The gas turbine and pressurized water reactor steam turbine combined circulation system of the present disclosure relates to a large-capacity, energy-saving, low-carbon, clean energy system. Thermal efficiency of the gas turbine and pressurized water reactor steam turbine combined circulation system is significantly higher than that of pressurized water reactor steam turbine in prior art; thermal efficiency of the gas turbine and pressurized water reactor steam turbine combined circulation system is also significantly higher than that of the gas-steam combined cycle in prior art.
The pressurized water reactor uses pressurized light water as a coolant and moderator, and the water does not boil in the reactor. Nuclear fuel is low enriched uranium. It is recognized by the world as a nuclear reactor with mature large-scale technology and safe operation and economy. The AP1000 can be used as a representative product of the third generation of pressurized water reactor nuclear power plants.
The main parameters of the AP1000 third-generation nuclear power plant steam generator (Steam Generator):
The main parameters of the AP1000 third-generation nuclear power plant steam turbine generator:
The saturated steam generated by the two steam generators is sent to the steam turbine high-pressure cylinder by the second circuit main steam system, and after the expansion work of the steam turbine high-pressure cylinder, the steam is discharged into two external steam-water separation reheaters; under the rated load, the external steam-water separation reheater reduces the humidity of 10%-13% contained in the steam exhaust of the steam turbine to about 0.17% or less. The external steam-water separation reheater has a two-stage reheater, and the first stage uses steam admission of the high-pressure cylinder as a heat source, and the second stage uses the main steam as a heat source, to heat the steam entering the reheater to a superheated state. The steam is heated and then enters three dual-flow turbine low-pressure cylinders through six pipes; part of the steam from the high-pressure cylinder and the low-pressure cylinder is extracted out to heat the feed water and condensate. The main condenser deoxidizes the condensate and transfers the waste heat to the circulating water system; the feed water is injected into the steam generator by the second circuit main feed pump; the steam turbine provides the steam extraction for the six-stage feed water and condensate heating; the extraction point of the high-pressure cylinder provides steam extraction for the number one high-pressure heater, and the high-pressure cylinder steam exhaust provides steam extraction to the deaerator. The third, fourth, fifth, and sixth-stage extraction points of the low-pressure cylinder supply steam extraction for the number three, number four, number five and number sixth low-pressure heaters, respectively, and the number five low-pressure heater and the number six low-pressure heater are usually arranged in the throat of the condenser.
Nuclear power plants that have been put into commercial operation in China (including Taiwan) are almost all pressurized water reactors; from the perspectives of technology, safety, economy, environmental protection and industrial characteristics, pressurized water reactor nuclear power units should not participate in power grid peaking, especially in frequent and drastic load adjustment.
According to the working temperature and the power of the unit, the heavy-duty gas turbines for power stations are divided into eight classes: A-B-C-D-E-F-G-H. The higher the intake temperature of the gas turbine, the higher the unit power, the higher the class, the higher the thermal efficiency, and the higher the steam exhaust temperature of the gas turbine.
The prior art gas turbine generally forms a gas-steam combined circulation system with a waste heat boiler and a steam turbine of the prior art; the steam turbine is or not reheated, has no steam extraction port, and has a medium and low-pressure supplemental steam inlet; the steam turbine is equipped with necessary auxiliary machines, such as condensate pump, circulating water pump, condenser, vacuum pump, cooling tower, lubricating oil system, control oil system, bypass system, etc.; the waste heat boiler is usually designed to operate under double pressures or triple pressures, respectively providing superheated steam of different pressures, each pressure having its own economizer, evaporator, steam drum and superheater; usually power generation of the gas turbine-driven generators accounts for ⅔ or more of the gas-steam combined cycle unit; power generation of the steam turbine-driven generators accounts for about ⅓ or less of the gas-steam combined cycle unit.
