Computing system 8a and 8b may each comprise a software application (e.g., a charge management system (CMS)) for controlling functionality. Computing system 8a comprises a system for monitoring a power grid (e.g., associated with power generated by utility(s) 5) frequency (e.g., 60 Hertz (Hz)) and enabling a customized charging process associated with enabling charging devices 11a . . . 11n to charge rechargeable power sources 14a . . . 14n based on a value of a monitored frequency and additional data (e.g., data associated with the operation of charging devices 12a . . . 12n). Computing system 8b comprises a system for monitoring a power grid (e.g., associated with power generated by utility(s) 5) frequency (e.g., 60 Hertz (Hz)) and enabling a customized charging process associated with enabling charging devices 12a . . . 12n to charge rechargeable power sources 15a . . . 15n based on a value of a monitored frequency and additional data (e.g., data associated with the operation of charging devices 11a . . . 11n). Although system 2 is described with respect to monitoring a nominal frequency of 60 Hz (i.e., associated with power generated by utility(s) 5 and used in power generation in the United States), note that system 2 may be used to monitor any nominal frequency value. For example, system 2 may be used to monitor a nominal frequency value of 50 Hz (i.e., used in Europe, Africa, Asia, Australia, etc).
System 2 is configured to enable several independent methods to determine when to charge rechargeable power sources 14a . . . 14n and 15a . . . 15n (e.g., within battery operated devices) and how quickly rechargeable power sources 14a . . . 14n and 15a . . . 15n should be charged. Note that although system 2 is described with respect to charging or recharging an electric and/or electric hybrid vehicle system 2 may be configured to charge and recharge any battery-operated device such as, inter alia, rechargeable scooters, consumer electronics, uninterruptible power supply (UPS) battery backup systems, etc. Each of computing systems 8a and 8b comprises a CMS (e.g., a software application) that is aware of when an electric vehicle (i.e., rechargeable power sources 14a . . . 14n and 15a . . . 15n via charging devices 11a . . . 11n and 12a . . . 12n) is plugged in to power transmission grid 7 in order to charge the batteries. The CMS could reside within the vehicle itself or at an electric outlet to which the vehicle is plugged into. The CMS may evaluate information including, inter alia, a time of day, a vehicle and vehicle owner(s), an amount of load required to charge the vehicle to its peak capacity, and known or anticipated future events that indicate when and how long the vehicle will be needed in the near future. Additionally, the CMS is aware of a current frequency signal level associated with power transmission grid 7. Therefore, the CMS may use the current frequency signal level and the aforementioned information to enable charging devices 11a . . . 11n and 12a . . . 12n to intelligently charge the vehicle(s) so that it is fully charged when needed and will reduce short term generation demand thereby increasing generation efficiency at a power provider's plant and ultimately reducing electric generation costs.
Each CMS may enable several different methods for intelligently charging rechargeable power sources 14a . . . 14n and 15a . . . 15n via charging devices 11a . . . 11n and 12a . . . 12n. For example, each CMS may enable a method to trickle charge a vehicle over the next X hours or employ a fast charge causing more electric load for that same time period. Alternatively, each CMS may enable a method to postpone charging altogether based on variable electric rates. Additionally, each CMS may change a charge rate and/or start and stop times based on an owner's electronic calendar information. Alternatively, any combination of the aforementioned methods may be used. For example, a charging method may be enabled based on a current electric load, a current electric cost, and a next anticipated run time.
The following methods (described in detail, infra) for intelligently charging an electric vehicle (e.g., comprising rechargeable power sources 14a . . . 14n and 15a . . . 15n) via a charging device (e.g., charging devices 11a . . . 11n and 12a . . . 12n) may be enabled by system 2 (i.e., comprising a CMS) of
A CMS may comprise a computer program product which resides at a residence or business. The CMS is capable of controlling one or more electrical outlets and determining how much of a load it allows a downstream device to create. The CMS may be a filter of sorts that changes an amount of amps drawn from power transmission grid 7. The CMS may be optionally connected to a grid management system (GMS). The CMS may implement a gradual acceleration method of 3 stage method of charging an electric vehicle via a charging device.
Gradual Acceleration Method
In all methods for intelligently charging rechargeable power sources 14a . . . 14n and 15a . . . 15n via charging devices 11a . . . 11n and 12a . . . 12n, system 2 may enable gradually increasing a load on power transmission grid 7 (i.e., rather than instantly drawing a full load) as instantly drawing a full load may cause the frequency signal of the grid to drop requiring a power company to fall back to demand (short-term) generation which may be costly. Since bulk generation may require about an hour to come on line system 2 may create a gradual acceleration of energy demand that ramps up to its full potential in a time period greater than an hour.
