Claims
- 1. An electric power generation plant comprising,
- a gas turbine subsystem free of a compressor,
- a compressor subsystem with an air heater remote from said gas turbine subsystem having an inlet receiving air and an outlet furnishing heated compressed air after heating by said air heater,
- and a compressed air line interlinking said outlet and said gas turbine subsystem,
- wherein said gas turbine subsystem comprises,
- a plenum connected to said compressed air line,
- a burn chamber having a compressed air inlet connected to said plenum and a fuel inlet,
- a gas expander connected to said burn chamber,
- and an electrical generator connected to said gas expander,
- and further comprising,
- a steam generator having a heat inlet connected to said gas expander and a steam outlet,
- a first steam turbine having a steam inlet connected to said steam outlet,
- and a drive shaft connected to said electrical generator.
- 2. An electric power generation plant comprising,
- a gas turbine subsystem free of a compressor,
- a compressor subsystem with an air heater remote from said gas turbine subsystem having an inlet receiving air and an outlet furnishing heated compressed air after heating by said air heater,
- a compressed air line interlinking said outlet and said gas turbine subsystem,
- wherein said compressor subsystem comprises,
- a boiler having a steam outlet,
- a compressor turbine having a steam inlet coupled to said steam outlet and a drive shaft,
- and an air compressor connected to said drive shaft.
- 3. An electric power generation plant in accordance with claim 1 and further comprising,
- a heating coil disposed within said boiler intercoupling said compressor and said compressed air line.
- 4. An electrical power generation plant, comprising,
- a gas turbine subsystem free of a compressor,
- a compressor subsystem remote from said gas turbine subsystem having an inlet receiving air and an outlet furnishing compressed air,
- and a compressed air line interlinking said outlet and said gas turbine subsystem,
- wherein said gas turbine comprises,
- a plenum connected to said compressed air line,
- a burn chamber having a compressed air inlet connected to said plenum and a fuel inlet,
- a gas expander connected to said burn chamber,
- and an electrical generator connected to said gas expander,
- and further comprising,
- a steam generator having a heat inlet connected to said gas expander and a steam outlet,
- a first steam turbine having a steam inlet connected to said steam outlet,
- and a drive shaft connected to said electrical generator.
- 5. An electrical power generation plant, comprising,
- a gas turbine subsystem free of a compressor,
- a compressor subsystem remote from said gas turbine subsystem having an inlet receiving air and an outlet furnishing compressed air,
- and a compressed air line interlinking said outlet and said gas turbine subsystem,
- wherein said compressor subsystem comprises,
- a boiler having a steam outlet,
- a compressor turbine having a steam inlet coupled to said steam outlet and a drive shaft,
- and an air compressor connected to said drive shaft,
- and further comprising,
- a heating coil disposed within said boiler intercoupling said compressor and said compressed air line.
- 6. An electrical power generation plant comprising,
- a gas turbine subsystem free of a compressor,
- a compressor subsystem free of compressed air storage remote from said gas turbine subsystem having an inlet receiving air and an outlet furnishing compressed air,
- a compressed air line interlinking said outlet and said gas turbine subsystem,
- wherein said gas turbine subsystem comprises,
- a plenum connected to said compressed air line,
- a burn chamber having a compressed air inlet connected to said plenum and a fuel inlet,
- a gas expander connected to said burn chamber,
- an electrical generator connected to said gas expander,
- and further comprising,
- a steam generator having a heat inlet connected to said gas expander and a steam outlet,
- a first steam turbine having a steam inlet connected to said steam outlet,
- and a drive shaft connected to said electrical generator.
- 7. An electrical power generation plant comprising,
- a gas turbine subsystem free of a compressor,
- a compressor subsystem free of compressed air storage remote from said gas turbine subsystem having an inlet receiving air and an outlet furnishing compressed air,
- a compressed air line interlinking said outlet and said gas turbine subsystem,
- wherein said compressor subsystem comprises,
- a boiler having-a steam outlet,
- a compressor turbine having a steam inlet coupled to said steam outlet and a drive shaft,
- an air compressor connected to said drive shaft,
- and a heating coil disposed within said boiler intercoupling said compressor and said compressed air line.
- 8. An electrical power generation plant in accordance with claim 3 and further comprising a fluid bed for heating said boiler by burning a fuel having sulphur and constructed and arranged to receive sufficient fuel having sulphur and limestone to reduce SO2 emission go that the Ca/S ratio is greater than 3.4 and sufficiently high to produce an ash product that is more than 50% free CaO.
- 9. An electrical power generation plant in accordance with claim 8 wherein said Ca/S ratio is within the range of 5.1 to 10.2.
- 10. An electrical power generation plant in accordance with claim 9 wherein said Ca/S ratio is substantially 8.5.
- 11. An electrical power generation plant comprising,
- a boiler having a steam outlet and a fluid bed for burning a fuel having sulphur content,
- said fluid bed constructed and arranged to receive sufficient fuel having sulphur and limestone for reducing SO2 production so that the ratio of Ca/S is greater than 3.4 and sufficiently high to produce an ash product that is more than 50% free CaO.
- 12. An electrical power generation plant in accordance with claim 11 wherein said Ca/S ratio is within the range of 5.1 to 10.2.
- 13. An electrical power generation plant in accordance with claim 12 wherein said Ca/S ratio is substantially 8.5.
- 14. A method of generating electrical power with a boiler having a steam outlet including,
- burning sufficient fuel having sulphur content with sufficient limestone to establish a Ca/S ratio greater than 3.4 and sufficiently high to produce an ash that is more than 50% free CaO.
- 15. A method in accordance with claim 14 wherein said Ca/S ratio is within the range of 5.5-10.2.
- 16. A method in accordance with claim 15 wherein said Ca/S ratio is substantially 8.5.
Parent Case Info
The invention relates to electrical power generating plants and is a continuation-in-part application of Ser. No. 08/049,072 filed Apr. 20, 1993 entitled ELECTRICAL POWER GENERATING (now abandoned).
US Referenced Citations (46)
Continuation in Parts (1)
|
Number |
Date |
Country |
Parent |
49072 |