Technical Problems to be Solved
The steam generator of the pressurized water reactor can only produce the saturated steam used in the second circuit, and has no steam superheating ability; the main function of the external steam-water separation reheater is to reduce the humidity of 10%-13% contained in the steam exhaust of the high-pressure steam turbine to about 0.17% or less, and in order to obtain a superheat less than 90K at the low-pressure cylinder inlet, even the second circuit main steam is used as the heat source of the external steam-water separation reheater; the high-pressure cylinder of the pressurized water reactor steam turbine is basically a wet steam turbine, the turbine blades of each turbine stage operate under wet steam conditions, which is not favorable for the long-term safe operation of the rotor blades; the low-pressure cylinder exhaust steam humidity is also quite higher than the coal-fired super-supercritical unit; the internal efficiency of the high-pressure cylinder and low-pressure cylinder is only about 80%, and its heat consumption is as high as 10405.7 kJ/kWh (excluding the electric pump power), and thermal efficiency is only 34.6% (excluding the electric pump power).
The Technical Solution Adopted to Solve its Technical Problems
The gas turbine and pressurized water reactor steam turbine combined circulation system of the invention adopts a completely different technical route from the prior art, and a combined circulation system is composed of a heavy-duty gas turbine and a pressurized water reactor steam turbine, and the heat of the gas turbine steam exhaust is used to set the main steam temperature of the second circuit from 272.8° C. Upward lifting, with the difference in steam produced by the pressurized water reactor and the number of heavy-duty gas turbine inputs and the load, the main steam temperature of the second circuit is operated in the range of 272.8° C. to 630° C.; the gas turbine and pressurized water reactor steam turbine combined circulation system Thermal efficiency is significantly higher than that of the prior art pressurized water reactor steam turbine; thermal efficiency of the gas turbine and pressurized water reactor steam turbine combined circulation system is also significantly higher than that of the prior art gas-steam combined cycle.
The present disclosure discloses a gas turbine and pressurized water reactor steam turbine combined circulation system, comprising: a steam turbine high-pressure cylinder (1), a steam-water separation reheater (2), a steam turbine low-pressure cylinder (3), a main steam reheat shutoff valve (4), a condenser (5), a number one high-pressure heater (6), a second circuit main feed water pump (7), a deaerator (8), a number three low-pressure heater (9), a number four low-pressure heater (10), a number five low-pressure heater (11), a number six low-pressure heater (12), a condensate pump (13), a waste heat boiler superheater (14), a waste heat boiler high-pressure economizer (15), a waste heat boiler low-pressure economizer (16), a steam generator (17), a pressurized water reactor (18), a first circuit main feed water pump (19), a gas turbine (20), a steam-water separation reheater bypass valve (21), a first-stage steam extraction reheat shutoff valve (22), a DCS distributed control system; heat generated by nuclear fuel rod in the pressurized water reactor (18) generates second circuit saturated steam in steam generator (17) through circulating first circuit pressurized water; a saturated steam outlet of the steam generator (17) is connected to a steam inlet of the waste heat boiler superheater (14); a steam outlet of the waste heat boiler superheater (14) is connected to a steam inlet of the steam turbine high-pressure cylinder (1) through a main steam valve and a speed control valve; the steam outlet of the waste heat boiler superheater (14) is connected to a main steam inlet of the steam-water separation reheater (2) through the main steam reheat shutoff valve (4); the first-stage steam extraction outlet of the steam turbine high-pressure cylinder is connected to a first-stage steam extraction inlet of the steam-water separation reheater (2) through the first-stage steam extraction reheat shutoff valve (22); a water side of the waste heat boiler high-pressure economizer (15) is connected in parallel with a water side of the number one high-pressure heater (6), to heat a high-pressure feed water at an outlet of the second circuit main feed water pump (7) in a