The invention relates generally to gas turbine engine power systems incorporating a power augmentation system. More specifically, improvements relating to steam and air power augmentation are provided.
Currently, many gas turbine engines operating at power plants utilize steam injection systems as a low-cost form of power augmentation. Typically steam injection is considered a relatively constant process because the start-up time and shut-down time of the steam injection system is typically on the order of thirty to sixty minutes.
Some steam injection systems of the prior art have a steam bleed near the injection point so that the steam can be used to heat the steam injection pipes. As steam injection is initiated through cold pipes, the hot steam condenses and forms water which is vented through the steam vent. Steam flow is gradually increased until the pipes are sufficiently heated, at which point water no longer forms. The steam vent then closes and the system is ready to inject steam into the gas turbine engine. This heating process for the steam pipes typically takes approximately thirty minutes.
Other prior art steam injection systems heat the steam injection pipes by slowly adding steam to the steam injection pipe and any resulting water that forms is injected into the gas turbine. Since the flow rates are extremely low, as water is typically not desired to be injected through a steam injection system into the gas turbine, this process typically takes in excess of thirty minutes to complete.
Steam is typically generated at a gas turbine site to either drive a steam turbine for producing additional power or is delivered to a supplemental process, such as an adjacent manufacturing facility, or in some cases both. When steam is generated for a supplemental process, the gas turbine power plant is referred to as a cogeneration plant, or cogen plant, because it is producing two products, electricity and steam. The recipient of the steam is called the steam host. Examples of a steam host can include a manufacturing or processing plant. Most cogen plants supply both electricity and steam to the steam host and sometimes the steam requirement and power requirement are not optimally balanced, so the cogen plant has to continuously optimize and balance the steam production and gas turbine output to try to meet the steam host's demand. This is a significant challenge, and as a result, there are periods when excess steam is produced as a result of the power requirement that cannot be avoided and in these cases, the cogen process loses efficiency.
Steam injection power augmentation systems are not typically deployed to meet short term spot market demands because they can take too long to come online and be available. For example, if there is a spike in power demand that is not expected to last long, then the steam injection power augmentation system is not advantageous to use. Additionally, steam injection systems are not considered optimal for fast-acting regulation devices due to their slow start-up speed.
A gas turbine incorporating a steam injection system in accordance with the prior art is depicted in
Typically the distance between the steam injection valve 114 and the steam injection isolation valve 113 can be several hundred feet. As a result, it takes about thirty minutes for the steam injection system to preheat to a desired operating temperature. Some steam injection systems do not have the steam vent valve 616 and therefore they can take even longer to preheat because of the sensitivity to injecting water into the gas turbine as the steam injection system is started up.
The current invention provides several embodiments for preheating a steam injection power augmentation system using compressed air to allow a rapid start of the steam injection system.
One aspect of the present invention relates to methods and systems that allow gas turbine systems to bleed air from the steam injection site within the gas turbine towards the source of the steam in order to preheat the steam injection piping to reduce the chance of water formation during steam injection start-up.
Another aspect of the present invention relates to methods and systems that allow gas turbine systems to bleed air from an external source of hot compressed air to the location of the steam injection near the gas turbine preheat the steam injection lines to eliminate the chance of water formation during steam injection initiation.
One embodiment of the invention relates to adding an air bleed valve on a new or existing steam injection system near the site of the steam source to allow air to backflow from the gas turbine to the site near the source of the steam.
Another embodiment of the invention relates to a system comprising a supplemental air injection system, such as a TurboPHASE system, providing hot compressed air to the gas turbine to preheat the steam injection piping.
Another advantage of the preferred embodiment is a more efficient use of steam such that excess steam being produced can now be used to reduce plant steam output while at the same time increasing plant electrical power output.
In another aspect of the present invention, a system and methods are provided for utilizing steam from a combined cycle power plant operation to provide additional mass flow to a gas turbine engine. Additional air is supplied to the gas turbine engine in order to provide power augmentation to the gas turbine engine. A power augmentation system is provided comprising a gas turbine engine, a heat recovery steam generator, steam injection piping connecting the gas turbine engine to the heat recovery steam generator, an air vent and air vent valve in communication with the steam injection piping, and an auxiliary air compression system comprising a fueled engine, an intercooled compressor, and a recuperator, where the recuperator heats air from the compressor with exhaust heat from the fueled engine. The steam injection valve, isolation valve, and air injection valve selectively permit a flow of steam from the heat recovery steam generator or air from the auxiliary air compression system, through the steam injection piping and into the gas turbine engine. A series of ways to operate the power augmentation system to improve gas turbine engine performance are also provided.
