Claims
- 1. In a fuel cell system stack of H.sub.2 -O.sub.2 PEM fuel cells each comprising a proton exchange membrane having an anode and a cathode affixed to opposing first and second surfaces respectively, a hydrogen flow field adjacent said anode electrode for flowing hydrogen into contact with said anode, and oxygen flow field adjacent said cathode for flowing an oxygen-bearing gas into contact with said cathode, a hydrogen supply manifold for supplying hydrogen to said hydrogen flow field, an oxygen supply manifold for supplying said oxygen-bearing gas to said oxygen flow field, a hydrogen exhaust gas manifold for receiving hydrogen from said hydrogen flow field, and an oxygen exhaust gas manifold for receiving oxygen-bearing gas from said oxygen flow field, the improvement comprising a flooding detector comprising first pressure sensor means communicating with said oxygen supply and exhaust manifolds for determining a first pressure drop between said oxygen supply and exhaust manifolds and a system controller responsive to said first pressure drop for alerting the stack's operator and/or initiating corrective measures if said first pressure drop exceeds a first predetermined threshold level of unacceptability indicative of water accumulating within the stack and blocking said oxygen flow field.
- 2. A fuel cell stack according to claim 1 further comprising second pressure sensor means communicating with said hydrogen supply and exhaust manifolds for determining a second pressure drop between said hydrogen supply and exhaust manifolds and a system controller responsive to said second pressure drop for alerting the stack's operator and/or initiating corrective measures if said second pressure drop exceeds a second predetermined threshold level of unacceptability indicative of water accumulating within the stack and locking said hydrogen flow field.
- 3. A method for monitoring a stack of H.sub.2 -O.sub.2 PEM fuel cells for flooding and alerting the stack's operator and/or triggering corrective action when flooding occurs, said stack comprising a plurality of H.sub.2 -O.sub.2 PEM fuel cells each comprising a proton exchange membrane having an anode and a cathode affixed to opposing first and second surfaces respectively, a hydrogen flow field adjacent said anode electrode for flowing humidified hydrogen into contact with said anode, and oxygen flow field adjacent said cathode for flowing a humidified, oxygen-bearing gas into contact with said cathode, a hydrogen supply manifold for supplying humidified hydrogen to said hydrogen flow field, an oxygen supply manifold for supplying humidified, oxygen-bearing gas to said oxygen flow field, a hydrogen exhaust gas manifold for receiving hydrogen from said hydrogen flow field, and an oxygen exhaust gas manifold for receiving oxygen-bearing gas from said oxygen flow field, comprising the steps of:
- a. determining the pressure drop .DELTA.P.sub.o, between said oxygen supply and exhaust manifolds at a particular electrical discharge rate of said stack;
- b. from an unflooded, reference fuel cell stack having oxygen flow fields substantially identical to the oxygen flow fields of the stack being monitored, determining a plurality of oxygen reference pressure drops, .DELTA.P.sub.R, at various electrical discharge rates;
- c. from the reference pressure drops determined from step "b", setting a predetermined threshold of unacceptable oxygen pressure drop for various electrical discharge rates of the stack;
- d. comparing the .DELTA.P.sub.o determined in step "a" to the oxygen reference pressure drop .DELTA.P.sub.R determined in step "b" at the same discharge rate as the stack being monitored;
- e. outputting a first signal from step "d" when .DELTA.P.sub.o is equal to or exceeds said predetermined threshold of unacceptable oxygen pressure drop; and
- f. in response to said first signal, initiating corrective measures to reduce flooding of said oxygen flow fields.
- 4. A method according to claim 3 including the step of increasing the mass flow rate of said oxygen-bearing gas to reduce said flooding.
- 5. A method according to claim 3 including the step of reducing the absolute pressure of the oxygen-bearing gas to reduce said flooding.
- 6. A method according to claim 3 including the step of substantially dehumidifying the oxygen-bearing gas to reduce said flooding.
- 7. A method according to claim 3 including:
- g. determining the pressure drop, .DELTA.P.sub.h, between said hydrogen supply and exhaust manifolds at a particular electrical discharge rate of said stack;
- h. from an unflooded, reference fuel cell stack having hydrogen flow fields substantially identical to the hydrogen flow fields of the stack being monitored, determining a plurality of hydrogen reference pressure drops .DELTA.P'.sub.R at various electrical discharge rates;
- i. from the hydrogen reference pressure drops determined in step "h", setting a predetermined threshold of unacceptable hydrogen pressure drop for various electric discharge rates of the stack;
- j. comparing the .DELTA.P.sub.h determined in step "g" to the hydrogen reference pressure drop .DELTA.P'.sub.R, determined in step "h" at the same discharge rate as the stack being monitored:
- k. outputting a second signal from step "j" when .DELTA.P.sub.h is equal to or exceeds said predetermined threshold of unacceptable hydrogen pressure drop; and
- l. in response to said second signal, initiating corrective measures to reduce flooding of said hydrogen flow fields.
Government Interests
The Government of the United States of America has rights in this invention pursuant to contract No. DE-AC02-90CH10435 awarded by the United States Department of Energy.
US Referenced Citations (1)
Number |
Name |
Date |
Kind |
5763113 |
Meltser et al. |
Jun 1998 |
|
Foreign Referenced Citations (3)
Number |
Date |
Country |
59-75572 |
Apr 1984 |
JPX |
2-86069 |
Mar 1990 |
JPX |
6-203860 |
Jul 1994 |
JPX |