3 Stage Charging Method
Chargers (e.g., charging devices 11a . . . 11n and 12a . . . 12n) may be enabled to operate in a variety of stages such as, inter alia, a 3 stage: bulk, acceptance, or absorb and float stage. During a bulk stage, a charging current is held at a constant and high value (level) until a voltage of a rechargeable power source (e.g., rechargeable power sources 14a . . . 14n and 15a . . . 15n) reaches a certain predefined level. The bulk stage is used to rapidly raise a state of charge (SOC) from a low discharged level to a near 100% charged level. As the SOC approaches 100%, a lower amount of current is required to hold the rechargeable power source at this predefined voltage. During an acceptance or absorb and float stage, a fixed and higher voltage level is used with a current level declining over time. This voltage level insures that chemical processes needed to recharge the battery occur to completion. The acceptance stage is disconnected at a predetermined ending current level (i.e., a current needed to hold the voltage will decline as the SOC increases) or a predefined period of time. After completion of the acceptance stage, the battery (e.g., any of rechargeable power sources 14a . . . 14n and 15a . . . 15n) is placed on a float or trickle charge to maintain the battery at 100% SOC. The CMS will interact with a charging device (e.g., any of charging devices 11a . . . 11n and 12a . . . 12n) by intelligently understanding the implications of stopping a charging process at each phase of operation and state of charge. A charging device operating in a float stage may terminate the float charge level for many hours, if necessary, due to a low grid power condition (e.g., associated with power transmission grid 7), without significantly reducing a functionality of a vehicle due to low battery SOC. A charging device operating in the bulk stage may be capable of contributing a greater reduction in demand, thereby enabling a greater demand response. However, disabling a bulk stage for lower values of a SOC, will greatly affect the ability of a vehicle to be used by a user due to a smaller amount of energy available from the battery. Likewise, for higher values of a SOC, the charging device may be capable of contributing a greater reduction in power demand, thereby increasing demand responses with less impact to the vehicle's usability. Therefore, the SOC and charge stage will be used to determine the extent of the response (e.g., lower SOC values accept shorter curtailments in charging and higher SOC values accept longer periods of curtailment).
Grid Management System (GMS)
The GMS comprises a computer program product and a centralized database. The GMS may be maintained by a power company (e.g., utility(s) 5). The GMS comprises the capability to coordinate between and send instructions to CMS units.
Independent Load-side Charging Method
During an independent load-side charging method, a CMS charges a vehicle based solely on a frequency level of the power transmission grid. As a frequency level of the power transmission grid falls below 60 Hz, the CMS reduces the electric load by decreasing the amount of current used to charge an electric vehicle. As the frequency level falls further below the power transmission grid target frequency level (60 Hz), additional electric load is reduced. Likewise, as the frequency level increases above the power transmission grid target frequency level (60 Hz), additional electric load is increased. The following implementation example 1 illustrates this feature.
Example 1
Sally returns to her home late in the evening and has no future plans for that day so she parks her electric vehicle and plugs it in to the power transmission grid (e.g., via one of charging devices 11a . . . 11n or 12a . . . 12n). The CMS enables a method for charging the vehicle at variable rates based on the current frequency level of the power transmission grid. Once the electric vehicle has a full charge, the CMS enables a method for providing a trickle charge to keep the batteries topped off.
Cooperative Load-side Charging Method
During a cooperative load-side charging method, the CMS(s) is aware of additional electric vehicles connected to the power transmission grid and attempts to distribute collective charge cycles of all the electric vehicles. For example, if 10 additional electric vehicles are connected to the power transmission grid then the CMS will determine an aggregate load to charge all 10 electric vehicles and enable charging only a percentage of the total and cycle through each subset until all are charged. The cooperative load-side charging method may be combined with the known future events load-side charging method as described, infra. Additional strategies may be implemented to evenly distribute a load across the power transmission grid including reducing each CMS load equally so that all 10 electric vehicles complete their charge by a target time frame. The following implementation example 2 illustrates this feature.
Example 2
Sally returns to her home late in the evening and has no future plans for that day so she parks her electric car and plugs it in to the power transmission grid (e.g., via one of charging devices 11a . . . 11n or 12a . . . 12n). The CMS sends a connected device status to a GMS which queries a central data warehouse to determine that Sally's vehicle is a 10th electric vehicle connected to the power transmission grid. The GMS determines that it can best distribute a load by charging only 2 electric vehicles at a time. Sally's CMS then enable charging her vehicle for 20 minutes, then goes off-line for 1 hour and 20 minutes at which time her CMS begins charging her electric vehicle for another 20 minutes. This cycle continues until all 10 vehicles are charged or until new vehicles are added or removed from the power transmission grid.