Additional advantages and features of the present invention will be set forth in part in a description which follows, and in part will become apparent to those skilled in the art upon examination of the following, or may be learned from practice of the invention. The instant invention will now be described with particular reference to the accompanying drawings.
The present invention is described in detail below with reference to the attached drawing figures, wherein:
The present invention is disclosed in
Typically, steam injection takes at least thirty minutes to initiate and achieve a desired steam injection level. With the steam system pre-heated, the steam injection system can be brought to full flow in less than three minutes. This same air bleed system can be used to purge the steam injection lines when the steam injection process is finished. Typically when the steam injection process is turned off, it is ramped down slowly, many times at a much slower pace than the start-up process. The steam flow is ramped down, because if the steam process is suddenly stopped, the steam injection piping will be full of steam and this steam will turn into water when the steam cools down. Utilizing an air purge system as disclosed herein allows the steam injection to be stopped rapidly, as the steam can be purged from the air steam lines with a process similar to the pre-heat cycle.
An additional benefit of both the pre-heat and the post purge is that the reverse flow can purge out any foreign matter that might be obstructing the steam injection system. For example, on a General Electric Frame 7FA gas turbine engine, the steam injection system has known operating issues such as plugging of the steam injection system. In this system, the steam is supplied to the gas turbine through a six inch pipe, which is a manifold to fourteen distinct combustors through a three inch pipe. Inside each combustor can there is an annulus that is approximately one inch wide by 0.75 inches tall that supplies ten steam pegs that have five holes approximately 0.030″ in diameter. If a foreign matter gets in the flow of steam, it will plug these small holes in the pegs. By purging air from these small holes, any foreign matter that might be caught in them can be flushed out to atmosphere or where ever the air vent is discharging the air.
Referring now to
The system 250 also comprises steam injection piping 601 connecting the gas turbine engine 1 to the HRSG 605. More specifically, the steam injection piping 601 comprises a steam injection valve 114 and an isolation valve 113. The system 250 also comprises an air vent 156 and air vent valve 112 that is in communication with the steam injection piping 601. As will be discussed further below, the isolation valve 113 and air vent valve 112 selectively permit the flow of compressed air from the compressor 10, and/or a compressor discharge plenum 14, through the steam injection piping 601 and to the air vent 156, thereby preheating the steam injection piping 601. The steam injection piping also includes a steam vent valve 116 for venting steam to the atmosphere through a steam vent 115 when steam is flowing.
It is important to note that the positions of the steam injection valve 114 and orientation of steam injection piping 601 is merely illustrative of an embodiment of the present invention. As such, it is envisioned that the steam injection valve 114 may be positioned closer to the HRSG 605. For example, in one embodiment is is envisioned that the steam injection piping 601 between the steam injection valve 114 and gas turbine engine 1 could be a couple hundred feet in length.
Steam 603 produced by the HRSG 605 can be used for multiple purposes. A portion of the steam 603 can be directed through steam injection piping 601, as discussed herein, for injection in the gas turbine engine 1. Alternatively, a portion of the steam 603 can be directed to an external process 602, such as for use in an adjacent manufacturing plant.
Referring now to
In a step 304, a supply of steam is generated by the heated exhaust from the gas turbine engine. Then, in a step 306, a portion of the air from the compressor, or compressor discharge plenum, is directed through at least a portion of the steam injection piping. As shown in
In a step 308, a determination is made as to whether the steam injection piping temperature has reached an acceptable level. Generally speaking, for the Frame 7FA gas turbine engine discussed above, the steam injection piping is desired to reach approximately 500 degrees Fahrenheit. If the temperature of the steam injection piping has not reached the desired temperature, then compressed air continues to pass through the steam injection piping in order to raise the temperature of the steam injection piping. As discussed above, an isolation valve and air vent valve are opened to permit the flow of compressed air from the gas turbine engine to preheat the steam injection piping. Furthermore, once the determination is made in step 308 that the piping has reached an acceptable temperature, the air vent valve closes and steam injection valve opens, directing steam from the HRSG through the piping. Once the steam injection piping has reached its desired operating temperature, then in a step 310, the flow of air from the compressor to the piping is terminated and then in step 312, at least a portion of the steam supply is directed through the piping and into the gas turbine engine. It is understood that the use of steam and compressed air could overlap such that both fluids could be passing through the piping. Furthermore, it is possible that steam and air could be vented from the piping simultaneously.