split manner; a water side of the waste heat boiler low-pressure economizer (16) is connected in parallel with a water side of a low-pressure heater group constituted by the number three low-pressure heater (9), the number four low-pressure heater (10), the number five low-pressure heater (11) and the number six low-pressure heater (12) which are connected in series, to heat condensate at an outlet of the condensate pump (13) is heated in a shunt manner; a turbocompressor inlet of the gas turbine (20) draws in air through an air filter group, and compressed air is mixed with natural gas and fully burned in the low nitrogen combustion system of the gas turbine (20), and high-temperature and high-pressure gas applies work in a gas turbine group of the gas turbine (20) to drive a turbogenerator at a side of the gas turbine; steam exhaust at the gas turbine group of gas turbine (20) enters a smoke-side inlet of a gas turbine waste heat boiler comprising the waste heat boiler superheater (14), the waste heat boiler high-pressure economizer (15), and the waste heat boiler low-pressure economizer (16) through a smoke duct; a smoke-side outlet of the gas turbine waste heat boiler is connected to a chimney or smoke is exhausted by a cooling tower in a manner of integrated chimney and cooling tower; a heavy-duty gas turbine and a pressurized water reactor steam turbine form a combined circulation system, and the heat of steam exhaust of the gas turbine is used to raise a main steam temperature of the second circuit from 272.8° C., where depending on different steam output of the pressurized water reactor as well as number and load of the heavy-duty gas turbine, the main steam temperature of the second circuit is operated in the range of 272.8° C. to 630° C.; the DCS distributed control system coordinates the control of the pressurized water reactor (18), the gas turbine (20), the steam-water separation reheater (2), the main steam reheat shutoff valve (4), the first-stage steam extraction reheat shutoff valve (22), the steam-water separation reheater bypass valve (21), the steam turbine high-pressure cylinder (1), and steam turbine low-pressure cylinder (3), where depending on different steam output of the pressurized water reactor as well as number and load of the heavy-duty gas turbine, the main steam temperature of the second circuit is operated in the range of 272.8° C. to 630° C.; the steam turbine high-pressure cylinder (1) is of dual flow and tangential steam admission with a rotor speed of 1500 rpm or 1800 rpm, where its flow capacity is designed based on simultaneous realization of both highest steam admission temperature and highest mass flow rate; materials used for a rotor, a high-temperature steam admission chamber, nozzles and blades of the steam turbine high-pressure cylinder (1) meet requirements for continuous operation at the highest steam admission temperature; strengths of the rotor, the high-temperature steam admission chamber, the nozzles and the blades of the steam turbine high-pressure cylinder (1) meet requirements of the simultaneous realization of both the highest steam admission temperature and the highest mass flow rate and have sufficient safety allowance; the steam turbine low-pressure cylinder (3) is constituted by three or four coaxial low-pressure cylinders of dual-flow and tangential steam admission depending on different operation backpressure; a steam admission temperature of the steam turbine low-pressure cylinder (3) is operated in the range of 343.5° C. to 253.6° C.; a maximum flow capacity of the steam turbine low-pressure cylinder (3) is designed based on a steam admission temperature of 343.5° C.; when a load of the gas turbine (20) is reduced, a steam admission temperature of the steam turbine low-pressure cylinder (3) is reduced to near 253.6° C., the main steam reheat shutoff valve (4) is switched on, and the steam-water separation reheater bypass valve (21) is switched off, so that the steam admission temperature of the steam turbine low-pressure cylinder (3) is not lower than 253.6° C.; when a load of the gas turbine (20) becomes 0, the first-stage steam extraction reheat shutoff valve (22) is switched on; the gas turbine (20) is constituted by three H-class gas turbines; the three H-class gas turbines respectively drive respective turbogenerators; gas turbine steam exhaust from the outlets of the gas turbine groups of the three H-class gas turbines is discharged into a same waste heat boiler; the steam-water