Off-peak Load-side Charging Method
During an off-peak load-side charging method, the CMS either comprises programmed variable charge rates or queries a GMS for a current rate table comprising charge rates. Charge rates comprise rates that a power company charges for power consumption. The rates are variable according to a time of day. Some power companies charge different rates at different times of day or days of the week. Therefore, it is beneficial to charge an electric vehicle during a time of day that is least expensive. In this situation, the CMS understands when the electric vehicle was connected, when the electric vehicle would likely be used next, and when the electric vehicle should begin charging in order to achieve a lowest recharge cost for the electric vehicle. The following implementation example 3 illustrates this feature.
Example 3
Sally returns to her home at 7 pm and has no future plans for that day so she parks her electric car and plugs it in to the power transmission grid (e.g., via one of charging devices 11a . . . 11n or 12a . . . 12n). The CMS queries a current rate table comprising charge rates and her calendar and determines that she will not need the vehicle until 7:30 am the following morning. Additionally, the CMS understands that the cost per kilowatt is 20% cheaper after 10:00 pm and that it is capable of fully charging the electric vehicle battery pack if it delays the start time until 10:00 pm. Sally's vehicle begins a gradual charging cycle starting at 10 pm and ramps up in energy usage by 11 pm where it is drawing a full load on that circuit for a stage 1 charge to the electric vehicle.
Known Future Events Load-side Charging Method
During a known future events load-side charging method, the CMS has access to the electric vehicle owner's electronic calendar and may query the electronic calendar to determine when the next usage of the vehicle is required. The electronic calendar may comprise a location field associated with a calendar event used to determine if the electric vehicle would be in use. A calendar entry may indicate, inter alia, a vacation day, an appointment across town, a remote teleconference, etc. Additional location information may be used including, inter alia, vehicle GPS information, historical information retrieved from data stored in a log, etc. Once the CMS has the next known location with an associated time, it may use that as a constraint within one of the alternative methods described herein. This location information allows the CMS to make more informed decisions as to when and how much load to generate on the grid for recharging the electric vehicle. The following implementation example 4 illustrates this feature.
Example 4
Sally returns to her home at 5:30 pm and has no future plans for that day so she parks her electric car and plugs it in to the power transmission grid (e.g., via one of charging devices 11a . . . 11n or 12a . . . 12n). The CMS reads her calendar and determines that she is not going to work at 7:30 am the following day (i.e., as she usually does) because she has an appointment with a doctor at 10:30 am. Additionally, the CMS queries the power company costs and determines that they are anticipating a high load the next day because of forecasted higher than average temperatures. The CMS additionally monitors the power transmission grid frequency level and determines that it should begin charging Sally's electric vehicle at 10:30 pm with a 1 hour gradual load increase so that by 11:30 pm the electric vehicle is drawing an 80% capacity load which it will maintain until 8:00 am. At 8:00 am, the CMS will drop to a 3rd stage trickle charge until 10:00 am when the electric vehicle will be completely charged and ready to go. The CMS avoids the more expensive power costs charged between 5:30 pm and 10:00 pm and distributed a charging cycle over a 12 hour period which helped reduce short-term demand generation at the power plant. Finally, the CMS also varied the charging load every few minutes to help counter frequency changes on the grid.
Consumer Load Historical Usage
During a consumer load historical usage method, the CMS has access to a day of week and time of day information, as well as a historical load profile of a residence. As the CMS is able to increase the charger rate in response to frequency excursions above 60 Hz, the CMS notes that the vehicle owner will have a low period of residential usage during a certain time period. The following implementation example 5 illustrates this feature.
Example 5
Sally returns to her home at 7 pm and has no future plans for that day so she parks her electric car in plugs it in to the power transmission grid (e.g., via one of charging devices 11a . . . 11n or 12a . . . 12n). The CMS queries a historical load profile data for the residence and notes that a time period between 1 am and 6 am comprises a very low period of electric consumption. Based on this information, the CMS enables a grid over-frequency mode between those times, thereby allowing for an increase of a charging rate in response to a grid frequency greater than 60 Hz. The CMS computes the charger rates required to fully charge the vehicle by 6 am and begins a 3 phase charge cycle. At 2:30 am, the CMS detects that the line frequency has risen to 60.05 Hz. The charger is operating in bulk stage and has additional current capacity. The CMS increases the rate of charge by 25% for the duration of the grid over-frequency event. At 3 am when the grid frequency falls within normal bounds, the CMS reduces the rate of charge to its previous value. It recalculates the remaining charge and completes charging the vehicle sooner than originally planned.