Referring now to
The system 450 also comprises steam injection piping 601 connecting the gas turbine engine 1 to the HRSG 605. More specifically, the steam injection piping 601 comprises a steam injection valve 114, a steam vent valve 116, and an isolation valve 113. The system 250 also comprises an air vent 156 and air vent valve 112 that are in communication with the steam injection piping 601. As will be discussed further below, the isolation valve 113 and air vent valve 112 selectively permit the flow of compressed air to the steam injection piping 601, thereby preheating the steam injection piping. The steam injection piping 601 also includes a steam vent valve 116 for venting steam to the atmosphere through a steam vent 115.
It is important to note that, as with the system 250 in
Steam 603 produced by the HRSG 605 can be used for multiple purposes. A portion of the steam 603 can be directed through steam injection piping 601, as discussed herein, for injection in the gas turbine engine 1. Alternatively, a portion of the steam 603 can be directed to an external process 602, such as for use in an adjacent manufacturing plant.
The power augmentation system 450 also comprises an auxiliary air compression system 470 which provides a source of external heated compressed air. One such system is produced by PowerPHASE, LLC of Jupiter, Fla., the same assignee as the present invention. The auxiliary air compression system 470 is similar to that disclosed in co-pending patent applications including U.S. patent application Ser. Nos. 14/350,469, 14/351,245, 14/329,340, 14/329,433, 14/462,000, and 14/534,598.
Such an auxiliary source of compressed air comprises a fueled engine 151 coupled to a multi-stage compressor 116. The fueled engine 151 takes ambient air 150 and fuel 124 and through its operation provides mechanical output in the form of power to drive the shaft which is coupled to compressor 116 as well as exhaust heat 152. The compressor 116 is a multi-stage intercooled compressor in which ambient air 115 is drawn into the compressor 116 and compressed to a higher pressure. After each stage of compression, the compressed air is cooled, thereby permitting further compression. After the air passes through the last stage of the intercooled compressor 116, the compressed air 117 passes into a recuperator 155. The recuperator 155 receives the compressed air 117 and exhaust heat 152 from the fueled engine 151. The temperature of the compressed air 117 increases as it passes through the recuperator 155 which is heated with the exhaust heat 152 to produce hot compressed air 118. The system 450 also comprises an air injection valve 111 located between the recuperator 155 and the steam injection piping 601. That is, upon opening of the air injection valve 111 and valve 116, heated compressed air from the auxiliary source of compressed air is directed into the steam injection piping 601. The auxiliary source of compressed air can be used to preheat the steam piping 601, inject air into the gas turbine 1, and also inject steam and air into the gas turbine.
Typically, the steam injection piping 601, which in this case is also an air injection means, is designed such that the pressure of the hot compressed air 118, or steam if it is being injected instead of air, is only about 5 to 10 psi higher than pressure in the gas turbine combustion discharge wrapper 14.
Referring now to
In a step 504, a supply of steam is generated by heated exhaust from the gas turbine engine. Then, in a step 506, heated compressed air from an auxiliary compressor and heated engine is generated. As shown in
In a step 508, the heated compressed air from the auxiliary source of compressed air produced by the fueled engine and intercooled compressor is directed into the steam injection piping. Then, in a step 510, a determination is made as to whether the steam injection piping temperature has reached an acceptable level. Generally speaking, for the Frame 7FA gas turbine engine discussed above, the steam injection piping is desired to reach approximately 500 degrees Fahrenheit. If the temperature of the steam injection piping has not reached the desired temperature, then compressed air continues to pass through the steam injection piping in order to raise the temperature of the steam injection piping, as discussed with respect to step 508. Once the steam injection piping has reached its desired operating temperature, then in a step 512, the flow of air from the compressor to the piping is terminated. Once the steam injection piping is at its desired temperature, then in step 514, at least a portion of the steam supply is directed through the piping and into the gas turbine engine. As discussed above, an air injection valve and air vent valve are opened to permit the flow of compressed air from the auxiliary source of compressed air to preheat the steam injection piping. Furthermore, once the determination is made in step 510 that the piping has reached an acceptable temperature, the air vent valve closes and steam injection valve opens, directing steam from the HRSG through the piping. It is understood that the use of steam and compressed air could overlap such that both fluids could be passing through the piping. Furthermore, it is possible that steam and air could be vented from the piping simultaneously.
Typical steam injection systems utilize steam that is in a highly superheated phase because of the potential temperature drop and concern for water formation. Also, high pressure steam injection systems promote even distribution of the steam throughout the gas turbine and steam nozzles are employed at the point of injection to accomplish this. Therefore the steam that is used is in a very high energy state, typically accomplished by using higher pressure steam, typically 100 to 150 psi higher than the pressure in the gas turbine compress discharge wrapper 114. With a combined air and steam injection system, the air 118 and steam 603 would be joined together and mix as they travel through the steam piping 601 and therefore, much lower quality steam can be used to accomplish the same level of power augmentation. Typically steam quality would be lowered by utilizing lower pressure steam source, and therefore, the steam would have been able to perform useful work in the steam turbine cycle before being extracted for injection, which improves the efficiency of the steam injection system.