separation reheater (2) is constituted by six or eight steam-water separation reheaters, that is, each steam admission and guide pipe of the low-pressure cylinder is equipped with a steam-water separation reheater; each steam-water separation reheater is equipped with a corresponding main steam reheat shutoff valve, a first-stage steam extraction reheat shutoff valve and a steam-water separation reheater bypass valve; when the steam-water separation reheater bypass valve is switched on, a pressure difference between an inlet and an outlet of the steam-water separation reheater does not exceed 15 kPa; the gas turbine waste heat boiler comprises a waste heat boiler superheater (14), a waste heat boiler high-pressure economizer (15), and a waste heat boiler low-pressure economizer (16); horizontal arrangement; the waste heat boiler superheater (14) is constituted by three stages superheater heating surfaces of high-temperature stage, medium-temperature stage, and low-temperature stage, and is arranged in a counter-flow manner with respect to the smoke duct; the waste heat boiler high-pressure economizer system is equipped with corresponding regulating valve groups for regulating flow distributions at a water side of the waste heat boiler high-pressure economizer (15) and at a water side of the number one high-pressure heater (6); the low-pressure economizer system configuration of the waste heat boiler is equipped with corresponding regulating valve groups for regulating flow distributions at a water side of the waste heat boiler low-pressure economizer (16) and at a water side of a low-pressure heater group constituted by the number three low-pressure heater (9), the number four low-pressure heater (10), the number five low-pressure heater (11), and the number six low-pressure heater (12) connected in series.
In
1 steam turbine high-pressure cylinder,
2 steam-water separation reheater,
3 steam turbine low-pressure cylinder,
4 main steam reheat shutoff valve,
5 condenser,
6 number one high-pressure heater
7 second circuit main feed pump,
8 deaerator,
9 number three low-pressure heater,
10 number four low-pressure heater,
11 number five low-pressure heater,
12 number six low-pressure heater,
13 condensate pump,
14 waste heat boiler superheater,
15 waste heat boiler high-pressure economizer,
16 waste heat boiler low-pressure economizer,
17 steam generator,
18 pressurized water reactor,
19 first circuit main feed pump,
20 gas turbine,
21 steam-water separation reheater bypass valve,
22 first-stage steam extraction reheat shutoff valve.
A preferred embodiment of the present disclosure will now be described with reference to
The present disclosure discloses a gas turbine and pressurized water reactor steam turbine combined circulation system, comprising: a steam turbine high-pressure cylinder (1), a steam-water separation reheater (2), a steam turbine low-pressure cylinder (3), a main steam reheat shutoff valve (4), condenser (5), a number one high-pressure heater (6), a second circuit main feed water pump (7), a deaerator (8), a number three low-pressure heater (9), a number four low-pressure heater (10), a number five low-pressure heater (11), a number six low-pressure heater (12), a condensate pump (13), a waste heat boiler superheater (14), a waste heat boiler high-pressure economizer (15), a waste heat boiler low-pressure economizer (16), a steam generator (17), a pressurized water reactor (18), a first circuit main feed water pump (19), a gas turbine (20), a steam-water separation reheater bypass valve (21), a first-stage steam extraction reheat shutoff valve (22), a DCS distributed control system; heat generated by nuclear fuel rod in the pressurized water reactor (18) generates second circuit saturated steam in steam generator (17) through circulating first circuit pressure water; a saturated steam outlet of the steam generator (17) is connected to a steam inlet of the waste heat boiler superheater (14); a steam outlet of the waste heat boiler superheater (14) is connected to a steam inlet of the steam turbine high-pressure cylinder (1) through a main steam valve and a speed control valve; the steam outlet of the waste heat boiler superheater (14) is connected to a main steam inlet of the steam-water separation reheater (2) through the main steam reheat shutoff valve (4); the first-stage steam extraction outlet of the steam turbine high-pressure cylinder is connected to a first-stage steam extraction inlet of the steam-water separation reheater (2) through