Still yet, any of the components of the present invention could be created, integrated, hosted, maintained, deployed, managed, serviced, etc. by a service supplier who offers to monitor a frequency signal associated with a supply voltage retrieved from a power grid and enable a customized charging process associated with charging rechargeable power sources. Thus the present invention discloses a process for deploying, creating, integrating, hosting, maintaining, and/or integrating computing infrastructure, comprising integrating computer-readable code into the computer system 90, wherein the code in combination with the computer system 90 is capable of performing a method for monitoring a frequency signal associated with a supply voltage retrieved from a power grid and enabling a customized charging process associated with charging rechargeable power sources. In another embodiment, the invention provides a business method that performs the process steps of the invention on a subscription, advertising, and/or fee basis. That is, a service supplier, such as a Solution Integrator, could offer monitor a frequency signal associated with a supply voltage retrieved from a power grid and enable a customized charging process associated with charging rechargeable power sources. In this case, the service supplier can create, maintain, support, etc. a computer infrastructure that performs the process steps of the invention for one or more customers. In return, the service supplier can receive payment from the customer(s) under a subscription and/or fee agreement and/or the service supplier can receive payment from the sale of advertising content to one or more third parties.
While
While embodiments of the present invention have been described herein for purposes of illustration, many modifications and changes will become apparent to those skilled in the art. Accordingly, the appended claims are intended to encompass all such modifications and changes as fall within the true spirit and scope of this invention.
This application is a continuation application claiming priority to Ser. No. 13/938,383 filed Jul. 10, 2013 , now U.S. Pat. No. 9,263,904 issued Feb. 16, 2016, which is a divisional application claiming priority to Ser. No. 12/623,483 filed Nov. 23, 2009 now U.S. Pat. No. 8,505,185 issued Aug. 13, 2013.
Number | Name | Date | Kind |
---|---|---|---|
5514946 | Lin et al. | May 1996 | A |
5566340 | Stewart et al. | Oct 1996 | A |
6963186 | Hobbs | Nov 2005 | B2 |
7747739 | Bridges et al. | Jun 2010 | B2 |
8125194 | Nethken | Feb 2012 | B2 |
8183826 | Tuffner et al. | May 2012 | B2 |
8258746 | Kirchner | Sep 2012 | B2 |
8508185 | Basham et al. | Aug 2013 | B2 |
9263904 | Basham | Feb 2016 | B2 |
20040095113 | Kernahan et al. | May 2004 | A1 |
20040117330 | Ehlers | Jun 2004 | A1 |
20040254688 | Chassin et al. | Dec 2004 | A1 |
20080067974 | Zhang et al. | Mar 2008 | A1 |
20080180058 | Patel et al. | Jul 2008 | A1 |
20080203973 | Gale et al. | Aug 2008 | A1 |
20080218121 | Gale et al. | Sep 2008 | A1 |
20100156348 | Kirchner | Jun 2010 | A1 |
20100289451 | Tuffner et al. | Nov 2010 | A1 |
20110012563 | Paryani et al. | Jan 2011 | A1 |
20110121791 | Basham et al. | May 2011 | A1 |
Entry |
---|
Office Action (Mail Date Jan. 31, 2013) for U.S. Appl. No. 12/623,483, filed Nov. 23, 2009. |
Amendment filed Mar. 19, 2013 in response to Office Action (Mail Date Jan. 31, 2013) for U.S. Appl. No. 12/623,483, filed Nov. 23, 2009. |
Notice of Allowance (Mail Date Apr. 11, 2013) for U.S. Appl. No. 12/623,483, filed Nov. 23, 2009. |
Ex Parte Quayle Action (Mail Date Jul. 30, 2015) for U.S. Appl. No. 13/938,383, filed Date Jul. 10, 2013. |
Response filed Sep. 29, 2015 to Ex Parte Quayle Action (Mail Date Jul. 30, 2015) for U.S. Appl. No. 13/938,383, filed Date Jul. 10, 2013. |
Notice of Allowance (mail Date Oct. 20, 2015) for U.S. Appl. No. 13/938,383, filed Jul. 10, 2013. |
Number | Date | Country | |
---|---|---|---|
20160126763 A1 | May 2016 | US |
Number | Date | Country | |
---|---|---|---|
Parent | 12623483 | Nov 2009 | US |
Child | 13938383 | US |
Number | Date | Country | |
---|---|---|---|
Parent | 13938383 | Jul 2013 | US |
Child | 14996300 | US |