Referring now to
The system 450 comprises a gas turbine engine 1 comprising a compressor 10 coupled to a turbine 16 by a shaft 6. The compressor 10 and turbine 16 are in fluid communication with one or more combustors 12 through a compressor discharge case 14. In fluid communication with the gas turbine engine 1 is a heat recovery steam generator (HRSG) 605 capable of producing steam for use in a power plant or external to the power plant.
Steam injection piping 601 is connected to the gas turbine engine 1 and the HRSG 605, where the steam injection piping 601 has a steam injection valve 114 and an isolation valve 113. The exact locations of the steam injection valve 114 and isolation valve 113 can vary. However, in one embodiment, the steam injection valve 114 is positioned near the where steam from the HRSG 605 is split to go to an external process 602, such as a steam turbine (not shown).
The auxiliary air compression system 470 comprises a fueled engine 151 coupled to a multi-stage intercooled compressor 116. Compressed air from the intercooled compressor 116 passes to a recuperator 155 where it is heated with exhaust heat from the fueled engine 151. The resulting output from the recuperator 155 is hot compressed air 118.
The power augmentation system 450 also comprises an air vent and an air vent valve 112 for regulating the flow of air through an air vent and to the atmosphere 156. Together, the air injection valve 111, air vent valve 112, and steam injection valve 114 are operable to selectively permit a flow of steam from the HRSG 605, or hot compressed air 118 from the auxiliary air compression system 470 through the steam injection piping 601 and to the gas turbine engine 1.
As discussed above, the power augmentation system 450 comprises valving for selectively directing air from the compressor discharge case 14 to flow into the steam injection piping 601 to preheat the steam injection piping 601. Heating the steam injection piping 601 prior to passing steam therethrough reduces the tendency for the steam flow to form condensation in the steam injection piping 601. In order for the air from the compressor discharge case 14 to flow through the steam injection piping 601, the isolation valve 113 is opened as well as the air vent valve 112, while the air injection valve 111 and steam injection valve 114 remain closed. In this configuration, compressed air from the gas turbine engine 1 is bled through the isolation valve 113, heats the steam injection piping 601 and vents to the atmosphere 156. Thus, when the compressor discharge air flow is used to heat the steam injection piping 601, it flow in a direction opposite of the flow of steam from the HRSG 605 or the air from the auxiliary air compression system 470.
As will be discussed in further detail below, the power augmentation system 450 provides a series of options to a gas turbine engine operator for injecting a steam flow, auxiliary source of compressed air, or a combination of the two into the gas turbine engine 1. The exact injection point for the flow of steam or compressed air from the auxiliary air compression system 470 can vary. However, as one skilled in the art will understand, one such injection point is the compressor discharge case 14, the area immediately upstream of the combustors 12 such that any work from the additional fluid provided to the gas turbine engine 1 is maximized by undergoing the combustion process.
One such benefit of steam injection is the availability of what one skilled in the art of power plant operation knows as spinning reserve, or excess available generating capacity. Often times, there is a long start-up time (approximately 30 minutes) associated with bringing the steam injection process online to the point that it can be injected into a gas turbine engine. However, this timeframe can be drastically reduced if the steam injection piping is preheated. This allows for additional mass flow to be readily available to the gas turbine engine, providing a spinning reserve through the gas turbine engine 1, should it be necessary in the event of an outage of another plant.
Referring now to
Referring to
Turning now to
Referring to
While the invention has been described in what is known as presently the preferred embodiment, it is to be understood that the invention is not to be limited to the disclosed embodiment but, on the contrary, is intended to cover various modifications and equivalent arrangements within the scope of the following claims. The present invention has been described in relation to particular embodiments, which are intended in all respects to be illustrative rather than restrictive.
From the foregoing, it will be seen that this invention is one well adapted to attain all the ends and objects set forth above, together with other advantages which are obvious and inherent to the system and method. It will be understood that certain features and sub-combinations are of utility and may be employed without reference to other features and sub-combinations. This is contemplated by and within the scope of the claims.
This application is a continuation-in-part of copending U.S. patent application Ser. No. 14/534,347 filed Nov. 6, 2014, which is incorporated by reference herein in its entirety.
Number | Date | Country | |
---|---|---|---|
Parent | 14534347 | Nov 2014 | US |
Child | 14799913 | US |