the first-stage steam extraction reheat shutoff valve (22); a water side of the waste heat boiler high-pressure economizer (15) is connected in parallel with a water side of the number one high-pressure heater (6), to heat a high-pressure feed water at an outlet of the second circuit main feed water pump (7) in a split manner; a water side of the waste heat boiler low-pressure economizer (16) is connected in parallel with a water side of a low-pressure heater group constituted by the number three low-pressure heater (9), the number four low-pressure heater (10), the number five low-pressure heater (11) and the number six low-pressure heater (12) which are connected in series, to heat condensate at an outlet of the condensate pump (13) is heated in a shunt manner; a turbocompressor inlet of the gas turbine (20) draws in air through an air filter group, and compressed air is mixed with natural gas and fully burned in the low nitrogen combustion system of the gas turbine (20), and high-temperature and high-pressure gas applies work in a gas turbine group of the gas turbine (20) to drive a turbogenerator at a side of the gas turbine; steam exhaust at the gas turbine group of gas turbine (20) enters a smoke-side inlet of a gas turbine waste heat boiler comprising the waste heat boiler superheater (14), the waste heat boiler high-pressure economizer (15), and the waste heat boiler low-pressure economizer (16) through a smoke duct; a smoke-side outlet of the gas turbine waste heat boiler is connected to a chimney or smoke is exhausted by a cooling tower in a manner of integrated chimney and cooling tower; a heavy-duty gas turbine and a pressurized water reactor steam turbine form a combined circulation system, and the heat of steam exhaust of the gas turbine is used to raise a main steam temperature of the second circuit from 272.8° C., where depending on different steam output of the pressurized water reactor as well as number and load of the heavy-duty gas turbine, the main steam temperature of the second circuit is operated in the range of 272.8° C. to 630° C.; the DCS distributed control system coordinates the control of the pressurized water reactor (18), the gas turbine (20), the steam-water separation reheater (2), the main steam reheat shutoff valve (4), the first-stage steam extraction reheat shutoff valve (22), the steam-water separation reheater bypass valve (21), the steam turbine high-pressure cylinder (1), and steam turbine low-pressure cylinder (3), where depending on different steam output of the pressurized water reactor as well as number and load of the heavy-duty gas turbine, the main steam temperature of the second circuit is operated in the range of 272.8° C. to 630° C.
The steam turbine high-pressure cylinder (1) is of dual flow and tangential steam admission with a rotor speed of 1500 rpm or 1800 rpm, where its flow capacity is designed based on simultaneous realization of both highest steam admission temperature and highest mass flow rate; materials used for a rotor, a high-temperature steam admission chamber, nozzles and blades of the steam turbine high-pressure cylinder (1) meet requirements for continuous operation at the highest steam admission temperature; strengths of the rotor, the high-temperature steam admission chamber, the nozzles and the blades of the steam turbine high-pressure cylinder (1) meet requirements of the simultaneous realization of both the highest steam admission temperature and the highest mass flow rate and have sufficient safety allowance.
The steam turbine low-pressure cylinder (3) is constituted by three or four coaxial low-pressure cylinders of dual-flow and tangential steam admission depending on different operation backpressure; a steam admission temperature of the steam turbine low-pressure cylinder (3) is operated in the range of 343.5° C. to 253.6° C.; a maximum flow capacity of the steam turbine low-pressure cylinder (3) is designed based on a steam admission temperature of 343.5° C.; when a load of the gas turbine (20) is reduced, a steam admission temperature of the steam turbine low-pressure cylinder (3) is reduced to near 253.6° C., the main steam reheat shutoff valve (4) is switched on, and the steam-water separation reheater bypass valve (21) is switched off, so that the steam admission temperature of the steam turbine low-pressure cylinder (3) is not lower than 253.6° C.; when a load of the gas turbine (20) becomes 0, the first-stage steam extraction reheat shutoff valve (22) is switched on.
