Claims
- 1. A fuel management method for a dual-phase nuclear reactor, said method comprising:
- installing a fuel assembly having first and second axial ends so that said first axial end is above said second axial end;
- operating said reactor a first time;
- shutting down said reactor;
- reinstalling said fuel assembly so that its second axial end is above said first axial end;
- operating said reactor a second time;
- shutting down said reactor;
- reinstalling said fuel assembly with said first axial end above said second axial end; and
- operating said reactor a third time.
- 2. A method as recited in claim 1 further comprising additional steps following said step of operating said reactor a third time, said additional steps comprising:
- shutting down said reactor; and
- disposing of said fuel assembly so that said fuel assembly is installed exactly three times in said reactor.
Parent Case Info
This is a continuation-in-part of pending U.S. patent application Ser. No. 07/553,073, filed Jul. 10, 1990.
US Referenced Citations (3)
Number |
Name |
Date |
Kind |
4631166 |
Camden |
Dec 1986 |
|
4655995 |
Freeman et al. |
Apr 1987 |
|
4767595 |
Wolters et al. |
Aug 1988 |
|
Continuation in Parts (1)
|
Number |
Date |
Country |
Parent |
553073 |
Jul 1990 |
|