The gas turbine (20) is constituted by three H-class gas turbines; the three H-class gas turbines respectively drive respective turbogenerators; gas turbine steam exhaust from the outlets of the gas turbine groups of the three H-class gas turbines is discharged into a same waste heat boiler. In another preferred embodiment, the gas turbine (20) is constituted by six F-class gas turbines; in yet another preferred embodiment, the gas turbine (20) is constituted by four G-class gas turbines.
The steam-water separation reheater (2) is constituted by six or eight steam-water separation reheaters, that is, each steam admission and guide pipe of the low-pressure cylinder is equipped with a steam-water separation reheater.
Each steam-water separation reheater is equipped with a corresponding main steam reheat shutoff valve, a first-stage steam extraction reheat shutoff valve and a steam-water separation reheater bypass valve; when the steam-water separation reheater bypass valve is switched on, a pressure difference between an inlet and an outlet of the steam-water separation reheater does not exceed 15 kPa.
The gas turbine waste heat boiler comprises a waste heat boiler superheater (14), a waste heat boiler high-pressure economizer (15), and a waste heat boiler low-pressure economizer (16); horizontal arrangement; the waste heat boiler superheater (14) is constituted by three stages superheater heating surfaces of high-temperature stage, medium-temperature stage, and low-temperature stage, and is arranged in a counter-flow manner with respect to the smoke duct; the waste heat boiler high-pressure economizer system is equipped with corresponding regulating valve groups for regulating flow distributions at a water side of the waste heat boiler high-pressure economizer (15) and at a water side of the number one high-pressure heater (6); the low-pressure economizer system configuration of the waste heat boiler is equipped with corresponding regulating valve groups for regulating flow distributions at a water side of the waste heat boiler low-pressure economizer (16) and at a water side of a low-pressure heater group constituted by the number three low-pressure heater (9), the number four low-pressure heater (10), the number five low-pressure heater (11), and the number six low-pressure heater (12) connected in series.
Number | Date | Country | Kind |
---|---|---|---|
2016 1 0458572 | Jun 2016 | CN | national |
This application is a continuation of International Application No. PCT/CN2017/000395, filed on Jun. 22, 2017, which claims priority from Chinese Patent Application No. 201610458572.3, filed on Jun. 23, 2016, both of which are hereby incorporated by reference in their entireties.
Number | Name | Date | Kind |
---|---|---|---|
5357746 | Myers | Oct 1994 | A |
6041588 | Bruckner | Mar 2000 | A |
6101982 | Fischer | Aug 2000 | A |
6145295 | Donovan | Nov 2000 | A |
6389797 | Sugishita | May 2002 | B1 |
7770376 | Brostmeyer | Aug 2010 | B1 |
7874162 | Tomlinson | Jan 2011 | B2 |
8141367 | Rancruel | Mar 2012 | B2 |
8572975 | Bilton | Nov 2013 | B2 |
9019108 | Chillar | Apr 2015 | B2 |
9470145 | Ball, Jr. | Oct 2016 | B2 |
9903276 | Hotta | Feb 2018 | B2 |
20030043952 | Itou | Mar 2003 | A1 |
20040148941 | Wylie | Aug 2004 | A1 |
20070204623 | Rollins, III | Sep 2007 | A1 |
20150033742 | Herrazti Garcia | Feb 2015 | A1 |
20180238271 | Bahn | Aug 2018 | A1 |
Number | Date | Country |
---|---|---|
2481522 | Apr 2006 | CA |
1300901 | Jun 2001 | CN |
1656570 | Aug 2005 | CN |
104314628 | Jan 2015 | CN |
104599730 | May 2015 | CN |
105439233 | Mar 2016 | CN |
106050419 | Oct 2016 | CN |
102008003138 | Jul 2008 | DE |
2547828 | Apr 2015 | RU |
Number | Date | Country | |
---|---|---|---|
20190170020 A1 | Jun 2019 | US |
Number | Date | Country | |
---|---|---|---|
Parent | PCT/CN2017/000395 | Jun 2017 | US |
Child | 16231496 | US |